Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Logistics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Assessment of Base Loads Generated by an Exercise Device in the HALO Module

The purpose of this document is to prescribe a uniform procedure that can be used to postprocess base loads generated by a crew member and an exercise device in the Gateway Habitation and Logistics Outpost (HALO) module. This memo has three primary sections. First, the exercise loads pass through a Vibration Isolation and Stabilization (VIS) system notionally depicted in Figure 1 for the purpose of preliminary analyses. This is described in Section 2. Next, these loads are processed in frequency domain as explained in Section 3. Finally, the resulting outputs are compared with a Gateway Program Loads and Dynamics (L&D) allocation given to the VIS system. This information is provided in Section 4.

Exercise↗

Comparing Trash Disposal and Reuse Options for Deep Space Gateway and Mars Missions

Taking out the trash at NASA's newly proposed Deep Space Gateway (DSG) will not be a trivial task. While not the most important aspect of planning this cislunar outpost, there are several options that should be carefully considered since they may affect the crew as well as mission mass and volume. This study extends an earlier one, which focused on waste disposal options for a Mars Transit Vehicle. In that study, gasifying and venting trash along the way was found to noticeably reduce propellant needs and launch mass, whereas keeping processed trash on board in the form of radiation shielding tiles would significantly lower the crew's radiation dose during a solar particle event. Another favorable strategy was packing trash in a used logistics module for disposal. Since the DSG does not need much propulsion to maintain its orbit and Orion will be present with its own radiation storm shelter at the Gateway, the driving factors of the waste disposal trade study are different than for the Mars mission. Besides reviewing the propulsion and radiation shielding factors, potential drivers such as mass, power, volume, crew time, and human factors (e.g. smell) were studied. Disposal options for DSG include jettison of a used logistics module containing waste after every human stay, jettison of the same logistics module after several missions once it is full, regular disposal of trash via an airlock, or gasifying waste products for easier disposal or reuse. Conversely, a heat melt compactor device could be used to remove water and stabilize trash into tiles which could be more compactly stored on board and used as radiation shielding. Equivalent system mass analysis is used to tally the benefits and costs (mass, volume, power, crew time) of each case on an equivalent mass basis. Other more subjective factors are also discussed. Recommendations are made for DSG and Mars mission waste disposal.

Ewert, Michael↗

Skylab Experiment M516 - Crew Activities/Maintenance Study

Skylab required daily movement about the interior of a 340 cu m vehicle and the handling and transfer of numerous loose items. Planned and unplanned maintenance tasks were also included in the daily routine of activity. Experiment M516, Crew Activities/Maintenance Study, involved an investigation of crew activity during routine daily operations. The overall objective was to secure in-flight data relevant to the performance of tasks in the weightless environment. This paper will present an evaluation of man's ability to handle and transport items of various sizes and masses (logistics management) and to make equipment repairs (maintenance). Results and conclusions are based on subjective crew comments, motion-picture film, and television transmissions.

Bond, R. L.↗

Expedition 3 Crew Interview: Frank Culbertson, Jr.

Expedition 3 Commander Frank Culbertson is seen being interviewed before leaving to become part of the third resident crew on the International Space Station (ISS). He answers questions about his inspiration to become an astronaut and his career path. He discusses his expectations for life on the ISS and the experiments he will be performing while on board. Culbertson gives details on the spacewalks that will take place during the STS-105 mission (the mission carrying the Expedition 3 crew up to the ISS) and the unloading operations for the Multipurpose Logistics Module.

Source record↗

Expedition 3 Crew Interview: Mikhail Turin

Expedition 3 Flight Engineer Mikhail Turin is seen being interviewed before leaving to become part of the third resident crew on the International Space Station (ISS). He answers questions about his inspiration to become an astronaut and his career path. He discusses his expectations for life on the ISS and the experiments he will be performing while on board. Turin gives details on the spacewalks that will take place during the STS-105 mission (the mission carrying the Expedition 3 crew up to the ISS) and the unloading operations for the Multipurpose Logistics Module.

Source record↗

Expedition 3 Crew Interview: Vladimir Dezhurov

Expedition 3 Pilot Vladimir Dezhurov is seen being interviewed before leaving to become part of the third resident crew on the International Space Station (ISS). He answers questions about his inspiration to become an astronaut and his career path. He discusses his expectations for life on the ISS and the experiments he will be performing while on board. Dezhurov gives details on the spacewalks that will take place during the STS-105 mission (the mission carrying the Expedition 3 crew up to the ISS) and the unloading operations for the Multipurpose Logistics Module.

Source record↗

Approach to In Situ Component Level Electronics Assembly Repair (CLEAR) for Constellation

Maintenance resupply is a significant issue for long duration space missions. Currently, the International Space Station (ISS) approaches maintenance primarily around replaceable modules called Orbital Replacement Units (ORU). While swapping out ORUs has served the ISS well keeping crew time for maintenance to a minimum, this approach assumes a substantial logistics capacity to provide replacement ORUs and return ORUs to Earth for repair. The ORUs used for ISS require relatively large blocks of replacement hardware even though the actual failed component may be several orders of magnitude smaller. The Component Level Electronics Assembly Repair (CLEAR) task was created to explore electronics repair down to the component level for future space missions. From 2006 to 2009, CLEAR was an activity under the Supportability project of the Exploration Technology Development Program. This paper describes the activities of CLEAR including making a case for component-level electronics repair, examination of current terrestrial repair hardware, and potential repair needs. Based on those needs, the CLEAR team proposes an architecture for an in-situ repair capability aboard a spacecraft or habitat. Additionally, this paper discusses recent progress toward developing in-space repair capabilities--including two spaceflight experiments-- and presents technology concepts which could help enable or benefit the same.

Struk, Peter M.↗

Deep Space Habitat Configurations Based On International Space Station Systems

A Deep Space Habitat (DSH) is the crew habitation module designed for long duration missions. Although humans have lived in space for many years, there has never been a habitat beyond low-Earth-orbit. As part of the Advanced Exploration Systems (AES) Habitation Project, a study was conducted to develop weightless habitat configurations using systems based on International Space Station (ISS) designs. Two mission sizes are described for a 4-crew 60-day mission, and a 4-crew 500-day mission using standard Node, Lab, and Multi-Purpose Logistics Module (MPLM) sized elements, and ISS derived habitation systems. These durations were selected to explore the lower and upper bound for the exploration missions under consideration including a range of excursions within the Earth-Moon vicinity, near earth asteroids, and Mars orbit. Current methods for sizing the mass and volume for habitats are based on mathematical models that assume the construction of a new single volume habitat. In contrast to that approach, this study explored the use of ISS designs based on existing hardware where available and construction of new hardware based on ISS designs where appropriate. Findings included a very robust design that could be reused if the DSH were assembled and based at the ISS and a transportation system were provided for its return after each mission. Mass estimates were found to be higher than mathematical models due primarily to the use of multiple ISS modules instead of one new large module, but the maturity of the designs using flight qualified systems have potential for improved cost, schedule, and risk benefits.

Smitherman, David↗

Deep Space Habitat Configurations Based on International Space Station Systems

A Deep Space Habitat (DSH) is the crew habitation module designed for long duration missions. Although humans have lived in space for many years, there has never been a habitat beyond low-Earth-orbit. As part of the Advanced Exploration Systems (AES) Habitation Project, a study was conducted to develop weightless habitat configurations using systems based on International Space Station (ISS) designs. Two mission sizes are described for a 4-crew 60-day mission, and a 4-crew 500-day mission using standard Node, Lab, and Multi-Purpose Logistics Module (MPLM) sized elements, and ISS derived habitation systems. These durations were selected to explore the lower and upper bound for the exploration missions under consideration including a range of excursions within the Earth-Moon vicinity, near earth asteroids, and Mars orbit. Current methods for sizing the mass and volume for habitats are based on mathematical models that assume the construction of a new single volume habitat. In contrast to that approach, this study explored the use of ISS designs based on existing hardware where available and construction of new hardware based on ISS designs where appropriate. Findings included a very robust design that could be reused if the DSH were assembled and based at the ISS and a transportation system were provided for its return after each mission. Mass estimates were found to be higher than mathematical models due primarily to the use of multiple ISS modules instead of one new large module, but the maturity of the designs using flight qualified systems have potential for improved cost, schedule, and risk benefits.

Smitherman, David↗

Research Operations and Integration Flight Session – Always Sweat the Small Stuff

Human research routinely involves elaborate operations with substantial hardware setup, such as functional MRIs, CT scans, ultrasounds, exercise sessions, and cardiac evaluations. These conspicuous operations garner most of our attention and, understandably, resources, but the unsung heroes of spaceflight human research often get by with little fanfare. The collection of human samples and surveys is often just as much of a challenge in terms of both planning and logistics. The samples and surveys are often collected or completed by the crew autonomously, with little to no oversight from science support staff, which puts them the most at risk for data loss. The Research Operations and Integration team will host an interactive session with audience participation to demonstrate the importance of the written communications and instructions that are provided to the astronauts. During this hands-on session, ROI will walk through the challenges faced to ensure astronaut subjects can successfully collect all the various samples (e.g., saliva, fecal, urine, and blood) that the human research community needs. The format will be part lecture and part game show intended to provide both an enlightening and fun session. As we often instruct the crew: “Don’t forget to arrive fasted and bring a list of all the medications you’ve taken in the past week.”

Cherie Morgan Oubre↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2021 to 2022 Overview

Over the past year, significant progress has occurred in technology development, ground testing, and ISS technology demonstrations within the NASA Environmental Control and Life Support (ECLSS) community. This paper provides a technology development update in the following capability areas: life support, environmental monitoring, fire safety, and logistics. Technologies for exploration missions must be reliable in their operation which support crewed mission phases. However, they also need to be put into a reduced use or dormant states to support uncrewed mission phases and then successfully and reliably returned to a nominal state to support crew. Multi-year demonstration of systems operation across this range of conditions are essential to mission success. Project overviews will include how the current activity supports the goal of multi-year demonstrations, planned follow-on activities, and what type of exploration mission elements are targeted for infusion. Technologies must be demonstrated and validated early enough to inform early exploration element milestone reviews (mission concept reviews, systems requirement reviews and no later than preliminary design reviews) so that supporting vehicle systems can also be matured. Consequently, for low technology readiness activities, it is important to also identify which mission elements they might infuse into and how they may offer potential operational, dormancy, or mass benefits. While low TRL technology timelines may not support initial mission needs, early infusion is still reasonable with sufficient testing to validate performance and reliability.

Life Support↗

Optimization of NTP System Truss to Reduce Radiation Shield Mass

The benefits of nuclear thermal propulsion are numerous and relevant to the current NASA mission goals involving but not limited to the crewed missions to mars and the moon. They do however also present new and unique challenges to the design and logistics of launching/operating spacecraft. One of these challenges, relevant to this discussion, is the significant mass of the shielding which is required to ensure an acceptable radiation environment for the spacecraft and crew. Efforts to reduce shielding mass are difficult to accomplish from material and geometric design points of the shield itself, however by increasing the distance between the nuclear engines and the main body of the spacecraft the required mass of the shielding is lessened considerably. The mass can be reduced significantly per unit length, though any additional mass added by the structure to create this distance serves to offset those savings, thus the design of a lightweight structure is ideal. The challenges of designing the truss are bounded by several limiting factors including; the loading conditions, the capabilities of the launch vehicle, and achieving the ideal truss length when factoring for the overall mass reduced. Determining the overall set of mass values for a truss of varying length is difficult since to maintain an optimally designed truss the geometry of the truss or its members must change. Thus the relation between truss mass and length for these loading scenarios is not linear, and instead has relation determined by the truss design. In order to establish a mass versus length trend for various truss designs to compare with the mass saved from the shield versus length, optimization software was used to find optimal geometric properties that still met the design requirements at established lengths. By solving for optimal designs at various lengths, mass trends could be determined. The initial design findings show a clear benefit to extending the engines as far from the main structure of the spacecraft as the launch vehicle's payload volume would allow when comparing mass savings verse the additional structure.

Scharber, Luke L.↗

Lunar-Mars Life Support Test Project: Human Factors and Crew Interactions - Phase 2

Phase 2 of the Lunar-Mars Life Support Test Project was conducted in June and July of 1996 at the NASA Johnson Space Center. The primary objective of Phase 2 was to demonstrate and evaluate an integrated physicochemical air revitalization and regenerative water recovery system capable of sustaining a human crew of four for 30 days inside a closed chamber. The crew (3 males and 1 female) was continuously present inside a chamber throughout the 30-day test. The objective of this paper was to describe crew interactions and human factors for the test. Crew preparations for the test included training and familiarization of chamber systems and accommodations, and medical and psychological evaluations. During the test, crew members provided metabolic loads for the life support systems, performed maintenance on chamber systems, and evaluated human factors inside the chamber. Overall, the four crew members found the chamber to be comfortable for the 30-day test. The crew performed well together and this was attributed in part to team dynamics, skill mix (one commander, two system experts, and one logistics lead), and a complementary mix of personalities. Communication with and support by family, friends, and colleagues were identified as important contributors to the high morale of the crew during the test. Lessons learned and recommendations for future testing are presented by the crew in this paper.

Ming, D. W.↗

Comments on the MIT Assessment of the Mars One Plan

The MIT assessment of the Mars One mission plan reveals design assumptions that would cause significant difficulties. Growing crops in the crew chamber produces excessive oxygen levels. The assumed in-situ resource utilization (ISRU) equipment has too low a Technology Readiness Level (TRL). The required spare parts cause a large and increasing launch mass logistics burden. The assumed International Space Station (ISS) Environmental Control and Life Support (ECLS) technologies were developed for microgravity and therefore are not suitable for Mars gravity. Growing food requires more mass than sending food from Earth. The large number of spares is due to the relatively low reliability of ECLS and the low TRL of ISRU. The Mars One habitat design is similar to past concepts but does not incorporate current knowledge. The MIT architecture analysis tool for long-term settlements on the Martian surface includes an ECLS system simulation, an ISRU sizing model, and an analysis of required spares. The MIT tool showed the need for separate crop and crew chambers, the large spare parts logistics, that crops require more mass than Earth food, and that more spares are needed if reliability is lower. That ISRU has low TRL and ISS ECLS was designed for microgravity are well known. Interestingly, the results produced by the architecture analysis tool - separate crop chamber, large spares mass, large crop chamber mass, and low reliability requiring more spares - were also well known. A common approach to ECLS architecture analysis is to build a complex model that is intended to be all-inclusive and is hoped will help solve all design problems. Such models can struggle to replicate obvious and well-known results and are often unable to answer unanticipated new questions. A better approach would be to survey the literature for background knowledge and then directly analyze the important problems.

Mars mission↗

Design of Two RadWorks Storm Shelters for Solar Particle Event Shielding

In order to enable long-duration human exploration beyond low-Earth orbit, the risks associated with exposure of astronaut crews to space radiation must be mitigated with practical and affordable solutions. The space radiation environment beyond the magnetosphere is primarily a combination of two types of radiation: galactic cosmic rays (GCR) and solar particle events (SPE). While mitigating GCR exposure remains an open issue, reducing astronaut exposure to SPEs is achievable through material shielding because they are made up primarily of medium-energy protons. In order to ensure astronaut safety for long durations beyond low-Earth orbit, SPE radiation exposure must be mitigated. However, the increasingly demanding spacecraft propulsive performance for these ambitious missions requires minimal mass and volume radiation shielding solutions which leverage available multi-functional habitat structures and logistics as much as possible. This paper describes the efforts of NASA's RadWorks Advanced Exploration Systems (AES) Project to design two minimal mass SPE radiation shelter concepts leveraging available resources: one based upon reconfiguring habitat interiors to create a centralized protection area and one based upon augmenting individual crew quarters with waterwalls and logistics. Discussion items include the design features of the concepts, a radiation analysis of their implementations, an assessment of the parasitic mass of each concept, and the result of a human in the loop evaluation performed to drive out design and operational issues.

Simon, Matthew↗

STS-114 Crew Interview: James M. Kelly, PLT

Pilot James M. Kelly, Lieutenant Colonel USAF, is shown during a prelaunch interview. He expresses the major goals of the mission which are to replace the Expedition Six crew of the International Space Station (ISS), install the Raffello Multi-Purpose Logistics Module, deliver the External Stowage Platform to the ISS, and replace the Control Moment Gyroscope (CMG). The major task that he has is to be the backup pilot for Commander Eileen Collins. He talks about the three new research racks brought up to the International Space Station inside the U.S. Destiny Laboratory along with the Window Observational Research Facility (WORF), Human Research Facility 2 (HRF-2), and a Minus Eighty Degree Laboratory Freezer (MELF-1). Kelly also explains how he uses the ISS' Robotic arm to lift the MPLM out of Atlantis' payload bay and attach it to the Unity node to unload hardware, supplies and maintenance items. This will be his second trip to the International Space Station.

Source record↗

Analysis of Alternative Jettison Design Concepts for Deep-space Missions

The management of waste generated onboard spacecraft during future long-duration, deep-space missions will require different solutions from those currently implemented on the International Space Station, which consist exclusively of collecting, storing, and returning the waste to Earth. Alternative options for managing spacecraft waste are to process it for recycling and recovering resources, and to jettison it overboard. The waste generated during a deep-space mission is derived mainly from spacecraft logistics supplies, food and beverage residues, personal or scientific items used by the crew, and unused spare components. Uncontained and unprocessed trash is a health hazard and a habitat volume liability, which makes onboard long-term storage a nonviable option. Jettison of solid, processed waste appear, on the other hand, to be an effective solution for crewed deep-space missions, leading not only to volume reduction and habitat safening, but also to considerable mass savings in the spacecraft’s propulsion system. However, the disposal of trash overboard also creates a navigation hazard for spacecraft and the risk of collisions with planetary bodies. This paper investigates alternative jettison design concepts for L2 libration orbit, Mars conjunction-class, and Mars opposition-class missions.

Jurek Parodi↗

A Review of Existing Policies Affecting the Jettison of Waste in Low Earth Orbit and Deep Space

The management of waste generated onboard spacecraft during future long-duration deep-space missions will require different solutions from those currently implemented on the International Space Station which consist exclusively of collecting, storing, and returning the waste to Earth. Alternative options for managing spacecraft waste are to process it for recycling and recovery of resources, and to jettison it overboard in a solid form (such as a compacted tile) or in a gaseous form after torrefaction or other trash-to-gas technologies. The waste generated during a deep-space mission is derived mainly from spacecraft logistics supplies, food and beverage residues, personal or scientific items used by the crew, human metabolic waste, and unused spare components. Uncontained and unprocessed trash is a potential health hazard and a habitat volume liability, which makes onboard long-term storage an inefficient and non-optimal option. However, the jettison of solid, processed waste appears to be an effective solution for crewed deep-space missions, leading not only to volume reduction and habitat safening, but also to considerable mass savings in the spacecraft’s propulsion system. However, the disposal of trash overboard also creates a navigation hazard for spacecraft and the potential risk of contamination of planetary bodies, interfering with the search for life. This paper investigates the requirements covered by existing policies that could affect the jettison concept of operations and system design.

Jettison↗