Search NASA⌕ Search

SEARCH · Search NASA

Results for “Capability Challenge”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Low-speed longitudinal orbiter qualities

The shuttle program took on the challenge of providing a manual landing capability for an operational vehicle returning from orbit. Some complex challenges were encountered in developing the longitudinal flying qualities required to land the orbiter manually in an operational environment. Approach and landing test flights indicated a tendency for pilot-induced oscillation near landing. Changes in the operational procedures reduced the difficulty of the landing task, and an adaptive stick filter was incorporated to reduce the severity of any pilot-induced oscillatory motions. Fixed-base, movingbase, and in-flight simulations were used for the evaluations, and in general, flight simulation was the only reliable means of assessing the low-speed longitudinal flying qualities problems. Overall, the orbiter control system and operational procedures have produced a good capability to routinely perform precise landings with a large, unpowered vehicle with a low lift-to-drag ratio.

Powers, B. G.↗

Active Control Technology Experience with the Space Shuttle in the Landing Regime

The shuttle program took on the challenge of providing a manual landing capability for an operational vehicle returning from orbit. Some complex challenges were encountered in developing the longitudinal flying qualities required to land the orbiter manually in an operational environmental. Approach and landing test flights indicated a tendency for pilot-induced oscillation near landing. Changes in the operational procedures reduced the difficulty of the landing task, and an adaptive stick filter was incorporated to reduce the severity of any pilot-induced oscillatory motions. Fixed-base, moving-base, and in-flight simulations were used for the evaluations, and in general, flight simulation was the only reliable means of assessing the low-speed longitudinal flying qualities problems. Overall, the orbiter control system and operational procedures have produced a good capability for routinely performing precise landings in a large, unpowered vehicle with a low lift-to-drag ratio.

Powers, B. G.↗

Active control technology experience with the Space Shuttle in the landing regime

The shuttle program took on the challenge of providing a manual landing capability for an operational vehicle returning from orbit. Some complex challenges were encountered in developing the longitudinal flying qualities required to land the orbiter manually in an operational environment. Approach and landing test flights indicated a tendency for pilot-induced oscillation near landing. Changes in the operational procedures reduced the difficulty of the landing task, and an adaptive stick filter was incorporated to reduce the severity of any pilot-induced oscillatory motions. Fixed-base, moving-base, and in-flight simulations were used for the evaluations, and in general, flight simulation has been the only reliable means of assessing the low-speed longitudinal flying qualities problems. Overall, the orbiter control system and operational procedures have produced a good capability for routinely performing precise landings in a large, unpowered vehicle with a low lift-to-drag ratio.

Powers, B. G.↗

Energy-Storage Modeling: State-of-the-Art and Future Research Directions

Given its physical characteristics and the range of services that it can provide, energy storage raises unique modeling challenges. This paper summarizes capabilities that operational, planning, and resource-adequacy models that include energy storage should have and surveys gaps in extant models. Existing models that represent energy storage differ in fidelity of representing the balance of the power system and energy-storage applications. Modeling results are sensitive to these differences. The importance of capturing chronology can raise challenges in energy-storage modeling. Some models ‘decouple’ individual operating periods from one another, allowing for natural decomposition and rendering the models relatively computationally tractable. Energy storage complicates such a modeling approach. Improving the representation of the balance of the system can have major effects in capturing energy-storage costs and benefits.

25 ENERGY STORAGE↗

Electrification of Aircraft: Challenges, Barriers, and Potential Impacts

Small-scale aircraft are being electrified with small e-aircraft already certified to fly and with test flights underway for retrofits of existing aircraft focused on near-term deployment. Internationally, from 2018 to 2020, the number of electric aircraft projects underway increased 50%. These technologies are projected to increase operational efficiency and reduce emissions and noise from a growing aviation sector. This emerging interest in aviation electrification includes aircraft, energy supply equipment, and battery storage manufacturers. Federal agencies are currently funding a variety of efforts including technology research as well as forecasting demand and environmental impacts and state governments have also begun pushing for further investigation in this area. This paper provides an overview of the current state and potential future development of aviation electrification. To understand the types of research questions around current and future challenges for this emerging sector, we consider a case study of the potential deployment of small commercial electric aircraft for existing, under-served markets and consider operational requirements and technical challenges as well as the range of questions that will need to be addressed around charging infrastructure, grid integration, policy and regulatory requirements, and emissions impacts. This case study also outlines potential nearer-term solutions and research areas of interest that will need to be addressed in the longer term at much larger scales and highlights NREL capabilities for addressing these challenges.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

International Coordination and Cooperation on LunaNet Spectrum

LunaNet is planned to be the network of networks operated by a set of cooperating organizations to provide interoperable Communications, networking, Position, Navigation, and Timing (CPNT) services to users on and around the Moon based on a framework of mutually agreed-upon standards, protocols, frequency bands and interface requirements. LunaNet follows a service-oriented architecture that is agnostic about the types of organizations that provide services, e.g., government, industry, or academia. LunaNet is open, scalable, resilient, secure, and extensible. To achieve these goals, LunaNet Service Providers (LNSP) must coordinate with each other to define and develop the architecture, to plan initial and evolved capabilities, and to operate their networks. One of the central LunaNet tenets is the use of shared spectrum. For example, the Lunar Augmented Navigation Service (LANS) acts like a Global Navigation Satellite System (GNSS) such as the US Global Positioning System (GPS) or European Galileo but the LNSPs’ contributions to LunaNet must use the same frequency band (2483.5 MHz-2500.0 MHz) and transmit the same waveform synchronized by highly accurate clocks so that Users ‘see’ one virtual network and use the same multilateration algorithm to determine their positions. This necessitates a high degree of spectrum coordination. NASA’s Lunar and Human Spaceflight Spectrum Management Team has been actively supporting development of the LunaNet Interoperability Specification (LNIS), soliciting inputs from spectrum policy and planning experts across NASA, ESA and JAXA. Cislunar spectrum use considerations have been studied and adjudicated within the Space Frequency Coordination Group (SFCG) and inform the ongoing discussion of a lunar communication and navigation architecture within the existing radio regulatory framework of the International Telecommunication Union, leading to the 2027 World Radiocommunication Conference (WRC-27). The frequency plan contained in the publicly released draft of the LunaNet Interoperability Specification reflects the initial phase of exploration (roughly to 2030) defining an optimal set of radio frequencies in appropriately allocated services consistent with WRC-23 decisions for use by known or planned CPNT applications, while striving to maximize coexistence and compatibility amongst cislunar systems and other systems within the near-Earth regime (< 2 million km from Earth). Important considerations include: protection of extremely sensitive receive-only radio astronomy systems on the lunar far side, known as the Shielded Zone of the Moon (SZM); compatibility between Direct with Earth (DWE) communications links and links needed to support relay satellites in lunar orbit with their customer systems on orbit or on the lunar surface; compatibility between multiple lunar surface communications systems and capabilities over varied and challenging terrain and distances; as well as ensuring compatibility and interoperability between navigation systems which either leverage Earth-based or in-situ lunar systems. In addition, the lunar CPNT architecture is envisioned to be the basis – with adjustments – of the future Mars CPNT architecture as we expand into the solar system using Interplanetary Networking (IPN). The second phase of lunar spectrum definition will address planned international capabilities for the next decade that will require action at WRC-27 and beyond. This paper will discuss each of these considerations in more depth and how the current LunaNet frequency plan addresses them.

LunaNet↗

STS payload ground handling mechanism at John F. Kennedy Space Center

The payload ground handling mechanism (PGHM), which lifts payloads out of the payload canister that brings them to the launch pad, is described. The PGHM then loads the payloads into the orbiter through the open payload bay doors. The challenge was to provide this capability in time for space shuttle mission 31-A. Meeting this STS requirement was considerably more challenging than using the stacking method for loading payloads on top of expendable vehicles. The new mechanism and its main features are discussed.

Cassisi, V.↗

Ventilator Technologies Sustain Critically Injured Patients

Consider this scenario: A soldier has been critically wounded in a sudden firefight in a remote region of Afghanistan. The soldier s comrades attend to him and radio for help, but the soldier needs immediate medical expertise and treatment that is currently miles away. The connection between medical support for soldiers on the battlefield and astronauts in space may not be immediately obvious. But when it comes to providing adequate critical care, NASA and the military have very similar operational challenges, says Shannon Melton of NASA contractor Wyle Integrated Science and Engineering. Melton works within Johnson Space Center s Space Medicine Division, which supports astronaut crew health before, during, and after flight. In space, we have a limited number of care providers, and those providers are not always clinicians with extensive medical training. We have limited room to provide care, limited consumables, and our environment is not like that of a hospital, she says. The Space Medicine Division s Advanced Projects Group works on combining the expertise of both clinicians and engineers to develop new capabilities that address the challenges of medical support in space, including providing care to distant patients. This field, called telemedicine, blends advanced communications practices and technologies with innovative medical devices and techniques to allow caregivers with limited or no medical experience to support a patient s needs. NASA, just by its nature, has been doing remote medicine since the beginning of the Space Program, says Melton, an engineer in the Advanced Projects Group. Since part of NASA s mandate is to transfer the results of its technological innovation for the benefit of the public, the Agency has worked with doctors and private industry to find ways to apply the benefits of space medicine on Earth. In one such case, a NASA partnership has resulted in new technologies that may improve the quality of emergency medicine for wounded soldiers on the battlefield and regular civilians.

Source record↗

Lunar Simulants, Analogues, and Standards: Needs and Realities for Mission Technologies Development

Integration of In-Situ Resource Utilization (ISRU) capabilities into missions present both challenges as well as benefits for future missions to the Moon and Mars. However, since ISRU systems and capabilities have not flown, mission planners have been hesitant to include ISRU capabilities in mission critical roles, thereby significantly reducing the benefits that ISRU can provide in mission mass and cost reductions. For ISRU systems to provide products and services to 'customers' such as life support, propulsion, and power systems, close development of requirements, hardware, and operations between ISRU and these systems are required. To address these development and incorporation challenges, NASA and csA initiated a series of analog field test demonstrations at sites in Hawaii. Two tests completed in November of 2008 and February of 2010 have demonstrate all the critical steps in operating ISRU systems on the lunar surface at relevant mission scales as well as integration with power and propulsion systems. The third field test planned for July 2012 will demonstrate that a mission to the lunar poles to locate and characterize ice and other volatiles is possible in a highly integrated mission with multiple space agencies. These analog field tests have shown that not only are ISRU systems feasible at relevant mission scales, that they can be successfully integrated into mission architectures.

Sibille, Laurent↗

Radio Afterglow Detection and AI-driven Response (RADAR): A Federated Framework for Gravitational-wave Event Follow-up

The landmark detection of both gravitational waves (GWs) and electromagnetic (EM) radiation from the binary neutron star merger GW170817 has spurred efforts to streamline the follow-up of GW alerts in current and future observing runs of ground-based GW detectors. Within this context, the radio band of the EM spectrum presents unique challenges. Sensitive radio facilities capable of detecting the faint radio afterglow seen in GW170817, and with sufficient angular resolution, have small fields of view compared to typical GW localization areas. Additionally, theoretical models predict that the radio emission from binary neutron star mergers can evolve over weeks to years, necessitating long-term monitoring to probe the physics of the various postmerger ejecta components. These constraints, combined with limited radio observing resources, make the development of more coordinated follow-up strategies essential—especially as the next generation of GW detectors promises a dramatic increase in detection rates. Here, we present RADAR, a framework designed to address these challenges by promoting community-driven information sharing, federated data analysis, and system resilience, while integrating AI methods for both GW signal identification and radio data aggregation. We show that it is possible to preserve data rights while sharing models that can help design and/or update follow-up strategies. We demonstrate our approach through a case study of GW170817, and discuss future directions for refinement and broader application.

Gravitational waves↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing for Mars: The Evolvable Mars Campaign 'Proving Ground' Approach

As the National Aeronautics and Space Administration (NASA) prepares to extend human presence beyond Low Earth Orbit, we are in the early stages of planning missions within the framework of an Evolvable Mars Campaign. Initial missions would be conducted in near-Earth cis-lunar space and would eventually culminate in extended duration crewed missions on the surface of Mars. To enable such exploration missions, critical technologies and capabilities must be identified, developed, and tested. NASA has followed a principled approach to identify critical capabilities and a "Proving Ground" approach is emerging to address testing needs. The Proving Ground is a period subsequent to current International Space Station activities wherein exploration-enabling capabilities and technologies are developed and the foundation is laid for sustained human presence in space. The Proving Ground domain essentially includes missions beyond Low Earth Orbit that will provide increasing mission capability while reducing technical risks. Proving Ground missions also provide valuable experience with deep space operations and support the transition from "Earth-dependence" to "Earth-independence" required for sustainable space exploration. A Technology Development Assessment Team identified a suite of critical technologies needed to support the cadence of exploration missions. Discussions among mission planners, vehicle developers, subject-matter-experts, and technologists were used to identify a minimum but sufficient set of required technologies and capabilities. Within System Maturation Teams, known challenges were identified and expressed as specific performance gaps in critical capabilities, which were then refined and activities required to close these critical gaps were identified. Analysis was performed to identify test and demonstration opportunities for critical technical capabilities across the Proving Ground spectrum of missions. This suite of critical capabilities is expected to provide the foundation required to enable a variety of possible destinations and missions consistent with the Evolvable Mars Campaign.. The International Space Station will be used to the greatest extent possible for exploration capability and technology development. Beyond this, NASA is evaluating a number of options for Proving Ground missions. An "Asteroid Redirect Mission" will demonstrate needed capabilities (e.g., Solar Electric Propulsion) and transportation systems for the crew (i.e., Space Launch System and Orion) and for cargo (i.e., Asteroid Redirect Vehicle). The Mars 2020 mission and follow-on robotic precursor missions will gather Mars surface environment information and will mature technologies. NASA is considering emplacing a small pressurized module in cis-lunar space to support crewed operations of increasing duration and to serve as a platform for critical exploration capabilities testing (e.g., radiation mitigation; extended duration deep space habitation). In addition, "opportunistic mission operations" could demonstrate capabilities not on the Mars critical path that may, nonetheless, enhance exploration operations (e.g., teleoperations, crew assisted Mars sample return). The Proving Ground may also include "pathfinder" missions to test and demonstrate specific capabilities at Mars (e.g., entry, descent, and landing). This paper describes the (1) process used to conduct an architecture-driven technology development assessment, (2) exploration mission critical and supporting capabilities, and (3) approach for addressing test and demonstration opportunities encompassing the spectrum of flight elements and destinations consistent with the Evolvable Mars Campaign.

Bobskill, Marianne R.↗

In Situ MOF Pyrolysis Construction of Hierarchical Porous Co‐Nanoparticles/Carbon Cloth Composites for Enhanced Electromagnetic Wave Shielding and Absorption

The development of high-performance electromagnetic protection materials integrating broadband absorption and effective shielding capabilities is hindered by challenges in simultaneously optimizing multiple electromagnetic properties through conventional material designs. This study pioneers a hierarchical porous Co nanoparticle/carbon cloth (Co/CC) composite via controlled annealing of a Co-MOF precursor on carbon cloth. The Co-MOF served a dual role as both magnetic source and pore-forming agent, enabling in situ generation of uniformly dispersed Co nanoparticles and creation of abundant pores/interfaces on the CC fibers during pyrolysis. This unique architecture synergistically enhanced dielectric loss (via interfacial/dipolar polarization) and magnetic loss (via natural resonance, exchange interactions, and eddy currents), significantly improving impedance matching. The hierarchical pores further functioned as integrated “absorption–reflection” units for efficient electromagnetic energy attenuation. Consequently, the Co/CC composite annealed at 800°C (Co/CC-800) achieves minimum reflection loss (−40.69 dB) and 120% effective absorption bandwidth extension (6.16 GHz) as a filler, and exhibits superior electromagnetic interference shielding effectiveness (46.66 dB) as an integrated component. Significantly, Co/CC-800 demonstrated robust photothermal and electrothermal conversion capabilities, ensuring operational stability in ice-covered and humid harsh environments. This work pioneers a pore-structure-mediated strategy to harmonize dielectric–magnetic synergy, providing a new paradigm for designing advanced multifunctional electromagnetic protection materials.

dielectric‐magnetic synergy↗

Demonstrating Capabilities for Mars Exploration on the Moon

The U.S. Space Policy Directive of 2017 calls for the United States to lead the return of humans to the Moon for long-term exploration and utilization, followed by human missions to Mars. To achieve these goals, NASA is working with commercial and international partners to develop systems and operational approaches that could be tested on the Moon to prepare for Mars missions. NASA’s human exploration strategy progresses in phases from the ISS in low-Earth orbit, to a sustained presence in cislunar space and on the Moon, to humans in Mars orbit, and finally humans on Mars. There is a huge jump in the capabilities required between the last two phases: humans in Mars orbit and humans on the surface. These include landing large payloads, surface habitation, extra-vehicular activity and crew mobility systems, in-situ resource utilization, and ascent from Mars to return the crew to Earth. Many of these needed capabilities can be tested first on the Moon to reduce the risk for Mars missions. There are a few challenges, however, in extrapolating from capability demonstrations on the Moon to enabling Mars missions such as greater remoteness, the Mars atmosphere, different gravity levels, and planetary protection. Key technologies, concepts for early demonstration of the required capabilities on the Moon, and potential areas for commercial and international partnerships will be discussed.

Moore, Christopher↗

Evaluating the Effectiveness of an Ultrasonic Acoustic Deterrent in Reducing Bat Fatalities at Wind Energy Facilities

This project was designed to use thermal video cameras and fatality monitoring to evaluate the effectiveness of an ultrasonic acoustic deterrent (UAD) on bat activity and mortality, respectively. Our goals were to redesign the UAD device and installation infrastructure, determine the placement on wind turbines to optimize safety, compatibility and functionality, and to compare the mortality among the following conditions: Control (deterrents off and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Deterrent (deterrents on and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Curtailment (deterrents off and turbines feathered up to 5/ m/s), and combination (deterrents on and turbines feathered up to 5 m/s). The project was divided into a Feasibility Study and Comparative Study. The objectives for the Feasibility Study were to develop an installation strategy, redesign a previous iteration of a UAD to improve performance and weatherization, and test the effectiveness of the deterrents on bat activity. The Feasibility Study was intended to work out potential issues using a relatively small number of devices prior to manufacturing and installing numerous devices for a larger-scale comparative study. The division of the project into these separate studies was based on previous experience and the challenges of assessing the capabilities of an untested UAD. During the initial development and manufacturing of the UAD, NRG Systems decided to use a piezoelectric transducer rather than an electrostatic transducer, which was used by a previous device (i.e. Deaton UAD). NRG Systems conducted lab testing (i.e., IP67 or Ingress Protection) to ensure no water or dust ingress. In addition, shock/drop trials and variations in temperature exposure were conducted as part of the reliability testing. NRG Systems also developed a communications system to allow for continuous performance monitoring of the UADs. For the Feasibility Study, we installed 6 UADs on each of 2 Gamesa G90 2-MW wind turbines (Turbine 14 and 8) at the South Chestnut Wind Energy Facility, Pennsylvania and monitored activity under control and treatment (i.e. Deterrent) conditions using thermal video monitoring. There are two major sources of variation in bat activity (beyond the anticipated treatment effect): 1) environment around the turbines might inherently favor more activity at one than the other; 2) weather conditions on any given night or within season difference (e.g., migration later during the study period) might favor more activity on some nights than on other nights. Because we could only monitor two turbines on any night, we sought to control the potential influences of these two sources by alternating the turbine on which deterrents were activated each night. If there were no loss of data due to technical failures, this design would result in an equal number of deterrent and control nights at each turbine through the monitoring period, balancing the effects of both sources of variation. We compared the time bats spent and the number of events that occurred in overlapping cameras FOV as an indicator of risk, since 80% of the overlapping FOV of the cameras was in the RSA. Equipment failures, majority due to lightning, resulted in only 17 nights with useable data, with unbalanced treatment assignment within turbines and uneven distribution of treatment assignment throughout the observational period. This resulted in a confounding of treatment assignment and seasonal change. Deterrent treatment was measured at Turbine 14 on only 2 of the first 8 usable nights (spanning the period from 8/18-9/17), whereas 6 times on Turbine 8. From 9/18-927, deterrent was on at Turbine 14 on 6 of the remaining 10 nights, and 4 on Turbine 8. We recorded a total of 1,057 bats and observed a reduction in number of events and duration of events at the UAD-activated turbine when it was Turbine 14. When Turbine 8 had the UAD activated, we observed no difference in number or duration of events. Variation between turbines is not unusual and can cause issues when study designs have no true replication, i.e., multiple turbines per treatment. Within-turbine differences suggested a trend for reduced activity when UADs were activated, particularly for Turbine 14. These results may be caused by the overall higher bat activity at Turbine 8 and confounding of treatment assignment and seasonal trends. We mapped 58 bat events in 3-dimensional space (3D), 30 and 28 events during control and treatment conditions, respectively. We observed bats crossing the rotor plane under both control and treatment conditions and observed a total of 40 confirmed or near-collisions (i.e., target close to blade but no visual confirmation of a strike) out of a total of 1,491 medium and high confidence bat observations (880 control, 611 at treatment). Twice as many collisions/possible collisions were observed during control conditions. Given the challenges with the equipment and potential confounding of the data (i.e., different activity levels at the two wind turbines), we were unable to determine whether this initial turbine placement and orientation was optimal. Given no new information on how best to install the devices, we elected to use the same placement and orientation for the comparative study. For the Comparative Study, the objectives were to investigate the relative mortality rates among 4 treatments. We searched the area within 90 m of each turbine daily to recover the highest number of fresh fatalities possible. We were unable to detect a clear reduction in mortality from deterrents alone for any individual species. Surprisingly, mortality rate of the eastern red bat (Lasiurus borealis) was estimated to be 1.3–4.2 times as much when turbines were operating normally and UADs were on than when UADs were off. Reduction in mortality of all bat species combined due to curtailment of turbines was estimated to be between 0%–38%. This effect was nullified when, in addition to curtailment, UADs were on, with 95% confidence interval ranging from a 45% reduction to a 36% increase in mortality. This was likely due to the large proportion of eastern red bats in the total carcass population. Mortality of all low-frequency echolocating bats combined (i.e. hoary bat [L. cinereus], big brown bat [Eptesicus fuscus], silver-haired bat [Lasionycteris noctivagans]) relative to control was lower when curtailed (95% CI: 0%–74%), but the addition of UADs had no detectable effect (95%CI: 13%–79%). The combined treatment reduced mortality in silver-haired bats relative to control by 11%–99%, compared to curtailment (81% reduction–67% increase) or deterrent (82% reduction–67% increase) alone. Because silver-haired bats comprised a large proportion of low-frequency calling bats found during this study, a similar effect was seen for that group. The higher mortality observed for eastern red bats at UAD compared to control could have been caused by several factors, such as the effective range of the UAD, particularly at higher frequencies, behavior, positioning of the devices on the nacelle, or a combination of these. We used 3D thermal videography to compare control and UAD bat behavior from two turbines using a total of 203 3D bat-tracks across 34 nights. We recorded a similar number of bat-tracks between treatment groups, with 51% and 49% for control and UAD, respectively. Due to potential differences in bat behavior around spinning vs stationary turbine blades, we examined UAD effectiveness separately for non-operating turbines (feathered below cut-in speed of 3.5 m/s) and operating (normal operation above wind speed of 3.5 m/s). We found a higher proportion of bat-tracks at operating turbines (82%) compared to non-operating turbines (18%), although this does not account for overall time turbines were operating versus not. At non-operating turbines the UAD appears to be effective at reducing the amount of time, flight length, and number of passes through the rotor plane, compared to control. In addition, we found bats approached turbines similarly between control and treatment turbines, with 61% of control and 63% of UAD bat-tracks originating leeward of the hub. In contrast, at operating turbines, we saw little change in bat behavior in response to UADs. For example, we found an increase in the average duration of bat-tracks between non-operating and operating turbines for UAD but at control turbines we found average duration decreased once turbines became operational. Both control and UAD had a high proportion of bat-tracks that crossed the rotor plane (i.e., collision risk) originate from the windward side when turbines were operational 65% to 92%, respectively. Given that the UAD devices closest to the blades were orientated parallel to the blades, its possible bats were not exposed to the signal until they were close to the turbine blades, as suggested by the slightly higher mean duration within 5 meters of the blades for UAD turbines. Future research should consider concentrating UAD intensity on the areas of risk (i.e. blades) with enough buffer to allow bats to react to the sound before entering the rotor-swept area (RSA). In addition, investigating the potential of installing UAD units windward of the turbine blades (e.g. a hub-mounted UAD), particularly since even under control conditions, a relatively high proportion (65%) of crosses through the blade plane originated windward. 3D thermal videography provided valuable information on future testing strategies (e.g. device placement, UAD orientation) to improve UAD effectiveness when bats are at risk (i.e., operating wind turbines). Across the entire project we experienced issues with the operation and communication with the UADs. Most of the issues occurred during the Feasibility Study and were resolved prior to the Comparability Study. Additional challenges surfaced during the Comparability Study but were remedied immediately and are thought to have little impact on the results. We had logistical constraints at the project that limited our ability use traditional methods in our camera calibration. Several calibrations showed inaccurate scales, which may have been related to inadequate spatial coverage of “points” in the camera calibration volume. Because we were using actual video recordings of bats at a wind turbine, the behavior of bats could have concentrated “points” in specific areas of the turbine (i.e. leeward of nacelle), and limited “points” in other areas, resulting in camera calibration issues. We have plans to address these inconsistencies and improving the software and related methodologies by early 2020.

17 WIND ENERGY↗

Reversible Phase Transitions Enable Cyclic Isothermal CO 2 Capture in Redox‐Activated Perovskite‐Structured Sorbents

Sorption‐enhanced steam reforming and gasification using CO 2 sorbents enable the production of H 2 ‐rich syngas from carbonaceous feedstocks but are limited by significant temperature swings and sintering‐induced activity loss. Perovskite‐structured oxides are presented herein as sintering‐resistant, redox‐activated isothermal CO 2 sorbents capable of overcoming these challenges by releasing lattice oxygen to partially oxidize the carbonaceous feedstock while capturing CO 2 , shifting equilibrium toward H 2 production. Building on this, the structural and thermodynamic impact of Fe doping on the CO 2 sorption properties of SrMn 1‐ x Fe x O 3‐ δ is investigated for sorption‐enhanced reforming. Experimental results demonstrate that these sorbents enable isothermal production of high‐quality, H 2 ‐enriched syngas from carbonaceous feedstocks. Laboratory and synchrotron‐based powder X‐ray diffraction analyses, coupled with density functional theory calculations, reveal the structural dynamics and energy landscape of the SrMn 1‐ x Fe x O 3‐ δ perovskite system under reaction conditions, elucidating the solid‐state reaction pathway and the effect of Fe doping on the extent of carbonation.

CO2 capture↗

Polymer Deconstruction and Redesign Strategies for Plastics Recycling

Advancing plastics recycling requires both the selective deconstruction of existing polymers and the design of new materials that enable efficient reuse without loss of performance. This perspective highlights an integrated approach that is rooted in polymer chemistry, catalysis, and process engineering which can enable a circular plastics economy. Here, we outline recent advances in catalytic, solvolytic, and enzymatic pathways for plastic deconstruction, and examine the molecular design principles driving next-generation recyclable-by-design and bio-based polymers. Despite these advances, major knowledge gaps remain in understanding the evolution of polymer morphology and catalyst structure during deconstruction, assessing deconstruction processes with realistic polymers, and offering redesigned polymers with competitive cost and environmental advantage over conventional plastics. United States Department of Energy (U.S. DOE) national laboratories offer unique capabilities to address these challenges through in situ and operando characterization, high-throughput experimentation, environmental studies, technoeconomic and life cycle assessment, scale-up support, and collaboration networks. Advances made in understanding plastic deconstruction mechanisms and structure-property correlations of redesigned polymers inform emerging research directions including autonomous experimentation, real-time feedback-enabled process optimization, and protein engineering for enzymatic depolymerization.

36 MATERIALS SCIENCE↗