Search NASA⌕ Search

SEARCH · Search NASA

Results for “Environmental and Life Support Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

International Space Station environmental control and life support system. Phase 3: Water Recovery Test Stage 9

A test has been completed at NASA's Marshall Space Flight Center (MSFC) to evaluate the latest water recovery system design for the United States On-Orbit Segment (USOS) of the International Space Station (ISS) with higher fidelity hardware and integration than has been achieved in previous Water Recovery Test (WRT) Stages. This test is referred to as WRT Stage 9. Potable and urine processing assemblies were integrated with end-use equipment and operated for 116 days. The overall integrated configuration of the test system included a single water recovery loop that was automated and controlled from a central computer. This report summarizes the test objectives, system design, test activities and protocols, significant results, anomalies and lessons learned throughout the WRT Stage 9.

D L Carter↗

Space Station Environmental Control and Life Support System Purge Control Pump Assembly Modeling and Analysis

Preliminary results from a thermal/flow analysis of the Purge Control Pump Assembly (PCPA) indicate that pump performance (mass flow rate) is enhanced via cooling of the housing and lowering of the inlet vapor quality. Under a nominal operational profile (25% duty cycle or less), at the maximum motor dissipation, it appears that the peristaltic tubing temperature will still remain significantly below the expected UPA condenser temperature (78 F max versus approximately 105 F in the condenser) permitting condensation in the pump head.

Schunk, R. Gregory↗

Environmental Control and Life Support System (ECLSS) System Engineering Workshop

This slide presentation begins with a recap on a previous lecture on the ECLSS subsystems, and the various types (i.e., Non-regenerative vs Regenerative, open loop vs closed loop, and physical-chemical vs bioregenerative) It also recaps the Equivalent system mass (ESM) metric. The presentation continues with a review of the ECLSS of the various NASA manned space exploration programs from Mercury, to the current planned Altair lunar landing, and Lunar base operations. There is also a team project to establish the ESM of two conceptualized missions.

Peterson, Laurie J.↗

International Space Station Environmental Control and Life Support System Status: 2012-2013

Controlling Carbon Dioxide (CO2) partial pressure in the habitable vehicle environment is a critical part of operations on the International Space Station (ISS). On the United States segment of ISS, CO2 levels are primarily controlled by the Carbon Dioxide Removal Assembly (CDRA). There are two CDRAs on ISS; one in the United States Laboratory module, and one in the Node3 module. CDRA has been through several significant operational issues, performance issues and subsequent re-design of various components, primarily involving the Desiccant Adsorbent Bed (DAB) assembly and Air Selector Valves (ASV). This paper will focus on significant operational and performance issues experienced by the CDRA team from 2008-2012.

Williams, David E.↗

Development of a Mars Environmental Control and Life Support System (ECLSS).

ECLS systems for very long-duration human missions to Mars will be designed to operate reliably for many years and will never be returned to Earth. The need for high reliability is driven by unsympathetic abort scenarios. Abort from a Mars mission could be as long as 450 days to return to Earth. Simply put, the goal of an ECLSS is to duplicate the functions the Earth provides in terms of human living and working on our home planet but without the benefit of the Earth's large buffers - the atmospheres, the oceans and land masses. With small buffers a space-based ECLSS must operate as a true dynamic system rather than independent processors taking things from tanks, processing them, and then returning them to product tanks. Key is a development process that allows for a logical sequence of validating successful development (maturation) in a stepwise manner with key performance parameters (KPPs) at each step; especially KPPs for technologies evaluated in a full systems context with human crews on Earth and on space platforms such as the ISS. This paper will explore the implications of such an approach to ECLSS development and the roles of ground and space-based testing necessary to develop a highly reliable life support system for long duration human exploration missions. Historical development and testing of ECLS systems from Mercury to the International Space Station (ISS) will be reviewed. Current work as well as recommendations for future work will be described.

Henninger, Donald L.↗

Advanced Life Support Research and Technology Development Metric

The Metric is one of several measures employed by the NASA to assess the Agency s progress as mandated by the United States Congress and the Office of Management and Budget. Because any measure must have a reference point, whether explicitly defined or implied, the Metric is a comparison between a selected ALS Project life support system and an equivalently detailed life support system using technology from the Environmental Control and Life Support System (ECLSS) for the International Space Station (ISS). This document provides the official calculation of the Advanced Life Support (ALS) Research and Technology Development Metric (the Metric) for Fiscal Year 2004. The values are primarily based on Systems Integration, Modeling, and Analysis (SIMA) Element approved software tools or reviewed and approved reference documents. For Fiscal Year 2004, the Advanced Life Support Research and Technology Development Metric value is 2.03 for an Orbiting Research Facility and 1.62 for an Independent Exploration Mission.

Hanford, A. J.↗

Advanced Life Support Research and Technology Development Metric: Fiscal Year 2003

This document provides the official calculation of the Advanced Life Support (ALS) Research and Technology Development Metric (the Metric) for Fiscal Year 2003. As such, the values herein are primarily based on Systems Integration, Modeling, and Analysis (SIMA) Element approved software tools or reviewed and approved reference documents. The Metric is one of several measures employed by the National Aeronautics and Space Administration (NASA) to assess the Agency s progress as mandated by the United States Congress and the Office of Management and Budget. Because any measure must have a reference point, whether explicitly defined or implied, the Metric is a comparison between a selected ALS Project life support system and an equivalently detailed life support system using technology from the Environmental Control and Life Support System (ECLSS) for the International Space Station (ISS). More specifically, the Metric is the ratio defined by the equivalent system mass (ESM) of a life support system for a specific mission using the ISS ECLSS technologies divided by the ESM for an equivalent life support system using the best ALS technologies. As defined, the Metric should increase in value as the ALS technologies become lighter, less power intensive, and require less volume. For Fiscal Year 2003, the Advanced Life Support Research and Technology Development Metric value is 1.47 for an Orbiting Research Facility and 1.36 for an Independent Exploration Mission.

Hanford, A. J.↗

The environmental control and life-support system for a lunar base: What drives its design

The purpose of this paper is to identify and briefly discuss some of the ground rules and mission scenario details that become drivers of the environmental control and life support (ECLS) system design and of the logistics related to the design. This paper is written for mission planners and non-ECLS system engineers to inform them of the details that will be important to the ECLS engineer when the design phase is reached. In addition, examples illustrate the impact of some selected mission characteristics on the logistics associated with ECLS systems. The last section of this paper focuses on the ECLS system technology development sequence and highlights specific portions that need emphasis.

Hypes, Warren D.↗

Study and development of a cryogenic heat exchanger for life support systems

A prototype cryogenic heat exchanger for removal of waste heat from a spacecraft environmental control life support system was developed. The heat exchanger uses the heat sink capabilities of the cryogenic propellants and, hence, can operate over all mission phases from prelaunch to orbit, to post landing, with quiescent periods during orbit. A survey of candidate warm fluids resulted in the selection of E-2, a fluorocarbon compound, because of its low freezing point and high boiling point. The final design and testing of the heat exchanger was carried out, however, using Freon-21, which is similar to E-2 except for its low boiling point. This change was motivated by the desire for cost effectiveness of the experimental program. The transient performance of the heat exchanger was demonstrated by an analog simulation of the heat sink system. Under the realistic transient heat load conditions (20 sec ramp from minimum to maximum Freon-21 inlet temperature), the control system was able to maintain the warm fluid outlet temperature within + or - 3 F. For a 20-sec ramp from 0 F to -400 F in the hydrogen inlet temperature, at maximum heat load, the warm fluid outlet temperature was maintained within + or - 7 F.

Soliman, M. M.↗

Space Station Freedom thermal control and life support system design

The Space Station Freedom thermal control system (TCS) and environmental control and life support system (ECLSS) are reviewed. Differences in the TCS and ECLSS are discussed between the early man-tended configuration (MTC) compared to the eventual evolutions to the permanently manned configuration (PMC). Concurrent analytical and developmental testing programs are included in the systems discussions as well as a description of an early 1993 flight test program on elements of the PMC water recovery system. Recent TCS design changes to the air cooling of rack mounted equipment are discussed. An overview of all TCS and ECLSS subsystems is included.

Wegrich, R. D.↗