Search NASASearch

SEARCH · Search NASA

Results for “Asset Integrity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Science Capabilities of the Common Habitat

The Common Habitat is the primary habitable element in a conceptual architecture feasibility study for long-duration space exploration with an eight-person crew size. On lunar or planetary surfaces, the Common Habitat forms the core of a Surface Base Camp. In microgravity, the Common Habitat is the core of the Deep Space Exploration Vehicle (DSEV), an in-space transportation spacecraft. The Common Habitat employs a horizontal orientation that is divided internally into a lower deck, mid deck, and upper deck, roughly separating outfitting into individual, work, and group functions. On a planetary surface, the habitat is incorporated into a base camp, located near the south pole in the case of the Moon. The Mars base camp is currently location agnostic. Each base camp is divided into habitation, landing, resource production, and power zones. In microgravity, the habitat is incorporated into the Deep Space Exploration Vehicle, a vessel capable of transporting the crew within the inner solar system. In addition to crew and teleoperated control of external science assets, the Common Habitat employs a suite of life and physical science laboratory systems to enable it to support science investigations across a variety of destination environments, primarily featuring the Moon and Mars, along with the intervening interplanetary space. Other potential destinations include Near Earth Asteroids and Venus and Earth orbits. Located in the aft starboard section of the Common Habitat mid deck, the life science laboratory supports primarily biology and human research. In its baseline configuration, the laboratory includes horizontal work surfaces, freezers, multiple gloveboxes, sample transfer/exposure capability, large instruments, and reconfigurable ISPR-compatible payload bays. The Medical Care Facility and exercise facility can also support life science research. In the aft port section of the mid deck, the physical science laboratory supports physics, chemistry, materials science, geology, and remote sensing (including astrophysics, heliophysics, Earth science, planetary science, and meteorology). It provides a baseline of similar ISPR-compatible payload bays and adds additional freezers, including those for cryogenic sample storage, a remote sensing workstation, more gloveboxes, also with sample transfer/exposure, combustion chambers, fluid mechanics chambers, and a gas chromatograph. It leverages the Command & Control Center for teleoperations of mobile science assets. Both laboratories are highly modular, with the ability to swap out both payloads and instruments on an as-needed basis. The integrated science outfitting of the Common Habitat positions its crew to contribute to all of NASA’s Moon to Mars science objectives and extend human understanding into the inner solar system.

Lunar Suface

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN

NASA Tech Briefs, November 2010

Topics covered include: Portable Handheld Optical Window Inspection Device; Salience Assignment for Multiple-Instance Data and Its Application to Crop Yield Prediction; Speech Acquisition and Automatic Speech Recognition for Integrated Spacesuit Audio Systems ; Predicting Long-Range Traversability from Short-Range Stereo-Derived Geometry; Browser-Based Application for Telemetry Monitoring of Robotic Assets; Miniature Low-Noise G-Band I-Q Receiver; Methods of Using a Magnetic Field Response Sensor Within Closed, Electrically Conductive Containers; Differential Resonant Ring YIG Tuned Oscillator; Microfabricated Segmented-Involute-Foil Regenerator for Stirling Engines; Reducing Seal Adhesion in Low Impact Docking Systems; Optimal Flow Control Design; Corrosion-Resistant Container for Molten-Material Processing; Reusable Hot-Wire Cable Cutter; Deployment of a Curved Truss; High-Volume Airborne Fluids Handling Technologies to Fight Wildfires; Modeling of Alkane Oxidation Using Constituents and Species; Fabrication of Lanthanum Telluride 14-1-11 Zintl High-Temperature Thermoelectric Couple; A Computer Model for Analyzing Volatile Removal Assembly; Analysis of Nozzle Jet Plume Effects on Sonic Boom Signature; Optical Sidebands Multiplier; Single Spatial-Mode Room-Temperature-Operated 3.0 to 3.4 micrometer Diode Lasers; Self-Nulling Beam Combiner Using No External Phase Inverter; Portable Dew Point Mass Spectrometry System for Real-Time Gas and Moisture Analysis; Maximum Likelihood Time-of-Arrival Estimation of Optical Pulses via Photon-Counting Photodetectors; Handheld White Light Interferometer for Measuring Defect Depth in Windows; Decomposition Algorithm for Global Reachability on a Time-Varying Graph; Autonomous GN and C for Spacecraft Exploration of Comets and Asteroids; Efficient Web Services Policy Combination; Using CTX Image Features to Predict HiRISE-Equivalent Rock Density; Isolation of the Paenibacillus phoenicis, a Spore-Forming Bacterium; Monolithically Integrated, Mechanically Resilient Carbon-Based Probes for Scanning Probe Microscopy; Cell Radiation Experiment System; Process to Produce Iron Nanoparticle Lunar Dust Simulant Composite; Inversion Method for Early Detection of ARES-1 Case Breach Failure; Use of ILTV Control Laws for LaNCETS Flight Research;and Evaluating Descent and Ascent Trajectories Near Non-Spherical Bodies.

Source record

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog

Simulation Technology at NASA

NASA Ames Research Center is home to several high-fidelity research flight and air-traffic control simulation facilities which, together with an experienced workforce, produce high-quality research data and findings that have proven to be applicable in the real world. These assets include the Vertical Motion Simulator (VMS), Crew Vehicle Systems Research Facility (CVSRF), Future Flight Central (FFC) air traffic control tower simulator, and several air-traffic control (ATC) simulators. The VMS combines a high-fidelity simulation capability with an adaptable simulation environment, enabling customization for numerous human-in-the-loop research applications. The distinctive feature of the VMS is its unparalleled large amplitude, high-fidelity motion capability. In over 30 years of continuous operation, the VMS has contributed significantly to the body of knowledge in a range of disciplines directly benefiting several aerospace programs and flight safety, including the design and development of flight control systems for the Joint Strike Fighter, Space Shuttle Orbiter, and rotorcraft. It continues to be used for researching new vehicle configurations, vehicle control and safety, transfer-of-training, etc., by NASA, other government agencies, and Industry.The CVSRF includes two motion-based flight simulators: a Boeing 747-400 full flight simulator and the reconfigurable Advanced Concepts Flight Simulator (ACFS). These simulators are primarily used to research air-traffic management concepts and procedures, advanced navigation and avionics concepts, and cockpit human factors. FFC is a full-sized control tower simulator with a 360-degree external field-of-view display system and reconfigurable system architecture. FFC and the ATC simulators are used for testing air-traffic management automation and decision support tools and demonstrate their feasibility in a realistic environment prior to technology transfer for implementation in the National Airspace System (NAS).To support integrated simulations and flight-tests for NASA's Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) Project, NASA developed a distributed test environment incorporating Live, Virtual, Constructive, (LVC) concepts. Development of the software enabling the LVC is conducted primarily at the Distributed Simulation Research Lab (DSRL) at NASA Ames. The LVC components provide the core infrastructure supporting simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This provides the ability to conduct tests more efficiently by promoting the use of existing distributed assets. The LVC infrastructure was used in several human-in-the-loop simulations to evaluate acceptance of Detect and Avoid (DAA) advisories used by UAS pilots to maintain well clear of other virtual traffic and to negotiate maneuvers with air traffic control. It is currently being used to support testing of self-separation algorithms between unmanned and manned aircraft in live flight. Further simulations with more comprehensive air traffic scenarios mixing live and virtual aircraft is planned.In the current fiscal environment, maintaining and upgrading these high-fidelity simulation assets and retaining the skilled workforce necessary to meet future research needs is the primary non-technical challenge.

CVSRF

Manufacturing Facility Inventory National Dataset (M-FIND)

This asset provides a high-fidelity, validated inventory of manufacturing facilities across the United States, filling a critical gap in publicly available industrial data. By integrating and cross-referencing thirteen distinct data sources, this dataset moves beyond the limitations of single-source registries to provide a harmonized list that includes precise geographic coordinates, industrial subsector designations, and—crucially—parcel-level spatial boundaries.

Billings, Blake [ORNL] (ORCID:0000000186021600)

Link Analysis in the Mission Planning Lab

The legacy communications link analysis software currently used at Wallops Flight Facility involves processes that are different for command destruct, radar, and telemetry. There is a clear advantage to developing an easy-to-use tool that combines all the processes in one application. Link Analysis in the Mission Planning Lab (MPL) uses custom software and algorithms integrated with Analytical Graphics Inc. Satellite Toolkit (AGI STK). The MPL link analysis tool uses pre/post-mission data to conduct a dynamic link analysis between ground assets and the launch vehicle. Just as the legacy methods do, the MPL link analysis tool calculates signal strength and signal- to-noise according to the accepted processes for command destruct, radar, and telemetry assets. Graphs and other custom data are generated rapidly in formats for reports and presentations. STK is used for analysis as well as to depict plume angles and antenna gain patterns in 3D. The MPL has developed two interfaces with the STK software (see figure). The first interface is an HTML utility, which was developed in Visual Basic to enhance analysis for plume modeling and to offer a more user friendly, flexible tool. A graphical user interface (GUI) written in MATLAB (see figure upper right-hand corner) is also used to quickly depict link budget information for multiple ground assets. This new method yields a dramatic decrease in the time it takes to provide launch managers with the required link budgets to make critical pre-mission decisions. The software code used for these two custom utilities is a product of NASA's MPL.

McCarthy, Jessica A.

Developing an Open Source, Reusable Platform for Distributed Collaborative Information Management in the Early Detection Research Network

For the past decade, the NASA Jet Propulsion Laboratory, in collaboration with Dartmouth University has served as the center for informatics for the Early Detection Research Network (EDRN). The EDRN is a multi-institution research effort funded by the U.S. National Cancer Institute (NCI) and tasked with identifying and validating biomarkers for the early detection of cancer. As the distributed network has grown, increasingly formal processes have been developed for the acquisition, curation, storage, and dissemination of heterogeneous research information assets, and an informatics infrastructure has emerged. In this paper we discuss the evolution of EDRN informatics, its success as a mechanism for distributed information integration, and the potential sustainability and reuse benefits of emerging efforts to make the platform components themselves open source. We describe our experience transitioning a large closed-source software system to a community driven, open source project at the Apache Software Foundation, and point to lessons learned that will guide our present efforts to promote the reuse of the EDRN informatics infrastructure by a broader community.

Early Detection Research Network (EDRN)

A Knowledge Graph Approach to Analyze Systems and Assets Health

Nuclear power plants collect large amounts of equipment reliability data elements that contain information on the statuses of component, assets, and systems. All these data elements precisely record asset and system performance and health throughout the lifecycle of those assets and systems. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers or databases), others are conceptual in nature (i.e., data elements come in different formats, numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). This paper directly focuses on the integration of numeric and textual data elements in order to assist plant system engineers in analyzing equipment reliability data. This task begins with preprocessing the data by extracting knowledge from textual data via natural language processing methods and quantifying system, asset, and component health based on numeric data. We then employed model-based system engineering (MBSE) models of systems and assets to identify their architecture and functional (i.e., cause and effect) relations. Data elements were then associated with a single MBSE graph element, based on their nature. This bonding of MBSE models and data elements constitutes a first-of-its-kind knowledge graph of a nuclear power plants system, with data elements being organized in a structured manner that enables system engineers to identify cause-effect trends in data elements and carry out appropriate actions in response.

97 - MATHEMATICS AND COMPUTING

A simulation-based test bed for data-association algorithms

A modular All-Source System-evaluation Test bed (ASSET) designed and developed for aiding in the testing and evaluation of advanced data-acquisition algorithms is described, with focus placed on the problem of integrating surveillance information in supporting command decision making. The evaluation procedure employed is based on a measure of the distance between a baseline representation and the representation produced by the association algorithm at some time instant. Choices for the baseline representation are presented, and scores are defined between these baselines and an algorithm representation. The test-bed architecture implementing the evaluation procedure is described, and sample outputs from performing algorithm evaluations in the test bed are outlined.

Brown, Donald E.

Incorporating the TRMM Dataset into the GPM Mission Data Suite

In June 2015 the TRMM satellite came to its end. The 17 plus year of mission data that it provided has proven a valuable asset to a variety of science communities. This 17plus year data set does not, however, stagnate with the end of the mission itself. NASA/JAXA intend to integrate the TRMM data set into the data suite of the GPM mission. This will ensure the creation of a consistent, intercalibrated, accurate dataset within GPM that extends back to November of 1998. This paper describes the plans for incorporating the TRMM 17plus year data into the GPM data suite. These plans call for using GPM algorithms for both radiometer and radar to reprocess TRMM data as well as intercalibrating partner radiometers using GPM intercalibration techniques. This reprocessing will mean changes in content, logical format and physical format as well as improved geolocation, sensor corrections and retrieval techniques.

TRMM

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN

PLANETARY DEFENSE: FINDINGS AND RECOMMENDATIONS FROM THE NATIONAL ACADEMIES PLANETARY SCIENCE AND ASTROBIOLOGY DECADAL SURVEY 2023 - 2032

The National Academies of Sciences, Engineering, and Medicine was chartered by the NASA Science Mission Directorate (SMD), with support from the National Science Foundation, to conduct a new decadal survey to develop a comprehensive science and mission strategy for planetary science (1). The survey was tasked to determine the current state of knowledge and to identify the most important scientific questions to be addressed in astrobiology and planetary science during the upcoming decade of 2023 - 2032. For the first time, the decadal survey also included and addressed the topic of planetary defense, now recognized as a key element of NASA’s planetary science activities under the direction of NASA’s SMD Planetary Defense Coordination Office. The topic of planetary defense was included in the decadal survey as a dedicated chapter, divided into five sections based on the framework from the U.S. National NEO Preparedness Strategy and Action Plan (2). These sections discussed: NEO Detection, Tracking, and Characterization NEO Modelling, Prediction, and Integration NEO Deflection and Disruption Missions International Cooperation on NEO Preparation NEO Impact Emergency Procedures and Action Protocols Content of these sections included identifying the activities, ground- and space-based assets, facilities, resources, technologies, and missions that should be considered to enable NEO preparedness over the next decade. Supporting inputs to this chapter involved contributions from submitted white papers authored by many members of the NEO science and planetary defense communities. In addition, a planetary defense rapid mission architecture study commissioned by the decadal survey small bodies panel and led by the Jet Propulsion Laboratory examined several different types of in-situ characterization and mitigation demonstration missions. All of this input contributed to the formulation of 42 findings and 11 recommendations that suggest a path forward for increasing our understanding of the NEO population and their associated physical characteristics, modelling the impact probabilities and hazard potential of these objects, and implementing plans to develop and test NEO impact mitigation capabilities. Including planetary defense in the decadal survey has helped sharpen the focus on this international issue and provided key inputs for stakeholders and decision makers to consider when developing future planetary defense-related activities. Such information is vital for developing a long-term integrated planetary defense capability able to protect humanity in the decades to come.

NEO Detection and Characterization

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd

Workshop Report: Rural Electric Cooperative Distributed Energy Resource Business Model Development Workshops

The United States' energy future is being shaped by decades of technology innovation, rapidly changing consumer requirements, and governmental focus on securing reliable, low-cost energy sources. With expanded electrification and increased emphasis on grid reliability coupled with the heightened complexity and risks associated with transmission infrastructure, the use of distributed energy resources (DERs) is more commonly being considered a safe, efficient, and cost-effective way to maintain grid resilience and reliability. Amidst improvements in performance, decreasing costs, and unprecedented federal policy support for DERs, electric cooperatives are considering new opportunities to use these assets to ensure secure and reliable operations for millions of customers. In light of these developments, a series of workshops were held to collaborate on the development of business models for DERs in rural electric cooperative ecosystems. The first workshop was held July 11, 2024, at the Tri-State Generation and Transmission Association Inc. headquarters in Westminster, Colorado (hereafter referred to as the "Tri-State Workshop"). The second workshop was hosted by PNGC Power on Oct. 9, 2024, in Portland, Oregon (hereafter referred to as the "PNGC Power Workshop"). These workshops convened representatives from G&Ts, distribution cooperatives,2 the energy industry, the financial community, the U.S. government, national and regional organizations, and national laboratories to share perspectives on the unique needs, challenges, and opportunities that they face as DERs are further integrated into the grid. The workshops were designed to address the following objectives: (1) develop the enabling attributes of electric cooperative DER business models, (2) explore pathways for generating community benefits from these assets, and (3) identify technical challenges and market risks for DERs in rural electric cooperative service territories. This report outlines key findings and major themes identified by workshop participants that federal agencies, G&Ts, distribution cooperatives, and other entities can consider to advance electric cooperative DER business models.

24 POWER TRANSMISSION AND DISTRIBUTION

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.

360-Degree Visual Detection and Target Tracking on an Autonomous Surface Vehicle

This paper describes perception and planning systems of an autonomous sea surface vehicle (ASV) whose goal is to detect and track other vessels at medium to long ranges and execute responses to determine whether the vessel is adversarial. The Jet Propulsion Laboratory (JPL) has developed a tightly integrated system called CARACaS (Control Architecture for Robotic Agent Command and Sensing) that blends the sensing, planning, and behavior autonomy necessary for such missions. Two patrol scenarios are addressed here: one in which the ASV patrols a large harbor region and checks for vessels near a fixed asset on each pass and one in which the ASV circles a fixed asset and intercepts approaching vessels. This paper focuses on the ASV's central perception and situation awareness system, dubbed Surface Autonomous Visual Analysis and Tracking (SAVAnT), which receives images from an omnidirectional camera head, identifies objects of interest in these images, and probabilistically tracks the objects' presence over time, even as they may exist outside of the vehicle's sensor range. The integrated CARACaS/SAVAnT system has been implemented on U.S. Navy experimental ASVs and tested in on-water field demonstrations.

ASV (AUTONOMOUS SEA SURFACE VEHICLE)