Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Estimating costs and performance of systems for machine processing of remotely sensed data

This paper outlines a method for estimating computer processing times and costs incurred in producing information products from digital remotely sensed data. The method accounts for both computation and overhead, and may be applied to any serial computer. The method is applied to estimate the cost and computer time involved in producing Level II Land Use and Vegetative Cover Maps for a five-state midwestern region. The results show that the amount of data to be processed overloads some example computer systems, but that the processing is feasible on others.

Ballard, R. J.↗

A Life-Cycle Cost Estimating Methodology for NASA-Developed Air Traffic Control Decision Support Tools

This paper describes the development of a life-cycle cost (LCC) estimating methodology for air traffic control Decision Support Tools (DSTs) under development by the National Aeronautics and Space Administration (NASA), using a combination of parametric, analogy, and expert opinion methods. There is no one standard methodology and technique that is used by NASA or by the Federal Aviation Administration (FAA) for LCC estimation of prospective Decision Support Tools. Some of the frequently used methodologies include bottom-up, analogy, top-down, parametric, expert judgement, and Parkinson's Law. The developed LCC estimating methodology can be visualized as a three-dimensional matrix where the three axes represent coverage, estimation, and timing. This paper focuses on the three characteristics of this methodology that correspond to the three axes.

Wang, Jianzhong Jay↗

Software Estimates Costs of Testing Rocket Engines

Simulation-Based Cost Model (SiCM), a discrete event simulation developed in Extend , simulates pertinent aspects of the testing of rocket propulsion test articles for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.

Smith, C. L.↗

Quality Guidelines for Energy Systems Studies: Cost Estimation Methodology for NETL Assessments of Power Plant Performance

This paper summarizes the methodology employed by the National Energy Technology Laboratory (NETL) in calculating power plant costs in its techno-economic studies, such as the Cost and Performance Baseline for Fossil Energy Systems series of reports. It also outlines the approach used to calculate the cost of electricity by which NETL evaluates electric power plants. These metrics and a clear understanding of the methodology used are essential in allowing different power plant technologies to be compared on a similar basis. These guidelines are tailored for power producing plants, although they can be applied to a variety of different revenue generating plants (e.g., coal to liquids, syngas generation, hydrogen).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced transportation system study: Manned launch vehicle concepts for two way transportation system payloads to LEO. Program cost estimates document

This report describes Rockwell International's cost analysis results of manned launch vehicle concepts for two way transportation system payloads to low earth orbit during the basic and option 1 period of performance for contract NAS8-39207, advanced transportation system studies. Vehicles analyzed include the space shuttle, personnel launch system (PLS) with advanced launch system (ALS) and national launch system (NLS) boosters, foreign launch vehicles, NLS-2 derived launch vehicles, liquid rocket booster (LRB) derived launch vehicle, and cargo transfer and return vehicle (CTRV).

Duffy, James B.↗

Improving Space Project Cost Estimating with Engineering Management Variables

Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

Hamaker, Joseph W.↗

Improving the estimated cost of sustained power interruptions to electricity customers

Electricity reliability and resiliency have become a topic of heightened interest in recent years in the United States. As utilities, regulators, and policymakers determine how to achieve optimal levels of electricity reliability while considering how best to prepare for future disruptions in power, the related issue of how much it costs when customers lose power remains a largely unanswered question. In 2006, Lawrence Berkeley National Laboratory developed an end-use based framework that estimates the cost of power interruptions in the U.S that has served as a foundational paper using the best available, yet far from perfect, information at that time. Since then, an abundance of work has been done to improve the quality and availability of information that now allow us to make a much more robust assessment of the cost of power interruptions to U.S. customers. In this paper, we find that the total U.S. cost of sustained power interruptions is 44 billion dollars per year (2015-) -25% more than the 26 billion dollars per year in 2002- (or 35 billion dollars per year in 2015-) estimated in our 2006 study.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report: Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications (2012-2016)

This report summarizes project activities for Strategic Analysis, Inc. (SA) Contract Number DE-EE0005236 to the U.S. Department of Energy titled “Transportation Fuel Cell System Cost Assessment”. The project defined and projected the mass production costs of direct hydrogen Proton Exchange Membrane fuel cell power systems for light-duty vehicles (automobiles) and 40-foot transit buses. In each year of the five-year contract, the fuel cell power system designs and cost projections were updated to reflect technology advances. System schematics, design assumptions, manufacturing assumptions, and cost results are presented.

08 HYDROGEN↗

Nuclear Energy Cost Estimates for Net Zero World Initiative

This report provides recommended parameters for incorporating nuclear energy systems into decarbonization modeling scenarios. The values are primarily intended for the Net Zero World (NZW) Initiative but are expected to prove useful to other related efforts. Both costs and operational metrics are provided in the study. Several cost factors, namely overnight capital costs (OCC) and operational costs are taken to be country specific. OCC is defined as the value of building the reactor in one night considering all costs prior to the start of operations including fuel for the initial core load. The value assumes the build is neither a first nor a ‘Nth’ of a kind, but somewhere in between. All costs are escalated to 2022 USD values.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost estimates of production scale semitransparent organic photovoltaic modules for building integrated photovoltaics

Building integrated photovoltaics (BIPVs) are attached to commercial and residential structures to enable solar energy harvesting. While conventional Si photovoltaics (PVs) are dominant in the current market, second and third generation thin film solar cells based on amorphous Si, CdTe, CIGS, perovskites or organic photovoltaics (OPVs) are often considered as an alternative for BIPV applications since they may offer reduced costs compared to Si PVs. Indeed, recent advances in performance suggest that lightweight, flexible and visibly transparent OPVs can potentially be integrated into windows or other applications to which Si PVs are less well suited. Here, we estimate the cost of high efficiency, semitransparent OPVs (ST-OPVs) based on solution processing in a roll-to-roll (R2R) manufacturing line. Assuming modules with 10% power conversion efficiency (PCE), a 70% geometric fill factor (GFF), and 95% inverter efficiency, we anticipate a %1.6 per Wp module manufacturing cost that includes the cost of the microinverter to condition the OPV dc output to be compatible with the ac line voltage of the building. The materials and inverter cost comprise ~90% of the total module cost. Hence, with simplified material synthesis and a lower inverter cost, including marginally improved PCE and GFF, we expect the cost can be as low as $0.47 per Wp. Here, while the module costs ~60% of the average (uninstalled) double-pane window, we expect the payback period can be as short as 2 to 6 years, suggesting that OPVs can be an economic and attractive candidate for BIPV applications.

14 SOLAR ENERGY↗

CFO Role in Cost Estimating & Budget Overview: GAO Review [Slides]

CFO works very closely with project controls to ensure correct rates and factors are being used. CFO automates where possible (e.g. upload from Work Package Generator to Oracle) to avoid data entry and errors. Consistent assumptions are made across program areas where possible. Weapons Program Planning & Integration Team coordinates all budget planning activities in PADWP office. Operating under uncertain budget conditions has resulted in close scrutiny of all costs and estimates.

99 GENERAL AND MISCELLANEOUS↗

Productivity and cost estimates for incorporating tracked processors into conventional loblolly pine harvesting regimes in the Southeastern United States

Due to the recent encouragement for loggers to integrate tracked processors into their conventional harvest equipment regime in the Southeastern United States, this study aimed to provide loggers with an estimate of the additional productivity and operating costs that could be incurred. Since tracked processors have rarely been operated in this region, a comparison study was conducted to determine differences in productivity and operating costs between a less experienced operator versus a more experienced operator. The study indicated the less experienced operator was able to produce 67 green tonnes/hour while the more experienced operator produced 80 green tonnes/hour. Costs per tonne for the less experienced operator were approximately $\$ $2.18/tonne at the end of year 1 and decreased to $\$$1.92/tonne at the end of year 5, depicting a $\$$0.26/tonne difference within 5 years. The more experienced operator incurred costs of $\$ $1.82/tonne at the end of year 1 and $\$ $1.61/tonne at the end of year 5 for a total difference of $\$ $0.21/tonne. A sensitivity analysis demonstrated that extreme fluctuations in fuel or maintenance/repair prices had less than a $\$ $0.20 increase in the final cost/ tonne. An increase in production rates from 65 to 125 tonnes decreased the cost/tonne $\$ $0.90/tonne, and increasing utilization rates from 50% to 85% decreased the cost per tonne of the processor by $\$ $0.78 per tonne. These results indicated that operators should be less concerned with changes in fuel and maintenance costs and be more concerned with their production and utilization rates.

54 ENVIRONMENTAL SCIENCES↗

Cost estimation of HVDC transmission system of Bangka’s NPP candidates

Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗