Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control of electric power systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

FARM supervisory capabilities for thermal energy storage

The FARM (Feasible Actuator Range Modifier) module is a component of the RAVEN-based FORCE framework for the analysis of Integrated Energy Systems (IES). FARM aids HERON in the solution of the power dispatch problem by evaluating feasible set-point signals to be issued to the control systems of the different IES unit components. Set-points need to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To enforce all these limits, a two-stage approach is adopted. First, the power dispatcher algorithm in HERON module estimates set-points that meet the constraints on the production variables, e.g., power levels and power ramp rate limits. These constraints are called explicit constraints. Then, if necessary, FARM adjusts these set-points to ensure the respect of the limits on the process variables of interest, given the knowledge of the system dynamics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). In this report, an overview of the major capabilities of the latest release of FARM is provided, along with a summary of the tool demonstration campaign conducted at the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility. These results assess the performance of the control system architecture embedding FARM both as a Validator of the HERON power dispatcher and as a real time Supervisory control scheme. Additionally, the report outlines the areas that FARM might benefit from, along with proposed solutions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Validation of Power Distribution Models using Load Flow Analysis in an ADMS Environment

Electric utilities are facing the need for better monitoring, analysis, and control of their distribution systems. An accurate mathematical model is a key to both the development of cutting-edge, scalable model-based algorithms and the assessment of emerging technologies such as distributed energy resources (DER) for grid planning and operation. However, the constantly evolving nature of power distribution systems poses challenges to maintaining accurate models. In this paper, we propose a novel load flow based approach to validate power distribution models. Networked equipment models described according to the Common Information Model (CIM) standard and a measurement model are used to formulate the distribution load flow problem. First, a system admittance matrix (Ybus) is derived from device-level CIM parameters. Next, the operational parameters (dynamic Ybus and nodal injections) are extracted from the measurement model using sensor configuration and equipment state. An iterative power flow method is then used to compute nodal voltages and branch flows that are compared against the measurement data to find any inconsistencies in the networked equipment model. This approach is implemented within GridAPPS-D, an open-source standards-based platform for advanced distribution management system (ADMS) application development, and demonstrated on the IEEE 13-bus, 123-bus, and 8500-node test feeders.

Common information model, model validation, power ↗

Deadband Voltage Control and Power Buffering for Extreme Fast Charging Station

Voltage fluctuation is one of the most common challenges that electric vehicle charging station (EVCS) may introduce to the power grid. Local reactive power compensation (Q-compensation) capability of bi-directional electric vehicle (EV) chargers can mitigate the steady-state voltage violations caused by the EV charging itself or changes in the neighboring loads. Power buffering, using energy storage system (ESS), can be utilized to address the voltage transients (sags and swells) as a result of EV charging at the EVCS. To address PI controller’s ‘hunting’ issue, this paper proposes a Q-sign triggered deadband voltage control (V-control) method at the point of common coupling (PCC). In addition, to ensure the ramp rate of EV charging is within the allowable limits set forth by the grid code, a ramp rate control is proposed that uses the ESS as a ‘power buffer’. Lastly, different from most reported work in the literature where no explicit limit of the power electronic converters (PECs) is considered, this work considers a reasonable apparent power capacity limit of the PECs when achieving the V-control. This limit also affects the amount of active power that can be obtained from the grid, and subsequently may require ESS to function as ‘load sharing’ device to provide supplemental active power to satisfy EV load. A case study simulated in MATLAB (interfaced with PLECS) is presented to demonstrate the effectiveness of the proposed approaches for EVCS operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Overview of Issues Related to IEEE Std 1547-2018 Requirements Regarding Voltage and Reactive Power Control

The revised Institute of Electrical and Electronics Engineers (IEEE) 1547 Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018) was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concept and requires the appropriate information required to calculate relevant settings and configurations. Various stakeholders have different roles in implementing the standard, and portions of the standard are directed toward a specific audience who must possess specialized information and technical training to use and apply the requirements. This document aims to (1) summarize a specific portion of the standard as concisely as possible and (2) provide the reader with introductory knowledge and information to support the utilization of the requirements.

14 SOLAR ENERGY↗

Control of hybrid boosting in highly diluted internal combustion engines

A novel hybrid system enabling both flexible supercharging and limited torque assist is studied to mitigate transient response challenges of a turbocharged spark ignition engine equipped with low pressure exhaust gas recirculation. The hybrid system, called a power split supercharger (SC), is configured with a planetary gear set that splits the supercharging power between a small low-voltage electric motor and the engine crankshaft. The air path controller relies on the coordination of four actuators on the engine side and three low-level actuators on the hybrid boosting device. A decentralized control scheme is used in this work, in which the master–slave structure of the boost pressure controller decreases the turbo-lag associated with exhaust gas recirculation, while minimizing the SC operation for fuel economy. A vector reference governor is used to prevent compressor surge during engine tip-outs. In addition, the desired intake manifold pressure is modified to provide time for evacuating the exhaust gas recirculation and avoiding misfires when transitioning to low load, while the hybrid capability of the power split SC is used to recuperate the unwanted generated power. All controllers are validated on both a mean value engine model and a high-fidelity engine model. Practical challenges of implementing the vector reference governor to the highly nonlinear engine air path with pressure pulsations originating from the engine reciprocation are discussed and some solutions are proposed.

Engineering↗

Precursor Analysis Report: SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003

The SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003 Precursor Analysis Report leverages publicly available information about Davis-Besse’s 2003 cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. On 25 January 2003, the SQL Slammer worm infected more than 90% of vulnerable hosts and crashed the internet in 10 to 15 minutes, making it one of the fastest spreading worms in history. SQL Slammer is a fileless, memory-resident worm that remotely exploits a stack-based buffer overflow vulnerability on local hosts to intensively scan and rapidly self-propagate across the internet. The worm infected approximately 300,000 unpatched hosts running Microsoft Structured Query Language (SQL) Server 2000 or Microsoft Desktop Engine (MSDE) 2000 with SQL Server Resolution Service. The SQL Slammer worm indirectly infected FirstEnergy’s Davis-Besse nuclear power plant by first infecting a consultant’s company network server and then propagating through an external misconfigured connection into Davis-Besse’s site network. The infection caused major network congestion, slow performance, data overloads, and the inability of local hosts to communicate with each other, which eventually caused a loss of availability and a loss of view when the Safety Parameter Display System (SPDS) and Plant Process Computer (PPC) crashed. At the time of the infection, the plant was already offline, the digital monitoring systems had redundant analog backups, and the plant control and safety functions were not affected, so there were no concerns of a safety breach. However, this incident resulted in many lessons learned and spawned important discussions about cybersecurity’s role in nuclear safety and electric power reliability regulation, policy, and guidance. Researchers and analysts identified 10 unique techniques utilized during the attack with a total of 640 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Eight of the identified techniques used during Davis-Besse cyber attack were precursors to the triggering event. Analysis identified 596 observables associated with these precursor techniques, 428 of which were assessed to have an increased likelihood of being perceived in the 331 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Towards an intuitive application of WEC control co-design

A simple co-design example in a reduced parameter space is presented for an oscillating flap device. Initially, the WEC geometry and mass properties are considered along with drivetrain gear ratio, inertia, motor constant and stiffness under both PI and optimal control. This parameter space is reduced to those to which performance is most sensitive for a fixed geometry. The gear ratio, drivetrain stiffness, and flap mass are found to be the most impactful design criteria as they can create orders of magnitude variations in power performance. The performance of the optimized system is compared with several sub-optimal variants in terms of electrical and mechanical power capture, transmission coefficients, and transducer power gain. Notably, though substantial power capture improvements are demonstrated when an optimal controller is employed, this power capture remains sensitive to appropriate selections of drivetrain and flap design parameters, implying that control co-design procedures remain necessary for high-performing WECs. Furthermore, a number of practical caveats and extensions to the presented co-design methodology are suggested, including the characterization of system static friction, especially in the presence of high gear ratios.

Control co-design↗

High-efficiency, air-stable manganese–iron oxide nanoparticle-pigmented solar selective absorber coatings toward concentrating solar power systems operating at 750 °C

Solar selective absorber coating with long-term thermal stability at high temperatures ≥750 °C in air is an important component to reduce the levelized cost of energy (LCOE) of concentrating solar power (CSP) systems toward 50% power efficiency and dispatchable solar electricity. Conventionally, solar spectral selectivity requires multilayer-interference coatings implemented by stringently controlled vacuum deposition, and these coatings degrade significantly at >700 °C in air. Herein, we established a quantitative design approach and demonstrated a proof-of-concept air-stable, manganese–iron oxide nanoparticle (NP)-pigmented solar selective coatings with a high solar absorptance of ~93%, a relatively low thermal emittance of ~52%, and an optical-to-thermal energy conversion efficiency >89% under 1,000× solar concentration at 750 °C toward Generation 3 CSP systems. These coatings demonstrate spectral selectivity using cost-effective spray coating approach, a notable improvement over conventional vacuum-deposited, multilayer solar selective coatings for low-cost, high-efficiency solar thermal receivers. In contrast to the thermal degradation of spectrally non-selective benchmark Pyromark 2500 coatings at 750 °C in air, the solar absorptance of the MnFe 2 O 4 -pigmented coatings on stainless steel 310 (SS 310) substrates is increased to ~92.9% and the optical-to-thermal energy conversion efficiency is improved to 89.7% after serving at 750 °C in air for 700 h. X-ray diffraction results reveal that this improvement is due to the transformation of MnFe 2 O 4 NPs into more thermodynamically stable, non-stoichiometric manganese-rich manganese ferrite and iron-rich manganese–iron oxide phases after 500 h aging at 750 °C. For >1,000 h-endurance testing at 750 °C in air and the subsequent 19 day-night thermal cycling between 750 °C (12 h/cycle) and 25 °C (12 h/cycle) on SS 310 substrates, the thermal degradation is mainly due to the CrO x microflake formation from SS 310 substrates rather than the coatings, which can be suppressed by preoxidizing the surface of SS 310. With lower emittance matrix material and further optimization of pigment NP stoichiometry, concentration, and coating thickness, it is promising to achieve an optimized thermal efficiency ≥92.5% with long-term thermal stability at 750 °C for Generation 3 CSP systems.

14 SOLAR ENERGY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP): Design Guidelines and Specifications for DC Distribution-Based Charging Hub

Managed under U.S. Department of Energy (DOE)-funded EVs@Scale Consortium, High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP) project aims to design and develop a high-power, interoperable charging experimental platform to research, develop, and demonstrate the integration and control approaches for a DC distribution-based high-power charging (HPC) system. The eCHIP project addresses the crucial need to design and validate efficient, low-cost, reliable, and interoperable solutions for DC-coupled charging hub ('DC hub' for short). This report explains the design, development, and implementation process of the experimental platform for the DC hub. The utilization of DC distribution holds significant potential for enhancing the operation of an HPC station architecture. However, there are challenges establishing the DC hub, including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products as well as novel, in-house designed solutions to evaluate different use cases at rated power and voltage levels.

33 ADVANCED PROPULSION SYSTEMS↗

Impact of Open Communication Networks on Load Frequency Control with Plug-In Electric Vehicles by Cyber-Physical Dynamic Co-Simulation

With the increasing electrification of the transportation sector to achieve the carbon neutrality objective, despite the challenges of charging electric vehicles (EV), there are also opportunities through smart charging EVs to improve system frequency stability; however, EV control technologies might require nontraditional communication support. This paper investigates the impacts of communication variations of EV on power system load frequency control through a cyber-physical dynamic system (CPDS) co-simulation. Here, the CPDS is built upon our previously developed transmission-and-distribution dynamic co-simulation model with the added communication variation functions (i.e., delay and packet loss). The case studies consider multiple communication variation scenarios when the system experiences an N-1 generation trip contingency. The scenarios include communication delays and packet loss using both homogeneous and heterogeneous assumptions. The outcomes of this work can help improve EV frequency regulation services and provide robust and effective tests for different load frequency control algorithms of the future power systems.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Review of Power System Support Functions for Inverter-Based Distributed Energy Resources - Standards, Control Algorithms, and Trends

Penetration of renewable energy in power systems has been increasing in the past decades in response to increased global electricity demand and concerns for the environment. Distributed energy resources (DERs) based on renewables have experienced rapid growth thanks to the incentive programs and broad-based participation. With the growing prevalence of DERs, the risk of grid instability and vulnerability increases due to the intermittent nature of renewable energy. At the same time, the voltage and frequency deviation problems emerge more often when the reverse power flow occurs under supply-demand imbalance in distributed power systems. Standards and grid codes have been issued for DER inverters to interconnect with the distribution grid. The updated standard and grid codes expect DERs to provide a variety of power system support functions in order to incorporate higher DER penetration and to maximize DER value to the grid. This paper provides an overview of the power system support functions from renewable DER inverters, which are categorized as: voltage regulation by active/reactive power control, frequency regulation by active power control, voltage ride-through, and frequency ride-through. The benefits and drawbacks of each algorithm are presented and compared with its predecessor, manifesting the logic in the evolution of the algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Blackstart Capability and Survivability of Wind Turbines with Fully Rated Converters

We report the blackstart capability of wind turbines is critical for the recovery of wind-dominant power systems from blackouts. If wind power plants are not able to restore a power system, the incorporation of wind resources into electric grids could be limited by blackstart capability. This paper tackles this problem by setting forth a grid-forming controller for Type 4 wind turbines which employ fully rated power converters. To this end, we engineer two-axis anti-windup proportional-integral regulators that serve to ride through restoration disturbances. We also design an active protection system to prevent wind turbines from stalling during recovery from blackouts. We demonstrate in a high-fidelity simulation environment that Type 4 wind turbines with the developed controllers and protection subsystem can: (i) re-energize a notional wind-dominant grid; (ii) ride through asymmetrical faults; and (iii) survive low wind speed events.

17 WIND ENERGY↗

A novel large-scale EV charging scheduling algorithm considering V2G and reactive power management based on ADMM

Electric vehicle aggregators (EVAs) that utilize vehicle-to-grid (V2G) technologies can function as both controllable loads and virtual power plants, providing key energy management services to the distribution system operator (DSO). EVAs can also balance the grid’s reactive power as a virtual static VAR compensator (SVC) and provide voltage stability by utilizing advanced electric vehicle (EV) chargers that are capable of four-quadrant operations to provide reactive power management. Finally, managed charging can benefit EVAs themselves by minimizing power factor penalties in their electricity bills. In this paper, we propose a novel EV charging scheduling algorithm based on a hierarchical distributed optimization framework that minimizes peak load and provides reactive power compensation for the DSO by collaboration with EVAs that manage both the active and the reactive charging and discharging power of participating EVs. Utilizing the alternative direction method of multipliers (ADMM), the proposed distributed optimization approach scales well with increased EV charging infrastructure by balancing active and reactive power while decreasing computational burden. In our proposed hierarchical approach, each EVA schedules the active and reactive EV charging and discharging power for 1) reactive power compensation in order to minimize power factor penalty and electricity cost accrued by the EVA, 2) satisfaction of each EV’s energy demand at minimal charging cost, and 3) peak shaving and load management for the DSO. When compared with an uncoordinated charging model, the efficacy of this proposed model is successfully demonstrated through a 300% decreased peak EV load for the DSO, 28% lower electricity costs for EV users, and 98.55% smaller power factor penalty, along with 17.58% lower overall electricity costs, for EVAs. The performance of our approach is validated in a case study with 50 EVs at multiple EVAs in an IEEE 13-bus test case and compared the results with uncoordinated EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperative fault management for resilient integration of renewable energy

Cooperative fault management (CFM) is designed herein to control different types of renewable energy resources cooperatively during electrical faults. This paper studies systems with a high penetration of photovoltaic (PV) energy and wind energy. First, CFM leverages power converters of PV farms to boost the ride-through capability of nearby doubly-fed induction generators (DFIGs). By controlling PV farms’ output voltages to change smoothly during both fault initiation and fault clearance, the widely used crowbar in DFIGs is less likely to be activated. Crowbar activation adversely makes DFIGs lose controllability and absorb reactive power. The second contribution is the development of a software-defined CFM controller and a controller in-the-loop demonstration of the real-time performance of this optimization-based CFM. CFM capitalizes on distributed optimization formulation to enable flexibility, plug-and-play, and privacy-preserving. Computation time, however, is a major concern for optimization-based dynamics control. Here, real-time controller-in-the-loop simulation results show optimization-based CFM can output reference values around 60 ms and is quick enough for dynamic control.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GridSTAGE (aka PowerDrone)

Simulation tool for electrical grid security. It is possible to select from pre-loaded power system topologies, enable different grid controls (like AGC, power system stabilizer), add faults, tweak different parameters, add pre-modeled attack scenarios, and run batch simulations to generate data needed for research.

Nandanoori, Sai Pushpak↗

Independent Review of the Proof-of-Concept Cyber100 Compass Cybersecurity Risk Tool

The U.S. Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER), and Office of Electricity (OE) commissioned the National Renewable Energy Laboratory (NREL) to develop a method and tool to enable electric utilities to understand and manage the risk of cybersecurity events that can lead to physical effects like blackouts. This tool, called Cyber100 Compass, uses cybersecurity data elicited from cybersecurity experts, then incorporates that data into a tool designed to be usable by cybersecurity non-experts who understand the system itself. The tool estimates dollar-valued risks for a current or postulated future electric power digital control configuration, in order to enable utility risk planners to prioritize among proposed cybersecurity risk mitigation options. With the development of the Cyber100 Compass tool for quantification of future cyber-physical security risks, NREL has taken an initial bold step in the direction of enabling and indeed encouraging electric utilities to address the potential for cybersecurity incidents to produce detrimental physical effects related to electric power delivery. As part of the Cyber100 Compass development process, DOE funded NREL to seek out an independent technical review of the risk methodology embodied in the tool. NREL requested this review from Sandia National Laboratories, and made available to Sandia a very late version of the project report, as well as NREL personnel to provide clarification and to respond to questions. This paper provides the result of the independent review activity.

97 MATHEMATICS AND COMPUTING↗

Ubiquitous Power Electronics in Future Power Systems: Recommendations to fully utilize fast control capabilities

Power electronics is becoming ubiquitous in power systems because the rapid growth of variable renewable generation such as wind and solar, responsive load, electric vehicles, energy storage, as well as DC transmission. As a result, a high percentage of electricity will be generated, transmitted or consumed by power electronics in the future power system. Such a high penetration of power electronics is changing power system operation landscapes and dynamic characteristics. Two major kinds of impact are reduced system mechanical inertia by inverter-based resources displacing conventional generation and active participation of many distributed energy resources through inverters. This has caused significant reliability challenges for power system operation. The mitigation approach so far has mostly focused on accommodating power electronics inverters as passive devices or creating synthetic inertias to make inverter-based generation behaving as conventional generators. However, the high-speed control capabilities of power electronics present new opportunities for achieving an optimal performance beyond conventional power systems. A lower-inertia system can be more responsive for improving reliability, and distributed small resources can be more adaptive and scalable for better flexibility and resilience. Power electronic inverters are capable of multiple fast control functions. To fully utilized the ubiquitous power electronics in power systems requires technology advancements in the following areas: data and communications to capture the new dynamic behaviors introduced by power electronics; modeling and simulation to understand the behaviors of power electronics and its interactions with other components in the context of power systems; control and optimization methods for fully utilizing the capabilities of power electronics for a new paradigm of performance beyond the traditional inertia-heavy system; and significant upgrades in power electronics hardware to cater to the new control capabilities. If properly controlled and optimized, power electronics can help transform the power system to be responsive, adaptive, and scalable.

Huang, Zhenyu↗