Search NASA⌕ Search

SEARCH · Search NASA

Results for “CARGO SPACECRAFT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Orbital fluid servicing and resupply operations

The capability to reservice spacecraft and satellites with expendable fluids will provide significant increases in the usability, operational efficiency and cost effectiveness of in-space systems. Initial resupply will be accomplished from the Orbiter cargo bay starting with monopropellant servicing which will eventually be extended to servicing of bipropellants and pressurants. Other fluids, such as freon, ammonia, methanol, superfluid helium, and liquid/gaseous nitrogen may also need to be resupplied once a space station becomes a reality. These fluids/gases are required for subsystem working fluid replacement and payload/experiment fluid replenishment. A logistics module operating on a 90 day schedule is planned for space station servicing. Resupplying hundreds of thousands of pounds of cryogenic propellants and reactants for users such as the Orbital Transfer Vehicle (OTV) also represents future logistics challenges. Implementation of on-orbit fluid transfer requires solving many problems including fluid management in the low-g environment, system docking and interface mating, configuration of user friendly avionics to monitor and control the entire servicing operation, and minimized maintenance and enhanced reliability. Candidate fluid transfer methods and possible gas transfer methods are discussed, and preliminary storable monopropellant and bipropellant tanker designs are summarized.

Eberhardt, R. N.↗

Constellation Program Thermal and Environmental Control and Life Support System Status: 2009 - 2010

The Constellation Program (CxP) consists of spacecrafts, launch vehicles, and support systems to execute the Exploration Architecture. The Program is currently divided into three distinct phases. The first phase is to develop a vehicle to provide limited cargo resupply capability and allow crew member rotation to the International Space Station (ISS). The second phase is to support the return of humans to the moon. The final phase is currently envisioned to allow the delivery of humans and cargo to Mars for an extended time. To implement this phased approach the CxP is currently working on the first vehicle and support systems to replace the Space Shuttle and allow continued access to space. This paper provides a summary of the CxP Thermal and Environmental Control and Life Support (ECLS) work that that has occurred across the different parts of the Program in support of these three phases over the past year.

Williams, David E.↗

Iodine Hall Thruster

Iodine enables dramatic mass and cost savings for lunar and Mars cargo missions, including Earth escape and near-Earth space maneuvers. The demonstrated throttling ability of iodine is important for a singular thruster that might be called upon to propel a spacecraft from Earth to Mars or Venus. The ability to throttle efficiently is even more important for missions beyond Mars. In the Phase I project, Busek Company, Inc., tested an existing Hall thruster, the BHT-8000, on iodine propellant. The thruster was fed by a high-flow iodine feed system and supported by an existing Busek hollow cathode flowing xenon gas. The Phase I propellant feed system was evolved from a previously demonstrated laboratory feed system. Throttling of the thruster between 2 and 11 kW at 200 to 600 V was demonstrated. Testing showed that the efficiency of iodine fueled BHT-8000 is the same as with xenon, with iodine delivering a slightly higher thrust-to-power (T/P) ratio. In Phase II, a complete iodine-fueled system was developed, including the thruster, hollow cathode, and iodine propellant feed system. The nominal power of the Phase II system is 8 kW; however, it can be deeply throttled as well as clustered to much higher power levels. The technology also can be scaled to greater than 100 kW per thruster to support megawatt-class missions. The target thruster efficiency for the full-scale system is 65 percent at high specific impulse (Isp) (approximately 3,000 s) and 60 percent at high thrust (Isp approximately 2,000 s).

Szabo, James↗

Technologies involved in configuring an advanced earth-to-orbit transport for low structural mass

A tradeoff study for a single-stage, earth-to-orbit transport spacecraft configured with low structural mass as the prime objective is presented. Among the major design elements affecting vehicle mass are: maneuverability and re-entry heating, the compatibility of an irregular cargo bay geometry to future mission requirements, the fabrication and assembly of large honeycomb structure fuselage sections, and the development of LOX/LH2 engine extendable nozzles and dual-propulsion schemes. It is shown that vehicle geometry and materials and structural technologies will be the critical areas in the development of such a system.

Macconochie, I. O.↗

NASA Pocket Statistics

Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

Source record↗

NASA Pocket Statistics

Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

Source record↗

NASA Pocket Statistics

NASA Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

Source record↗

Electromagnetic Radiation in the Plasma Environment Around the Shuttle

As part of the SAMPIE (The Solar Array Module Plasma Interaction Experiment) program, the Langmuir probe (LP) was employed to measure plasma characteristics during the flight STS-62. The whole set of data could be divided into two parts: (1) low frequency sweeps to determine voltage-current characteristics and to find electron temperature and number density; (2) high frequency turbulence (HFT dwells) data caused by electromagnetic noise around the shuttle. The broadband noise was observed at frequencies 250-20,000 Hz. Measurements were performed in ram conditions; thus, it seems reasonable to believe that the influence of spacecraft operations on plasma parameters was minimized. The average spectrum of fluctuations is in agreement with theoretical predictions. According to purposes of SAMPIE, the samples of solar cells were placed in the cargo bay of the shuttle, and high negative bias voltages were applied to them to initiate arcing between these cells and surrounding plasma. The arcing onset was registered by special counters, and data were obtained that included the amplitudes of current, duration of each arc, and the number of arcs per one experiment. The LP data were analyzed for two different situations: with arcing and without arcing. Electrostatic noise spectra for both situations and theoretical explanation of the observed features are presented in this report.

Vayner, Boris V.↗

STS-69 Flight Day 9 Video File

The song, 'He's A Tramp', from the Walt Disney cartoon movie, 'Lady and the Tramp', awakened the astronauts, Cmdr. Dave Walker, Pilot Ken Cockrell, and Mission Specialists Jim Voss, Jim Newman, and Mike Gernhardt, on the ninth day of the STS-69 mission. The Wake Shield Facility (WSF) was again unberthed from the shuttle cargo bay and , using the shuttle's robot arm, held over the side of the shuttle for five hours where it collected data on the electrical field build-up around the spacecraft as part of the Charging Hazards and Wake Studies Experiment (CHAWS). Voss and Gernhardt rehearsed their Extravehicular Activity (EVA) spacewalk, which was planned for the next day. Earth views included cloud cover, a hurricane, and its eye.

Source record↗

NASA Pocket Statistics

This booklet of pocket statistics includes the 1996 NASA Major Launch Record, NASA Procurement, Financial, and Workforce data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Luanch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

Source record↗

Ares V: Progress Toward Unprecedented Heavy Lift

Ares V represents the vehicle that will again make possible human exploration beyond low Earth orbit. The Ares V is part of NASA s Constellation Program architecture developed to support the International Space Station (ISS), establish a permanent human presence on the Moon, and explore it to an extent far greater than was possible with the Apollo Program. Ares V will carry the lunar lander to orbit where it will join the Orion crew spacecraft, launched by the smaller Ares I launch vehicle. Then the Ares V upper stage will send the Orion and lander to the Moon. Ares V is also intended to launch automated cargo landers to the Moon. The Ares vehicles are designed to employ the proven technologies and experience from the Space Shuttle, Delta IV, and earlier U.S. programs, as well as sharing common components where feasible. The Ares V is in an early stage of concept development. However, commonality allows it to benefit from development work already under way on the Ares I, including the first stage booster, and upper stage, J-2X upper stage engine. This paper will discuss progress to date on the Ares V and its potential for freeing payload designers from current mass and volume constraints. Progress includes development progress on Ares I elements that will be shared by the two launch vehicles. The Ares I first stage recently completed a successful test firing of Development Motor 1 (DM-1). The J-2X engine is proceeding with manufacturing of components for the first development engines that will be used for testing. Several component-level tests have been completed or are under way that will help verify designs and confirm solutions to design challenges. The Ares V Earth departure stage will benefit from the Ares I upper stage development, including design, manufacturing, and materials testing. NASA is also working with government and industry to collect data on flights and testing of the operational RS-68 engine and potential upgrades. The Ares V team continues to evaluate technical options, vehicle configurations, and operations concepts for the Ares V. The team recently completed a Fall Face-to-Face meeting that served as a stepping-stone to the Systems Requirements Review (SRR). This four-day meeting served as an information exchange for the various teams at several NASA field centers and supporting contractors.

Sumrall, Phil↗

Retrievable Payload Carrier (RPC): Next generation Long Duration Exposure Facility

The Retrievable Payload Carrier (RPC) is described which is a multi-experiment, free-flyer spacecraft being privately developed to make in-space experimentation more accessible and economically feasible for research and development organizations. The carrier concept was derived from NASA's highly successful and flight proven Long Duration Exposure Facility (LDEF). The LDEF capabilities were enhanced to meet new customer requirements. This reusable payload carrier is planned for launch and retrieval by the space shuttle on a regular basis. The RPC's compact design facilitates flexible manifesting of the shuttle cargo bay space, thereby, permitting timely launches and retrievals. The vehicle is designed so that either the entire carrier can be retrieved from orbit, or individual experiment pallets can be removed and replaced in orbit. This gives customers even greater control over their experiment recoveries. A fully operational RPC System consists of: (1) a carrier spacecraft; (2) a ground control station for communication with customer payloads and the carrier; (3) a ground processing facility to provide refurbishment, final checkout, and integration of customer payloads and the carrier; and (4) the personnel required to support both the development and operation phases of the program. Customer payloads will fly 6 to 18 month missions, or longer, as required. Spreading launch, operations, and retrieval costs over multiple experimental payloads results in minimized customer costs. The RPC Program's initial objective is to operate a simple carrier system which meets basic customer service needs.

Perry, Arthur T.↗

The COLD-SAT program

The Cryogenic On-Orbit Liquid Depot Storage, Acquisition and Transfer (COLD-SAT) satellite is an experimental spacecraft launched from an expendable launch vehicle which is designed to investigate the systems and technologies required for efficient and reliable management of cryogenic fluid in the reduced-gravity space environment. Future applications such as Space Station, Space Transportation Vehicle (STV), external tank (ET), aft cargo carrier (ACC) propellant scavenging, storage depots, and lunar and interplanetary missions, among others, have provided the impetus to pursue this technology in a timely manner to support the design efforts. A refined conceptual approach has been developed and an overview of the COLD-SAT program is described which includes the following: (1) a definition of the technology needs and the accompanying experimental six-month baseline mission; (2) a description of the experiment subsystem, major features, and rationale for satisfaction of primary and secondary experiment requirements using LH2 as the test fluid; and (3) a presentation of the conceptual design of the COLD-SAT spacecraft subsystems which support the on-orbit experiment with emphasis on those areas which posed the greatest technical challenge.

Bailey, William J.↗

NASA Pocket Statistics: 1997 Edition

POCKET STATISTICS is published by the NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA). Included in each edition is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, Aeronautics and Space Transportation and NASA Procurement, Financial and Workforce data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. All Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.

Source record↗

Human Missions to Mars Orbit, Phobos, and Mars Surface Using 100-kWe-Class Solar Electric Propulsion

Solar electric propulsion (SEP) tugs in the 100-kWe range, may be utilized to preposition cargo in the Mars system to enable more affordable human missions to Phobos and to the surface of Mars. The SEP tug, a high heritage follow-on to the 50-kWe SEP spacecraft proposed for the Asteroid Redirect Robotic Mission (ARRM), would have the same structure, tankage, electric propulsion components, and avionics as the ARRM version, But with double the number of solar arrays, Hall thrusters, and power processor units (PPUs) and would be accommodated within the same launch envelope defined for ARRM. As a feasibility study, a 950-day human mission to Phobos using a conjunction class trajectory, such as the 2033 opportunity, was developed using two 100-kWe SEP vehicles to preposition a habitat at Phobos and propulsion stages in high Mars orbit (HMO). An architecture concept for a crewed Mars surface lander mission was also developed as a reference to build on the Phobos mission architecture, adding a lander element that could be delivered using chemical propulsion and aerocapture.

Price, Humphrey W.↗

Reusable Manned Lunar Vehicle

Report presents concept for reusable manned spacecraft to fly to and from Moon. Concept calls for lunar lander based in low orbit around Moon and transfer stage that shuttles between orbiting lander and Earth. Lander would deliver 30 tons of cargo to surface of Moon robotically and return to low orbit around Moon. Alternatively, lands eight crew-members and supplies for 165 days and return them to orbit. Transfer stage carries propellant for lander from Earth. Upon return to atmosphere of Earth slows itself by aerobraking.

Sherwood, Brent↗

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.

Lichodziejewski, David↗

Landing Humans and Human-Class Cargo on the Moon and Mars

For more than a decade, efforts have been ongoing at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, to land humans and large, human-rated cargo on planetary bodies like the Moon and Mars. This work continues today under the Center’s Lander Programs (LP) office. Recognizing MSFC’s heritage, NASA stood up the Human Landing System program at the Center in August 2019 to be responsible for spacecrafts that will land the next American astronauts on the Moon under Artemis. With work well underway for the historic Artemis III mission to land the first woman and first person of color on the lunar surface through the Appendix H Option A contract with SpaceX, LP is focused on the development of landers that will support the Agency’s long-term Artemis efforts at the Moon and NASA’s future at Mars. In March 2022, NASA announced its plan to solicit a second industry provider in addition to SpaceX to develop and demonstrate a lander that meets the program’s extended set of requirements for missions beyond Artemis III. Under the umbrella of Sustaining Lunar Development, these requirements will meet NASA’s needs for recurring, long-term access to the lunar surface, such as accommodating an increased crew size and delivering more mass to the surface. Additionally, NASA plans to leverage crewed lander development activities to procure and certify the design of landers capable of human-class cargo delivery. This paper will examine how the Lander Program office at MSFC is bridging from the initial demonstration phase of development for the Human Landing System program to the Sustaining Lunar Development phase and feeding forward to Mars. The requirements and lines of effort for landing humans and human class cargo will be discussed, as well as near-term and future milestones for the program.

Lemuel Carpenter↗