Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

HydraGNN_OPF_GFM_2026 - Ensemble of predictive graph foundation models for power grid applications

This dataset supports research on graph foundation models for optimal power flow (OPF) on electric grids using HydraGNN. It contains heterogeneous graph representations of PGLib-OPF cases spanning systems from 14 to 13,659 buses, together with packed HDF5 datasets for pretraining, feasibility classification, and N-1 contingency analysis. The release includes OPF solution data, downstream fine-tuning datasets, pretrained HeteroSAGE and HeteroHEAT model checkpoints, hyperparameter-optimization summaries across multiple heterogeneous GNN architectures, and aggregated fine-tuning results for sample-efficiency studies. The dataset is designed to enable scalable training, evaluation, and transfer-learning studies for OPF surrogate modeling, including node-level AC-OPF solution prediction, graph-level prediction, feasibility classification, operating-condition generalization, and contingency-response tasks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

System and method for analyzing oscillatory stability in electrical power transmission systems

A computer-based method for contingency analysis of oscillatory stability in an electrical power transmission system is provided. The method uses at least one processor. The method includes receiving, by the at least one processor, a plurality of component inputs from a plurality of system components within the electrical power transmission system. The method also includes generating a nominal matrix for the electrical power transmission system. The nominal matrix includes a set of equations at least partially modeling the electrical power transmission system. The method further includes calculating eigenvalues and eigenvectors of the nominal matrix. The method also includes identifying a contingency representing a postulated disturbance of the electrical power transmission system. The method further includes estimating a contingency eigenvalue for the contingency using the eigenvalues and eigenvectors of the nominal matrix.

Baone, Chaitanya Ashok↗

Physically Realistic Estimates of Electric Water Heater Demand Response Resource

Multiple grid integration studies have examined the value of demand response, including from water heaters, to bulk power systems. Common shortcomings of these studies include physically unrealistic assumptions. For example, studies often assume that all electric water heater load can be shed for up to an hour to provide capacity or contingency service, that all electric water heater load is shiftable, and that round-trip efficiencies for shifting service are 100%. Another issue is that simply summing up estimates of individual water heaters' flexibility bounds, an attractive idea for constructing the MW-scale resources necessary for direct inclusion in grid investment and operational models, can result in significant overestimates of actual resource, because, e.g., a water heater with the ability to reduce load may not be able sustain the reduction for as long as the aggregate model suggests is possible. This presentation demonstrates the impact of estimating the flexibility of electric water heaters with physically realistic models suitable for grid service analysis. Electric water heater flexibility representations are constructed based on ResStock simulations of New England. Specifically, we examine contingency resource (related to capacity, shed, and contingency reserve services) and energy shifting resource from electric resistance and heat pump water heaters. Different estimation methods are compared; and the surrogate models' event responses are validated against events directly simulated in EnergyPlus. We also demonstrate the impact of using electric water heaters for contingency reserves and energy shifting in detailed models of possible future ISO New England power systems.

building energy modeling↗

A Hybrid Dynamic/Steady-State Tool With Protection Simulation for Cascading-Outage Analysis of Extreme Events in Power Systems

The bulk electric power grid is subject to vulnerabilities from component outages, which in certain combinations (extreme events) might lead to cascading outages. Some of these outages can be severe enough to trigger brownouts and blackouts. Much is known about mitigating the first few failures near the beginning of a cascade, but there are few established methods and tools for directly analyzing the risks of cascading component outages over a longer time scale. Current power system tools have limited ability to perform detailed and accurate cascading-outage analysis, which could be computationally intensive. The Dynamic Contingency Analysis Tool (DCAT) enables power system planning engineers to more realistically assess the consequences of extreme contingencies and potential cascading events across their systems and interconnections. DCAT has several unique features: (i) detailed hybrid dynamic and steady-state analysis of power systems to mimic real-world cascading outages, (ii) detailed modeling of protection systems embedded in the dynamic simulation, (iii) simulation of corrective action after transients, (iv) simulation of islanding , and (v) high-performance computing capability to simulate a large number of contingencies in a reasonable time. DCAT outputs will help find technically sound solutions to reduce the risk of cascading outages. This paper provides details of DCAT methodology and shows its capabilities with extreme events on real-world cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Value of Faster Computation for Power Grid Operation

As a result of the grid evolution meeting the information revolution, the power grid is becoming far more complex than it used to be. How to feed data in, perform analysis, and extract information in a real-time manner is a fundamental challenge in today’s power grid operation, not to mention the significantly increased complexity in the smart grid environment. Therefore, high performance computing (HPC) becomes one of the advanced technologies used to meet the requirement of real-time operation. This paper presents benefit case studies to show the value of fast computation for operation. Two fundamental operation functions, state estimation (SE) and contingency analysis (CA), are used as examples. In contrast with today’s tools, fast SE can estimate system status in a few seconds—comparable to measurement cycles. Fast CA can solve more contingencies in a shorter period, reducing the possibility of missing critical contingencies. The benefit case study results clearly show the value of faster computation for increasing the reliability and efficiency of power system operation.

high performance computing↗

High-Performance Computing for Real-Time Grid Analysis and Operation

Power grids worldwide are undergoing an unprecedented transition as a result of grid evolution meeting information revolution. The grid evolution is largely driven by the desire for green energy. Emerging grid technologies such as renewable generation, smart loads, plug-in hybrid vehicles, and distributed generation provide opportunities to generate energy from green sources and to manage energy use for better system efficiency. With utility companies actively deploying these technologies, a high level of penetration of these new technologies is expected in the next 5-10 years, bringing in a level of intermittency, uncertainties, and complexity that the grid did not see nor design for. On the other hand, the information infrastructure in the power grid is being revolutionized with large-scale deployment of sensors and meters in both the transmission and distribution networks. The future grid will have two-way flows of both electrons and information. The challenge is how to take advantage of the information revolution: pull the large amount of data in, process it in real time, and put information out to manage grid evolution. Without addressing this challenge, the opportunities in grid evolution will remain unfulfilled. This transition poses grand challenges in grid modeling, simulation, and information presentation. The computational complexity of underlying power grid modeling and simulation will significantly increase in the next decade due to an increased model size and a decreased time window allowed to compute model solutions. High-performance computing is essential to enable this transition. The essential technical barrier is to vastly increase the computational speed so operation response time can be reduced from minutes to seconds and sub-seconds. The speed at which key functions such as state estimation and contingency analysis are conducted (typically every 3-5 minutes) needs to be dramatically increased so that the analysis of contingencies is both comprehensive and real time. An even bigger challenge is how to incorporate dynamic information into real-time grid operation. Today’s online grid operation is based on a static grid model and can only provide a static snapshot of current system operation status, while dynamic analysis is conducted offline because of low computational efficiency. The offline analysis uses a worst-case scenario to determine transmission limits, resulting in under-utilization of grid assets. This conservative approach does not necessarily lead to reliability. Many times, actual power grid scenarios are not studied, and they will push the grid over the edge and resulting in outages and blackouts. This chapter addresses the HPC needs in power grid analysis and operations. Example applications such as state estimation and contingency analysis are given to demonstrate the value of HPC in power grid applications. Future research directions are suggested for high performance computing applications in power grids to improve the transparency, efficiency, and reliability of power grids.

Contingency Analysis↗

Enhanced Choice for Viewing Cocaine Pictures in Cocaine Addiction

Individuals with cocaine use disorder (CUD) chose cocaine over nondrug rewards. In two newly designed laboratory tasks with pictures, we document this modified choice outside of a cocaine administration paradigm. Choice for viewing cocaine, pleasant, unpleasant, or neutral pictures-under explicit contingencies (choice made between two fully visible side-by-side images) and under more implicit contingencies (selections made between pictures hidden under flipped-over cards)-was examined in 20 CUD and 20 matched healthy control subjects. Subjects also provided self-reported ratings of each picture's pleasantness and arousal. Under both contingencies, CUD subjects chose to view more cocaine pictures than control subjects, group differences that were not fully explained by the self-reported picture ratings. Furthermore, whereas CUD subjects choice for viewing cocaine pictures exceeded choice for viewing unpleasant pictures (but did not exceed choice for viewing pleasant pictures, in contrast to their self-reported ratings), healthy control subjects avoided viewing cocaine pictures as frequently as, or even more than, unpleasant pictures. Finally, CUD subjects with the most cocaine viewing selections, even when directly compared with selections of the pleasant pictures, also reported the most frequent recent cocaine use. Enhanced drug-related choice in cocaine addiction can be demonstrated even for nonpharmacologic (pictorial) stimuli. This choice, which is modulated by alternative stimuli, partly transcends self-reports (possibly indicative of a disconnect in cocaine addiction between self-reports and objective behavior) to provide an objective marker of addiction severity. Neuroimaging studies are needed to establish the neural underpinnings of such enhanced cocaine-related choice.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Harnessing distributed GPU computing for generalizable graph convolutional networks in power grid reliability assessments

Although machine learning (ML) has emerged as a powerful tool for rapidly assessing grid contingencies, prior studies have largely considered a static grid topology in their analyses. This limits their application, since they need to be re-trained for every new topology. Here, this paper explores the development of generalizable graph convolutional network (GCN) models by pre-training them across a range of grid topologies and contingency types. We found that a GCN model with auto-regressive moving average (ARMA) layers with a line graph representation of the grid offered the best predictive performance in predicting voltage magnitudes (VM) and voltage angles (VA). We introduced the concept of phantom nodes to consider disparate grid topologies with a varying number of nodes and lines. For pre-training the GCN ARMA model across a variety of topologies, distributed graphics processing unit (GPU) computing afforded us significant training scalability. The predictive performance of this model on grid topologies that were part of the training data is substantially better than the direct current (DC) approximation. Although direct application of the pre-trained model to topologies that are not part of the grid is not particularly satisfactory, fine-tuning with small amounts of data from a specific topology of interest significantly improves predictive performance. In general, this paper highlights the feasibility of training large-scale GNN models to assess the reliability of power grids by considering a wide variety of grid topologies and contingency types. With the advent of foundational models in ML and the exponential increase in GPU computing clusters, generalizable ML models will significantly enhance how utilities manage power systems and make decisions in real-time or near-real-time.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Reserve and energy scarcity pricing in United States power markets: A comparative review of principles and practices

Here, errors in forecasting load and renewable-based generation in restructured power systems mean that independent system operators (ISOs) must procure sufficient operating reserves to keep the real-time operation of the system reliable and secure. But when procured reserves turn out to be insufficient in real-time due to the lack of resource capacity or ramp capability, operators often set higher prices for reserves and energy to encourage more supply, and to motivate consumers to decrease usage or shift it to other times. This procedure, which is called scarcity or shortage pricing, is a core feature of U.S. electricity markets. It is receiving increased attention from market designers and stakeholders because scarcity will become more important for spot price formation in the future with the increased penetration of zero-marginal cost renewables, and the shrinking role of fuel costs in setting prices. Scarcity pricing is implemented in various ways by different ISOs. These differences have practical implications for the level of prices and incentives for investment, operations, and demand modification. In this paper, general approaches and specific calculation procedures for reserve and energy scarcity pricing practices and calculations across the seven ISO-based U.S. power markets are reviewed and compared. A consistent terminology is used to facilitate the comparison. Current scarcity pricing practices are grouped into three approaches: (1) imposing an adder after the spot market is run; (2) including stepwise demand curves within market clearing procedures for non-contingency reserve products (e.g., the novel flexiramp product), which tends to yield longer right tails for energy scarcity premium curves; and (3) having stepwise demand curves for traditional contingency reserve products only, which results in shorter right tails in energy scarcity curves. A generic numerical example is presented to highlight the large practical differences among the reserve scarcity pricing approaches and specific implementations. To further investigate factors that contribute the most to demand curves differences among ISOs, a sensitivity analysis is performed. This analysis shows that the largest source of differences among the curves is the scarcity prices assumed in the case of severe scarcity, while the number of steps used and whether flexiramp is considered also yields important differences in scarcity prices. As renewable penetration increases, it will become increasingly crucial to employ administrative demand curves so that spot prices more effectively motivate supply and demand adjustments exactly when and where they are needed. This study shows that the different assumptions yield very different scarcity premiums for reserves and energy, and are likely to provide divergent incentives for resources to respond to shortages. It is concluded that to promote market efficiency, a reserve shortage demand curve should have at least three features: inclusion of the marginal value of reserve products at each shortage level, consideration of the magnitude and probability of supply contingencies, and avoidance of abrupt price discontinuities that can cause excessively volatile market outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal allocation of series FACTS devices in large‐scale systems

Series flexible AC transmission systems devices, such as the variable series reactor, have the ability to continuously regulate the transmission line reactance so as to control power flow. This study presents a new approach to optimally locating such devices in the transmission network considering multiple operating states and contingencies. To investigate optimal investment, a single target year planning with three different load patterns is considered. The transmission contingencies may occur under any of the three load conditions and the coupling constraints between base case and contingencies are included. A reformulation technique transforms the original mixed integer non‐linear programming model into mixed integer linear programming model. To further relieve the computational burden and enable the planning model to be directly applied to practical large‐scale systems, a two‐phase decomposition algorithm is introduced. Detailed numerical simulation results on IEEE 118‐bus system and the Polish 2383‐bus system illustrate the efficient performance of the proposed algorithm.

Zhang, Xiaohu↗

Experimental Characterization Test of a Grid-Forming Inverter for Microgrid Applications

Standardized experimental testing protocols for grid forming (GFM) inverters to ensure expected operation under both normal and contingency conditions do not exist. Such protocols increase the confidence of system owner/operators that an inverter deployed in a proposed system will engage in typical behaviors to ensure interoperability with other units and ancillary equipment (e.g. protection equipment). This paper presents systematic and comprehensive test protocols to evaluate the performance of GFM inverters under the following operational configurations: islanded operation, heterogeneous islanded operation (parallel with a synchronous generator), grid-connected operation, and transition operation. A commercial GFM inverter is used to verify the test protocols and to understand the inverter's performance and functionalities. In particular, required configuration and tuning of the inverter will be explained in the full paper to enrich the testing protocol.

black start↗

Rapid Active Power Control of Photovoltaic Systems for Grid Frequency Support

As deployment of power electronic coupled generation such as photovoltaic (PV) systems increases, grid operators have shown increasing interest in calling on inverter-coupled generation to help mitigate frequency contingency events by rapidly surging active power into the grid. When responding to contingency events, the faster the active power is provided, the more effective it may be for arresting the frequency event. This paper proposes a predictive PV inverter control method for very fast and accurate control of active power. This rapid active power control method will increase the effectiveness of various higher-level controls designed to mitigate grid frequency contingency events, including fast power-frequency droop, inertia emulation, and fast frequency response, without the need for energy storage. The rapid active power control method, coupled with a maximum power point estimation method, is implemented in a prototype PV inverter connected to a PV array. The prototype inverter's response to various frequency events is experimentally confirmed to be fast (beginning within 2 line cycles and completing within 4.5 line cycles of a severe test event) and accurate (below 2% steady-state error).

14 SOLAR ENERGY↗

Impact of Transportation Electrification on the System's Dynamic Frequency Response

Transportation electrification is an integral component of the energy decarbonization transition. This paper investigates the impact of distributed energy resources (DERs), including distributed photovoltaics (DPV) and electric vehicles (EVs), in the primary frequency response of the power grid. Increasing DER adoption poses challenges to maintaining grid frequency stability. However, DERs' ability to provide fast frequency regulation services-primary frequency response (PFR) and secondary frequency response (SFR)-can be exploited to recover the frequency after an N-1 contingency event in the system. This paper also investigates the importance of a droop control strategy through dynamic models of DPV and EV to provide the primary frequency regulation services following the contingency event. A dynamic EV model, based on the PVD1 model Western Electricity Coordinating Council (WECC) introduced, has been used for the simulation. Further, DERs' primary frequency response is studied for five different cases of DER penetration levels after the system is exposed to the generator trip. Additionally, different frequency regulation capacities of EVs are analyzed. The studies show that an increment in DERs capacity providing effective PFR can improve the system frequency nadir and stabilize the frequency faster after the generation trip contingency.

distributed energy resources↗

Structure-Informed Graph Learning of Networked Dependencies for Online Prediction of Power System Transient Dynamics

Online transient analysis plays an increasingly important role in dynamic power grids as the renewable generation continues growing. Traditional numerical methods for transient analysis not only are computationally intensive but also require precise contingency information as input, and therefore, are not suitable for online applications. Existing online transient assessment studies focus on the determination of post-contingency system stability or stability margin. Here, this paper develops a novel graph-learning framework, Deep-learning Neural Representation or DNR, for online prediction, of the time-series trajectories of the system states using initial system responses that can be measured by phasor measurement units (PMUs). The proposed DNR framework consists of two sequential modules: a Network Constructor that captures network dependencies among generators, and a Dynamics Predictor that predicts the system trajectories. The key to improved prediction performance is the introduction of the spatio-temporal message-passing operations into graph neural networks with structural knowledge. Its effectiveness and scalability are validated through comparative studies, demonstrating the prediction performance under different contingency scenarios for systems of different sizes. This framework provides a solution to online predicting post-fault system dynamics based on real-time PMU measurements. Additionally, it can also be applied to facilitate the offline transient simulation without simulating the entire trajectories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

User Guide for VISION 3.4.7 (Verifiable Fuel Cycle Simulation) Model

The purpose of this document is to provide a guide for using the current version of the Verifiable Fuel Cycle Simulation (VISION) model. This is a complex model with many parameters and options; the user is strongly encouraged to read this user guide before attempting to run the model. This model is an R&D work in progress and may contain errors and omissions. It is based upon numerous assumptions. This model is intended to assist in evaluating 'what if' scenarios and in comparing fuel, reactor, and fuel processing alternatives at a systems level. The model is not intended as a tool for process flow and design modeling of specific facilities nor for tracking individual units of fuel or other material through the system. The model is intended to examine the interactions among the components of a fuel system as a function of time varying system parameters; this model represents a dynamic rather than steady-state approximation of the nuclear fuel system. VISION models the nuclear cycle at the system level, not individual facilities, e.g., 'reactor types' not individual reactors and 'separation types' not individual separation plants. Natural uranium can be enriched, which produces enriched uranium, which goes into fuel fabrication, and depleted uranium (DU), which goes into storage. Fuel is transformed (transmuted) in reactors and then goes into a storage buffer. Used fuel can be pulled from storage into either separation or disposal. If sent to separations, fuel is transformed (partitioned) into fuel products, recovered uranium, and various categories of waste. Recycled material is stored until used by its assigned reactor type. VISION is comprised of several Microsoft Excel input files, a Powersim Studio core, and several Microsoft Excel output files. All must be co-located in the same folder on a PC to function. You must use Powersim Studio 8 or better. We have tested VISION with the Studio 8 Expert, Executive, and Education versions. The Expert and Education versions work with the number of reactor types of 3 or less. For more reactor types, the Executive version is currently required. The input files are Excel2003 format (xls). The output files are macro-enabled Excel2007 format (xlsm). VISION 3.4 was designed with more flexibility than previous versions, which were structured for only three reactor types - LWRs that can use only uranium oxide (UOX) fuel, LWRs that can use multiple fuel types (LWR MF), and fast reactors. One could not have, for example, two types of fast reactors concurrently. The new version allows 10 reactor types and any user-defined uranium-plutonium fuel is allowed. (Thorium-based fuels can be input but several features of the model would not work.) The user identifies (by year) the primary fuel to be used for each reactor type. The user can identify for each primary fuel a contingent fuel to use if the primary fuel is not available, e.g., a reactor designated as using mixed oxide fuel (MOX) would have UOX as the contingent fuel. Another example is that a fast reactor using recycled transuranic (TRU) material can be designated as either having or not having appropriately enriched uranium oxide as a contingent fuel. Because of the need to study evolution in recycling and separation strategies, the user can now select the recycling strategy and separation technology, by year.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demand Response as a System Reliability Resource

The Demand Response as a System Reliability Resource project consists of six technical tasks: • Task 2.1. Test Plan and Conduct Tests: Contingency Reserves Demand Response (DR) Demonstration—a pioneering demonstration of how existing utility load-management assets can provide an important electricity system reliability resource known as contingency reserve. • Task 2.2. Participation in Electric Power Research Institute (EPRI) IntelliGrid—technical assistance to the EPRI IntelliGrid team in developing use cases and other high-level requirements for the architecture. • Task 2.3. Research, Development, and Demonstration (RD&D) Planning for Demand Response Technology Development—technical support to the Public Interest Energy Research (PIER) Program on five topics: Sub-task 1. PIER Smart Grid RD&D Planning Document; Sub-task 2. System Dynamics of Programmable Controllable Thermostats; Sub-task 3. California Independent System Operator (California ISO) DR Use Cases; Sub-task 4. California ISO Telemetry Requirements; and Sub-task 5. Design of a Building Load Data Storage Platform. • Task 2.4. Time Value of Demand Response—research that will enable California ISO to take better account of the speed of the resources that it deploys to ensure compliance with reliability rules for frequency control. • Task 2.5. System Integration and Market Research: Southern California Edison (SCE)—research and technical support for efforts led by SCE to conduct demand response pilot demonstrations to provide a contingency reserve service (known as non-spinning reserve) through a targeted sub-population of aggregated residential and small commercial customers enrolled in SCE’s traditional air conditioning (AC) load cycling program, the Summer Discount Plan. • Task 2.6. Demonstrate Demand Response Technologies: Pacific Gas and Electric (PG&E)—research and technical support for efforts led by PG&E to conduct a demand response pilot demonstration to provide non-spinning reserve through a targeted sub-population of aggregated residential customers enrolled in PG&E’s AC load curtailment program, the Smart AC™ Demand Response Program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Monticello Mill Tailings Site Operable Unit III Annual Groundwater Report May 2014 Through April 2015, October 2015

This report provides the annual analysis of water quality restoration progress, cumulative through April 2015, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1,700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site (OU I) and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. Contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern. LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of Significant Difference to include a pump-and-treat system using a single extraction well and treatment by zero-valent iron (ex-situ treatment system). The contingency action was optimized in 2015 with the installation of 8 extraction wells and 16 monitoring wells in a focused area of the aquifer (area of attainment). Contaminated water is treated by solar evaporation at an existing onsite LM facility. Environmental monitoring at OU III consists of twice-yearly (April and October) collection and analysis of hydrologic and water-quality data from an established network of observation wells, seeps, and surface water locations. The scope of monitoring was expanded in 2009 for the ex situ treatment system and in 2015 for the remedy optimization system. Operation and monitoring of the ex situ treatment system was discontinued in 2014 with the start-up of the remedy optimization system. No data anomalies for OU III water quality trending or restoration progress are identified for the May 2014 through April 2015 reporting period. Although some regions of the aquifer demonstrate decreasing concentration trends, such trending is not evident for the bulk of the aquifer and a prolonged restoration period is indicated. The groundwater contingency remedy optimization system captures significant contaminant mass (primarily uranium) from the area of attainment; however, because that system only became operational in 2015, a long-term forecast of restoration progress is premature.

54 ENVIRONMENTAL SCIENCES↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗