AK Re-evaluation of Rocky Flats Pond Sludge: Planning for Surprises - 16218
The Advanced Mixed Waste Treatment Project (AMWTP) uses the Sludge Repack Process (SRP) to treat prohibited liquids in retrieved containers of sludge originally stored in the early 1970's. Many of these containers were generated in the Rocky Flats Plant 2. Stage Sludge process. In June, 2015, operators at SRP identified containers of waste with historical IDs beginning with the prefix 742, indicating they were from the 2. stage process, but which were marked with the words 'Pond Sludge' and contained unusual waste such as rolled asphalt and plant material. This event required a reevaluation of the AK, which concluded that the pond sludge containers were from the same generating process as the rest of the 2. stage sludge, and did not change the hazardous waste numbers, waste material parameters or waste matrix code. This case study demonstrated the uncertainty inherent in all AK because of the long time period between generation of the waste and current characterization. Records are missing, unreadable, and difficult to interpret; memories are faulty; and containers continue to surprise us with unexpected waste. AK must be continually reevaluated and updated throughout the life of the project. When disposing of legacy waste, conditions such as that described in this case study should be expected and planned for. (authors)