Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Evaluation of a High-Power Target Design for Positron Production at CEBAF

A source for polarized positron beams at the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is being designed. The Polarized Electrons for Polarized Positrons (PEPPo) concept is used to produce polarized e$^+$e$^-$-pairs from the bremsstrahlung radiation of a longitudinally polarized electron beam interacting within a high-Z conversion target. The scheme under consideration includes a 4 mm thick tungsten target that absorbs 17 kW deposited by a 1 mA continuous-wave electron beam with an energy of 120 MeV. The concept of a rotating tungsten rim mounted on a water-cooled copper disk was explored. The results of ANSYS thermal and mechanical analyses are discussed together with FLUKA evaluations of the radiation damages.

Ushakov, A.↗

Degraded beam study of CEBAF

An electron beam degrader has been installed in the CEBAF injector in support of the positron capabilities of the machine, enabling machine acceptance measurements and testing of large emittance beam transport. This update provides the current state of the project, including proposed beam tests and preliminary results from simulations and previous beam studies.

Lizarraga-Rubio, Victor [Universidad de Guanajuato↗

Milliampere Beam Studies using High Polarization Photocathodes at the CEBAF Photoinjector

Extending the charge lifetime of today's spin polarized GaAs photoelectron guns from tens to thousands of Coulombs is a requirement for long-duration operation at milliampere beam current. There are two main approaches frequently considered to achieve this goal. The first is improving photo-gun vacuum, which provides a direct means to minimize the ill effects of ion bombardment and associated QE decay. In this contribution, we demonstrate the second: enhancing the charge lifetime at milliampere beam current by using large laser spots which serves to distribute ion damage over a larger region of the photocathode. The efficacy of this approach was presented at past workshops, but using bulk GaAs and green laser light without RF structure. In this contribution, highly polarized beam was produced from strained-superlattice GaAs/GaAsP photocathodes inside the 130 kV photo-gun at the CEBAF photoinjector, at beam currents from 0.5 to 1.5 mA and with a clear indication of lifetime enhancement using laser beams as large as ~8 mm2. However, when the laser beam size was increased beyond this diameter, further lifetime enhancement was not observed which highlights the importance of proper cathode/anode design to maintain loss-free beam delivery and the preservation of static vacuum conditions. In addition, this contribution presents electron beam polarization measurements at currents to 1 mA.

Grames, Joseph M.↗

Petabyte Class Storage at Jefferson Lab (CEBAF)

By 1997, the Thomas Jefferson National Accelerator Facility will collect over one Terabyte of raw information per day of Accelerator operation from three concurrently operating Experimental Halls. When post-processing is included, roughly 250 TB of raw and formatted experimental data will be generated each year. By the year 2000, a total of one Petabyte will be stored on-line. Critical to the experimental program at Jefferson Lab (JLab) is the networking and computational capability to collect, store, retrieve, and reconstruct data on this scale. The design criteria include support of a raw data stream of 10-12 MB/second from Experimental Hall B, which will operate the CEBAF (Continuous Electron Beam Accelerator Facility) Large Acceptance Spectrometer (CLAS). Keeping up with this data stream implies design strategies that provide storage guarantees during accelerator operation, minimize the number of times data is buffered allow seamless access to specific data sets for the researcher, synchronize data retrievals with the scheduling of postprocessing calculations on the data reconstruction CPU farms, as well as support the site capability to perform data reconstruction and reduction at the same overall rate at which new data is being collected. The current implementation employs state-of-the-art StorageTek Redwood tape drives and robotics library integrated with the Open Storage Manager (OSM) Hierarchical Storage Management software (Computer Associates, International), the use of Fibre Channel RAID disks dual-ported between Sun Microsystems SMP servers, and a network-based interface to a 10,000 SPECint92 data processing CPU farm. Issues of efficiency, scalability, and manageability will become critical to meet the year 2000 requirements for a Petabyte of near-line storage interfaced to over 30,000 SPECint92 of data processing power.

Chambers, Rita↗

Polarization Measurements in Photoproduction with CEBAF Large Acceptance Spectrometer

A significant part of the experimental program in Hall-B of the Jefferson Lab is dedicated to the studies of the structure of baryons. CEBAF Large Acceptance Spectrometer (CLAS), availability of circularly and linearly polarized photon beams and recent addition of polarized targets provides remarkable opportunity for single, double and in some cases triple polarization measurements in photoproduction. An overview of the experiments will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Performance Evaluation of Undulator Radiation at CEBAF

The performance of undulator radiation (UR) at CEBAF with a 3.5 m helical undulator is evaluated and compared with APS undulator-A radiation in terms of brilliance, peak brilliance, spectral flux, flux density and intensity distribution.

43 PARTICLE ACCELERATORS↗

The CEBAF Element Database

With the inauguration of the CEBAF Element Database (CED) in Fall 2010, Jefferson Lab computer scientists have taken a step toward the eventual goal of a model-driven accelerator. Once fully populated, the database will be the primary repository of information used for everything from generating lattice decks to booting control computers to building controls screens. A requirement influencing the CED design is that it provide access to not only present, but also future and past configurations of the accelerator. To accomplish this, an introspective database schema was designed that allows new elements, types, and properties to be defined on-the-fly with no changes to table structure. Used in conjunction with Oracle Workspace Manager, it allows users to query data from any time in the database history with the same tools used to query the present configuration. Users can also check-out workspaces to use as staging areas for upcoming machine configurations. All Access to the CED is through a well-documented Application Programming Interface (API) that is translated automatically from original C++ source code into native libraries for scripting languages such as perl, php, and TCL making access to the CED easy and ubiquitous.

99 GENERAL AND MISCELLANEOUS↗

RF System Modeling for the CEBAF Energy Upgrade

An RF system model, based on MATLAB/SIMULINK, has been developed for analyzing the basic characteristics of the low level RF (LLRF) control system being designed for the CEBAF 12 GeV Energy Upgrade. In our model, a typical passband cavity representation is simplified to in-phase and quadrature (I&Q) components. Lorentz Force and microphonic detuning are incorporated as a new quadrature carrier frequency (frequency modulation). Beam is also represented as in-phase and quadrature components and superpositioned with the cavity field vector. Signals pass through two low pass filters, where the cutoff frequency is equal to half of the cavity bandwidth, then they are demodulated using the same detuning frequency. Because only baseband I&Q signals are calculated, the simulation process is very fast when compared to other controller-cavity models. During the design process we successfully analyzed gain requirements vs. field stability for different superconducting cavity microphonic backgrounds and Lorentz Force coefficients. Moreover, we were able to evaluate different types of a LLRF system’s control algorithm: GDR (Generator Driven Resonator) and SEL (Self Excited Loop) [1] as well as klystron power requirements for different cavities and beam loads.

99 GENERAL AND MISCELLANEOUS↗

HOM Survey of the First CEBAF Upgrade Style Cavity Pair

The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.

43 PARTICLE ACCELERATORS↗

Simulation Studies of Beam-Beam Effects of a Ring-Ring Electron-Ion Collider Based on CEBAF

The collective beam-beam effect can potentially cause a rapid growth of beam sizes and reduce the luminosity of a collider to an unacceptably low level. The ELIC, a proposed ultra high luminosity electron-ion collider based on CEBAF, employs high repetition rate crab crossing colliding beams with very small bunch transverse sizes and very short bunch lengths, and collides them at up to 4 interaction points with strong final focusing. All of these features can make the beam-beam effect challenging. In this paper, we present simulation studies of the beam-beam effect in ELIC using a self-consistent strong-strong beam-beam simulation code developed at Lawrence Berkeley National Laboratory. This simulation study is used for validating the ELIC design and for searching for an optimal parameter set.

43 PARTICLE ACCELERATORS↗

Recent Progress on Design Studies of High-Luminosity Ring-Ring Electron-Ion Collider at CEBAF

The conceptual design of a ring-ring electron-ion collider based on CEBAF has been continuously optimized to cover a wide center-of-mass energy region and to achieve high luminosity and polarization to support next generation nuclear science programs. Here, we summarize the recent design improvements and R&D progress on interaction region optics with chromatic aberration compensation, matching and tracking of electron polarization in the Figure-8 ring, beam-beam simulations and ion beam cooling studies.

43 PARTICLE ACCELERATORS↗

Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules

The CEBAF 12 GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. These cryomodules were tested during production to characterize their microphonic response in situ. For several early cryomodules, detailed (vibration) modal studies of the cryomodule string were performed during the assembly process to identify the structural contributors to the measured cryomodule microphonic response. Structural modifications were then modelled, implemented, and verified by subsequent modal testing and in-situ microphonic response testing. Interim and latest results from this multi-stage process will be reviewed.

43 PARTICLE ACCELERATORS↗

Source and Extraction for Simultaneous Four-hall Beam Delivery System at CEBAF

A new design for simultaneous delivery of the electron beam to all four 12 GeV CEBAF experimental halls* requires a new 750 MHz RF separator system in the 5th pass extraction region, a 250 MHz repetition rate for its beams, and addition of a fourth laser at the photo-cathode gun. The proposed system works in tandem with the existing 500 MHz RF separators and beam repetition rate on the lower passes. The new 5th pass RF separators will have the same basic design but modified to run at 750 MHz. The change to the beam repetition rate will be at the photo-cathode gun through an innovative upgrade of the seed laser driver system using electro-optic modulators. The new laser system also allows addition of the fourth laser. The new RF separators, the new laser system and other hardware changes required to implement the Four-Hall operation delivery system will be discussed in this paper.

43 PARTICLE ACCELERATORS↗

The JLAB 12 GeV Energy Upgrade of CEBAF

This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

43 PARTICLE ACCELERATORS↗

Field Emission and Consequences as Observed and Simulated for CEBAF Upgrade Cryomodules

High gamma and neutron radiation levels were monitored at the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) after installation of new cavity cryomodules and initial test runs in the frame of the ongoing 12 GeV upgrade program. The dose rates scaled exponentially with cavity accelerating fields, but were independent of the presence of an electron beam in the accelerator. Hence, field emission (FE) is the source of origin. This has led to concerns regarding the high field operation (100 MV per cryomodule) in the future 12 GeV era. Utilizing supercomputing, novel FE studies have been performed with electrons tracked through a complete cryomodule. It provides a principal understanding of experimental observations as well as ways to mitigate FE as best as practicable by identification of problematic cavities.

Marhauser, Frank↗

Exploiting new electrochemical understanding of niobium electropolishing for improved performance of SRF cavities for CEBAF

Recent incorporation of analytic electrochemistry into the development of protocols for electropolishing niobium SRF cavities has yielded new insights for optimizing this process for consistent, high-performance results. Use of reference electrodes in the electrolyte, electrochemical impedance spectroscopy (EIS), rotating disk electrodes (RDE), and controlled sample temperatures has greatly clarified the process dynamics over the empirical understanding developed via years of practice. Minimizing RF losses at high operational gradients is very valuable for CW linacs. Jefferson Lab is applying these new insights to the low-loss 7-cell cavity design developed for the CEBAF 12 GeV Upgrade. Together with controlled cleaning and assembly techniques to guard against field-emission-causing particulates, the resulting process is yielding consistent cavity performance that exceeds project requirements. Cavity tests show BCS-limited Q well above 30 MV/m. Detailed process data, interpretation, and resulting rf performance data will be presented.

Reece, Charles E.↗

RESULTS OF THE 2015 HELIUM PROCESSING OF CEBAF CRYOMODULES

Many conference series have adopted the same The CEBAF accelerator at Jefferson Lab consists of an injec-tor and two linacs connected by arcs. Each linac contains 25 cryomodules that are designed to deliver an integrated energy of 2.2 GeV per pass to an electron beam in order to meet 12 GeV energy requirements. Helium processing is a processing technique that is used to reduce field emis-sion (FE) in SRF cavities. Helium processing of the 50 installed linac cryomodules was seen as necessary to support 12 GeV energy requirements. This paper will describe the processing procedure and summarize the results of this effort.

Drury, Michael A.↗

RF CALIBRATION OF CEBAF LINAC CAVITIES THROUGH PHASE SHIFTS

This paper describes a new beam-based method of cavity energy gain calibration based on varying the cavity phase. This method can be fully automated and allows a larger range of momentum excursions during measurement than previous calibration approaches. Monte Carlo simulations suggest that a calibration precision of 2-3% could be realistically achieved using this method. During the commissioning of the Continuous Electron Beam Accelerator Facility's (CEBAF) energy upgrade to 12 GeV, 876 measurements were performed on 375 of the 400 linac cavities in Fall 2015 and applied December 2015. Linac optics appears to be closer to design as a result. The resulting ensemble proved to be 2% over the value needed to get the desired energy in the arcs. Continued offline analysis of the data has allowed for error analysis and better understanding of the process.

Carpenter, Adam P.↗