Search NASA⌕ Search

SEARCH · Search NASA

Results for “Deep Space Transit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Orbit-determination performance of Doppler data for interplanetary cruise trajectories. Part 1: Error analysis methodology

An error covariance analysis methodology is used to investigate different weighting schemes for two-way (coherent) Doppler data in the presence of transmission-media and observing-platform calibration errors. The analysis focuses on orbit-determination performance in the interplanetary cruise phase of deep-space missions. Analytical models for the Doppler observable and for transmission-media and observing-platform calibration errors are presented, drawn primarily from previous work. Previously published analytical models were improved upon by the following: (1) considering the effects of errors in the calibration of radio signal propagation through the troposphere and ionosphere as well as station-location errors; (2) modelling the spacecraft state transition matrix using a more accurate piecewise-linear approximation to represent the evolution of the spacecraft trajectory; and (3) incorporating Doppler data weighting functions that are functions of elevation angle, which reduce the sensitivity of the estimated spacecraft trajectory to troposphere and ionosphere calibration errors. The analysis is motivated by the need to develop suitable weighting functions for two-way Doppler data acquired at 8.4 GHz (X-band) and 32 GHz (Ka-band). This weighting is likely to be different from that in the weighting functions currently in use; the current functions were constructed originally for use with 2.3 GHz (S-band) Doppler data, which are affected much more strongly by the ionosphere than are the higher frequency data.

Ulvestad, J. S.↗

NASA’s Evolving Ka-Band Network Capabilities to Meet Mission Demand

Space missions are increasingly demanding higher data rates to support the growth in information-intensive mission operations. This growth is reflected in planned and operational missions from low Earth orbit, such as the upcoming NASA-Indian Space Research Organization (ISRO) Synthetic Aperture Radar (NISAR) and Plankton, Aerosol, Cloud and Ocean Ecosystem (PACE) missions, to the future Artemis lunar campaign, and the recently launched James Webb Space Telescope (JWST) orbiting at the Sun-Earth L2 Lagrange point. JWST was the first L2 mission to be defined as a high data rate mission transmitting at 28 Megabits per second (Mbps), or 270 Gigabits of science data per day. ISRO and PACE anticipate achieving data throughputs of 5-40 Terabits per day. These data rates exceed the capabilities of S-band and X-band frequency allocations and are a key driver for migrating to the 26 GHz Ka-band frequency allocation. The NASA Space Communications and Navigation (SCaN) program has been preparing the networks to support this demand by pursuing critical Ka-band infrastructure. The status of current and evolving network capability, including the Near Space Network’s Initiative for Ka-band Advancement (NIKA), and the Deep Space Network’s Lunar Exploration Upgrades (DLEU), as well as profiling mission usage of Ka-band services, are discussed in detail. The push toward Kaband, is not only an opportunity for increased performance, but alleviates current challenges with contentious and cluttered spectrum access in S- and X-band. The paper provides an overview of these advantages and advanced techniques that optimize its use before the transition to optical communications becomes an imperative. The challenges and potential mitigations for missions considering selection of Ka-band network services are also discussed.

Ka-band↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a 5-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASAs safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are "one deep." The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting "brain drain" could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning.

Source record↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying a "Proving Ground" near the Moon to conduct human space exploration missions in preparation for future flights to Mars. This paper describes a concept of operations ("conops") for activities in the Proving Ground, focusing on the construction and use of a mobile Cislunar Transit Habitat capable of months-long excursions within and beyond the Earth-Moon system. Key elements in the conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System heavy-lift rocket. Potential additions include commercial launch vehicles and logistics carriers, solar electric propulsion stages to move elements between different orbits and eventually take them on excursions to deep space, a node module with multiple docking ports, habitation and life support blocks, and international robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The conops describes "case studies" of notional missions chosen to guide the design of the architecture and its elements. One such mission is the delivery of a ~10-ton pressurized element, co-manifested with an Orion on a Block 1B Space Launch System rocket, to the Proving Ground. With a large solar electric propulsion stage, the architecture could enable a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to safely quantify the risk of landing deconditioned crews on Mars. The conops also discusses aborts and contingency operations. Early return to Earth may be difficult, especially during later Proving Ground missions. While adding risk, limited-abort conditions provide needed practice for Mars, from which early return is likely to be impossible.

Love, Stanley G.↗

Ion Propulsion for Solar System Exploration

NASA's Evolutionary Xenon Thruster (NEXT) is ready for transition-to-flight. The thruster has completed all qualification-level environmental testing, and has demonstrated a xenon propellant throughput, total impulse, and total operating hours greatly in excess of anticipated planetary science mission requirements, and exceeding that achieved by any other thruster technology in the history of electric propulsion. NEXT is the next generation system, a natural progression in technology from that implemented successfully on the Deep-Space one and Dawn missions, developed at NASA's Glenn Research Center in Cleveland, Ohio. The first implementation of NEXT will be on NASA 's Double Asteroid Redirection Test (DART). DART will be the first demonstration of the kinetic impact technique to change the motion of an asteroid in space. The DART mission is in Phase C, led by Johns Hopkins University Applied Physics Laboratory. The DART spacecraft will utilize the NASA Evolutionary Xenon Thruster solar electric propulsion system as its primary in-space propulsion system. By utilizing NEXT, DART is able to gain significant flexibility to the mission timeline and launch window, as well as decrease in launch vehicle cost. This presentation will review NASA's investment strategy in electric propulsion _ in particular gridded ion thruster technology _ as it applies to solar system exploration. Results obtained from implementing this technology on Deep-Space one and Dawn will be reviewed. Mission studies which highlight the impacts of the NEXT technology will be discussed, and near-term proposed and scheduled missions including DART and CAESAR (Comet Astrobiology Exploration Sample Return) will be reviewed.

Electric Propulsion↗

NASA’s Evolving Ka-band Network Capabilities to Meet Mission Demand

Space missions are increasingly demanding higher data rates to support the growth in information-intensive mission operations. This growth is reflected in planned and operational missions from low Earth orbit, such as the upcoming NASA-Indian Space Research Organization (ISRO) Synthetic Aperture Radar (NISAR) and Plankton, Aerosol, Cloud and Ocean Ecosystem (PACE) missions, to the future Artemis lunar campaign, and the recently launched James Webb Space Telescope orbiting at the Sun-Earth L2 Lagrange point. JWST was the first L2 mission to be defined as a high data rate mission transmitting at 8 Mbps, or 270 gigabits of science data per day. ISRO and PACE anticipate achieving data throughputs of 5-40 terabits per day. These data rates exceed the capabilities of S-band and X-band frequency allocations and are a key driver for migrating to the 26 GHz Ka-band frequency allocation. The NASA Space Communications and Navigation (SCaN) program has been preparing the networks to support this demand by pursuing critical Ka-band infrastructure. The status of current and evolving network capability, including the Near Space Network’s Initiative for Ka-band Advancement (NIKA), and the Deep Space Network’s Lunar Exploration Upgrades (DLEU), as well as profiling mission usage of Ka-band services, are discussed in detail. The push toward Ka-band, is not only an opportunity for increased performance, but alleviates current challenges with contentious and cluttered spectrum access in S- and X-band. The paper provides an overview of these advantages and advanced techniques that optimize its use before the transition to optical communications becomes an imperative. The challenges and potential mitigations for missions considering selection of Ka-band network services are also discussed.

space communications↗

Integrated Waste Trade Study: Lunar Surface to Deep Space

The Logistics Reduction Project is one of NASA's technology development projects that is preparing humanity for deep space missions. Reducing the mass and volume of logistical supplies that must be carried from Earth to support the missions and their crews is the primary goal of the project. Effective ways to achieve this goal include reducing, reusing, or recycling wastes generated throughout the mission. Due to the goal of the project, waste processing technologies were analyzed for Lunar surface missions at various lengths and an 850-day Mars transit mission to evaluate the potential benefits of waste processing pertaining to each mission. The technologies assessed include trash compaction, trash-to-gas and human metabolic waste processing technologies, integrated with the baseline architectures of each mission’s habitat. The fully integrated systems were analyzed using an equivalent system mass, which is a metric that encompasses the mass, volume, power and cooling of a system, resulting in an estimate of launch mass and serving as a proxy for cost. Each system’s equivalent system mass was compared to that of the baseline waste processing system of the respective habitat, hand compaction with storage for Lunar surface missions and hand compaction with jettisoning for Mars transit, to evaluate whether the traded waste processing technology was beneficial. This analysis identifies a general trend that more sophisticated waste processing can be beneficial depending on the mission duration. For Lunar surface missions, the water recovery from waste processing can pay off over consecutive missions, due to offsetting the losses from the system via extravehicular activities. In contrast for Mars transit, the primary objective is mass removal from the spacecraft, so technologies like trash-to-gas are competitive with the baseline. Furthermore, the technologies which can recover resources from waste, such as water, may present additional advantages to an ever-changing Mars mission architecture.

Waste processing↗

Recommendations Emerging from an Analysis of NASA's Deep Space Communications Capacity

During 2016-2017, NASA’s Space Communications and Navigation (SCaN) Office chartered a study of Deep Space Network (DSN) communications capacity relative to projected future-mission demand over the next 30 years. In this paper, we briefly describe the methodology used to analyze capacity vs. demand over such a broad timeframe, summarize key findings emerging from the analysis, and discuss the associated recommendations. Performing the analysis entailed: identifying key factors shaping the anticipated future mission set, identifying several alternative future mission set scenarios consistent with these factors, and then analyzing each mission set scenario in terms of required antenna capacity, downlink and uplink capabilities, and spectrum as a function of time. On the basis of these aggregate requirements, DSN loading simulations were then conducted that examined how well each of the postulated mission sets could load up onto the the DSN’s “in-plan” architecture. To the extent that capacity shortfalls emerged during these baseline simulations, architectural solutions to the shortfalls were then postulated and tested via additional simulations. In general, the trend analyses and baseline loading simulations indicated a significant progression in challenges over the next three decades. In the current decade, the DSN appeared to be operating very close to capacity. The first human exploration mission and its secondary payload launch opportunities for cubesats traveling beyond GEO contributed to this loading. As a consequence, the main challenge appeared to be managing peak assetcontention periods. In the next decade, the DSN continued to operate close to capacity but also began transitioning to more frequent human mission support. Upgrading for, and operating, a human-rated system while continuing to meet robotic mission customer requirements emerged as the key challenge. In the 2030’s and beyond, simulations suggested a need for fundamentally new capability and capacity. The high data rates and long link distances characteristic of human Mars exploration drove requirements far beyond what is currently “in plan.” The key challenge then became determining the most cost-effective combination of RF and optical assets for communicating with the postulated human Mars assets while still providing for the needs of all the other missions across the solar system. Various link budget, visibility, and loading analyses ultimately suggested that the human Mars exploration demands of the 2030’s could best be addressed with two cross-linked RF-optical areostationary relays (or an areostationary relay and deep space habitat) providing a dual “trunk link” to an array of 2-to-3 additional 34m beam waveguide antennas and an ~8.5m optical antenna at each DSN Complex. The dual “trunk link” would enable the same amount of total data return to Earth as a single trunk link at twice the data rate, but with only half the required array size on the ground, assuming use of Multiple Spacecraft Per Antenna (MSPA) techniques. MSPA techniques, including a Multiple Uplink Per Antenna (MUPA) technique currently under investigation, also showed promise for reducing asset contention in the decades prior to human Mars exploration.

Lee, Carlyn-Ann↗

The formation of aligned spheres in miscibility gap systems

The development of regularly sized and spaced rods or spheres in a monotectic system is presently considered in terms of interface breakdown and capillary instability mechanisms between two liquid phases. The most important relationship, which governs the rod-to-aligned spheres transition, is the temperature gradient-to-growth rate ratio that determines the depth of the intercellular nodes. Rods will develop when these nodes are shallow by comparison to rod circumference, and spheres will develop when they are deep.

Schafer, C.↗

Physiological Health Challenges for Human Missions to Mars

During the next decades, manned space missions are expected to be aiming at the Lagrange points, near Earth asteroids, and Mars flyby and/or landing. The question is therefore: Are we ready to go? To answer this with a yes, we are currently using the International Space Station to develop an integrated human physiological countermeasure suite. The integrated countermeasure suite will most likely encounter: 1) Exercise devices for aerobic, dynamic and resistive exercise training; 2) sensory‐motor computer training programs and anti‐motion sickness medication for preparing EVAs and G‐transitions; 3) lower limb bracelets for preventing and/or treating the VIIP (vision impairment and intracranial pressure) syndrome; 4) nutritional components for maintenance of bone, muscle, the cardiovascular system and preventing oxidative stress and damage and immune deficiencies (e. g. omega‐3 fatty acids, PRO/K, anti‐oxidants and less salt and iron); 5) bisphosphonates for preventing bone degradation.; 6) lower body compression garment and oral salt and fluid loading for landing on a planetary surface to combat orthostatic intolerance; 7) laboratory analysis equipment for individualized monitoring of biomarkers in blood, urine and saliva for estimation of health status in; 8) advanced ultrasound techniques for monitoring bone and cardiovascular health; and 9) computer modeling programs for individual health status assessments of efficiency and subsequent adjustments of countermeasures. In particular for future missions into deep space, we are concerned with the synergistic effects of weightlessness, radiation, operational constraints and other spaceflight environmental factors. Therefore, increased collaboration between physiological, behavioral, radiation and space vehicle design disciplines are strongly warranted. Another venue we are exploring in NASA's Human Research Program is the usefulness of artificial gravity for mitigating the health risks of long duration weightlessness.

Norsk, Peter↗

A Detailed Analysis of the Gl 486 Planetary System

Context . The Gl 486 system consists of a very nearby, relatively bright, weakly active M3.5V star at just 8 pc with a warm transiting rocky planet of about 1.3 R ⨁ and 3.0 M ⨁ . It is ideal for both transmission and emission spectroscopy and for testing interior models of telluric planets. Aims . To prepare for future studies, we aim to thoroughly characterise the planetary system with new accurate and precise data collected with state-of-the-art photometers from space and spectrometers and interferometers from the ground. Methods . We collected light curves of seven new transits observed with the CHEOPS space mission and new radial velocities obtained with MAROON-X at the 8.1m Gemini North telescope and CARMENES at the 3.5m Calar Alto telescope, together with previously published spectroscopic and photometric data from the two spectrographs and TESS. We also performed near-infrared interferometric observations with the CHARA Array and new photometric monitoring with a suite of smaller telescopes (AstroLAB, LCOGT, OSN, TJO). This extraordinary and rich data set was the input for our comprehensive analysis. Results . From interferometry, we measure a limb-darkened disc angular size of the star Gl 486 at θ LDD = 0.390 ± 0.018 mas. Together with a corrected Gaia EDR3 parallax, we obtain a stellar radius R * = 0.339 ± 0.015 R ⨀ . We also measure a stellar rotation period at P rot = 49.9 ± 5.5 days, an upper limit to its XUV (5–920 Å) flux informed by new Hubble/STIS data, and, for the first time, a variety of element abundances (Fe, Mg, Si, V, Sr, Zr, Rb) and C/O ratio. Moreover, we imposed restrictive constraints on the presence of additional components, either stellar or sub-stellar, in the system. With the input stellar parameters and the radial-velocity and transit data, we determine the radius and mass of the planet Gl 486 b at R p = 1.343 +0.063 -0.062 R ⨀ and M p = 3.00 +0.13 -0.13 M ⨁ , with relative uncertainties of the planet radius and mass of 4.7% and 4.2%, respectively. From the planet parameters and the stellar element abundances, we infer the most probable models of planet internal structure and composition, which are consistent with a relatively small metallic core with respect to the Earth, a deep silicate mantle, and a thin volatile upper layer. With all these ingredients, we outline prospects for Gl 486 b atmospheric studies, especially with forthcoming James Webb Space Telescope (Webb) observations.

Planetary systems↗

From Exploration Flight Test-1 to Artemis II--A NASA Langley's Orion Aerosciences Overview

The Orion Aerosciences program at NASA Langley has played a central role in advancing the aerodynamic and aeroheating prediction capabilities required for the Orion crew vehicle’s return from deep space. This presentation provides a technical overview of aerosciences contributions spanning Exploration Flight Test-1 (EFT-1), Artemis I, and the ongoing post-flight analysis of Artemis II. EFT-1 provided the first high-energy entry dataset for Orion, enabling critical validation of aerodynamic force and moment predictions, static and dynamic stability characteristics, and aeroheating environments at relevant flight Mach and Reynolds numbers. Flight-derived pressure data were used to refine the Flush Air Data System (FADS) methodology for atmospheric density reconstruction and to improve Best Estimated Trajectory (BET) solutions. The EFT-1 data also offered key insights into heat shield performance, including char layer recession, in-depth thermal response, and material retention behavior under flight conditions, informing updates to both thermal response models and uncertainty quantification practices. Building on EFT-1, Artemis I extended the database to true lunar-return conditions. Observations of heat shield performance, including localized char loss, bondline response, and recession variability, provided an unprecedented opportunity to reassess Thermal Protection System (TPS) and aeroheating modeling assumptions. Aerodynamic reconstruction efforts incorporated improved FADS calibration, enhanced atmospheric modeling, and refined force and moment databases to reduce trajectory and load uncertainties. Aeroheating comparisons between pre-flight predictions and flight data enabled targeted model updates, particularly in transitional flow environments and wake heating regions. For Artemis II, these lessons were systematically incorporated into the pre-flight prediction process. Updates included refined aerodynamic databases anchored to flight-validated corrections, improved density estimation and BET methodologies using enhanced database interpolation algorithm and FADS modeling, and revised aeroheating design environments informed by Artemis I material response observations. By the time of the workshop, Artemis II post-flight analysis will be underway, and preliminary findings will be presented where available, including early comparisons of aerodynamic reconstruction, atmospheric density estimation, and thermal protection system performance relative to updated predictions. Collectively, this body of work is a testament to the dedicated and multidisciplinary team whose sustained efforts have contributed to the program’s success and to the progressive maturation of Orion aerosciences modeling through numerical modeling, ground and flight data assimilation. The integrated advancement of aerodynamics, trajectory reconstruction, FADS-based density estimation, and aeroheating analysis has reduced predictive uncertainty and strengthened confidence for future crewed lunar and deep-space missions.

Orion↗

Constraints on Cumulus Parameterization from Simulations of Observed MJO Events

Two recent activities offer an opportunity to test general circulation model (GCM) convection and its interaction with large-scale dynamics for observed Madden-Julian oscillation (MJO) events. This study evaluates the sensitivity of the Goddard Institute for Space Studies (GISS) GCM to entrainment, rain evaporation, downdrafts, and cold pools. Single Column Model versions that restrict weakly entraining convection produce the most realistic dependence of convection depth on column water vapor (CWV) during the Atmospheric Radiation Measurement MJO Investigation Experiment at Gan Island. Differences among models are primarily at intermediate CWV where the transition from shallow to deeper convection occurs. GCM 20-day hindcasts during the Year of Tropical Convection that best capture the shallow–deep transition also produce strong MJOs, with significant predictability compared to Tropical Rainfall Measuring Mission data. The dry anomaly east of the disturbance on hindcast day 1 is a good predictor of MJO onset and evolution. Initial CWV there is near the shallow–deep transition point, implicating premature onset of deep convection as a predictor of a poor MJO simulation. Convection weakly moistens the dry region in good MJO simulations in the first week; weakening of large-scale subsidence over this time may also affect MJO onset. Longwave radiation anomalies are weakest in the worst model version, consistent with previous analyses of cloud/moisture greenhouse enhancement as the primary MJO energy source. The authors’ results suggest that both cloud-/moisture-radiative interactions and convection–moisture sensitivity are required to produce a successful MJO simulation.

Madden-Julian Oscillation↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars.

exploration↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

[Note: this is the presentation for a companion paper with the following abstract] The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars. Note: Slide 9 contains a ~2 min video, best viewed when downloaded. Once downloaded to begin video you may be requested to hit options and Trust this document.

Long-duration spaceflight↗

UltraSail CubeSat Solar Sail Flight Experiment

UltraSail is a next-generation, highrisk, high-payoff sail system for the launch, deployment, stabilization, and control of very large (km2 class) solar sails enabling high payload mass fractions for interplanetary and deep space spacecraft. UltraSail is a non-traditional approach to propulsion technology achieved by combining propulsion and control systems developed for formation- flying microsatellites with an innovative solar sail architecture to achieve controllable sail areas approaching 1 km2, sail subsystem area densities approaching 1 g/m2, and thrust levels many times those of ion thrusters used for comparable deep space missions. UltraSail can achieve outer planetary rendezvous, a deep-space capability now reserved for high-mass nuclear and chemical systems. There is a twofold rationale behind the UltraSail concept for advanced solar sail systems. The first is that sail-andboom systems are inherently size-limited. The boom mass must be kept small, and column buckling limits the boom length to a few hundred meters. By eliminating the boom, UltraSail not only offers larger sail area, but also lower areal density, allowing larger payloads and shorter mission transit times. The second rationale for UltraSail is that sail films present deployment handling difficulties as the film thickness approaches one micrometer. The square sail requires that the film be folded in two directions for launch, and similarly unfolded for deployment. The film is stressed at the intersection of two folds, and this stress varies inversely with the film thickness. This stress can cause the film to yield, forming a permanent crease, or worse, to perforate. By rolling the film as UltraSail does, creases are prevented. Because the film is so thin, the roll thickness is small. Dynamic structural analysis of UltraSail coupled with dynamic control analysis shows that the system can be designed to eliminate longitudinal torsional waves created while controlling the pitch of the blades, while using solar photon pressure to slew the spin axis. Vacuum tests have also verified that electrostatic and molecular adhesion forces can substantially be eliminated by making the film electrically conductive, reducing the peel force of the film off the storage roll to levels of 100s of micro-N. The innovation demonstrated the capability of deploying a six-micron aluminum- coated film from a reel through a slit in vacuum. The innovation also demonstrated a spin-stabilized method for deploying a long reel of solar sail film using solar pressure to spin-up and orbit raise the satellite, and also a gravity gradient method for deploying a long reel of solar sail film using solar pressure to orbit raise the satellite. The solar sail mass fraction of 25% is consistent with high specific impulse ion systems, but without the added weight and cost of a power source and processing unit. The large sail area, coupled with low film density, is giving UltraSail a high payload fraction. The UltraSail deployment scheme unrolls a micrometerscale reflection-coated polyimide film from a storage mandrel to a maximum length of several kilometers with the aid of a blade tip satellite.

Carroll, David↗

NEXT Long-Duration Test Neutralizer Performance and Erosion Characteristics

The NASA's Evolutionary Xenon Thruster (NEXT) program is developing the next-generation ion propulsion system with significant enhancements beyond the state-of-the-art to provide future NASA science missions with enhanced capabilities at a low total development cost. A Long-Duration Test (LDT) was initiated in June 2005, to verify the NEXT propellant throughput capability to a qualification-level of 450 kg, 1.5 times the anticipated throughput requirement of 300 kg per thruster based on mission analyses. As of September 2, 2009, the thruster has accumulated 24,400 hr of operation with extensive durations at the following input powers: 6.9, 4.7, 1.1, and 0.5 kW. The thruster has processed 434 kg of xenon, surpassing the NASA Solar Technology Application Readiness (NSTAR) program thruster propellant throughput demonstrated during the extended life testing of the Deep Space 1 flight spare ion thruster and approaching the NEXT development qualification throughput goal of 450 kg. The NEXT LDT has demonstrated a total impulse of 16.1 10(exp 6zzz0 N s; the highest total impulse ever demonstrated by an ion thruster. A reduction in neutralizer flow margin has been the only appreciable source of thruster performance degradation. The behavior of the neutralizer is not easily predicted due to both erosion and deposition observed in previous wear tests. Spot-to-plume mode transition flow data and in-situ erosion results for the LDT neutralizer are discussed. This loss of flow margin has been addressed through a combination of a design change in the prototype-model neutralizer to increase flow margin at low emission current and to update the NEXT throttle table to ensure adequate flow margin as a function of propellant throughput processed. The new throttle table will be used for future LDT operations. The performance of the NEXT LDT neutralizer is consistent with that observed for long-life hollow cathodes. The neutralizer life-limiting failure modes are progressing as expected and the neutralizer data indicate none of the neutralizer failures are imminent.

Herman, Daniel A.↗