Search NASA⌕ Search

SEARCH · Search NASA

Results for “Alternative Identifiers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

The Representation of Action Plans in Long Term Memory

A sequence of experiments conducted on a two hand chord typewriter, to compare the efficiency of different coding principles employed to associate letters with their chord productions is described. This keyboard represents an effort to identify effective alternatives to the existing typewriter. It consists of two seperate 5-key panels (one for each hand), and letters are entered by typing chords composed of one to five fingers. Each panel is capable of producing the full alphabet. One group of experiments was designed to separate between perceptual and motor factors in the acivation of single letter chords. The results underline the importance of perceptual factors in the activation of motor plans. The complexity of the patterns employed to represent letters was shown to account for 50 percent of variance in the typing speeds of single letters. The theoretical implications of these results are discussed in relation to a vision based theory of action plans.

Fussfeld, G. N.↗

Workstations take over conceptual design

Workstations provide sufficient computing memory and speed for early evaluations of aircraft design alternatives to identify those worthy of further study. It is recommended that the programming of such machines permit integrated calculations of the configuration and performance analysis of new concepts, along with the capability of changing up to 100 variables at a time and swiftly viewing the results. Computations can be augmented through links to mainframes and supercomputers. Programming, particularly debugging operations, are enhanced by the capability of working with one program line at a time and having available on-screen error indices. Workstation networks permit on-line communication among users and with persons and computers outside the facility. Application of the capabilities is illustrated through a description of NASA-Ames design efforts for an oblique wing for a jet performed on a MicroVAX network.

Kidwell, George H.↗

Lightweight composite reflector panels

The Hexel Corp. has produced additional composite panels, based on JPL designs, that: (1) have increased the panel size from 0.15 to 0.40 meters, (2) have improved the as-manufactured surface precision 3.0 to approx. 1.0 micron RMS, (3) have utilized different numbers of face sheet plys, (4) have improved face sheet fiber orientation, (5) have variations of aluminum honeycomb core cell size, (6) have combined graphite/epoxy (Gr/Ep) face sheets with E-glass honeycomb cores, and (7) have used standard aluminum core with face sheets composed of combinations of glass, Kevlar, and carbon fibers. Additionally, JPL has identified candidate alternate materials for the facesheets and core, modified the baseline polymer panel matrix material, and developed new concepts for panel composite cores. Dornier designed and fabricated three 0.6 meter Gr/Ep panels, that were evaluated by JPL. Results of both the Hexel and Dornier panel work were used to characterize the state-of-the-art for Gr/Ep mirrors.

Freeland, R. E.↗

Design of a device to remove lunar dust from space suits for the proposed lunar base

The National Aeronautics and Space Administration plans to begin construction of a lunar base soon after the turn of the century. During the Apollo missions, lunar dust proved to be a problem because the dust adhered to all exposed material surfaces. Since lunar dust will be a problem during the establishment and operation of this base, the need exists for a device to remove the dust from space suits before the astronauts enter clean environments. The physical properties of lunar dust were characterized and energy methods for removing the dust were identified. Eight alternate designs were developed to remove the dust. The final design uses a brush and gas jet to remove the dust. The brush bristles are made from Kevlar fibers and the gas jet uses pressurized carbon dioxide from a portable tank. A throttling valve allows variable gas flow. Also, the tank is insulated with Kapton and electrically heated to prevent condensation of the carbon dioxide when the tank is exposed to the cold (- 240 F) lunar night.

Harrington, David↗

Physical Evaluation of Cleaning Performance: We Are Only Fooling Ourselves

Surface cleaning processes are normally evaluated using visual physical properties such as discolorations, streaking, staining and water-break-free conditions. There is an assumption that these physical methods will evaluate all surfaces all the time for all subsequent operations. We have found that these physical methods are lacking in sensitivity and selectivity with regard to surface residues and subsequent process performance. We will report several conditions where evaluations using visual physical properties are lacking. We will identify possible alternative methods and future needs for surface evaluations.

Pratz, Earl↗

Control and Identification of Turbulent Boundary Layer Separation

Effective delay of turbulent boundary layer separation could be achieved via closed-loop control. Constructing such a system requires that sensor data be processed, real-time, and fed into the controller to determine the output. Current methods for detection of turbulent boundary layer separation are lacking the capability of localized, fast and reliable identification of the boundary layer state. A method is proposed for short-time FFT processing of time series, measured by hot-film sensors, with the purpose of identifying the alternation of the balance between small and large scales as the boundary layer separates, favoring the large scales. The method has been validated by comparison to other criteria of separation detection and over a range of baseline and controlled flow conditions on a simplified high-lift system, incorporating active flow control.

Seifert, Avi↗

Air and Water System (AWS) Design and Technology Selection for the Vision for Space Exploration

This paper considers technology selection for the crew air and water recycling systems to be used in long duration human space exploration. The specific objectives are to identify the most probable air and water technologies for the vision for space exploration and to identify the alternate technologies that might be developed. The approach is to conduct a preliminary first cut systems engineering analysis, beginning with the Air and Water System (AWS) requirements and the system mass balance, and then define the functional architecture, review the International Space Station (ISS) technologies, and discuss alternate technologies. The life support requirements for air and water are well known. The results of the mass flow and mass balance analysis help define the system architectural concept. The AWS includes five subsystems: Oxygen Supply, Condensate Purification, Urine Purification, Hygiene Water Purification, and Clothes Wash Purification. AWS technologies have been evaluated in the life support design for ISS node 3, and in earlier space station design studies, in proposals for the upgrade or evolution of the space station, and in studies of potential lunar or Mars missions. The leading candidate technologies for the vision for space exploration are those planned for Node 3 of the ISS. The ISS life support was designed to utilize Space Station Freedom (SSF) hardware to the maximum extent possible. The SSF final technology selection process, criteria, and results are discussed. Would it be cost-effective for the vision for space exploration to develop alternate technology? This paper will examine this and other questions associated with AWS design and technology selection.

Jones, Harry↗

Advanced Extravehicular Activity Breakout Group Summary

This viewgraph document summarizes the workings of the Advanced Extravehicular Activity (AEVA) Breakout group in a Martian environment. The group was tasked with: identifying potential contaminants and pathways for AEVA systems with respect to forward and backward contamination; identifying plausible mitigation alternatives and obstacles for pertinent missions; identifying topics that require further research and technology development and discuss development strategies with uncertain Planetary Protection (PP) requirements; Identifying PP requirements that impose the greatest mission/development costs; Identifying PP requirements/topics that require further definition;

Kosmo, Joseph J.↗

Identifying Contingency Requirements using Obstacle Analysis on an Unpiloted Aerial Vehicle

This paper describes experience using Obstacle Analysis to identify contingency requirements on an unpiloted aerial vehicle. A contingency is an operational anomaly, and may or may not involve component failure. The challenges to this effort were: ( I ) rapid evolution of the system while operational, (2) incremental autonomy as capabilities were transferred from ground control to software control and (3) the eventual safety-criticality of such systems as they begin to fly over populated areas. The results reported here are preliminary but show that Obstacle Analysis helped (1) identify new contingencies that appeared as autonomy increased; (2) identify new alternatives for handling both previously known and new contingencies; and (3) investigate the continued validity of existing software requirements for contingency handling. Since many mobile, intelligent systems are built using a development process that poses the same challenges, the results appear to have applicability to other similar systems.

fault protection↗

Design of Orion Soil Impact Study using the Modern Design of Experiments

Two conventional One Factor At a Time (OFAT) test matrices under consideration for an Orion Landing System subscale soil impact study are reviewed. Certain weaknesses in the designs, systemic to OFAT experiment designs generally, are identified. An alternative test matrix is proposed that is based in the Modern Design of Experiments (MDOE), which achieves certain synergies by combining the original two test matrices into one. The attendant resource savings are quantified and the impact on uncertainty is discussed.

DeLoach, Richard↗

Dynamic RPS Path to Flight

NASA Glenn Research Center has been pursuing the development of dynamic power conversion for several decades. Candidate NASA missions involve mutli-year travel to far away destinations, or to extreme environments where sunlight does not exist. Human-base mission studies also show that power needs would be beyond the capabilities of solar energy conversion, and instead would require nuclear reactor energy sources, for which the thermal energy must be converted to electricity. Dynamic power conversion technology has developed sufficiently to make a sound engineering argument that it is suitable for these NASA missions. Dynamic conversion power sources have yet to be flown in space, and thus suffer a disadvantage owing to their lack of heritage data on flight missions. One of the largest obstacles for adoption is the uncertainty in reliability of a device with moving parts. However, significant progress has been made toward demonstrating the technology capable in all relevant environments, with the necessary long life. Another hurdle for adoption is the lack of mission, which would drive specific requirements, and provide a solid timeline for technology development endpoint. Until a mission is identified, an alternative approach is necessary to advance a dynamic power conversion system towards flight.

Oriti, Sal↗

Dynamic RPS Path to Flight - Nuclear and Emerging Technologies for Space

NASA Glenn Research Center has been pursuing the development of dynamic power conversion for several decades. Candidate NASA missions involve mutli-year travel to far away destinations, or to extreme environments where sunlight does not exist. Human-base mission studies also show that power needs would be beyond the capabilities of solar energy conversion, and instead would require nuclear reactor energy sources, for which the thermal energy must be converted to electricity. Dynamic power conversion technology has developed sufficiently to make a sound engineering argument that it is suitable for these NASA missions. Dynamic conversion power sources have yet to be flown in space, and thus suffer a disadvantage owing to their lack of heritage data on flight missions. One of the largest obstacles for adoption is the uncertainty in reliability of a device with moving parts. However, significant progress has been made toward demonstrating the technology capable in all relevant environments, with the necessary long life. Another hurdle for adoption is the lack of mission, which would drive specific requirements, and provide a solid timeline for technology development endpoint. Until a mission is identified, an alternative approach is necessary to advance a dynamic power conversion system towards flight.

Oriti, Salvatore↗

Recommendations Emerging from an Analysis of NASA's Deep Space Communications Capacity

During 2016-2017, NASA’s Space Communications and Navigation (SCaN) Office chartered a study of Deep Space Network (DSN) communications capacity relative to projected future-mission demand over the next 30 years. In this paper, we briefly describe the methodology used to analyze capacity vs. demand over such a broad timeframe, summarize key findings emerging from the analysis, and discuss the associated recommendations. Performing the analysis entailed: identifying key factors shaping the anticipated future mission set, identifying several alternative future mission set scenarios consistent with these factors, and then analyzing each mission set scenario in terms of required antenna capacity, downlink and uplink capabilities, and spectrum as a function of time. On the basis of these aggregate requirements, DSN loading simulations were then conducted that examined how well each of the postulated mission sets could load up onto the the DSN’s “in-plan” architecture. To the extent that capacity shortfalls emerged during these baseline simulations, architectural solutions to the shortfalls were then postulated and tested via additional simulations. In general, the trend analyses and baseline loading simulations indicated a significant progression in challenges over the next three decades. In the current decade, the DSN appeared to be operating very close to capacity. The first human exploration mission and its secondary payload launch opportunities for cubesats traveling beyond GEO contributed to this loading. As a consequence, the main challenge appeared to be managing peak assetcontention periods. In the next decade, the DSN continued to operate close to capacity but also began transitioning to more frequent human mission support. Upgrading for, and operating, a human-rated system while continuing to meet robotic mission customer requirements emerged as the key challenge. In the 2030’s and beyond, simulations suggested a need for fundamentally new capability and capacity. The high data rates and long link distances characteristic of human Mars exploration drove requirements far beyond what is currently “in plan.” The key challenge then became determining the most cost-effective combination of RF and optical assets for communicating with the postulated human Mars assets while still providing for the needs of all the other missions across the solar system. Various link budget, visibility, and loading analyses ultimately suggested that the human Mars exploration demands of the 2030’s could best be addressed with two cross-linked RF-optical areostationary relays (or an areostationary relay and deep space habitat) providing a dual “trunk link” to an array of 2-to-3 additional 34m beam waveguide antennas and an ~8.5m optical antenna at each DSN Complex. The dual “trunk link” would enable the same amount of total data return to Earth as a single trunk link at twice the data rate, but with only half the required array size on the ground, assuming use of Multiple Spacecraft Per Antenna (MSPA) techniques. MSPA techniques, including a Multiple Uplink Per Antenna (MUPA) technique currently under investigation, also showed promise for reducing asset contention in the decades prior to human Mars exploration.

Lee, Carlyn-Ann↗

Protecting Crew and Surface Systems with a Long-Duration Lunar Safe Haven

NASA’s Artemis program will send astronauts to the lunar surface for extended mission durations throughout the 2030s, with a focus on sustainability and extensibility for Mars exploration, as described in NASA’s “Artemis Plan”. However, NASA must place more emphasis on protecting both the crew and the exploration surface systems if they hope to achieve long-duration sustainability on the lunar surface. It is now reasonably achievable with excavation, construction, and autonomy technologies to achieve a significant level of protection that architectures have been unable to achieve to date. The Lunar Safe Haven (LSH) was proposed to protect astronauts, electronics, and other surface exploration systems from the hazards of the lunar environment, including radiation, micrometeoroid strikes, lunar dust, thermal vacuum, etc. During the study, Level Zero Requirements were developed for the LSH, and a decision analysis framework was baselined to evaluate concepts. The LSH Study also performed a comprehensive trade study, during which it identified numerous alternatives for establishing and maintaining a safe haven shelter on the lunar surface. This paper reviews the products developed during the study and presents the final recommendations.

radiation shielding↗

Neutron Instruments Added at Oak Ridge

The neutron scattering facilities at Oak Ridge National Laboratory continue their development as new instruments are commissioned and join the user program at the Spallation Neutron Source and High Flux Isotope Reactor. More than 640 proposals were received for beam time during the January-May 2011 period on SNS and HFIR instruments with about half either being accepted or identified as alternates. The proposal call for the period June-December 2011, announced at http://neutrons.ornl.gov, will close February 23, 2011.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Elk Valley Rancheria Energy Efficiency and Alternatives Analysis

The Elk Valley Rancheria, California ('Tribe') is a federally recognized Indian tribe located in Del Norte County, California, in the northwestern corner of California. The Tribe, its members and Tribal enterprises are challenged by increasing energy costs and undeveloped local energy resources. The Tribe currently lacks an energy program. The Tribal government lacked sufficient information to make informed decisions about potential renewable energy resources, energy alternatives and other energy management issues. To meet this challenge efficiently, the Tribe contracted with Frank Zaino and Associates, Inc. to help become more energy self-sufficient, by reducing their energy costs and promoting energy alternatives that stimulate economic development. Frank Zaino & Associates, Inc. provided a high level economic screening analysis based on anticipated electric and natural gas rates. This was in an effort to determine which alternative energy system will performed at a higher level so the Tribe could reduce their energy model by 30% from alternative fuel sources. The feasibility study will identify suitable energy alternatives and conservation methods that will benefit the Tribe and tribal community through important reductions in cost. The lessons learned from these conservation efforts will yield knowledge that will serve a wider goal of executing energy efficiency measures and practices in Tribal residences and business facilities. Pacific Power is the provider of electrical power to the four properties under review at $ 0.08 per Kilowatt-hour (KWH). This is a very low energy cost compared to alternative energy sources. The Tribe used baseline audits to assess current and historic energy usage at four Rancheria owned facilities. Past electric and gas billing statements were retained for review for the four buildings that will be audited. A comparative assessment of the various energy usages will determine the demand, forecast future need and identify the differences in energy costs, narrowing the focus of the work and defining its scope. The Tribe's peak demand periods will help determine the scope of need for alternative energy sources. The Tribe's Energy Efficiency and Alternatives Analysis report included several system investigations which include fuel cells, wind turbines, solar panels, hydro electric, ground source heat pumps, bio mass, cogeneration & energy conservation and implementation for the existing properties. The energy analysis included site visits to collect and analyze historical energy usage and cost. The analysis also included the study of the building systems for the Elk Valley Casino, Elk Valley Rancheria administration complex, United Indian Health Service/Small Community Center complex and the Tribal Gaming Commission Offices. The analysis involved identifying modifications, performing an engineering economic analysis, preparation of a rank ordered list of modifications and preparation of a report to provide recommendations and actions for the Tribe to implement.

03 NATURAL GAS↗