Search NASA⌕ Search

SEARCH · Search NASA

Results for “loop currents”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,785 records · Page 100

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

The SURE House (Solar Decathlon 2015)

Coastal towns and cities across the Northeastern US, with their high population density, aged utility infrastructure, and unique geography, are increasingly vulnerable to climate change related storm events. In October 2012 superstorm Sandy highlighted the fragility of our current coastal building types and made clear the need for a new model of design and construction which works to understand and mitigate these weaknesses. Dramatic changes in public policy, championed by both The Federal Emergency Management Agency (FEMA) and the National Flood Insurance Program (NFIP) are driving the rebuilding of these shore communities, often resulting in costly renovations, un-sustainable neighborhood configurations and in direct conflict with concurrent government policies such as The American with Disabilities Act (ADA). The SURE HOUSE demonstrates a series of new design solutions to these conflicting public policies and environmental imperatives. At Stevens Institute of Technology, the 2015 Solar Decathlon started with the challenge: Can we design a home for coastal New Jersey that dramatically reduces its energy use while protecting itself from the realities of a changing, more extreme climate? The SURE HOUSE merges the iconic 20th century shore home with 21st century building science. Utilizing innovative renewable energy technologies, a ‘Passive House’ level building envelope, and rugged glass-fiber-composite materials to flood-proof the home, the SURE HOUSE is a high-performance, net-zero-energy home, armored against extreme weather, designed for the contemporary lifestyle of the Jersey Shore and other vulnerable coastal communities. SUSTAINABLE At Stevens, we recognize that energy use in the home and workplace is directly connected to the growing problem of climate change. Reducing our energy consumption by designing higher performing, compact homes that are both functional, comfortable and desirable is the first critical step towards a modern, sustainable architecture for New Jersey and beyond. This is what informed the architectural design of the house. Configured about a compact form, thickly insulated and air-sealed walls eliminate thermal bridging and minimize energy losses while advanced glazing brings in free solar heat during the winter months. As a result of these passive design strategies, the SURE HOUSE has a greatly reduced carbon footprint requiring 91% less energy than a typical New Jersey home. Photovoltaic (PV) arrays on both the rooftop and operable shutters easily provide energy in excess of the home’s modest demands. The Stevens team considers a truly sustainable home in the era of climate change, one that prioritizes low energy use, and integrates right-sized renewable generation to supply the home’s needs. Low consumption, low production. RESILIENT In October of 2012, Hurricane Sandy wreaked havoc along the east coast of the US. In New Jersey alone there was an estimated 29.4 billion dollars in damages, 346,000 homes affected, and almost two and a half million people left without power, in some cases for over 10 days. Recovery from this storm and associated flooding is ongoing to this day, as many New Jersey homeowners grapple with the large costs of rebuilding and struggle to adapt to complicated new home building regulations. Damage from this storm to Hoboken, the home of the Stevens Institute of Technology’s campus, and to the New Jersey shore was extensive and many students on the SURE HOUSE team were directly affected by this historic event. The Stevens design team recognizes that in a world of more frequent and stronger storms, the ability to absorb and adapt to change is more important than ever. Successfully weathering the next storm and its aftermath is one of the primary goals in the design of the SURE HOUSE prototype. The SURE HOUSE introduces unique ‘dry flood-proofing’ methods to residential construction. Innovative wall and floor flood-proofing, utilizing durable composite sheathing materials adapted from the boating industry, were developed by the student team to render the SURE House’s building envelope flood proof up to the FEMA AE 6/7 Zone (+ 6/7 feet of water above sea-level). Designed and fabricated utilizing glass-fiber composite materials, the custom storm shutter system serves to protect the large glazed openings of the home from both air-borne debris impact and water infiltration during a storm event while also providing deterrence from the vandalism that often occurs in the aftermath of a calamitous event. During extended power outages, a ‘resilient’ solar array is capable of supplying critical amounts of energy and hot water to the home, without the use of battery storage or grid infrastructure. PV Description AC GRID-TIED PV SYSTEM The SURE HOUSE solar system consists of two distinct arrays, the grid-tied rooftop array which produces AC Powerand the shutter-mounted array which converts DC power generated by the modules directly into usable heat for the domestic hot water (DHW). The roof-mounted AC grid-tied array is comprised of three strings, two 11 module strings connected to an SMA SB 5000TL-US-223 inverter and a single 10 module string equipped and an SMA SB 3000TL-US-22 central inverter. All modules for the rooftop AC array are LG MonoX 2804 watt solar panels, chosen for their durability and efficiency. Inverter sizing and string size are optimized to the electrical characteristics of the chosen PV modules and the desired energy production, see Appendix 5B. The SURE HOUSE is projected to produce 12,353 kWh per year to meet 6,157 kWh per year of estimated consumption. Solar modules for the two AC grid-tied sub arrays are mounted on the main roof surface of the SURE HOUSE with a 10 degree tilt angle using a partially-ballasted polyethylene roof mounting system made by Renusol, which is particularly suited to the corrosive salt air of a coastal environment. This method was chosen for its installation simplicity and to limit detrimental roof penetrations. The 10 degree tilt optimizes the energy generated per roof area at a lower price, see Appendix 5A, and ensures that there is minimal wind uplift. DC SOLAR ELECTRIC DOMESTIC HOT WATER The SURE HOUSE’s approach to sustainable and resilient domestic hot water (DHW) consists of a unique, custom engineered DC solar electric hot water system. Employing the use of Advanced Energy’s DC electric PV heater (DCPVH)5 to heat domestic water well beyond the draw temperature, the SURE HOUSE is able to obtain a remarkably high solar fraction of 75% or more. The custom modified 80 gallon Vaughn DHW tank acts as a large solar ‘battery’ that stores heat energy in the form of hot water at almost 150 degrees, harvesting energy when the sun is out for use later in the day or overnight. The system, which uses electricity rather than heated fluid, is distinct from traditional ‘solar thermal’ systems by eliminating the dangers and associated maintenance issues of fluid based systems. By forgoing the use of external fluid loops, overheated solar collectors and pipes are not an issue for the SURE HOUSE system which never needs any yearly or seasonal flushing. In weather conditions where the integrated DCPVH unit cannot produce enough hot water via solar energy alone, the Vaughn hot water tank comes factory made with an AC powered 2.6 COP heat pump and a AC heating coil that serve as back-up heating elements. The DCPVH is powered by a DC array consisting of 10 custom-made Solbian by PVilion 180 watt, monocrystalline, flexible solar modules6. The Solbian modules are directly mounted to the top half of the operable storm shutters on the south façade of the SURE HOUSE. The SURE HOUSE team worked closely with PVillion, a PV system designer specializing in flexible architectural photovoltaics, to design an adhesive system that works with the glass-fiber storm shutter surface in a reliable manner over an extended period. Because this system operates in DC-only mode and never connects to the municipal power grid, the system can continue to create hot water safely and effectively even during grid disruption events. This hot water, and the energy stored within it, could be used for a range of activities including washing and cooking to more elaborate hydronic heating systems as desired. See Appendix 6 for system engineering, sizing and modeling.

14 SOLAR ENERGY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗