Search NASA⌕ Search

SEARCH · Search NASA

Results for “Development Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

COGIHTO: Comprehensive Geothermal Integrated HVAC Retrofits in Disadvantaged Communities

Geothermal heating and cooling (GHC) systems offer one of the most efficient approaches to provide space conditioning and water heating in buildings. Due to the relatively stable temperature of the ground year-round, these systems can provide an efficient solution to decarbonize heating systems. Yet this technology has faced limited market adoption due to its high first cost. This project seeks to address this barrier by designing a community GHC system at a public housing development in New York, taking advantage of load diversity (in terms of the timing and amount of heating / cooling used per person) that a larger community offers to reduce the size and thus first cost of a GHC system. Project success would result in societal benefit from reduced energy and fossil fuel use, reduced local emissions, and improved comfort, which would positively impact the health and well-being this community. This report presents the findings from Phase 1 project supported by the Department of Energy’s Geothermal Technologies Office and includes the technical design of a GHC at a public housing development in New York. To support the success of a potential deployment of a GHC system, the team conducted community engagement and prepared an assessment of the local workforce needs. The project team, led by EPRI, considered a subset of NYCHA housing developments that were previously identified by NYCHA as suitable for GHC retrofits. This report presents the site selection criteria the team developed and the overall score assigned to each of the eight developments considered. One site was selected for focus of the technical design: Stapleton Houses in Staten Island, a mid-size development with roughly 700 apartments across 6 buildings. The site has an existing hot water hydronic loop served by natural gas boilers for space heating and water heating. The technical design partner assessed baseline energy consumption at the site and established thermal models of the apartment buildings to assist in the design. The team considered several GHC system configurations and selected a hybrid geothermal design fed from water-source heat pumps with auxiliary gas boilers in a central plant. This design best leveraged the existing site configuration and minimized costs due to additional electrical infrastructure upgrades. The report also details the feedback received from community engagement efforts and the findings from the workforce needs assessment and workforce transition plan. Members of the site maintenance staff and the resident advisory council were interviewed for their input and feedback about both the site’s existing heating/cooling infrastructure and how a construction project would impact resident life. This feedback was taken into consideration when completing the geothermal system design. Research was conducted into existing workforce development opportunities available to NYCHA residents. A workforce development plan was established using information from NYCHA’s resident economic empowerment and sustainability group, along with training material and curriculum from the International Ground Source Heat Pump Association (IGSHPA).

15 GEOTHERMAL ENERGY↗

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SCRES Energy Quest Workshop (Technical Report)

Energy Quest: Sitka’s Path to 2050 is a game based public engagement tool developed as part of the Sitka Community Renewable Energy Strategy and the U.S. Department of Energy’s Energy Transitions Initiative Partnership Project Cohort 3. Designed for Sitka’s isolated island microgrid, which is powered primarily by hydropower and depends on imported diesel for backup, the game translated complex long term energy planning questions into an interactive format. In facilitated workshops, residents built energy roadmaps to 2050, explored tradeoffs, and expressed priorities around four themes: affordability, reliability, self sufficiency, and innovation. Across sessions, participants showed strong support for increasing local self sufficiency and resilience, even when this required balancing near term affordability with long term investments. They emphasized reducing dependence on imported diesel, making better use of existing hydropower, and considering new renewable generation such as solar, wind, and additional hydropower. Survey and game responses also highlighted interest in using surplus hydropower to support new industries, expanding electrification of heating and transportation, and exploring emerging technologies and green fuels. The report organizes these findings into four scenario themes to guide Sitka’s 2050 energy planning. Affordability focuses on managing rate impacts, efficiency, and conservation. Reliability addresses diversified generation, backup power, and energy security. Self sufficiency emphasizes distributed generation and reduced reliance on imported fuels. Innovation explores new technologies, marine based energy solutions, and low carbon fuels. By grounding future planning in these community derived themes, Energy Quest shows how a game based approach can make technical energy planning more accessible and inclusive for remote communities. For questions about the game board and piece production email Dr. Sarah Troise (sarah.troise@pnnl.gov)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARM FY2025 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility is dedicated to delivering high-quality radar data that significantly advance our understanding of cloud and precipitation processes, improving climate models. With radars operating across diverse frequencies, scanning modes, and global climate conditions, extensive staffing is essential for effective management. Due to current staffing constraints, achieving the expected level of operational excellence requires a more strategic approach. To address this challenge, ARM has developed an operational radar plan for the upcoming Fiscal Year 2025 (FY25) based on budget and staffing considerations.

54 ENVIRONMENTAL SCIENCES↗

ARM FY2025 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility is dedicated to delivering high-quality radar data that significantly advance our understanding of cloud and precipitation processes, improving climate models. With radars operating across diverse frequencies, scanning modes, and global climate conditions, extensive staffing is essential for effective management. Due to current staffing constraints, achieving the expected level of operational excellence requires a more strategic approach. To address this challenge, ARM has developed an operational radar plan for the upcoming Fiscal Year 2025 (FY25) based on budget and staffing considerations. This report summarizes the Fiscal Year 2024 (FY24) ARM radar-related activities and outlines the strategic plan for FY25. It presents a comprehensive radar plan that includes detailed activities, priorities, and a projected timeline aligned with the ARM radar roadmap. Key tasks, detailed in Table 1, cover various radar operational stages and coordinated efforts among ARM teams.

54 ENVIRONMENTAL SCIENCES↗

ARM FY2026 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility maintains a suite of advanced atmospheric radar systems that serve as critical tools in ARM’s mission to provide continuous, high-quality observations for advancing the understanding and modeling of atmospheric processes. These radar systems enable detailed characterization of clouds, precipitation, and dynamic structures in the atmosphere, supporting a broad range of scientific applications. The number of deployed systems exceeds what current staffing levels can fully support for continuous 24/7/365 operation. As such, it is essential to have a clearly defined and community-informed plan that prioritizes radar operations and communicates ARM’s strategy for sustaining and evolving these observational assets. This FY2026 Radar Plan outlines ARM’s approach to managing its radar portfolio—balancing scientific impact, operational feasibility, and long-term sustainability. It reflects ARM’s continued commitment to delivering calibrated, well-documented radar data products that enable process-level studies and support the development and evaluation of weather and climate models. Through this plan, ARM aims to ensure transparency in decision-making, alignment with user needs, and support for innovative science across the facility’s fixed and mobile observatories. Given uncertainties around the Fiscal Year (FY) 2026 budget, this plan was developed to assume business as usual and will be updated as budgets and plans may change. It should be noted that, given the limited timeframe involved, this plan will be more succinct than previous plans.

47 OTHER INSTRUMENTATION↗

Enhancement of Carbon Capture Reactor Performance (Final Technical Report)

Significant challenges are still present in post-combustion CO 2 capture and new technologies and advanced components are needed to significantly advance the deployment of CO 2 capture for natural gas combined cycle (NGCC) plants. Critical elements of CO 2 capture that still need to be addressed include how to increase CO 2 mass transfer in the absorber column with liquid to gas ratios of <1.2, while reducing the size of the absorber column to reduce capital costs. Research involving chemical mechanism with design, synthesis, and assembly of materials with targeted functionally were combined with advanced additive manufacturing techniques towards development of enhanced CO 2 capture reactors that can lead to safe, reliable, and low-cost carbon capture technologies. The objective of the project was to develop and test novel carbon capture materials and reactor components that contribute to increased CO 2 mass transfer through increased turbulent gas-liquid interface and improved solvent wetting within the absorber. A technoeconomic analysis (TEA) was completed showing how the proposed technology decreases capital costs by reducing the size of the absorber column and the amount of packing required for high CO 2 capture rates. A technology maturation plan (TMP) was also developed to describe the current technology readiness levels (TRL) and outline additional research and development (R&D) needed to further develop these advanced components for NGCC CO 2 capture plants. The successful completion of this project has shown a pathway to reduce the absorber size and associated construction costs of post-combustion NGCC CO 2 capture systems at 97% capture and promote the utilization of abundant natural gas for production of reliable electricity.

20 FOSSIL-FUELED POWER PLANTS↗

Ion-Pair Proton Exchange Membrane Fuel Cells for Heavy-duty Transportation

The purpose of this project is to build a fuel cell prototype that demonstrates high temperature proton exchange membrane fuel cell technology (HT PEMFC) commercial readiness. It advances from a technology baseline established in a prior CRADA in which these same Parties collaborated during the years 2020-2024. These efforts are aligned with the intentions of the DOE Hydrogen Fuel Cell Technology Office (HFTO) L’Innovator Pilot Program. Participant observes that its US-based competitive advantage may be improved by further optimizing Laboratory inventions. This CRADA is intended to further improve National Laboratory compositions and to develop commercial HT PEMFC membrane electrode assemblies (MEAs) that perform over a range of operating temperatures and relative humidity, that generate power from both low grade and pure hydrogen, and that are resistant to air impurities. Participant’s goal is to advance the commercial competitiveness of National Laboratory technologies in fuel cell products for heavy-duty truck integrators, for stationary power generation, marine applications, and for emerging interest from commercial aviation. The Parties will collaborate on producing a HT PEMFC MEA that integrates LANL ion pair technology and Brookhaven catalyst technology. The Laboratories plan to research and develop compositions for testing and evaluation. The participant will manufacture multiple MEAs based on the Laboratory compositions and will enable selected customers to validate performance characteristics. The Laboratories will convey to Participant the methods of making the National Laboratory compositions such that Participant may reproduce and then scale Laboratory methods into commercial production. Throughout the project, the Laboratories and Participant will iteratively test and optimize the compositions of materials of the MEAs, intending to optimize characteristics such as power density and lifecycle durability. Participant’s intended customers include fuel cells for large trucks, aviation, power back up, marine, and portable power.

99 GENERAL AND MISCELLANEOUS↗

Resilient Energy Transition Planning for Ouzinkie, Alaska

This report documents an energy system planning study for the village of Ouzinkie, Alaska, conducted by the U.S. Department of Energy's (DOE) Energy Transitions Initiative Partnership Project (ETIPP). Ouzinkie is a small remote community located on Spruce Island, Alaska, in the Kodiak Archipelago. The Ouzinkie community is served by a local electrical system powered by a combination of diesel generators and a hydroelectric turbine. Due to aging assets, however, the power system reliability has declined in recent years, while the cost of operating the diesel generators has increased significantly. To address these problems, Ouzinkie asked ETIPP to provide technical assistance to develop an updated integrated plan for improvements to the Ouzinkie power system, in order to transition to a more reliable and resilient system powered by renewable energy resources.

13 HYDRO ENERGY↗

Development of the first 1 GHz niobium-tin quarter-wave cavity

Niobium-Tin (Nb3Sn) is a promising alternative to pure niobium for low-beta ion accelerators due to low RF losses even at high frequencies. At 4.5 K, the expected Bardeen-Cooper-Schrieffer resistance of Nb3Sn is a few nano-Ohms at 1 GHz, with two orders of magnitude improvement compared to pure niobium. The low Nb3Sn RF losses allow the use of higher frequency, much smaller cavities while maintaining 4.5 K operation that is compatible with cryocoolers. This work aims to demonstrate the feasibility of coating a high-frequency 1 GHz, compact quarter-wave cavity. The development of this cavity has the potential to transform low-beta ion accelerators through size reductions and by enabling the replacement of large helium cryoplants with small plug-in cryocoolers. We have designed, built, and tested a 1GHz Nb3Sn coated quarter-wave cavity. Nb3Sn coating has been performed once by vapor diffusion at Fermilab. Cryogenic cold tests show a quality factor of ~1E9 at low accelerating electric fields or ~7 times higher than the theoretical limit for pure niobium at 1GHz. This first coating does not yet meet our quality factor or gradient goals; however, we plan to continue to develop this cavity.

Zhou, Yang [Argonne]↗

2023 Annual Explosives Inventory Completion

The 2023 Lawrence Livermore National Laboratory (LLNL) annual explosives inventory was executed from May 18, 2023 to September 27, 2023 and was verified for accuracy effective September 28, 2023 following the LLNL Explosive Materials Inventory Plan. This year’s annual inventory includes changes incorporated based on the Department of Energy (DOE) Office of Inspector General (OIG) Audit Report DOE-OIG-20-50, The Department of Energy’s Storage and Disposition of Explosives Material at Selected Sites, dated July of 2020. Based on the associated recommendations, explosives at DOE and National Nuclear Safety Administration (NNSA) sites are considered "sensitive personal property" and applicable inventories must comply with 41 CFR 109, Personal Property Management. This regulation adds additional stipulations which require the annual inventory to include accountability of the total site inventory. In addition, the inventory must be performed by personnel other than the property owner, or alternatively must include independent verification. The development of the inventory plan was agreed to by the LLNL Explosives Safety Committee in conjunction with the LLNL Property and Business Division Leader. The LLNL Explosive Materials Inventory Plan was reviewed and approved by the DOE Explosives Safety Committee Chair on May 17, 2023 and by the NNSA Property Management Office on May 25, 2023.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

EVs@Scale NextGen Profiles: EVSE Characterization 2024

As part of the U.S. Department of Energy's EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High power charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. EVSE characterization was conducted over a wide range of DC output current and DC voltage charging for nominal and off-nominal test conditions. Test plans and procedures were developed and refined to define the test configurations and requirements, measurement parameters, and test procedures used throughout NextGen Profiles testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Williston Basin CORE-CM Initiative Final Report

The University of North Dakota Energy & Environmental Research Center (EERC) is leading the Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Initiative to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce rare-earth elements (REEs), CMs, and nonfuel carbon-based products (CBPs). This project is the first phase in a long-term program and set the stage for future work by assessing resource, market, technology, and infrastructure knowledge; identifying knowledge gaps; developing a series of plans to be carried out in future work; and initiating stakeholder engagement. Composed of several tasks, the project sought to identify, characterize, and assess several necessary aspects vital to make this future work a reality. The project’s fundamental task was to characterize the Williston Basin CORE-CM resources. Over 2500 samples from multiple sources were utilized to begin the assessment. Several locations were identified in western North Dakota where sample analysis identified the total REE (TREE) concentration as being over 500 parts per million (ppm), which is at a concentration level that would be suitable to consider for mining and extraction. Current operating coal mines have sufficient concentrations of TREEs for consideration. However, the current data across the basin are still not adequate to fully characterize REE and CM content nor give reliable estimates of the total resource potential. Waste stream reuse was also considered, and several streams were identified which ranged from potential energy sources to chemicals to material wastes. This includes streams that result from oil and gas production. These streams are not fully characterized, and further data are needed before they can be accurately assessed. Infrastructure within the Williston Basin is suitable for expansion of a new industry to mine, extract, and concentrate REEs and CMs. The development of this industry will not only preserve many existing jobs in the coal-mining industry but produce many new jobs. The supply chain for REEs and CMs is currently controlled outside of the United States in nations such as China, but the potential to develop the supply chain within the basin is considered possible. Processing of the mined materials for REEs and CMs needs further research. The technology and knowhow exist outside of the United States, and within the country much of the knowledge has been lost and must be regained. To develop the supply chain and regain lost processing technology, the creation of technology innovation centers (TICs) is crucial. The Williston Basin contains several similar centers and entrepreneurial assistance for other industries that can be applied in the development of REE and CM innovation centers. Education to develop the new skill sets required is also needed. Outreach is important for the development of the REE and CM industry within the basin. Understanding throughout federal and state governments, state agencies, industry, and resource end users is vital for the industry to form and grow. Through this project these groups have been contacted through bulletins, presentations, webinars, and annual symposiums. The report is a summary of the work conducted and throughout refers to a series of appendixes which contain more thorough and specific information about each section.

01 COAL, LIGNITE, AND PEAT↗

An On-Demand Electric Transit Case Study of New Rochelle, New York

This work explores the extent to which an on-demand mobility service utilizing lightweight electric vehicles (EVs) provides community and sustainability benefits in New Rochelle, New York. Travel and survey data from September 2019 through 2023 are used to describe the system and estimate impacts on travelers. The system was found to be used more by women (nearly 60%) and younger demographics (>65% under the age of 42), with peak use in the middle of the day and a grocery store as a top origin and destination. The service is utilized primarily for short trips (86% under 2 miles), and the small, right-sized EVs have carbon dioxide emissions associated with charging the fleet that are roughly one-quarter of the fleet emissions of conventional hybrid vans and nearly 50 times less than a fleet of diesel buses. Mapping current socio-spatial dynamics of travel demand can inform equity performance, as well as assist future planning and service area development and possible extensions to similar smaller, lower-density environments that are nearby and connected to major metropolitan areas. The findings in this case study suggest on-demand electric transit may be a significant and growing space for advancing clean and highly valued public mobility services. Sustainable public transport interventions that consider right-sized, electric, on-demand vehicles can help achieve improved accessibility and reduce energy use and greenhouse gas emissions. This work was presented at the Transportation Research Board (TRB) 2025 Annual Meeting on January 7, 2025.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

TCO Analysis Approach and Regional Analysis of dWPT for Class 8 Tractors

Dynamic Wireless Power Transfer (dWPT) is a method by which battery electric vehicles (BEVs) can charge their battery while traveling on the road without the need for a physical conductive connection to the power source. dWPT has been proposed as a strategy to enable a reduction in vehicle battery capacity and associated mass and cost. In this slide deck presented at the EVs@Scale Consortium - Wireless Power Transfer Pillar Deep-Dive Meeting on November 11th, 2023, NREL provides results from an evaluation of dWPT using data from Class 8 tractors driving in the Atlanta Metro Area. NREL selected data for archetypal days representing local, regional, and long-haul trips, defined according to trip length, that included travel on primary roadways. EVI-InMotion (Electric Vehicle Infrastructure - InMotion), a systems planning and optimization tool developed at NREL, was used to evaluate dWPT performance assuming dWPT charging on 120 road segments for a total roadway lane distance of 2,365 miles. The EVI-InMotion results and representative day drive cycles were analyzed with NREL's T3CO (Transportation Technology Total Cost of Ownership) tool to estimate the total cost of ownership (TCO) for scenarios comprising two model years - 2030 and 2040 - and two technology progress cases. TCO was calculated for diesel, fuel cell electric, BEVs with batteries sized assuming no dWPT capabilities, and 200kWh BEVs with dWPT installed. This analysis finds that en-route stationary charging frequency and downtime when not on electrified roadways are the main contributors to TCO for the dWPT vehicles and that these vehicles can achieve cost parity with FCEVs at low electricity costs. Based on the scenario assumptions used here, low electricity costs would further help the cost parity with diesel vehicles in regional and long-haul cases due to stationary fueling downtime. This presentation also concludes that key factors affecting the parity potential of dWPT-capable vehicles include more extensive dWPT road coverage, higher en-route charging power, less expensive power batteries, and higher hydrogen or diesel fuel costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Offshore Wind Energy Validation Experiment Hierarchy

This paper provides a summary of planning work for experiments that will be necessary to address the long-term model validation needs required to meet offshore wind energy deployment goals. Conceptual experiments are identified and laid out in a validation hierarchy for both wind turbine and wind plant applications. Instrumentation needs that will be required for the offshore validation experiments to be impactful are then listed. The document concludes with a nominal vision for how these experiments can be accomplished.

17 WIND ENERGY↗

The Grid Value of Ocean Current Energy in Florida

Ocean current energy technology has been proposed as a potential contributor to Florida's energy portfolio. There has been limited investigation of how this energy would be valued when integrated into the Florida electrical grid. This study assesses three future grid scenarios to evaluate the impact of adding zero-cost ocean current energy to each. The Resource Planning Model, a tool developed by the National Renewable Energy Laboratory, is used to identify the least-cost generation mix through 2050, with and without ocean current energy. The first scenario is a base case and assumes existing policies in which the addition of ocean current energy does not retire fossil-based technologies but variable generation technologies. In the second scenario, solar and storage technologies are lower cost, and the addition of ocean current generation enables those technologies along with wind to retire existing natural gas units earlier. In the third scenario, which requires a 95% reduction in carbon emissions from 2020 levels by 2050, ocean current energy can play a role in decarbonization along with other variable generation technologies. This analysis is intended to inform stakeholders on the opportunity, potential challenges, and overall value to the grid of ocean current technology from a reliability and availability focused perspective.

capacity expansion model↗