At least 1,801 records · Page 100

Reflected Neutron Effects in Multiplicity Measurements of Bare HEU Assemblies

In a passive multiplicity characterization of highly enriched uranium (HEU) assemblies, fission chains are initiated by the characteristically fast neutrons from spontaneous fission of 238 U and 235 U as well as cosmic-ray spallation neutrons. Active interrogation of HEU uses other physical mechanisms for starting chains by inducing fission from high-energy neutrons, high-energy gamma-rays, delayed neutrons, or thermal neutrons. In all cases a contribution to the initiation of fission chains is the reflection of neutrons that initially escape the assembly and re-enter it after undergoing some scattering. The reflected neutron flux is geometry dependent and a combination of fast and thermal energies. The reflected thermal neutron contribution occurs hundreds of microseconds after the beginning of the fission chain and can be distinguished from the cosmic-ray spallation neutrons unrelated to fission chains, resulting in an HEU detection signature with high signal-to-noise. However, the reflected thermal neutron flux can be eliminated with an efficient thermal neutron absorber to investigate reflected neutron effects. In this paper, active and passive multiplicity measurements with HEU oxide assemblies of up to 16 kg of fuel pins and HEU metal assemblies of up to five 18 kg storage castings are reported. Each case demonstrates the differences in HEU signature when a borated thermal neutron absorber is present and shows the various detectable signatures with 3He proportional counters, the standard detector for differential die-way and neutron multiplicity measurements, and liquid scintillators, a detector capable of operating on the timescale of fission chains.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Expanding the Trilinos developer community.

The Trilinos Project started approximately nine years ago as a small effort to enable research, development and ongoing support of small, related solver software efforts. The 'Tri' in Trilinos was intended to indicate the eventual three packages we planned to develop. In 2007 the project expanded its scope to include any package that was an enabling technology for technical computing. Presently the Trilinos repository contains over 55 packages covering a broad spectrum of reusable tools for constructing full-featured scalable scientific and engineering applications. Trilinos usage is now worldwide, and many applications have an explicit dependence on Trilinos for essential capabilities. Users come from other US laboratories, universities, industry and international research groups. Awareness and use of Trilinos is growing rapidly outside of Sandia. Members of the external research community are becoming more familiar with Trilinos, its design and collaborative nature. As a result, the Trilinos project is receiving an increasing number of requests from external community members who want to contribute to Trilinos as developers. To-date we have worked with external developers in an ad hoc fashion. Going forward, we want to develop a set of policies, procedures, tools and infrastructure to simplify interactions with external developers. As we go forward with multi-laboratory efforts such as CASL and X-Stack, and international projects such as IESP, we will need a more streamlined and explicit process for making external developers 'first-class citizens' in the Trilinos development community. This document is intended to frame the discussion for expanding the Trilinos community to all strategically important external members, while at the same time preserving Sandia's primary leadership role in the project.

99 GENERAL AND MISCELLANEOUS↗

Search for Time Reversal Symmetry Violation with TREK at J-PARC (Closeout Report)

This DOE Early Career Award has enabled Dr. Michael Kohl to take on and expand his leadership roles in several projects such as TREK@J-PARC, OLYMPUS@DESY, MUSE@PSI, and in the experimental program in Hall C at Jefferson Lab. Dr. Kohl has successfully accomplished several items: (i) Preliminary results from SANE (E08-003) at Jefferson Lab: Former HU graduate student Anusha Liyanage has pursued her PhD research on SANE. Her analysis of the elastic ep scattering data has resulted in the extraction of the proton electric-to-magnetic form factor ratio from double spin asymmetries at the highest momentum transfer to date. The results are almost final and a publication is in preparation. (ii) Approval of TREK/E36 for running, preparation of simulation and analysis: the TREK experiment has been stage-II approved in fall 2013, has been mounted on the hall floor from November 2014 to April 2015, has been commissioned in April-June 2015 and is scheduled to run in fall 2015. The group has contributed significantly with simulations and magnetic field map calculations, has investigated the sensitivity of TREK to new light neutral particles, and contributed substantially to the mounting and commissioning of the experiment. (iii) Running of OLYMPUS and analysis: Under Dr. Kohl's leadership as spokesman, the OLYMPUS experiment has completed data taking beginning of 2013; calibrations and analysis have been well underway, with results to be expected in the course of 2015. (iv) Operation of GEM detectors at OLYMPUS and MUSE: The GEM telescopes built for OLYMPUS luminosity monitoring with forward-angle ep elastic scattering have been operated successfully, have meanwhile been relocated to PSI, and have been re-commissioned as beam particle trackers for the PSI secondary beams for MUSE. (v) Trained and prepared postdocs and graduate students for their future careers. Two postdocs from Dr. Kohl's group (Dr. Juergen Diefenbach and Dr. Peter Monaghan) have found permanent academic positions. Two former graduate students of the group have graduated and received their PhD degrees in nuclear physics (Dr. Anusha Liyanage and Dr. Ozgur Ates). In particular, this award has enabled Dr. Kohl to pursue the TREK project (Time Reversal Experiment with Kaons) at J-PARC, which he has been leading and advancing as International Spokesperson. Originally proposed as a search for time reversal symmetry violation, the project has evolved into a precision test of lepton flavor universality in the Standard Model along with sensitive searches for physics beyond the Standard Model through a possible discovery of new particles such as a sterile neutrino or a neutral gauge boson from the hidden sector in the mass region up to 300 MeV/c2. Experiment TREK/E36, first proposed in 2010, has been mounted between November 2014 and April 2015, and commissioning with beam has been started in April 2015, with production running anticipated in early summer and late fall 2015. It uses the apparatus from the previous KEK/E-246 experiment with partial upgrades to measure the ratio of decay widths of leptonic two-body decays of the charged kaon to µν and eν, respectively, which is highly sensitive to the ratio of electromagnetic charged lepton couplings and possible new physics processes that could differentiate between μ and e, hence breaking lepton flavor universality of the Standard Model. Through the searches for neutral massive particles, TREK/E36 can severely constrain any new physics scenarios designed to explain the proton radius puzzle.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Evaluation of Erosion of the Dummy “EE” Plate 19 in YA Type ATR Fuel Element During Reactor PALM Cycles

Advanced Test Reactor (ATR) Cycle 153B-1 was a 14-day, high-power, powered axial locator mechanism (PALM) operating cycle that completed on April 12, 2013. Cycle 153B-1 was a typical operating cycle for the ATR, and did not result in any unusual plant transients. ATR was started up and shut down as scheduled. The PALM drive physically moves the selected experiments into and out of the core to simulate reactor startup and heat up, and shutdown and cooldown transients, while the reactor remains in steady-state conditions. However, after the cycle was over, when the fuel elements were removed from the core and inspected, several thousand flow-assisted erosion pits and “horseshoeing” defects were readily observed on the surface of the several YA-type fuel elements (these are aluminum “dummy” plates that contain no fuel). In order to understand these erosion phenomena, a thermal-hydraulic model of coolant channel 20 on a YA-M fuel element was generated. The boundaries of the model were the aluminum EE plate of a YA-M fuel element and a beryllium reflector block with 13 horizontal saw cuts which represented regions of zero flow. The heat generated in fuel plates 1 through 18 was modeled to be passing through the aluminum EE plate. The coolant channel 20 width was set at 0.058 in. (58 mils). It was established that the horizontal saw cuts had a significant effect on the temperature of the coolant. The flow, which was expected to vary linearly with gradual heating of the coolant as it passed through the channel, was extremely turbulent. The temperature rise, which was expected to be a smooth “S” curve, was represented by a series temperature rise “humps,” which occurred at each horizontal saw cut in the beryllium reflector block. Each of the 13 saw cuts had a chamfered edge which resulted in the coolant flow being re-directed as a jet across the coolant channel into the surface of the EE plate, which explained the temperature rise and the observed scalloping and pitting degradation on the YA-M fuel elements. In the case of scalloping (horseshoeing) a surprising similarity of that defect to those appearing on aluminum plate rolled in over-lubrication conditions, were established. In turn, this made us think that the principal feature responsible for the appearance of these defects, was horizontal cuts in the beryllium reflector block created to arrest the propagation of large vertical crack(s) in Be in PALM cycles with higher overall fluence. This assumption was fully confirmed by the results of thermo-hydraulic simulations. The neutronics data for these modeling experiments were provided using advanced irradiation simulations (MCNP, HELIOS). In the case of pitting erosion the following corrective measures were proposed based upon the results of JMatPro v.8.2 modeling (TTT- and CCT-diagrams): change the fabrication process by adding blister anneal before program anneal, immediately after cold rolling of AA6061plate. This step will allow achieving complete recrystallization, eliminating of strengthening due to metastable precipitates, and reduce the possibility of forming sharp microstructural features upon the surface.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A NEW SYNTHETIC LIBRARY OF THE NEAR-INFRARED Ca II TRIPLET INDICES. I. INDEX DEFINITION, CALIBRATION, AND RELATIONS WITH STELLAR ATMOSPHERIC PARAMETERS

Adopting the SPECTRUM package, which is a stellar spectral synthesis program, we have synthesized a comprehensive set of 2890 near-infrared (NIR) synthetic spectra with a resolution and wavelength sampling similar to the Sloan Digital Sky Survey (SDSS) and the forthcoming Large Sky Area Multi-Object Fiber Spectroscopic Telescope (LAMOST) spectra. During the synthesis, we applied the 'New grids of ATLAS9 Model Atmosphere' to develop a grid of local thermodynamic equilibrium model atmospheres for effective temperatures (T{sub eff}) ranging from 3500 to 7500 K, for surface gravities (log g) from 0.5 to 5.0 dex, for metallicities ([Fe/H]) from -4.0 to 0.5 dex, and for solar ([{alpha}/Fe] = 0.0 dex) and non-solar ([{alpha}/Fe] = +0.4 dex) abundances. This synthetic stellar library is composed of 1350 solar scaled abundance (SSA) and 1530 non-solar scaled abundance (NSSA) spectra, grounding on which we have defined a new set of NIR Ca II triplet indices and an index CaT as the sum of the three. These defined indices were automatically measured on every spectrum of the synthetic stellar library and calibrated with the indices computed on the observational spectra from the INDO-U.S. stellar library. In order to check the effect of {alpha}-element enhancement on the so-defined Ca II indices, we compared indices measured on the SSA spectra with those on the NSSA ones at the same trine of stellar parameters (T{sub eff}, log g, [Fe/H]); luckily, little influences of {alpha}-element enhancement were found. Furthermore, comparisons of our synthetic indices with the observational ones from measurements on the INDO-U.S. stellar library, the SDSS-DR7 and SDSS-DR8 spectroscopic survey are presented, respectively, for dwarfs and giants in specific. For dwarfs, our synthetic indices could well reproduce the behaviors of the observational indices versus stellar parameters, which verifies the validity of our index definitions for dwarfs. For giants, the consistency between our synthetic indices and the observational ones does not appear to be as good. However, a new synthetic library of NIR Ca II indices has been founded for deeper studies on the NIR wave band of stellar spectra, and this library is particularly appropriate for the SDSS and the forthcoming LAMOST stellar spectra. We have regressed the strength of the CaT index as a function of stellar parameters for both dwarfs and giants after a series of experimental investigations into relations of the indices with stellar parameters. For dwarfs, log g has little effect on the indices, while [Fe/H] and T{sub eff} play a role together. The leading factor is probably [Fe/H], which changes the strength of the indices by a positive trend. For giants, log g starts to influence the strength of the indices by a negative trend for the metal-poor, and even impact deeply for the metal-rich; besides, [Fe/H] and T{sub eff} still matter. In addition, we briefly discussed the major differences between our Ca II triplet indices and the CaHK doublet indices. Ultimately, a supplemental experiment was carried out to show that spectral noises do have effects on our set of NIR Ca II indices. However, the influence is not weak enough to be ignored if the signal-to-noise ratio falls below 20.

79 ASTRONOMY AND ASTROPHYSICS↗

C++ Coding Standards for the AMP Project

This document provides an initial starting point to define the C++ coding standards used by the AMP nuclear fuel performance integrated code project and a part of AMP's software development process. This document draws from the experiences, and documentation [1], of the developers of the Marmot Project at Los Alamos National Laboratory. Much of the software in AMP will be written in C++. The power of C++ can be abused easily, resulting in code that is difficult to understand and maintain. This document gives the practices that should be followed on the AMP project for all new code that is written. The intent is not to be onerous but to ensure that the code can be readily understood by the entire code team and serve as a basis for collectively defining a set of coding standards for use in future development efforts. At the end of the AMP development in fiscal year (FY) 2010, all developers will have experience with the benefits, restrictions, and limitations of the standards described and will collectively define a set of standards for future software development. External libraries that AMP uses do not have to meet these requirements, although we encourage external developers to follow these practices. For any code of which AMP takes ownership, the project will decide on any changes on a case-by-case basis. The practices that we are using in the AMP project have been in use in the Denovo project [2] for several years. The practices build on those given in References [3-5]; the practices given in these references should also be followed. Some of the practices given in this document can also be found in [6].

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Tonopah Test Range Air Monitoring: CY2018 Meteorological, Radiological, and Wind Transported Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and to provide information for designing long-term monitoring of the sites. The monitoring program in 2018 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403. Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Monitoring at TTR in calendar year (CY) 2018 provided surveillance of both ambient conditions, and ground disturbance associated with remediation activities at Clean Slate II and III. The first half of CY2018 data from Stations 404 and 405 at Clean Slate II were collected during remediation activities at that site, and data collected during the final third of the year at Stations 401 and 403 at Clean Slate III coincided with remediation work at the site. Ambient conditions prevailed at Station 400 throughout the year. Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM 10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 kilometers per hour (km/hr) (20 miles per hour [mph]). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time at the sites. Ground disturbing remediation activities were carried out at Clean Slate II from October 31, 2017, until July 26, 2018. Station 404 is located closest to the remediation area and is downwind of the area when winds are from the south. By late November, analysis of dust from the air sampler at Station 404 registered increases in plutonium-239+240 ( 239+240 Pu) concentrations. Peak plutonium concentrations, accompanied by elevated gross alpha concentrations and the detection of americium-241 ( 241 Am) by gamma spectroscopy, occurred between March and May 2018. During spring and early summer of 2018, elevated radionuclide concentrations were also measured in dust collected from the air sampler at Station 405, which is more than twice the distance from the remediation activity as Station 404. A minor but sustained increase in gross alpha concentration of suspended dust collected at Stations 400, 401, and 403 was also observed starting in May 2018 and continuing into August. Stations 401 and 403 are approximately 4.8 to 6.4 km (three to four miles) from Clean Slate II and Station 400 is approximately 13 km (eight miles) from that site. The radionuclide content of material that saltated into the passive Big Spring Number Eight (BSNE) traps during the Clean Slate II remediation period increased in both the traps facing toward and away from the fenced contamination area at Station 404, with the largest increases in concentration (almost five times the previous 239+240 Pu concentration) observed in the traps facing the fenced area. The radionuclide concentration in material in the trap facing away from the fence more than doubled from that measured in 2017. A similar increase was observed for the saltation trap facing away from the fenced area at Station 405, although no increase was observed for material captured in the trap facing the fenced area. Particles ranging in size from 50 to 500 µm generally move by saltation processes and are not expected to significantly contribute to dose for someone breathing in the standard respiratory zone for adult humans (1.5 to 1.7 m [4.9 to 5.6 ft] above ground level) because they are too large to be entrained in the air as suspended dust. Remediation activities at Clean Slate III began on September 5, 2018, and continued until a brief hiatus started on December 20, 2018. Although Station 401 is much closer to the remediation area than Station 403, the first increase in gross alpha and 239+240 Pu concentrations was noted in dust from filters collected at Station 403 in early November 2018. The highest radionuclide concentrations of 2018 at the Clean Slate III stations were recorded in air samples taken from Stations 401 and 403 in late December 2018 and these concentrations were comparable between the two station locations. Gamma rate data measured by the PICs was slightly higher than the annual average at Stations 401 and 403 after remediation activities began, but no single measurement was outside of the range observed in 2018 prior to remediation activities. No increase in radionuclide concentration was observed for the Clean Slate III remediation time period on air filters collected from the other stations. Radiological monitoring at Station 400—which is located at the ROC, and therefore the closest regularly staffed work location to the Clean Slate sites—recorded a higher mean gross alpha activity from dust collected on air sampler filters than in previous years. The individual biweekly air filters yielded measurements of gross alpha that were at or below the mean plus one standard deviation measured in CY2017, except for the period from April 25, 2018, through September 12, 2018. Nonetheless, gamma spectroscopy of all air filters from Station 400 identified only naturally occurring radionuclides, with no detection of americium-241 ( 241 Am) (which is used as an indicator of plutonium-241[ 241 Pu]). Alpha spectroscopy of selected air filters collected at Station 400 did not detect plutonium-238 ( 238 Pu) or 239+240 Pu above the analytical detection limit. Gross beta and gamma exposure rate data were comparable to data from regional CEMP stations. No saltation traps are deployed at Station 400. Considering the ambient monitoring periods during CY2018, the monitoring stations adjacent to the Clean Slate sites recorded above-background 238 Pu and 239+240 Pu concentrations (SNL, 1998; Turner et al., 2003) in samples collected by passive saltation traps and on selected air filters. These observations were consistent with previous years and indicated that radionuclide movement occurred under ambient conditions by processes of both saltation and suspension. The presence of radionuclides in all saltation traps, both upwind and downwind of the fenced contamination areas, was consistent with previous radiological survey results (EG&G, 1979) that show lower concentration radiologically contaminated material dispersed outside the fenced area. Although 239+240 Pu concentrations in the air filter samples were sometimes orders of magnitude higher than background, the concentrations were below risk-based action levels defined for an industrial area worker scenario (U.S. DOE, 2014). The interception of airborne dust with above-background radionuclide concentrations demonstrates that dispersal processes are continuing. Strong winds are the driver for both suspension and saltation of dust and soil. The recorded wind speed and PM10 during remediation activities at Clean Slate II and III identified discrete wind events lasting approximately five to eight hours each, which accounted for the greatest PM 10 concentrations at the monitoring stations. These events captured the effect of winds from the northwest and from the south. The observed differences in dust loading and radionuclide concentrations for the monitoring stations when they were either upwind or downwind of the contamination area identify the remediation area as a source of plutonium contaminated dust. The increase in concentration of radionuclides in airborne dust during the remediation activities, compared with measurements under previous ambient conditions (mean 239+240 Pu concentrations during remediation activities are approximately nine to 40 times higher compared to pre-remediation concentrations, depending on monitoring station), highlights the impact of land disturbance on wind-borne contaminant transport from the Clean Slate test areas. The meteorological and particulate matter monitoring indicated that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation occurred under ambient conditions and accelerated when the sites were disturbed. The 239+240 Pu alpha spectroscopy results indicated that airborne concentrations during remediation activities ranged from 2 × 10-16 to 380 × 10-16 µCi/ml. These results can be compared to the derived air concentration limit for 239 Pu of 6 × 10-11 µCi/ml for occupational workers contained in Code of Federal Regulations 10 CFR 835, Occupational Radiation Protection. Even though the air sampling results document an increase in concentration during remediation activities, the observed concentrations are less than 0.06 percent of the occupational limit. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure.

54 ENVIRONMENTAL SCIENCES↗

Stop managing people, start managing agreements - 15081

One definition of management in business and organizations is: 'the function that coordinates the efforts of people to accomplish goals and objectives using available resources efficiently and effectively'. Unfortunately, what it takes to coordinate (literally, to create order together) is beyond the scope of today's management tools. The top five management tools in the world, according to a Bain 2013 survey, are: Strategic Planning; Customer Relationship Management; Employee Engagement Surveys; Benchmarking; and Balanced Scorecard. These are useful tools in business and organizations, but do not help managers coordinate the complex performance networks of agreements with resource providers, team members, and internal and external user-customers and authorities required to accomplish group or organizational goals. How do we manage such a network? While coordination is increasingly necessary in today's world of work, it is also a much neglected area of serious study because it is, almost literally, an invisible phenomenon. We can observe people inside groups, as well as their activities and results, but coordination is a product of managing what is going on between groups, not inside them. The challenge is making that in-between visible and actionable, not just 'white space'. A solution: define a Team's performance as agreements - and deliveries on the agreements - for products, services, and communications - the things moving between a Team and its immediate circle of resource providers, customers, and authorities relevant to a goal. This approach has been shown to reduce operational costs while also increasing team members' recognition of their interdependent responsibilities. Managers and Team leaders can then turn any Team goal into an opportunity for accomplishment in three steps: 1. Define 'performance' in terms of deliverable products, services, and communications for every goal; 2. Keep performance status current and visible to all team members; and 3. Debrief and update performance status routinely. Teamwork and engagement in goal accomplishment require a focus on Sender-Receiver agreements, productive communication, and timely and accurate status-tracking and feedback. Sustaining the context for accomplishment is not about managing people - it requires supporting coordination for the network of agreements in which people operate. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lattice QCD Calculation of Nucleon Structure

It is emphasized in the 2015 NSAC Long Range Plan that "understanding the structure of hadrons in terms of QCD's quarks and gluons is one of the central goals of modern nuclear physics." Over the last three decades, lattice QCD has developed into a powerful tool for ab initio calculations of strong-interaction physics. Up until now, it is the only theoretical approach to solving QCD with controlled statistical and systematic errors. Since 1985, we have proposed and carried out first-principles calculations of nucleon structure and hadron spectroscopy using lattice QCD which entails both algorithmic development and large-scale computer simulation. We started out by calculating the nucleon form factors -- electromagnetic, axial-vector, πNN, and scalar form factors, the quark spin contribution to the proton spin, the strangeness magnetic moment, the quark orbital angular momentum, the quark momentum fraction, and the quark and glue decomposition of the proton momentum and angular momentum. The first round of calculations were done with Wilson fermions in the `quenched' approximation where the dynamical effects of the quarks in the sea are not taken into account in the Monte Carlo simulation to generate the background gauge configurations. Beginning in 2000, we have started implementing the overlap fermion formulation into the spectroscopy and structure calculations. This is mainly because the overlap fermion honors chiral symmetry as in the continuum. It is going to be more and more important to take the symmetry into account as the simulations move closer to the physical point where the u and d quark masses are as light as a few MeV only. We began with lattices which have quark masses in the sea corresponding to a pion mass at ~ 300 MeV and obtained the strange form factors, charm and strange quark masses, the charmonium spectrum and the D s meson decay constant f D s , the strangeness and charmness, the meson mass decomposition and the strange quark spin from the anomalous Ward identity. Recently, we have started to include multiple lattices with different lattice spacings and different volumes including large lattices at the physical pion mass point. We are getting quite close to being able to calculate the hadron structure at the physical point and to do the continuum and large volume extrapolations, which is our ultimate aim. We have now finished several projects which have included these systematic corrections. They include the leptonic decay width of the ρ, the πN sigma and strange sigma terms, and the strange quark magnetic moment. Over the years, we have also studied hadron spectroscopy with lattice calculations and in phenomenology. These include Roper resonance, pentaquark state, charmonium spectrum, glueballs, scalar mesons a 0 (1450) and σ(600) and other scalar mesons, and the 1 -+ meson. In addition, we have employed the canonical approach to explore the first-order phase transition and the critical point at finite density and finite temperature. We have also discovered a new parton degree of freedom -- the connected sea partons, from the path-integral formulation of the hadronic tensor, which explains the experimentally observed Gottfried sum rule violation. Combining experimental result on the strange parton distribution, the CT10 global fitting results of the total u and d anti-partons and the lattice result of the ratio of the momentum fraction of the strange vs that of u or d in the disconnected insertion, we have shown that the connected sea partons can be isolated. In this final technical report, we shall present a few representative highlights that have been achieved in the project.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Annual report of monitoring at Morrill, Kansas, in 2010.

Carbon tetrachloride contamination in groundwater at Morrill, Kansas, was initially identified in 1985 during statewide testing of public water supply wells for volatile organic compounds (VOCs). High levels of nitrate were also present in the wells. The city of Morrill is located in Brown County in the northeastern corner of the state, about 7 mi east of Sabetha. The population of Morrill as of the 2000 census was approximately 277. All residents of Morrill now obtain their drinking water from the Sabetha municipal water system via a pipeline constructed in 1991. Starting in 1922, eight different public wells formerly served the Morrill municipal system at some time. Because of poor water quality, including high nitrate levels attributed to numerous animal feeding operations in the vicinity and application of fertilizer on agricultural lands, use of the local groundwater from any public well for municipal supply purposes was terminated in 1991 in favor of obtaining water from the Sabetha municipal water system. Investigations of the carbon tetrachloride and nitrate contamination by the Kansas Department of Health and Environment (KDHE) in 1989, 1994, and 1996 (KDHE 1989; GeoCore 1994a-e, 1996) identified a localized plume of carbon tetrachloride in groundwater extending downgradient from a grain storage facility located in the northwestern section of Morrill. The facility was formerly operated by the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), from 1950 to 1971. Since termination of the CCC/USDA grain storage operations in 1971, the property and existing grain bins have been used for private grain storage up to the present time. Prior to 1986, commercial grain fumigants were commonly used by the CCC/USDA, as well as private and commercial grain storage operations, to preserve grain. Because the identified carbon tetrachloride contamination could in part be linked to historical use of carbon tetrachloride-based fumigants at its former facility, in 2003 the CCC/USDA assumed responsibility for the site investigation of the carbon tetrachloride contamination. The CCC/USDA involvement began with development and implementation of a work plan for a Phase I expedited site characterization (Argonne 2003). That investigation and subsequent investigations (Argonne 2004, 2005a) were performed by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne continues to provide technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The initial investigation by the CCC/USDA in 2003 determined that soils at the former facility have not been impacted by grain fumigation activities. Neither carbon tetrachloride nor chloroform was detected in near-surface soils or in subsurface soils collected to bedrock or to a depth of 15 ft below ground level (BGL). Therefore, no identifiable human health risk is associated with either carbon tetrachloride or chloroform in shallow soils, which additionally pose no further threat of contamination to groundwater. High carbon tetrachloride concentrations in groundwater (maximum 390 {micro}g/L in a sample collected from monitoring well MW3S - located on the former CCC/USDA property - in 1995) have declined significantly during long-term monitoring by the KDHE and currently by the CCC/USDA. Maximum levels within the plume of < 50 {micro}g/L at present confirm that no continuing soil source remains at the former CCC/USDA facility. Nevertheless, carbon tetrachloride concentrations exceeding the KDHE Tier 2 risk-based screening level of 5.0 {micro}g/L remain. In September 2005, the CCC/USDA initiated periodic sampling of groundwater at Morrill, in accord with a monitoring program approved by the state (KDHE 2005), to monitor carbon tetrachloride concentrations in the groundwater. Under the KDHE-approved monitoring plan (Argonne 2005b), groundwater was initially sampled twice yearly for a period of two years. The samples were analyzed for VOCs, as well as for selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The data have been inconclusive overall, possibly because of the relatively low contaminant concentrations in the plume. Nevertheless, consistently low levels of dissolved oxygen (DO) and oxidation-reduction potential (ORP) at monitoring well MW1D (in the deepest portion of the contaminated aquifer) and the presence of chloroform (the primary degradation product of carbon tetrachloride) suggest that some degree of reductive dechlorination is occurring.

54 ENVIRONMENTAL SCIENCES↗

Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.

54 ENVIRONMENTAL SCIENCES↗

Advanced SOFC quality control and the role of manufacturing defects on stack reliability

Atrex Energy rolled out first commercial SOFC generator products in 2013. Following that we embarked on implementation of mass production in order to ramp up productivity and lower the costs in the meantime. To ensure the goal of mass production, an accurate, cost effective and consistent quality control methodology needs to be in place. The aim of this DOE funded project is to devise a machine and methodology for cell quality control using modern non-destructive testing methods and cell rejection criterion based on the empirical determination of the role of manufacturing flaws on stack degradation and reliability. The work scope encompasses two goals aimed at 1) developing automatable techniques for objective flaw detection and 2) developing an understanding of the ramifications of flaws on stack and cell reliability. By accomplishing these two goals it is likely that an advanced stage Quality Control (QC) device can be developed. This project scope encompasses: 1) Invention of a high speed automated instrument for spatial mapping of surface and sub-surface imperfections in production cells (ex situ) using modern imaging techniques. 2) Identification of rejection criteria upon which to screen cells from production by: a. Magnification of the effect of production defects on cell degradation through fabrication and testing of micro-cells which encompass these imperfections. b. The long term testing of full size production cells both as single cells and in small stacks, in order to correlate the (in situ) performance and degradation with the imperfection type (identified ex-situ) and hence be able to classify imperfections as actual defects. We first built a defect library with the cells containing imperfections classified and documented. The cells with various imperfections were tested to evaluate the imperfection potential impact on cell electrochemical performance. Evaluations were conducted on minicell, single cell and stack levels. On minicell level, pinhole, scratch, crack, contamination, and pop-out were investigated. We found: (1) none of the imperfections causes calamity type failure, (2) pinholes do not show measurable effect on minicell performance, (3) imperfection such as electrolyte abrasion, scratch, and pop out cause minicell potential to fluctuate by different degrees; the cells with such imperfections exhibit sensitivity of potential to high fuel utilization and “self healing” behavior. On single cell level we evaluated the effect of long crack and high population pinholes. The cell with a long crack does not show performance compromise at start. There is no potential fluctuation or sensitivity to high fuel utilization or catastrophic failure. The voltage degradation due to thermal cycle is slightly higher than normal cells. The cells with high population pinholes perform surprisingly as well as normal cells over a period of 3,500h. Even when subjected to cyclic load condition, the cells 4 show negligible degradation. Our cells appear to have “self immunization” feature which fends off the adversary effects of certain imperfections. Defects were also evaluated on stack level. Two stacks were made each with ten defect cells. The first stack was tested for 13,2000h under steady load condition while the second was tested for 9,000h under transient load conditions. We found: (1) voltage fluctuation and sensitivity to thermal cycle were not observed in contrast to minicell test, (2) of the various cracks examined, including longitudinal cracks, circumferential crack, crack near closed and open ends, none exhibited distinguishable impact on performance, (3) defect cells exhibited higher degradation rates on average under steady load condition; Individually some defect cells performed similarly or better than reference cells, (4) under steady load condition all the cells degrade monotonically with degradation rate increasing with time, (5) under cyclic (transient) load condition, both defect and reference cells exhibit complex dynamic behaviors, (6) fuel loss (leak) was measured occasionally for stack 1, the cells with crack showed the highest fuel loss increase, nevertheless, no correlation with performance degradation could be established with certainty, and (7) no catastrophic failure ever happened other than incremental degradation. Posttest inspection and microanalysis were carried out; the observations are summarized in what follows: (1) Electrolyte pinholes, some scratches and IC porosity became undetectable after testing. (2) The cathode covering the popout defects is intact without any cracking or delamination. (3) The scratch was covered by cathode in pristine state; Ni oxide or NiO-YSZ filled the space where electrolyte was missing. After >10,000h operation, the cathode that used to cover the scratch was missing but the size of the scratch remains unchanged; there is a fairly dense Ni oxide layer on top of the scratch. (4) All of the cracks remain their original dimensions. Current collector kept longitudinal cracks closed which mitigated the adversary effect of crack on cell performance/durability. (5) The crack at open end showed some deterioration manifested by a small oxidation zone in the vicinity of the crack. Wide spectrum of imaging techniques were surveyed and evaluated to detect tubular SOFC defects. Optical methods, with and without assistance of expression technique, were applied to detect all kinds of defects. Thermograph method in combination of CO2 leak, ultra-sound and electric potential was also extensively evaluated to detect surface and under-surface defects such as short circuit. Based on these works, laser camera has been selected to build the final QC machine vision inspection system. The Gocator laser profile sensor was setup to generate 2D surface intensity images of tubular SOFC surface which were analyzed with Sherlock machine vision software supplied by Teledyne Dalsa. The Gocator output was integrated with the Sherlock software and enabled live images to be imported by a Common Vision Blox driver. The Sherlock software was programmed to detect various surface defects from the surface intensity images generated by the Gocator. These measurements are subsequently used to make pass or fail decisions.

01 COAL, LIGNITE, AND PEAT↗

NbTaV_BCC_SolidSolution_128atoms_VASP6

We performed density functional theory (DFT) calculations for body-centered-cubic (BCC) structures with 128 lattices sites of solid solution ternary alloys niobium-tantalum-vanadium (Nb-Ta-V). The first-principle code that has been used to run the calculations is the closed-source Vienna Ab-Initio Simulation Package (VASP). The calculations have been collected by sampling chemical compositions across the entire compositional range. The chemical compositions have been sampled by progressively changing the number of atoms per constituent by 8. For each chemical composition of binaries and ternaries, the first-principle calculations have been run for 100 randomized arrangements of the constituents on the BCC lattice sites. We collected data for a total of 10,500 randomized atomic structures over 105 chemical compositions. The calculations have been collected on NERSC-Perlmutter using the VASP 6.3.2. The VASP calculations for every atomic structure have been performed in 2 main steps: 1. Starting from an ideal body-centered-cubic (BCC) structure, geometry optimization with low precision has been executed to perform a preliminary optimization of the atomic structure. The output for this calculations is available in the files 0.CONTCAR, 0.OUTCAR, rlx1.out. 2. Using the atomic structure resulting from the preliminary geometry optimization, a second geometry optimization has been performed using normal precision. The output for this calculations is available in the files CONTCAR, OUTCAR, rlx2.out, vaspout.h5, and vasprun.xml. Every chemical composition sampled across the composition range in the dataset has its own directory. The convention used to name the directories for ternary alloys is AXBYCZ, where A, B, and C refer to the constituents, and X, Y, and Z are positive integers that represent the number of atoms for each constituent and their values still sum up to 128. Each atomic structure associated with a specific chemical composition has its own sub-directory within the directory of the corresponding chemical composition. The sub-directories for each atomic structure for each chemical composition are named 'case-*', where * is a positive integer that spans all the values from 1 through 100, extremes included. The files contained in each sub-directory 'case-*' for each atomic structure are as follows: 1. INCAR: input file that contains various parameters and settings for controlling the behavior of the electronic structure calculations 2. 0.POSCAR: input file that defines the atomic structure of a system 3. 0.CONTCAR: output file that provides the atomic positions and cell parameters after the first geometry optimization has been run with the precision variable set to PREC=Low in the INCAR file 4. 0.OUTCAR: output file that contains detailed information about the progress of a calculation after the first geometry optimization has been run with the precision variable set to PREC=Low in the INCAR file 5. rlx1.out: file with diagnostic information about the execution of the first geometry optimization with precision variable set to PREC=Low in the INCAR file 6. POSCAR: input file that defines the atomic structure of a system after the first geometry optimization has been run at low precision. This represents the input for the second geometry optimization run with the precision variable set to PREC=Normal in the INCAR file 7. CONTCAR: output file that provides the atomic positions and cell parameters after the second geometry optimization has been run with the precision variable set to PREC=Normal in the INCAR file 8. OUTCARL: output file that contains detailed information about the progress of a calculation after the second geometry optimization has been run with the precision variable set to PREC=Normal in the INCAR file 9. rlx2.out: file with diagnostic information about the execution of the second geometry optimization with precision variable set to PREC=Normal in the INCAR file 10. vaspout.h5: hierarchical HDF5 file containing the inputs and outputs of a VASP calculation. To analyze the data in this file we recommend using py4vasp. This file is only produced if the VASP version used is compiled with HDF5 support 11. vasprun.xml: contains similar information to OUTCAR, but in an xml format. This research is sponsored by the Artificial Intelligence Initiative as part of the Laboratory Directed Research and Development (LDRD) Program of Oak Ridge National Laboratory, managed by UT-Battelle, LLC, for the US Department of Energy under contract DE-AC05-00OR22725. This work used resources of the Oak Ridge Leadership Computing Facility, which is supported by the Office of Science of the U.S. Department of Energy under Contract No. DE-AC05-00OR22725, under Directorate Discretionary awards MAT025 (Materials Science) and LRN026 (Machine Learning), and INCITE award MAT201. This work also used resources of the National Energy Research Scientific Computing Center, which is supported by the Office of Science of the U.S. Department of Energy under Contract No. DE-AC02-05CH11231, under award ERCAP0025216.

36 MATERIALS SCIENCE↗

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP locale has historically had a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning this quarter, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original and new instrumentation made available through the American Recovery and Reinvestment Act (ARRA). The central facility and 4 extended facilities will remain, but there will be up to 16 surface new characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place within the next 12 months. The AMF continues its 20-month deployment in Graciosa Island, Azores, Portugal, that started May 1, 2009. The AMF will also have additional observational capabilities within the next 12 months. Users can participate in field experiments at the sites and mobile facility, or they can participate remotely. Therefore, a variety of mechanisms are provided to users to access site information. Users who have immediate (real-time) needs for data access can request a research account on the local site data systems. This access is particularly useful to users for quick decisions in executing time-dependent activities associated with field campaigns at the fixed sites and mobile facility locations. The eight computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the AMF; and the DMF at PNNL. However, users are warned that the data provided at the time of collection have not been fully screened for quality and therefore are not considered to be official ACRF data. Hence, these accounts are considered to be part of the facility activities associated with field campaign activities, and users are tracked. In addition, users who visit sites can connect their computer or instrument to an ACRF site data system network, which requires an on-site device account. Remote (off-site) users can also have remote access to any ACRF instrument or computer system at any ACRF site, which requires an off-site device account. These accounts are also managed and tracked.

54 ENVIRONMENTAL SCIENCES↗

Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan (Final Report No. 2)

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in December 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AP1000{sup R} licensing and deployment in the United States

In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final Report- "An Algorithmic and Software Framework for Applied Partial Differential Equations (APDEC): A DOE SciDAC Integrated Software Infrastructure Center (ISIC)

All of the work conducted under the auspices of DE-FC02-01ER25473 was characterized by exceptionally close collaboration with researchers at the Lawrence Berkeley National Laboratory (LBNL). This included having one of my graduate students - Sarah Williams - spend the summer working with Dr. Ann Almgren a staff scientist in the Center for Computational Sciences and Engineering (CCSE) which is a part of the National Energy Research Supercomputer Center (NERSC) at LBNL. As a result of this visit Sarah decided to work on a problem suggested by Dr. John Bell the head of CCSE for her PhD thesis, which she finished in June 2007. Writing a PhD thesis while working at one of the University of California (UC) managed DOE laboratories is a long established tradition at the University of California and I have always encouraged my students to consider doing this. For example, in 2000 one of my graduate students - Matthew Williams - finished his PhD thesis while working with Dr. Douglas Kothe at the Los Alamos National Laboratory (LANL). Matt is now a staff scientist in the Diagnostic Applications Group in the Applied Physics Division at LANL. Another one of my graduate students - Christopher Algieri - who was partially supported with funds from DE-FC02-01ER25473 wrote am MS Thesis that analyzed and extended work published by Dr. Phil Colella and his colleagues in 1998. Dr. Colella is the head of the Applied Numerical Algorithms Group (ANAG) in the National Energy Research Supercomputer Center at LBNL and is the lead PI for the APDEC ISIC which was comprised of several National Laboratory research groups and at least five University PI's at five different universities. Chris Algieri is now employed as a staff member in Dr. Bill Collins' research group at LBNL developing computational models for climate change research. Bill Collins was recently hired at LBNL to start and be the Head of the Climate Science Department in the Earth Sciences Division at LBNL. Prior to this he had been a Deputy Section Head at the National Center for Atmospheric Research in Colorado. My understanding is that Chris Algieri is the first person that Bill hired after coming to LBNL. The plan is that Chris Algieri will finish his PhD thesis while employed as a staff scientist in Bill's group. Both Sarah and Chris were supported in part with funds from DE-FC02-01ER25473. In Sarah's case she received support both while at U.C. Davis (UCD) taking classes and writing an MS thesis and during some of the time she was living in Berkeley, working at LBNL and finishing her PhD thesis. In Chris' case he was at U.C. Davis during the entire time he received support from DE-FC02-01ER25473. More specific details of their work are included in the report below. Finally my own research conducted under the auspices of DE-FC02-01ER25473 either involved direct collaboration with researchers at LBNL - Phil Colella and Peter Schwartz who is a member of Phil's Applied Numerical Algorithms Group - or was on problems that are closely related to research that has been and continues to be conducted by researchers at LBNL. Specific details of this work can be found below. Finally, I would like to note that the work conducted by my students and me under the auspices of this contract is closely related to work that I have performed with funding from my DOE MICS contract DE-FC02-03ER25579 'Development of High-Order Accurate Interface Tracking Algorithms and Improved Constitutive Models for Problems in Continuum Mechanics with Applications to Jetting' and with my CoPI on that grant Professor Greg Miller of the Department of Applied Science at UCD. In theory I tried to use funds from the SciDAC grant DE-FC02-01ER25473 to support work that directly involved implementing algorithms developed by my research group at U.C. Davis in software that was developed and is maintained by my SciDAC CoPI's at LBNL.

97 MATHEMATICS AND COMPUTING↗

The Development of a Small-Scale Project Model for Waste Management at the Port Hope Conversion Facility - 19126

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. Over time, Cameco's ongoing operations contributed to an increase in the volume of low-level radioactive waste managed onsite. Since 2011, Cameco has completed annual waste management campaigns with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations. With disposal options for low-level radioactively contaminated wastes in Canada limited due to cost considerations and no commercially accessible landfills licensed for radioactive material. In recent years, Cameco has started to ship marginally contaminated wastes (<500 ppm uranium) to the United States for disposal in an appropriate landfill owned by US Ecology in Idaho. Numerous successful campaigns totaling over 1,000 successful shipments, have been completed to transport drummed and/or bagged material by rail in gondola cars to the disposal facility in Idaho since 2011. All shipments have been completed in compliance with all environmental regulations, with a perfect compliance record maintained to date. To achieve this excellent compliance record, the campaigns require careful planning by both organizations, as well as deployment of personnel from the Idaho facility during the campaign for project management, characterization and/or radiation monitoring support. As the accumulated waste inventory has been reduced through these projects, the scope and duration of each campaign has also decreased. In the last few years, road transport directly to the Idaho facility has also been utilized. This option allows for the deployment of small projects that may be completed for a smaller inventory of a specific waste type and to manage newly-generated low-level radioactive wastes on an ongoing basis. These projects have ranged from a single standard van shipment to multiple trucks running continuous loops between the Ontario and Idaho or Ontario and an intermediary site and have been utilized for marginally contaminated wastes (<500 ppm uranium) as well as marginally contaminated wastes with additional hazard classification. Cameco and US Ecology personnel have collaborated to develop characterization and shipment procedures that enable these projects to be executed in full compliance with all Canadian and US regulations, without deployment of personnel from the Idaho facility, while maintaining adequate oversight by both organizations to ensure that the waste is safely and compliantly managed. These protocols have been implemented and optimized for the Port Hope Conversion Facility and will be rolled out to other Cameco facilities in Ontario through 2019. Cameco expects to utilize the small project model for the long term to ensure that eligible marginally contaminated wastes (<500 ppm uranium) are managed appropriately to ensure that once the legacy material is eliminated, it remains so. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refine your search to explore more results.