NorthernSTAR Project Overcoat: Exterior Insulation Strategies for 1.5-Story Roof Applications in Cold Climates

This is a repository for all NorthernSTAR Overcoat insulation retrofit projects. Both houses received Overcoat insulation retrofit on roof only, performed by Cocoon Insulation. 1 - St. Louis Park house - St. Louis Park, MN 2 - Edina house - Edina, MN In this second study, the team wished to analyze the before and after air-tightness data from roof only ETMMS retrofits on 1.5-story homes in cold and very cold climates. To identify homes to analyze, we reached out to our national network of energy professionals, home performance contractors, and general contractors who had expressed interest in promoting roof-only External Thermal Moisture Management System (ETMMS) to clients. Five projects by three contractors were submitted for consideration as they were being done to mitigate severe ice dams for homeowners. Only two of the five projects followed a roof only ETMMS protocol. Data from the other three projects, however, were reviewed with the air-tightness data of 250 roof-only, interior-applied energy retrofits on 1.5-story homes provided by three NorthernSTAR industry partners. These data represent homes in the general market as well as homes that were part of the state of Minnesota weatherization program.

adhered applied membrane↗

Community-Scale Attic Retrofit and Home Energy Upgrade Data Mining - Hot Dry Climate

Retrofitting is an essential element of any comprehensive strategy for improving residential energy efficiency. The residential retrofit market is still developing, and program managers must develop innovative strategies to increase uptake and promote economies of scale. Residential retrofitting remains a challenging proposition to sell to homeowners, because awareness levels are low and financial incentives are lacking. The U.S. Department of Energy's Building America research team, Alliance for Residential Building Innovation (ARBI), implemented a project to increase residential retrofits in Davis, California. The project used a neighborhood-focused strategy for implementation and a low-cost retrofit program that focused on upgraded attic insulation and duct sealing. ARBI worked with a community partner, the not-for-profit Cool Davis Initiative, as well as selected area contractors to implement a strategy that sought to capitalize on the strong local expertise of partners and the unique aspects of the Davis, California, community. Working with community partners also allowed ARBI to collect and analyze data about effective messaging tactics for community-based retrofit programs. ARBI expected this project, called Retrofit Your Attic, to achieve higher uptake than other retrofit projects, because it emphasized a low-cost, one-measure retrofit program. However, this was not the case. The program used a strategy that focused on attics-including air sealing, duct sealing, and attic insulation-as a low-cost entry for homeowners to complete home retrofits. The price was kept below $4,000 after incentives; both contractors in the program offered the same price. The program completed only five retrofits. Interestingly, none of those homeowners used the one-measure strategy. All five homeowners were concerned about cost, comfort, and energy savings and included additional measures in their retrofits. The low-cost, one-measure strategy did not increase the uptake among homeowners, even in a well-educated, affluent community such as Davis. This project has two primary components. One is to complete attic retrofits on a community scale in the hot-dry climate on Davis, CA. Sufficient data will be collected on these projects to include them in the BAFDR. Additionally, ARBI is working with contractors to obtain building and utility data from a large set of retrofit projects in CA (hot-dry). These projects are to be uploaded into the BAFDR.

affordable housing↗

LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575

The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currently planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between the contractors and DOE-RL. Information Management (IM) is a key part of the LTS program. The IM Program identifies, locates, stores, protects and makes accessible Hanford LTS records and data to support the transfer of property ultimately to LM. As such, DOE-RL manages the Hanford LTS Program in a manner consistent with LM's goals, policies, and procedures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of LTS at DOE's Hanford Site

Hanford's Long-Term Stewardship (LTS) Program has evolved from a small, informal process, with minimal support, to a robust program that provides comprehensive transitions from cleanup contractors to long-term stewardship for post-cleanup requirements specified in the associated cleanup decision documents. The LTS Program has the responsibility for almost 100,000 acres of land, along with over 200 waste sites and will soon have six cocooned reactors. Close to 2,600 documents have been identified and tagged for storage in the LTS document library. The program has successfully completed six consecutive transitions over the last two years in support of the U.S. DOE Richland Operations Office's (DOE-RL) near-term cleanup objectives of significantly reducing the footprint of active cleanup operations for the River Corridor. The program has evolved from one that was initially responsible for defining and measuring Institutional Controls for the Hanford Site, to a comprehensive, post remediation surveillance and maintenance program that begins early in the transition process. In 2013, the first reactor area -- the cocooned 105-F Reactor and its surrounding 1,100 acres, called the F Area was transitioned. In another first, the program is expected to transition the five remaining cocooned reactors into the program through using a Transition and Turnover Package (TTP). As Hanford's LTS Program moves into the next few years, it will continue to build on a collaborative approach. The program has built strong relationships between contractors, regulators, tribes and stakeholders and with the U.S. Department of Energy's Office of Legacy Management (LM). The LTS Program has been working with LM since its inception. The transition process utilized LM's Site Transition Framework as one of the initial requirement documents and the Hanford Program continues to collaborate with LM today. One example of this collaboration is the development of the LTS Program's records management system in which, LM has been instrumental. The development of a rigorous data collection and records management systems has been influenced and built off of LMs success, which also ensures compatibility between what Hanford's LTS Program develops and LM. In another example, we are exploring a pilot project to ship records from the Hanford Site directly to LM for long-term storage. This pilot would gain program efficiencies so that records would be handled only once. Rather than storage on-site, then shipment to an interim Federal Records Center in Seattle, records would be shipped directly to LM. The Hanford LTS Program is working to best align programmatic processes, find efficiencies, and to benchmark site transition requirements. Involving the Hanford LTS Program early in the transition process with an integrated contractor and DOE team is helping to ensure that there is time to work through details on the completed remediation of transitioning areas. It also will allow for record documentation and storage for the future, and is an opportunity for the program to mature through the experiences that will be gained by implementing LTS Program activities over time.

54 ENVIRONMENTAL SCIENCES↗

Technology Solutions Case Study: Guidance on Taped Insulating Sheathing Drainage Planes

The energy efficiency-based financial benefits of adding exterior insulation are well accepted by the building industry, and using exterior insulation as the drainage plane is the next logical step. This case study focuses on the field implementation of taped board insulation as the drainage plane in both new and retrofit residential applications, and provides information and recommendations for insulation contractors, general contractors, builders, remodelers, mechanical contractors, and homeowners. The order of work completed during home construction and retrofit improvements is important. Health and safety issues must be addressed first and are more important than durability issues, and durability issues are more important than saving energy. Three significant items are required to make taped insulating sheathing a simple, long term, and durable drainage plane: first, horizontal joints should be limited or eliminated wherever possible; where a horizontal joint exists, use superior materials; and, frequent installation inspection and regular trade training are required to maintain proper installation.

BSC↗

High-Quality Home Performance: Arizona's Home Performance with ENERGY STAR (R) Program

Arizona Public Service (APS) has created a high-quality Home Performance with ENERGY STAR (ENERGY STAR) program. In addition to being based on the ENERGY STAR guidelines developed by the U.S. Department of Energy and U.S. Environmental Protection Agency, they have used two other national guideline/standards to improve quality and contractor satisfaction: DOE's Standard Work Specifications for Home Energy Upgrades (SWS) and the Home Performance Coalition's Home Performance Extensible Markup Language (HPXML). As the program found areas for improvement, they worked with their implementer FSL Home Energy Solutions (FSL) to develop a quality assurance (QA) program based on the SWS. They also worked with energy assessment and other software providers to implement HPXML in a program administration software platform. This gave contractors a choice in what energy assessment software they used - each tool allowed in the program exported HPXML seamlessly to the program administration platform. APS worked closely with FSL and contractors to implement the QA program and roll out the software improvements. After implementing the QA program and software, the program saw approximately 15% improvement in measure and work scope quality.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Case Studies of Residential Façade Upgrades in Four Climate Zones

This paper reports on a project that explored the viability of insulation and window upgrades during siding retrofits in four case studies across the United States. Thousands of homes are re-sided every year, but only a fraction of consumers add insulation and upgrade the windows at the same time, even though a siding replacement is the ideal time to update the thermal performance of building enclosures. To better understand why more siding retrofits do not include insulation and window upgrades, research staff from several organizations collaborated with the U.S. Department of Energy on a multi-faceted research project that included a cost analysis, workforce analysis, market assessment, and contractor assessment. This paper will review four in-field case studies conducted with contractors actively engaged in home re-siding projects that agreed to add rigid insulation and window upgrades as part of their projects. Findings from the case studies will be presented including contractor perspectives, cost, and technical approaches on projects, located in multiple climate zones including Bellingham WA, Jackson MS, Kalamazoo MI, and Phoenix AZ. All projects involved adding continuous rigid insulation on the exterior walls and installation of new cladding. Cladding types varied from wood and metal to fiber cement, vinyl, and traditional stucco. All homes also received a window upgrade, although upgrades varied depending on the original condition of the windows and climate; upgrades included triple-pane windows, low-e storm windows, and exterior shading. Key findings including technical approaches, opportunities, barriers, and project cost will be presented.

re-siding, insulation, rigid insulation, exterior ↗

Lower Three Runs Remediation Safety Preparation Strategy - 13318

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site. It is a large blackwater stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was discharged and contaminated a 20 mile stretch of Lower Three Runs Stream that narrows and provides a limited buffer of US DOE property along the stream and flood-plain. Based on data collected during the years 2009 and 2010 under American Recovery and Re-investment Act funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. In agreement with the Environmental Protection Agency and the South Carolina Department of Health and Environmental Control, three areas were identified for remediation [1] (SRNS April 2012). A comprehensive safety preparation strategy was developed for safe execution of the LTR remediation project. Contract incentives for safety encouraged the contractor to perform a complete evaluation of the work and develop an implementation plan to perform the work. The safety coverage was controlled to ensure all work was observed and assessed by one person per work area within the project. This was necessary due to the distances between the fence work and three transects being worked, approximately 20 miles. Contractor Management field observations were performed along with DOE assessments to ensure contractor focus on safe performance of the work. Dedicated ambulance coverage for remote worker work activities was provided. This effort was augmented with access to medical evacuation services. The areas where the work was performed were remote and difficult to get emergency vehicles to in a timely manner in case of an accident. Satellite phones were utilized due to intermittent phone coverage. High visibility vests were utilized to enable any hunters in the area to see the workers; due to the limited buffer areas along the stream route. An innovative approach to providing the necessary protection for workers during periods of extreme heat and humidity was also employed, which included the use of 'heat islands' with fans and crew trailers and ice vests for workers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Resolution of Technical Issues at the Waste Treatment and Immobilization Plant Pretreatment Facility - 17281

The U.S. Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility has a number of first-of-a-kind technical challenges that have required additional expert analysis and testing activities to resolve. In 2006, an External Flowsheet Review Team identified 28 technical vulnerabilities with the plant design or future operability. Over a period of three months starting in September 2012, a number of top scientists and engineers conducted a review of the major technical issues associated with the design and operability of the WTP. These experts also provided independent advice on some of the broader challenges associated with completing the Hanford tank waste mission - highlighting the linkage between the physical and chemical properties of the tank waste and the PT Facility technical issues. In 2012 and early 2013, DOE's Office of River Protection (ORP) directed the WTP contractor to suspend production work on the PT Facility until the outstanding technical issues could be resolved and the nuclear safety basis could be updated and brought into alignment with any updates to the facility design and/or process flowsheet. By late 2016, DOE and the WTP contractor resolved three of the eight outstanding technical issues: - (T1) Hydrogen Gas in Vessels; - (T2) Criticality in PT Facility Vessels; - (T3) Hydrogen in Piping and Ancillary Vessels (HPAV). Resolving all three of these issues required a combination of engineering studies and updates to foundational PT Facility safety basis documents to ensure both the design features and safety control strategies were adequately developed and fully supportable. The five remaining unresolved technical issues are Pulse-Jet Mixing (PJM) of Vessels (T4), Erosion and Corrosion in WTP Vessels and Piping (T5), PT Facility Optimization (T6), Black Cell Vessel Structural Integrity (T7), and Facility Ventilation (T8). Specific plans for resolving each of the five remaining technical issues have been developed by the WTP contractor. This paper provides a synopsis of the status of PT Facility technical issue resolution, and how resolution of the issues will enable DOE to make an informed decision to establish a new performance baseline for the PT Facility at a future date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Resuming Full Construction on the Waste Treatment and Immobilization Plant's High-Level Waste Facility - 16283

The U.S. Department of Energy (DOE) restricted certain engineering, procurement and construction work on the Waste Treatment and Immobilization Plant's (WTP) High-Level Waste (HLW) Facility in 2012 and early 2013 because of unresolved technical issues, and a need to align the nuclear safety basis with the design as the HLW Facility technical issues were resolved. The DOE Office of River Protection (ORP) needed a way to minimize the government's risk exposure, while continuing limited critical path construction work and resolving the technical and safety basis issues. ORP issued the Plan for Evaluation and Decision to Proceed for the High-Level Waste Facility in October 2013 to establish the process to evaluate the WTP contractor's progress on resolving the issues and to identify actions and deliverables needed to facilitate an ORP decision to resume production activities. This process provided for a phased resumption of HLW engineering, procurement and construction activities, with two decision points: Decision 1: Authorization to resume design/production engineering along with limited procurements and construction ramp-up. Decision 2: Full authorization to resume engineering, procurement and construction. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. The decision to proceed with production engineering in the HLW Facility was based on significant progress in resolving technical issues and improving work processes to align the HLW design and safety basis. ORP is working closely with the WTP contractor to facilitate decisions for resuming procurement of HLW Facility equipment with safety functions, and resuming full construction in the most complex process cells in the Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prioritizing and Managing Technology Needs to Meet River Protection Project Mission Objectives - 16462

Over 56 million gallons of radioactive waste are stored in 177 large underground tanks at the Hanford Site, located in southeastern Washington State. This nuclear waste resulted from plutonium production for the nation's nuclear defense program. The River Protection Project (RPP) mission is to: - Safeguard and safely manage waste stored in the Hanford tanks, - Treat the waste using the Waste Treatment and Immobilization Plant (WTP), - Ensure safe disposition of the waste to protect the Columbia River and the environment. Each aspect of the mission requires some application of technology in order to meet the mission objectives. The RPP Technology Roadmap document presents a comprehensive, integrated assessment of the technology-related advances needed to ensure successful completion of the Hanford tank waste cleanup mission. This paper describes the development of the RPP Technology Roadmap, summarizes its content, describes integration and collaboration with the Department of Energy's national laboratories to support the work identified, and defines how priorities were identified to ensure near-term RPP mission commitments can be accomplished while preserving the longer term technology development elements necessary for mission completion. The Challenge - Managing a wide variety of technology needs that involve multiple organizations, contractors, and national laboratories presents additional challenges when funding constraints are factored in. A process was needed to ensure the technology needs supporting near term mission priorities were appropriately identified, prioritized, and supported through the fiscal year planning process. Additionally, the national laboratory resources necessary to support many of the technologies require coordination to ensure the most appropriate resources are applied at the appropriate level without duplication or contradiction of effort. The Solution - The RPP Technology Roadmap was developed with the primary purposes to: - Identify technology related items needed to support or enhance the River Protection Project (RPP) mission, - Prioritize technology needs to support fiscal year planning processes, - Organize National laboratory support of the RPP mission and communicate needs to the participating contractors. The Technology Roadmap is consistent with Department of Energy (DOE) Hanford mission priorities and is also in alignment with other Hanford Site technical initiatives and policy and planning documents. The Technology Roadmap highlights the current estimated technology needs and identifies where planning shortfalls exist and where national laboratory participation is needed to support mission success. This information assists fiscal year planning and national laboratory contracting processes to ensure that technology needs are supported. In addition to supporting the RPP baseline mission, the Technology Roadmap provides a basis for strategic planning by identifying opportunities to use technology solutions to enhance mission efficiency. This waste management paper describes the innovative and collaborative processes used to develop, validate, and communicate the results so the project owners and the national laboratories can most effectively plan work scope and resources. A discussion of the following processes is included: - Technology needs and task owner identification, - Functional area grouping and area lead identification, - Needs prioritization, - High priority needs ranking (including validation), - Results compilation and planning gap identification, - Results presentation by project and functional area, - National laboratory coordination and collaboration. Application - The process used to develop the RPP technology roadmap is applicable to any site where multiple national laboratories and contractors are involved in identifying and implementing technology based solutions. This process is also applicable to the DOE HQ role to provide prioritization and coordination of the nationwide technology development activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

After School Matters Program at the Hanford Site - 16569

CH2M HILL Plateau Remediation Company (CH2M), a prime contractor for environmental remediation at the U.S. Department of Energy Hanford Site in southeast Washington State, partnered with the nonprofit After School Matters (ASM) organization to provide outreach to local elementary school students in 2013-2014. The program emphasizes building relationships between youths and adults through academic tutoring, homework assistance, mentoring and physical fitness development. The program assists students from families where adults are often unemployed or underemployed. This project not only gives employees an opportunity to mentor and teach local youths, it also helps them prepare the next generation of leaders and experts. A substantial number of employees will be eligible for retirement within the next ten years, and their extensive institutional knowledge will go with them. Visiting schools and sharing this knowledge and experience gives students insights into career opportunities they might not otherwise consider. This program proved so successful, another Hanford Contractor involved their workers, expanding the program to a second elementary school. Also, the program caught the eye of a nonprofit organization, 21. Century After-School Program, who invited the team to expand to a third elementary school. The ASM program at the Hanford Site: (1) targets an often overlooked group of students and provides an opportunity to mentor and teach the future generation; (2) positively impacts the students, volunteers and community; (3) has expanded its reach to other contractors and schools. Lessons learned from this community education program provide valuable context for other organizations interested in similar outreach efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Addressing Workers' Concerns Related to Chemical Vapors at the Hanford Site - 19054

Washington River Protections Solutions, LLC (WRPS) is the prime contractor for the Department of Energy (DOE) Tank Farm Operations at the Hanford Site, and is responsible for the management and retrieval of millions of gallons of radioactive and chemical wastes, stored in 177 underground tanks; a legacy of decades of production activities at the Site. The potential for workforce exposure to the chemical vapors from the tanks has long been a concern for the workforce and for DOE and its tank contractors; concerns about tank vapors is an issue that pre-dates WRPS's incumbency as the Tank Operations Contractor. In response to an increase in the number of tank vapor events reported by workers at the Hanford Site in 2014, WRPS commissioned the Savannah River National Laboratory with establishing and overseeing a panel of external, independent experts (Tank Vapor Assessment Team (TVAT)) to examine chemical vapor management and related worker-protection measures at the Hanford Tank Farms. The TVAT released the Hanford Tank Vapor Assessment Report (SRNL-RP-2014-00791) in late 2014, which included several recommendations to reduce the potential for chemical vapor exposures. From 2015- 2018, governmental and external groups conducted additional assessments to review the progress made in implementing the TVAT recommendations, and the overall Industrial Hygiene (IH) program. All of these assessments specifically recommended WRPS take action to improve communications with the workforce around the subject of tank vapors. Some further recommended assessing the effectiveness of vapors-related communications. In fiscal year 2016, WRPS and DOE Office of River Protection (DOE-ORP) formed an Integrated Project Team (IPT) to: (1) develop the strategy for addressing chemical vapors and (2) define the future chemical vapor protection actions at the Tank Farms. The actions are designed to address the recommendations from the external assessments as part of the overall effort to mitigate vapors-related exposure incidences, and to ensure workers are safe and feel safe while working in and around the Hanford Tank Farms. A comprehensive vapor management communication plan, engagement processes, and effectiveness measurements were established as essential components of the IPT effort. The Chemical Protection Program Office (CPPO) was formed, in part, to deliver on these IPT initiatives, monitor performance, and drive improvements to WRPS's vapors-related communications and engagement efforts at the Hanford Tank Farms. The CPPO was created as a temporary program office tailored to address these unique challenges by augmenting traditional company performance monitoring and communications (i.e. all employee e-mails, posters, and formal briefings). Modeled in broad concept after the successful program office WRPS created to support the American Recovery and Reinvestment Act, CPPO has also proven successful in its mission. Because concerns about chemical vapors in the workplace were expressed by the workforce, they are a key stakeholder. As such, the CPPO has concentrated its information sharing efforts toward the WRPS workforce. With a focus on empathetic engagement, continuous improvement, and transparent information sharing, the CPPO has developed and implemented a strategy for improving worker trust in vapors-related communications and increasing the workforce knowledge of responses taken to address chemical vapors. Effective implementation of this strategy is demonstrated by the results of workforce surveys, which indicate measured and important improvement in the effectiveness of vapors-communications and the knowledge level workers report about vapor issues compared to the previous year. This paper discusses the utilization of a temporary program office and the unique approach that the CPPO implemented to achieve success, including: strategic application of the technical and communications staff skill mix of the organization (including talent development opportunities such as stretch assignments for WRPS's Strategic Talent Development program members and support from WRPS college interns), teaming with other WRPS' organizations such as IH, Engineering and Communications and Public Relations (C and PR), the development of new types of information sharing to support the effort, and the methods by which the effectiveness of the communications efforts are measured to drive continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Environmental Management System Communication at Large Sites - 20480

At a large Department of Energy-owned (DOE) site, there are challenges to communicating Environmental Management System (EMS) topics effectively. With multiple contractors and Environmental Management System scopes, as well as a large number of employees, communication preferences and possibilities vary, providing both the benefit and the challenge of differing pathways for sharing information. Additionally, data collection for site-wide environmental reporting involves numerous points of contact spread across contractors and requires organization and integrated communication. Focusing on the value of communication to enhance EMS education and awareness to drive environmental performance, we discuss the communication methods used both at a site-wide level and by individual organizations. Example methods include site-wide working group meetings, internal Share Point, site-wide surveys, collaborative reporting, weekly newsletters, and combined communication efforts with the Integrated Safety Management System (ISMS). Using external audit results to gauge employee environmental awareness and culture, we analyze the effectiveness of EMS communications. In conclusion, integration of EMS communication in alignment with the ISMS has assisted in meeting International Organization of Standardization 14001 (ISO 14001) requirements and strengthened the concept that environmental protection is part of safety for workers and the site. Increased environmental enthusiasm and awareness supports the effectiveness of EMS communication methods and positive external audit results. These results benefit other sites with EMS to gain knowledge of integrated communication efforts that increase the effectiveness of the EMS, environmental performance, and conformance with ISO 14001. By assessing the effectiveness of actual EMS communication methods, contractors will be able to take away tools to enhance environmental communication in their workplace. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

42 ENGINEERING↗