Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

System Assessment of a High Power 3-U CubeSat

The Advanced eLectrical Bus (ALBus) CubeSat project is a technology demonstration mission of a 3-UCubeSat with an advanced, digitally controlled electrical power system capability and novel use of Shape Memory Alloy (SMA) technology for reliable deployable solar array mechanisms. The objective of the project is to, through an on orbit demonstration, advance the state of power management and distribution (PMAD) capabilities to enable future missions requiring higher power, flexible and reliable power systems. The goals of the mission include demonstration of: 100 Watt distribution to a target electrical load, efficient battery charging in the orbital environment, flexible power system distribution interfaces, adaptation of power system control on orbit, and reliable deployment of solar arrays and antennas utilizing re-settable SMA mechanisms. The power distribution function of the ALBus PMAD system is unique in the total power to target load capability of 100 W, the flexibility to support centralized or point-to-load regulation and ability to respond to fast transient power requirements. Power will be distributed from batteries at 14.8 V, 6.5 A to provide 100 W of power directly to a load. The deployable solar arrays utilize NASA Glenn Research Center superelastic and activated Nitinol(Nickel-Titanium alloy) Shape Memory Alloy (SMA) technology for hinges and a retention and release mechanism. The deployable solar array hinge design features utilization of the SMA material properties for dual purpose. The hinge uses the shape memory properties of the SMA to provide the spring force to deploy the arrays. The electrical conductivity properties of the SMA also enables the design to provide clean conduits for power transfer from the deployable arrays to the power management system. This eliminates the need for electrical harnesses between the arrays and the PMAD system in the ALBus system design. The uniqueness of the SMA retention and release mechanism design is the ability to reset the mechanism, allowing functional tests of the mechanisms prior to flight with no degradation of performance. The project is currently in preparation at the NASA Glenn Research Center for a launch in late calendar year of 2017. The 100 Watt power distribution and dual purpose, re-settable SMA mechanisms introduced several system level challenges due to the physical constraints in volume, mass and surface area of 3-U CubeSats. Several trade studies and design cycles have been completed to develop a system which supports the project objectives. This paper is a report on the results of the system level trade studies and assessments. The results include assessment of options for thermal control of 100 Watts of power dissipation, data from system analyses and engineering development tests, limitations of the 3-U system and extensibility to larger scale CubeSat missions.

CubeSat↗

Lunar Orbiter 3 - Photographic Mission Summary

Systems performance, lunar photography, and launch operations of Lunar Orbiter 3 photographic mission. The third of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 01:17 GMT on February 5,1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final 1 maneuvering and acceleration to the velocity required to maintain the 100-nautical-milealtitude Earth orbit was controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-burn period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the entire boost trajectory.

Source record↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 1: Study summary

A study was conducted to determine the configuration and tradeoffs of a tracking and data relay satellite. The study emphasized the design of a three axis stabilized satellite and a telecommunications system optimized for support of low and medium data rate user spacecraft. Telecommunications support to low and high, or low medium, and high data rate users, considering launches with the Delta 2914, the Atlas/Centaur, and the space shuttle was also considered. The following subjects are presented: (1) launch and deployment profile, (2) spacecraft mechanical and structural design, (3) attitude stabilization and control subsystem, and (4) reliability analysis.

Hill, T. E.↗

Space Station flight telerobotic servicer functional requirements development

The Space Station flight telerobotic servicer (FTS), a flight robotic system for use on the first Space Station launch, is described. The objectives of the FTS program include: (1) the provision of an alternative crew EVA by supporting the crew in assembly, maintenance, and servicing activities, and (2) the improvement of crew safety by performing hazardous tasks such as spacecraft refueling or thermal and power system maintenance. The NASA/NBS Standard Reference Model provides the generic, hierarchical, structured functional control definition for the system. It is capable of accommodating additional degrees of machine intelligence in the future.

Oberright, John↗

National Space Transportation System Reference. Volume 2: Operations

An overview of the Space Transportation System is presented in which aspects of the program operations are discussed. The various mission preparation and prelaunch operations are described including astronaut selection and training, Space Shuttle processing, Space Shuttle integration and rollout, Complex 39 launch pad facilities, and Space Shuttle cargo processing. Also, launch and flight operations and space tracking and data acquisition are described along with the mission control and payload operations control center. In addition, landing, postlanding, and solid rocket booster retrieval operations are summarized. Space Shuttle program management is described and Space Shuttle mission summaries and chronologies are presented. A glossary of acronyms and abbreviations are provided.

Source record↗

GRACE: Gravity Recovery and Climate Experiment

While gravity is much weaker than other basic forces in nature, such as magnetism and electricity, its effects are ubiquitous and dramatic. Gravity controls everything from the motion of the ocean tides to the expansion of the entire Universe. To learn more about the mysteries of gravity, twin satellites named GRACE--short for the Gravity Recovery and Climate Experiment--are being launched to make detailed measurements of Earth's gravity field. This experiment could lead to discoveries about gravity and Earth's natural systems, which could have substantial benefits for society and the world's population. The GRACE mission will be the inaugural flight of NASA's Earth System Science Pathfinder Program (ESSP). A component of NASA's Earth Science Enterprise (ESE), the ESSP missions are intended to address unique, specific highly focused scientific issues and provide measurements required to support Earth science research.

Ward, A.↗

NASA-STD-(I)-6016, Standard Materials and Processes Requirements for Spacecraft

This document is directed toward Materials and Processes (M&P) used in the design, fabrication, and testing of flight components for all NASA manned, unmanned, robotic, launch vehicle, lander, in-space and surface systems, and spacecraft program/project hardware elements. All flight hardware is covered by the M&P requirements of this document, including vendor designed, off-the-shelf, and vendor furnished items. Materials and processes used in interfacing ground support equipment (GSE); test equipment; hardware processing equipment; hardware packaging; and hardware shipment shall be controlled to prevent damage to or contamination of flight hardware.

Pedley, Michael↗

The Successful Implementation of NASA Orbital Debris Requirements for the Retirement of TDRS-1

TDRS-1 was decommissioned on October 28th 2009 following more than 26 years of operation. The Grand Old Dame of the TDRSS constellation wa s launched aboard the maiden voyage of the Space Shuttle Challenger ( STS-6) in April 1983. TDRS-1 survived a malfunction of the Inertial Upper Stage eventually utilizing its own propulsion system to success fully reach its assigned station in geosynchronous orbit. The anomalo us beginning of the TDRS-1 mission was not without lasting consequenc es as the primary reaction control system (A-side) was completely di sabled with an apparent propellant leak and the secondary system (B-s ide) suffered damage to its negative roll thruster rendering the thru ster inoperable. Following decommissioning the challenge to completin g a successful TDRS-1 end-of-mission (EOM) was the implementation of the stringent orbital debris requirements of NPR 8715.6 with a parti ally functioning spacecraft not originally designed to meet those req uirements. The TDRS-1 EOM had three key goals: 1) removal of the spac ecraft from geosynchronous orbit; 2) depletion of the remaining prope llant; and 3) passivation of all other sources of energy storage or generation. The TDRS-1 EOM approach was one of minimizing risks while accomplishing the goals above. The orbit raising portion of EOM was accomplished using deltavelocity operations already proven during pre vious stationchanging maneuvers. The propellant depletion approach wa s necessarily more aggressive as over 20 hours of burn time was requ ired to deplete the remaining fuel. A novel approach utilizing a spin ning, thrusting, passively controlled spacecraft configuration was ut ilized to achieve reasonable burn durations that met schedule constra ints. This nonstandard configuration required careful analysis of ele ctrical, thermal, and communication subsystems. The configuration wa s thoroughly simulated prior to the start of operations and carefully characterized during the initial spin period and first burn. Passiva tion was by definition a unique operation not previously performed wi thin the TDRS 1-7 constellation. Use was made of a TDRS spacecraft si mulator to verify the operational procedure to mitigate risks and pro vide crew training. TDRS-1 orbit raising maneuvers commenced on June 5th 2010 and completed on June 14th with an apogee 370 km and a peri gee 352 km above geosynchronous altitude. 127 kg of propellant were e stimated to be remaining in the tanks at the completion of orbit rais ing. TDRS-1 was placed in its spinning orientation on June 16th and the first fuel depletion burn was performed the following day. A seri es of 10 depletion burns were performed ending on June 26th when both propellant tank pressures experienced dramatic drops. Final passivat ion was performed on June 27 th deactivating electronics, removing t he batteries from the bus and solar arrays, and disabling the space-t o-ground communications equipment. The Second TDRS Ground Terminal (S TGT) continued to open loop track TDRS-1 for several days attempting command reacquisition several times a day. All attempts were unsucce ssful confirming passivation was achieved. The TDRS-1 orbit at passiv ation was an orbital debris compliant 36,319 x 36,128 km in height. W hile differing spacecraft designs may preclude mimicking the exact TD RS-1 EOM approach, the TDRS-1 campaign serves to demonstrate that pr e-NPR 8715.6 designs can be made to meet the requirements resulting i n a reduced orbit debris environment for future missions

Mirczak, Walter↗

Performance Comparison of Wireless Sensor Network Standard Protocols in an Aerospace Environment: ISA100.11a and ZigBee

Wireless Sensor Networks (WSNs) can provide a substantial benefit in spacecraft systems, reducing launch weight and providing unprecedented flexibility by allowing instrumentation capabilities to grow and change over time. Achieving data transport reliability on par with that of wired systems, however, can prove extremely challenging in practice. Fortunately, much progress has been made in developing standard WSN radio protocols for applications from non-critical home automation to mission-critical industrial process control. The relative performances of candidate protocols must be compared in representative aerospace environments, however, to determine their suitability for spaceflight applications. In this paper, we will present the results of a rigorous laboratory analysis of the performance of two standards-based, low power, low data rate WSN protocols: ZigBee Pro and ISA100.11a. Both are based on IEEE 802.15.4 and augment that standard's specifications to build complete, multi-hop networking stacks. ZigBee Pro targets primarily the home and office automation markets, providing an ad-hoc protocol that is computationally lightweight and easy to implement in inexpensive system-on-a-chip components. As a result of this simplicity, however, ZigBee Pro can be susceptible to radio frequency (RF) interference. ISA100.11a, on the other hand, targets the industrial process control market, providing a robust, centrally-managed protocol capable of tolerating a significant amount of RF interference. To achieve these gains, a coordinated channel hopping mechanism is employed, which entails a greater computational complexity than ZigBee and requires more sophisticated and costly hardware. To guide future aerospace deployments, we must understand how well these standards relatively perform in analog environments under expected operating conditions. Specifically, we are interested in evaluating goodput -- application level throughput -- in a representative crewed environment in the presence of varying levels of 802.11g Wi-Fi traffic. To do so, we use the NASA Johnson Space Center Wireless Habitat Testbed (WHT), a metallic, habitation-sized module designed for co-existence testing of wireless systems. In its quiescent state, the sealed WHT provides an RF-quiet environment to which we can selectively add interfering systems; it also provides a realistic level of multi-path self-interference for systems under investigation. In our test, we deploy two representative five node networks, configured in a star topology with all nodes reporting directly to a WSN gateway. Each ZigBee network WSN node is built using a Texas Instruments (TI) CC2530 system-on-a-chip radio running TI's ZigBee Pro Z-stack. Each ISA100.11a network node is built using a Nivis VersaNode 210 system-on-a-chip radio. In both cases, radios interface with TI MSP430-F5438 microcontroller implementing a common test application. Interference is provided by a D-link 802.11g Wi-Fi router transporting traffic generated using the Iperf network testing tool. For the single-channel ZigBee network, effects of both direct and indirect Wi-Fi interference are evaluated. For the channel-hopping ISA100.11a network, effects of interference from multiple Wi-Fi routers configured in non-overlapping 802.11g channels are evaluated. Our results show that, in general, the more lightweight ZigBee network performs well at low interference levels, but performance degrades as interference increases. Conversely, the more complex and costly ISA100.11a network continues to perform well as Wi-Fi interference levels increase.

Wagner, Raymond S.↗

Estimating the Effects of Astronaut Career Ionizing Radiation Dose Limits on Manned Interplanetary Flight Programs

The Hybrid Inflatable DSH combined with electric propulsion and high power solar-electric power systems offer a near TRL-now solution to the space radiation crew dose problem that is an inevitable aspect of long term manned interplanetary flight. Spreading program development and launch costs over several years can lead to a spending plan that fits with NASA's current and future budgetary limitations, enabling early manned interplanetary operations with space radiation dose control, in the near future while biomedical research, nuclear electric propulsion and active shielding research and development proceed in parallel. Furthermore, future work should encompass laboratory validation of HZETRN calculations, as previous laboratory investigations have not considered large shielding thicknesses and the calculations presented at these thicknesses are currently performed via extrapolation.

Koontz, Steven L.↗

Mass Property Measurements of the Mars Science Laboratory Rover

The NASA/JPL Mars Science Laboratory (MSL) spacecraft mass properties were measured on a spin balance table prior to launch. This paper discusses the requirements and issues encountered with the setup, qualification, and testing using the spin balance table, and the idiosyncrasies encountered with the test system. The final mass measurements were made in the Payload Hazardous Servicing Facility (PHSF) at Kennedy Space Center on the fully assembled and fueled spacecraft. This set of environmental tests required that the control system for the spin balance machine be at a remote location, which posed additional challenges to the operation of the machine

rover↗

Human Factors Throughout the Life Cycle: Lessons Learned from the Shuttle Program

With the ending of the Space Shuttle Program, it is critical that we not forget the Human Factors lessons we have learned over the years. At every phase of the life cycle, from manufacturing, processing and integrating vehicle and payload, to launch, flight operations, mission control and landing, hundreds of teams have worked together to achieve mission success in one of the most complex, high-risk socio-technical enterprises ever designed. Just as there was great diversity in the types of operations performed at every stage, there was a myriad of human factors that could further complicate these human systems. A single mishap or close call could point to issues at the individual level (perceptual or workload limitations, training, fatigue, human error susceptibilities), the task level (design of tools, procedures and aspects of the workplace), as well as the organizational level (appropriate resources, safety policies, information access and communication channels). While we have often had to learn through human mistakes and technological failures, we have also begun to understand how to design human systems in which individuals can excel, where tasks and procedures are not only safe but efficient, and how organizations can foster a proactive approach to managing risk and supporting human enterprises. Panelists will talk about their experiences as they relate human factors to a particular phase of the shuttle life cycle. They will conclude with a framework for tying together human factors lessons-learned into system-level risk management strategies.

human factors↗

Seeker 1.0: Prototype Robotic Free Flying Inspector Mission Overview

Seeker 1.0 is a prototype free flying robot that will one day be capable of inspecting human-rated spacecraft. Building off previous free flyer experience, this technology will eventually improve safety of human spacecraft by offering a variety of inspection capabilities for both routine and emergency scenarios providing increased capability and safety over current inspection methods. Seeker 1.0 is capable of 6 degree of freedom flight via a cold gas propulsion system and can operate up to 1 hour via a semi-autonomous guidance, navigation, and control system. The prototype spacecraft is capable of capturing still images at a variety of resolutions up to 13 MP. The initial test flight utilizes a command and data relay box called Kenobi. Kenobi is a derivative of the Seeker design and will communicate between Cygnus and Seeker and store data for post-mission downlink. Seeker and Kenobi have launched inside a NanoRacks External CubeSat Deployer (NRCSD-E) attached to the NG-11 Cygnus ISS resupply vehicle and will operate after Cygnus departs ISS and moves to a safe altitude. Operations will last approximately 30 minutes and will consist of basic vehicle maneuvers while capturing high-resolution still images. With any remaining time and propellant, Seeker will demonstrate additional safety capabilities and maneuvers required for operations around a crewed spacecraft. The Seeker project utilized the Class IE process that allows for streamlined flight hardware development and increased mission risk tolerance.

Spacecraft Inspection↗

The NASA Advanced Composite Solar Sail System (ACS3) Flight Demonstration: A Technology Pathfinder for Practical Smallsat Solar Sailing

NASA’s Space Technology Mission Directorate (STMD) is developing a new generation of compactly packageable composite booms designed specifically for small spacecraft applications where volumes for deployable structures are limited. NASA’s Advanced Composite Solar Sail System (ACS3) will be the first spaceflight application of this boom technology. ACS3 will also be NASA’s first practical solar sail. Objectives of the ACS3 project are to deploy an 80 m2composite boom solar sail in low Earth orbit, and as an extended goal, demonstrate controlled solar sailing flight, including orbit raising and lowering. An overview of the ACS3 project and objectives, including descriptions of ACS3’s solar sail structures and materials technology, 12U CubeSat spacecraft systems, and flight concept of operations, is provided here. Scalability of the ACS3 solar sail to future, near-term smallsat solar sailing mission requirements will also be discussed. Launch of ACS3 is currently anticipated for mid to late 2022.

Keats Wilkie↗

Strategy Developed for Selecting Optimal Sensors for Monitoring Engine Health

Sensor indications during rocket engine operation are the primary means of assessing engine performance and health. Effective selection and location of sensors in the operating engine environment enables accurate real-time condition monitoring and rapid engine controller response to mitigate critical fault conditions. These capabilities are crucial to ensure crew safety and mission success. Effective sensor selection also facilitates postflight condition assessment, which contributes to efficient engine maintenance and reduced operating costs. Under the Next Generation Launch Technology program, the NASA Glenn Research Center, in partnership with Rocketdyne Propulsion and Power, has developed a model-based procedure for systematically selecting an optimal sensor suite for assessing rocket engine system health. This optimization process is termed the systematic sensor selection strategy. Engine health management (EHM) systems generally employ multiple diagnostic procedures including data validation, anomaly detection, fault-isolation, and information fusion. The effectiveness of each diagnostic component is affected by the quality, availability, and compatibility of sensor data. Therefore systematic sensor selection is an enabling technology for EHM. Information in three categories is required by the systematic sensor selection strategy. The first category consists of targeted engine fault information; including the description and estimated risk-reduction factor for each identified fault. Risk-reduction factors are used to define and rank the potential merit of timely fault diagnoses. The second category is composed of candidate sensor information; including type, location, and estimated variance in normal operation. The final category includes the definition of fault scenarios characteristic of each targeted engine fault. These scenarios are defined in terms of engine model hardware parameters. Values of these parameters define engine simulations that generate expected sensor values for targeted fault scenarios. Taken together, this information provides an efficient condensation of the engineering experience and engine flow physics needed for sensor selection. The systematic sensor selection strategy is composed of three primary algorithms. The core of the selection process is a genetic algorithm that iteratively improves a defined quality measure of selected sensor suites. A merit algorithm is employed to compute the quality measure for each test sensor suite presented by the selection process. The quality measure is based on the fidelity of fault detection and the level of fault source discrimination provided by the test sensor suite. An inverse engine model, whose function is to derive hardware performance parameters from sensor data, is an integral part of the merit algorithm. The final component is a statistical evaluation algorithm that characterizes the impact of interference effects, such as control-induced sensor variation and sensor noise, on the probability of fault detection and isolation for optimal and near-optimal sensor suites.

Source record↗

Optimal guidance law development for an advanced launch system

A regular perturbation analysis is presented. Closed-loop simulations were performed with a first order correction including all of the atmospheric terms. In addition, a method was developed for independently checking the accuracy of the analysis and the rather extensive programming required to implement the complete first order correction with all of the aerodynamic effects included. This amounted to developing an equivalent Hamiltonian computed from the first order analysis. A second order correction was also completed for the neglected spherical Earth and back-pressure effects. Finally, an analysis was begun on a method for dealing with control inequality constraints. The results on including higher order corrections do show some improvement for this application; however, it is not known at this stage if significant improvement will result when the aerodynamic forces are included. The weak formulation for solving optimal problems was extended in order to account for state inequality constraints. The formulation was tested on three example problems and numerical results were compared to the exact solutions. Development of a general purpose computational environment for the solution of a large class of optimal control problems is under way. An example, along with the necessary input and the output, is given.

Calise, Anthony J.↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service.Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations.The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-to-station handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an in-orbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

High performing actuation system for use with a louver array for satellite thermal control

A high performing actuation system has been developed to drive one pair or a set of 9 pairs of louver blades. The system uses a Bourdon spiral as the driving member. The response time of the liquid expansion of the spiral system is in the order of three seconds. Besides performance tests, qualification tests have been carried out on a prototype system, demonstrating that the actuation system withstands normal launching conditions; projected operating life of 7 years with more than 7000 cycles can be expected.

Reusser, P. U.↗

Refine your search to explore more results.