Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resources, Interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Interconnection Assessment Methodology and Cost Benefit Analysis for High-Penetration PV Deployment in the Arizona Public Service System

In an effort to better understand the impacts of high penetrations of photovoltaic (PV) generators on distribution systems, Arizona Public Service and its partners completed a multi-year project to develop the tools and knowledge base needed to safely and reliably integrate high penetrations of utility- and residential-scale PV. Building upon the APS Community Power Project-Flagstaff Pilot, this project investigates the impact of PV on a representative feeder in northeast Flagstaff. To quantify and catalog the effects of the estimated 1.3 MW of PV that will be installed on the feeder (both smaller units at homes and large, centrally located systems), high-speed weather and electrical data acquisition systems and digital 'smart' meters were designed and installed to facilitate monitoring and to build and validate comprehensive, high-resolution models of the distribution system. These models are being developed to analyze the impacts of PV on distribution circuit protection systems (including coordination and anti-islanding), predict voltage regulation and phase balance issues, and develop volt/VAr control schemes. This paper continues from a paper presented at the 2014 IEEE PVSC conference that described feeder model evaluation and high penetration advanced scenario analysis, specifically feeder reconfiguration. This paper presents results from Phase 5 of the project. Specifically, the paper discusses tool automation; interconnection assessment methodology and cost benefit analysis.

14 SOLAR ENERGY↗

Commercialization of Distribution System Load Modeling Tool for Improved DER Interconnection Studies

Residential and commercial buildings have huge potential to contribute value to improve grid resilience by participating grid services. To reveal the significant value, it is critical to estimate the grid service capability from these buildings. Unlike the large-scale distributed energy resources such as wind and solar farms, those buildings need to participate grid services in aggregation, not by individual. Therefore, it is important to appropriately group buildings for aggregation. The load profiles in the same group will have similar characteristics at the same time step, so grid operators can send the grid service signal to the customer group with a higher chance to respond at that time step. In this paper, we develop a load profile clustering method to classify the building-level load profiles for grid service capability estimation. In our two-step clustering approach, we first calculate the total load consumption for each building, clustering the load profiles based on energy consumption level. Then, we further cluster the load profiles in each energy cluster based on the load shape. The parameter selection for each clustering step is discussed. The proposed method is applied on actual building-level load profiles, and the results have proved the effectiveness of this method.

14 SOLAR ENERGY↗

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Characterization of demand response in the commercial, industrial, and residential sectors in the United States

The goal of our study is to provide an overview of demand response (DR) technologies, including standards and end uses, in the United States and describe resource characteristics and the attributes of 14 specific DR resources in the U.S. commercial, residential, and industrial sectors. The attributes reviewed for the end uses being considered are response frequency, response time, the need for and impacts of energy pre- or recharge, the cost of enabling a resource to respond to a load-curtailment signal, and the magnitude of load curtailment in a given resource. We also describe controls and communications technologies that can enable end uses to participate in DR programs. The characterization was initially developed as a foundational work to quantify hourly availability of DR resources from the selected end uses followed by a multi-laboratory effort that quantified DR's value within the Western Interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Improving the Performance of Integrated Power-Hardware-in-the-Loop and Quasi-Static Time-Series Simulations

This paper introduces a novel multirate cosimulation architecture that overcomes previous challenges integrating faster real-time, microseconds-scale, power-hardware-in-the-loop (PHIL) with larger scale but slower, real-time, seconds-scale, quasi-static time-series (QSTS) simulation. Specifically, an intermediate reduced-equivalent electromagnetic transient (EMT) model duplicates the key power system topology to capture high-speed dynamics and converge hardware-power system interactions between QSTS updates. Exchanging multidimensional parameter vectors (loads, control status, etc.) between the QSTS and EMT models enables capturing the interactions of the rich, high-node-count (thousands of electrical nodes) QSTS model with the hardware. This architecture offers full spatial resolution from QSTS, including individual load dynamics, actual distribution management system controls, and nodal voltages. Simultaneously, the intermediate EMT model provides more detailed high-speed transients of key distributed energy resource hardware interactions. In addition, we use careful PHIL interface design and the exchange of complex power data, rather than current, to further improve performance. This cosimulation architecture is demonstrated by testing a simulated distribution system with an interconnected 500-kVA advanced photovoltaic (PV) inverter in PHIL. In conclusion, the architecture successfully captured PV local volt-volt ampere reactive (volt-VAR) control interactions with the larger network under time-varying electrical and weather conditions.

42 ENGINEERING↗

Frequency Response Study of a U.S. Western Interconnection Under Extra-High Photovoltaic Generation Penetrations

Increasing penetration levels of solar photovoltaic (PV) and the reduced inertia of inverter-based generation technologies have caught the attention of the electric power industry and academia in the United States. This paper conducts a comprehensive frequency response study of the Western Interconnection under high penetration levels of PV, which are up to 80% at the interconnection level and 100% at the regional level. Based on the 2022 Light Spring case, PV has been projected by areas for four PV penetration levels based on collected realistic PV distribution information. The overall system frequency response has been analyzed under different scenarios. In particular, the 100% regional PV penetration case has been developed to reveal local frequency issues in the Western Interconnection. The potential of using existing resources to improve frequency response has also been studied. New insights in this paper address the implications of the rapid deployment of solar generation in the Western Interconnection.

14 SOLAR ENERGY↗

Frequency Response Study of a U.S. Western Interconnection under Extra-High Photovoltaic Generation Penetrations: Preprint

Increasing penetration levels of solar photovoltaic (PV) and the reduced inertia of inverter-based generation technologies have caught the attention of the electric power industry and academia in the United States. This paper conducts a comprehensive frequency response study of the Western Interconnection under high penetration levels of PV, which are up to 80% at the interconnection level and 100% at the regional level. Based on the 2022 Light Spring case, PV has been projected by areas for four PV penetration levels based on collected realistic PV distribution information. The overall system frequency response has been analyzed under different scenarios. In particular, the 100% regional PV penetration case has been developed to reveal local frequency issues in the Western Interconnection. The potential of using existing resources to improve frequency response has also been studied. New insights in this paper address the implications of the rapid deployment of solar generation in the Western Interconnection.

14 SOLAR ENERGY↗

Integrating High Penetrations of PV into Southern California: Year 2 Project Update; Preprint

Southern California Edison (SCE) is well into a five-year project to install a total of 500 MW of distributed photovoltaic (PV) energy within its utility service territory. Typical installations to date are 1-3 MW peak rooftop PV systems that interconnect to medium-voltage urban distribution circuits or larger (5 MW peak) ground-mounted systems that connect to medium-voltage rural distributioncircuits. Some of the PV system interconnections have resulted in distribution circuits that have a significant amount of PV generation compared to customer load, resulting in high-penetration PV integration scenarios. The National Renewable Energy Laboratory (NREL) and SCE have assembled a team of distribution modeling, resource assessment, and PV inverter technology experts in order toinvestigate a few of the high-penetration PV distribution circuits. Currently, the distribution circuits being studied include an urban circuit with a PV penetration of approximately 46% and a rural circuit with a PV penetration of approximately 60%. In both cases, power flow on the circuit reverses direction, compared to traditional circuit operation, during periods of high PV power productionand low circuit loading. Research efforts during year two of the five-year project were focused on modeling the distribution system level impacts of high-penetration PV integrations, the development and installation of distribution circuit data acquisition equipment appropriate for quantifying the impacts of high-penetration PV integrations, and investigating high-penetration PV impactmitigation strategies. This paper outlines these research efforts and discusses the following activities in more detail: the development of a quasi-static time-series test feeder for evaluating high-penetration PV integration modeling tools; the advanced inverter functions being investigated for deployment in the project's field demonstration and a power hardware-in-loop test of a 500-kW PVinverter implementing a limited set of advanced inverter functions.

14 SOLAR ENERGY↗

A Tale of Two Cities: Greensburg Resurrected as a National Model for Green Communities

This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. To help local distributed system owners get the most value for electricity sent back to the grid, NREL drafted safety and reliability ordinances, an interconnection agreement, and net-metering policies for the city to consider. NREL and the Energy Department also assisted with wind energy resource analysis, feasibility studies, and business plans.

disaster recovery↗

High Energy Physics Network Requirements Review: Two-Year Update

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. ESnet interconnects DOE national laboratories, user facilities, and major experiments so that scientists can use remote instruments and computing resources as well as share data with collaborators, transfer large datasets, and access distributed data repositories. ESnet is specifically built to provide a range of network services tailored to meet the unique requirements of the DOE’s data-intensive science. In July 2023, the Energy Sciences Network (ESnet) and the High Energy Physics program (HEP) of the DOE SC organized an interim ESnet requirements review of HEP-supported activities, to follow up on the work started during the 2020 HEP Network Requirements Review. Preparation for these events included checking back with the key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare updates to their previously submitted case study documents, so that ESnet could update the understanding of any changes to the current, near-term, and long-term status, expectations, and processes that will support the science activities of the program.

97 MATHEMATICS AND COMPUTING↗

Creation of System Validation Platform

The objective of this CRADA between Sandia National Laboratories (SNL) and SunSpec Alliance (SunSpec) was to create a software test platform called the System Validation Platform (SVP) that performs end-to-end certification testing of photovoltaic (PV) inverters, energy storage systems, and other distributed energy resources (DERs). The SVP automates interactions of test equipment (PV and grid simulators), data acquisition systems, and interoperable DERs to certify the devices for advanced grid-support functions and interoperability. To assist electricity grid, operators maintain voltage and frequency, new interconnection requirements in the U.S. and Europe require DERs to have grid-support functions with adjustable settings. Automating the certification process for DER devices impacts the bottom line of NRTLs because they do not need to rely on test engineers running days (or weeks) of experiments to validate the performance of the equipment. These savings can then be passed down to the DER vendors so the certification process becomes less expensive and lowers the barrier to market for PV inverters, charge controllers, and other grid-interconnected equipment. This technology can also be used as a research platform for SNL, other national labs, and universities that would like to run hardware tests with power electronics equipment.

14 SOLAR ENERGY↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of High-Penetration Levels of Photovoltaics into the Distribution Grid on Oahu, Hawaii: Detailed Analysis of HECO Feeder WF1

Renewable generation is growing at a rapid rate due to the incentives available and the aggressive renewable portfolio standard (RPS) targets implemented by state governments. Distributed generation in particular is seeing the fastest growth among renewable energy projects, and is directly related to the incentives. Hawaii has the highest electricity costs in the country due to the high percentage of oil burning steam generation, and therefore has some of the highest penetration of distributed PV in the nation. The High Penetration PV (HiP-PV) project on Oahu aims to understand the effects of high penetration PV on the distribution level, to identify penetration levels creating disturbances on the circuit, and to offer mitigating solutions based on model results. Power flow models are validated using data collected from solar resources and load monitors deployed throughout the circuit. Existing interconnection methods and standards such as IEEE 1547, Hawaii Rule 14H and California Rule 21 are evaluated in these emerging high penetration scenarios. A key finding is a shift in the level of detail to be considered and moving away from steady-state peak time analysis towards dynamic and time varying simulations. Each level of normal interconnection study is evaluated and enhanced to a new level of detail, allowing full understanding of each issue.

14 SOLAR ENERGY↗

DE‐SC0022708 RESEARCH PERFORMANCE FINAL REPORT

GismoPower’s Final Research Report documents the outcomes of a DOE SBIR Phase II project focused on advancing the MEGA® (Mobile Electricity Generating Appliance), a trailerable, plug-in solar canopy appliance designed to deliver appliance-class electricity generation for homes, small businesses and renters. The project’s core objective was to remove the technical and regulatory barriers that have historically prevented plug-in solar systems from being safely certified, permitted, and interconnected in the United States.

14 SOLAR ENERGY↗

Report on Transmission Cost Allocation for RTOs and Others (Presentation)

Presented at the MARC 2011 Annual Conference, 6 June 2011, Rapid City, South Dakota. This presentation provides an overview of the latest research findings and policy developments pertaining to cost allocation and new variable generation resources on the power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Management of Risk and Uncertainty Through Optimized Co-Operation of Transmission Systems and Microgrids With Responsive Loads (Final Report)

The evolution of the power system to the reliable, efficient and sustainable system of the future will involve development of both demand- and supply-side technology and operations. Ambitious national and state-level goals around the decarbonization of electricity relies on the integration of very high levels of renewable resources, most of which are variable and intermittent. The use of demand response is an ideal approach to counterbalance the intermittency of renewable generation and brings the consumer into the spotlight. Though individual consumers are interconnected at the low-voltage distribution system, these resources are typically modeled as variables at the transmission network level. Demand-side participation cannot be leveraged effectively without explicitly including the distribution system dynamics in the optimization-based wholesale market operations. This project grew from a vision for co-optimized interaction of distribution systems, or microgrids, with the high-voltage transmission system. In this framework, microgrids encompass consumers, distributed renewables and storage. The energy management system of the lower voltage system (distribution or microgrid) can also sell (buy) excess (necessary) energy from the transmission system. Until recently, very little research had been conducted on the co-optimization of these two systems due to computational limitations. However, advances in computational capabilities, and the judicious use of decomposition methods and innovative approximation methods for high-dimension dynamic programming made this goal a viable objective for this project, leading to a fundamental shift in the ability to integrate and fully utilize demand-side resources. To this end, the modeling framework developed introduces a novel co-optimization framework, to include the operations of both the transmission and distribution systems (or microgrids) in operational decision making. This framework was used to analyze renewable and distributed generation along with responsive demand and to compare the capability of co-optimized systems to perform with higher levels of variable renewables. An ideal microgrid is defined as an electric entity capable of operating in both interconnected (with the high-voltage grid) and islanded mode. As such, the microgrid should incorporate generating units (traditional units and intermittent) and if needed, exchange power with the high-voltage grid. The interplay between the microgrid and high-voltage grid motivated the development of the co-optimization approach to ensure efficient performance of the interconnected network. Results show that the use of a bi-level optimization approach is an appropriate structure, capable of co-optimizing a transmission system with multiple distribution systems and microgrids. While increasing the number of connected systems provides increasing flexibility for renewables integration this can also the economic benefits to the low-voltage subsystems with each additional system connected. Comparison of a traditional single-level decision structure with the co-optimization approach illustrates a reduction in overall system cost under co-optimization, while specific cost allocations to transmission and distribution systems are changed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗