Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Automated Data Assimilation and Flight Planning for Multi-Platform Observation Missions

This is a progress report on an effort in which our goal is to demonstrate the effectiveness of automated data mining and planning for the daily management of Earth Science missions. Currently, data mining and machine learning technologies are being used by scientists at research labs for validating Earth science models. However, few if any of these advanced techniques are currently being integrated into daily mission operations. Consequently, there are significant gaps in the knowledge that can be derived from the models and data that are used each day for guiding mission activities. The result can be sub-optimal observation plans, lack of useful data, and wasteful use of resources. Recent advances in data mining, machine learning, and planning make it feasible to migrate these technologies into the daily mission planning cycle. We describe the design of a closed loop system for data acquisition, processing, and flight planning that integrates the results of machine learning into the flight planning process.

Oza, Nikunj↗

FRIEDA: Flexible Robust Intelligent Elastic Data Management Framework

Scientific applications are increasingly using cloud resources for their data analysis workflows. However, managing data effectively and efficiently over these cloud resources is challenging due to the myriad storage choices with different performance, cost trade-offs, complex application choices and complexity associated with elasticity, failure rates in these environments. The different data access patterns for data-intensive scientific applications require a more flexible and robust data management solution than the ones currently in existence. FRIEDA is a Flexible Robust Intelligent Elastic Data Management framework that employs a range of data management strategies in cloud environments. FRIEDA can manage storage and data lifecycle of applications in cloud environments. There are four different stages in the data management lifecycle of FRIEDA – (i) storage planning, (ii) provisioning and preparation, (iii) data placement, and (iv) execution. FRIEDA defines a data control plane and an execution plane. The data control plane defines the data partition and distribution strategy, whereas the execution plane manages the execution of the application using a master-worker paradigm. FRIEDA also provides different data management strategies, either to partition the data in real-time, or predetermine the data partitions prior to application execution.

97 MATHEMATICS AND COMPUTING↗

Guide to data collection

Guidelines and recommendations are presented for the collection of software development data. Motivation and planning for, and implementation and management of, a data collection effort are discussed. Topics covered include types, sources, and availability of data; methods and costs of data collection; types of analyses supported; and warnings and suggestions based on software engineering laboratory (SEL) experiences. This document is intended as a practical guide for software managers and engineers, abstracted and generalized from 5 years of SEL data collection.

Source record↗

Vehicle management and mission planning in support of shuttle operations.

An operational approach to shuttle mission planning during high flight frequency years (20 or more flights per year) is described wherein diverse mission planning functions interface via an interactive computer system and common data base. The Vehicle Management and Mission Planning System (VMMPS) is proposed as a means of helping to accomplish the mission planning function. The VMMPS will link together into an interactive system the major mission planning areas such as trajectory, crew, vehicle performance, and launch operations. A common data base will be an integral part of the system and the concept of standard mission types and phases will be used to minimize mission to mission uniqueness. The use of this system will eliminate much redundancy and replanning, shorten interface times between functions, and provide a means to evaluate unplanned events and modify schedules.

Pruett, W. R.↗

Regional Land Use Mapping: the Phoenix Pilot Project

The Phoenix Pilot Program has been designed to make effective use of past experience in making land use maps and collecting land use information. Conclusions reached from the project are: (1) Land use maps and accompanying statistical information of reasonable accuracy and quality can be compiled at a scale of 1:250,000 from orbital imagery. (2) Orbital imagery used in conjunction with other sources of information when available can significantly enhance the collection and analysis of land use information. (3) Orbital imagery combined with modern computer technology will help resolve the problem of obtaining land use data quickly and on a regular basis, which will greatly enhance the usefulness of such data in regional planning, land management, and other applied programs. (4) Agreement on a framework or scheme of land use classification for use with orbital imagery will be necessary for effective use of land use data.

Anderson, J. R.↗

How to Flatten the Earth?

Since the passage of the Geospatial Data Act (GDA) in 2018, federal agencies, including the Department of Energy (DOE), have been working to ensure compliance and outline guidance for the geospatial datasets and affiliated products publicly released from their agencies. At DOE this sparked work to develop a geospatial data management strategy and implementation plan; both of which spotlighted the need for the agency to set preferred guidance for the agency to use to inform the release of any public facing geospatial data and products. One of the immediate needs was set around establishing preferred guidance for coordinate systems, given the foundational role they play in all geospatial data, as they help reference data to the earth. DOE’s Geospatial Information Officer (GIO) and the Geospatial Sciences Steering Committee (GSSC) worked together to summarize best practices and current DOE uses to outline recommendations for coordinate systems to use for public geospatial data and products. This poster summarizes the role of coordinate systems, trends in coordinate system use from across the Department that were used to set preferred guidance for the Department to consider when releasing public-facing geospatial data and products.

Bauer, Jennifer↗

Wrap-up session

Listening to the case studies that were presented it became quite evident that the best data management systems were the ones where data managers and research scientists worked as a team developed in the early stages of project planning. Examples that were given included WOCE Data Assembly Centres e.g., Drifters, the Global Temperature Salinity Pilot Project (GTSPP) collaboration with Joint Analyses Centres in the U.S. and Australia, and JGOFS/BOFS development of Topical Centres. While each of these has some elements unique to the project, each had brought together 'teams' of Principal Investigators (PI's) and data management experts at an early stage of project development. Conversely, projects which had considered data management as a totally separate activity with lower priority often failed to provide the service required to meet scientific objectives. Therefore, the following actions should be brought to the attention of relevant groups within the IOC and other international organizations: (1) Publicize, at the national and international level, underway data/scientist collaborations that may be used as models in planning for the future. (2) Reduce adversarial situations where data managers and scientists appear to be in competition. (3) Colocation and other forms of collaboration often results in very high quality data sets and more timely data submission. Improved timeliness of data submissions was a common theme throughout the workshop and must be considered an important element in all future plans. Improvements in timely submission of data were noted. In order to continue this trend the advantages of timely submission of data must be stressed to those planning new ocean science projects.

Holland, Geoffrey↗

Risky Business

During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.

Yarbrough, Katherine↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

LANL Regular Employee Population and Demographics, FY15-21

This document summarizes an effort to compile and analyze the LANL regular employee population’s demographic attributes and trends between FY15-FY21 using MicroStrategy, a web-based data analytics and visualization tool. LANL’s HR Division collected and prepared data for the Weapons Program’s annual reporting activities for the 2017 through 2023 NNSA Stockpile Stewardship and Management Plan (SSMP). Los Alamos workforce data represent the fiscal year-end snapshot of the permanent employee population who are categorized by the Common Occupational Classification System (COCS). This work enables further analyses, including trends for all workforce attributes presented in the SSMPs as well as a definition of a crosswalk between COCS categorization and the internal laboratory job classification hierarchy. Data for other sites and the federal workforce, as shown in the SSMPs, are included and corresponding figures can be visualized within the MicroStrategy tool. A portable, Excel-based version of the tool was developed and shared with the multi-site workforce working group. This summary highlights selected aspects of the LANL regular workforce. The data analyses and visualizations communicate insights within three major themes regarding permanent LANL employees: 1) demographic transformation, 2) attrition, and 3) skills. Regarding demographic transformation, and consistent with the general trend across the enterprise, early career regular employees are the fastest growing group, with growth ranging between 12-34% year-to-year over the seven-year period analyzed. The data also reflect effects of internal and external factors on attrition; the large spike in separations in FY18 aligns with the contract transition from LANS to Triad and the dip in attrition between FY20-FY21 is likely a result of the global pandemic. The population of regular employees in general management, engineer, and operator COCS categories have the fastest growth rates amongst all the occupational categories. The MicroStrategy and Excel tools provide additional details and trends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A strategy for residual acceleration data reduction and dissemination

A data reduction plan is being developed to efficiently process residual acceleration data from orbiting space laboratories. Implementation of the reduction plan will result in a useful, manageable accelerometer data base which can be readily employed by principal investigators during post-flight analysis of experimental results. The data reduction plan will also assist in the characterization of the acceleration environment of orbiters, which is important for the planning of future experimental missions. Prototype versions of the reduction plan are being tested using accelerometer data recorded during the Spacelab 3 (SL3) mission. Transient disturbances caused by shuttle and experiment operations and crew activities are being cataloged. The magnitudes of such disturbances can be as much as 0.01 g, but are rarely sustained for more than a fraction of a second and tend to vary greatly in orientation. It is found that the recorded frequency components of the SL3 disturbances do not exceed tolerance limits determined from modeling for a selected experiment set.

Rogers, Melissa J. B.↗

Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

54 ENVIRONMENTAL SCIENCES↗

The task manager

Management principles and objectives for data systems task manager

DATA PROCESSING↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

DIAMS revisited: Taming the variety of knowledge in fault diagnosis expert systems

The DIAMS program, initiated in 1986, led to the development of a prototype expert system, DIAMS-1 dedicated to the Telecom 1 Attitude and Orbit Control System, and to a near-operational system, DIAMS-2, covering a whole satellite (the Telecom 2 platform and its interfaces with the payload), which was installed in the Satellite Control Center in 1993. The refinement of the knowledge representation and reasoning is now being studied, focusing on the introduction of appropriate handling of incompleteness, uncertainty and time, and keeping in mind operational constraints. For the latest generation of the tool, DIAMS-3, a new architecture has been proposed, that enables the cooperative exploitation of various models and knowledge representations. On the same baseline, new solutions enabling higher integration of diagnostic systems in the operational environment and cooperation with other knowledge intensive systems such as data analysis, planning or procedure management tools have been introduced.

Haziza, M.↗

Design, Construction, and Field Validation of a Blown-In Fiberglass Wall System in a Cold, Wet, and Windy Climate

In the Native Village of Tununak, located on Nelson Island in Southwest Alaska,buildings are exposed to wind-driven rain and snow throughout the year. The Cold Climate Housing Research Center (CCHRC) and Knauf Insulation partnered with the community in 2018 to design a residence for a public safety officer. Construction began in fall 2021 and is scheduled to conclude in summer 2022. The house will use integrated trusses with floor, attic, and wall cavities filled with blown-in fiberglass insulation. Hygrothermal models of the building envelope system demonstrate that the high ambient moisture load will wet the outer edges of the insulation annually regardless of the extent and integrity of exterior weather sealing measures; blown-in fiberglass is expected to be more resilient to this wetting than blown-in cellulose. To verify this, researchers will embed temperature, relative humidity, and moisture sensors in the two windward walls of the house to monitor the ability of the blown-in fiberglass insulation to dry out after wetting events that may have occurred during the transport of the insulation to the building site, storage of the insulation on site, construction process, or after installation in the wall. Sensors will remain in place for two years,documenting the wall's performance over time and verifying the design's potential for use in buildings located in climates where the chance for moisture damage is high. Here, we describe the wall system , design criteria, and the results from the hygrothermal modeling. We share details on the monitoring system's components and the planned management and analysis of data. Finally, we explain how the experiences and data from this project will inform future builds in similar locations.

building design↗

SU-D-BRD-07: Automatic Patient Data Audit and Plan Quality Check to Support ARIA and Eclipse

Purpose: To ensure patient safety and treatment quality in RT departments that use Varian ARIA and Eclipse, we developed a computer software system and interface functions that allow previously developed electron chart checking (EcCk) methodologies to support these Varian systems. Methods: ARIA and Eclipse store most patient information in its MSSQL database. We studied the contents in the hundreds database tables and identified the data elements used for patient treatment management and treatment planning. Interface functions were developed in both c-sharp and MATLAB to support data access from ARIA and Eclipse servers using SQL queries. These functions and additional data processing functions allowed the existing rules and logics from EcCk to support ARIA and Eclipse. Dose and structure information are important for plan quality check, however they are not stored in the MSSQL database but as files in Varian private formats, and cannot be processed by external programs. We have therefore implemented a service program, which uses the DB Daemon and File Daemon services on ARIA server to automatically and seamlessly retrieve dose and structure data as DICOM files. This service was designed to 1) consistently monitor the data access requests from EcCk programs, 2) translate the requests for ARIA daemon services to obtain dose and structure DICOM files, and 3) monitor the process and return the obtained DICOM files back to EcCk programs for plan quality check purposes. Results: EcCk, which was previously designed to only support MOSAIQ TMS and Pinnacle TPS, can now support Varian ARIA and Eclipse. The new EcCk software has been tested and worked well in physics new start plan check, IMRT plan integrity and plan quality checks. Conclusion: Methods and computer programs have been implemented to allow EcCk to support Varian ARIA and Eclipse systems. This project was supported by a research grant from Varian Medical System.

60 APPLIED LIFE SCIENCES↗