Search NASA⌕ Search

SEARCH · Search NASA

Results for “Estimated On Time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Interplanetary Propagation of Coronal Mass Ejections

Although more than ten thousand coronal mass ejections (CMEs) are produced during each solar cycle at the Sun, only a small fraction hits the Earth. Only a small fraction of the Earth-directed CMEs ultimately arrive at Earth depending on their interaction with the solar wind and other large-scale structures such as coronal holes and CMEs. The interplanetary propagation is essentially controlled by the drag force because the propelling force and the solar gravity are significant only near the Sun. Combined remote-sensing and in situ observations have helped us estimate the influence of the solar wind on the propagation of CMEs. However, these measurements have severe limitations because the remote-sensed and in-situ observations correspond to different portions of the CME. Attempts to overcome this problem are made in two ways: the first is to model the CME and get the space speed of the CME, which can be compared with the in situ speed. The second method is to use stereoscopic observation so that the remote-sensed and in-situ observations make measurements on the Earth-arriving part of CMEs. The Solar Terrestrial Relations Observatory (STEREO) mission observed several such CMEs, which helped understand the interplanetary evolution of these CMEs and to test earlier model results. This paper discusses some of these issues and updates the CME/shock travel time estimates for a number of CMEs.

Gopalswamy, Nat↗

The Dynamical Evolution of the Earth-Moon Progenitors: Motivation and Methodology - 1

The Giant Impact Hypothesis was introduced in the mid-1970's after consideration of results from the Apollo Moon missions. This hypothesis best explains the similarity in elemental proportions in lunar and terrestrial rocks, the depletion of lunar volatiles, the lack of lunar iron. and the large angular momentum in the Earth-Moon system. Comparison between the radiometric ages of inclusions in the most primitive meteorites and those of inclusions in the oldest lunar rocks and the differentiation age of Earth suggests that the Earth-Moon system formed about 100 Myr after the oldest meteorites. In addition, the age of the famous Martian meteorite ALH84001 and an early solidification time estimated from the Martian crust, suggest that the inner Solar System was fairly clear of large bodies about 10 Myr after the oldest meteorites formed. Thus, the 'standard model' suggests that for a period of several tens of millions of years the terrestrial planet region had few. if any, lunar-sized bodies and there were five terrestrial planets, Mercury, Venus, the two progenitors of the Earth-Moon system, and Mars. To simulate the dynamics of the Solar System before the hypothesized Moon-forming impact, we are integrating the Solar System with the Earth-Moon system replaced by two bodies in heliocentric orbits between Venus and Mars. The total (orbital) angular momentum of the Earth-Moon progenitors is that of the present Earth-Moon system, and their total mass is that of the Earth-Moon system. We are looking at ranges in mass ratio and initial values for eccentricity, inclination. and semi-major axis. We are using the SYMBA integrator to integrate these systems until a collision occurs or a time of 200 Myr elapses. Results are presented in a companion paper.

Lissuer, Jack↗

Design of infrasound-detection system via adaptive LMSTDE algorithm

A proposed solution to an aviation safety problem is based on passive detection of turbulent weather phenomena through their infrasonic emission. This thesis describes a system design that is adequate for detection and bearing evaluation of infrasounds. An array of four sensors, with the appropriate hardware, is used for the detection part. Bearing evaluation is based on estimates of time delays between sensor outputs. The generalized cross correlation (GCC), as the conventional time-delay estimation (TDE) method, is first reviewed. An adaptive TDE approach, using the least mean square (LMS) algorithm, is then discussed. A comparison between the two techniques is made and the advantages of the adaptive approach are listed. The behavior of the GCC, as a Roth processor, is examined for the anticipated signals. It is shown that the Roth processor has the desired effect of sharpening the peak of the correlation function. It is also shown that the LMSTDE technique is an equivalent implementation of the Roth processor in the time domain. A LMSTDE lead-lag model, with a variable stability coefficient and a convergence criterion, is designed.

Khalaf, C. S.↗

Circadian rhythms in man.

Effect of isolation from external time cues on human circadian rhythms such as body temperature, sleeping period, passage of time estimation and urine excretion

HUMAN REACTION↗

Evolution of white dwarf stars.

Cooling time estimation for white dwarf stars with ion component undergoing condensation, based on plasma thermodynamic properties

Vila, S. C.↗

The origin and goals of the automated stellar proper motion survey

The historical background of the automation of the stellar proper motion survey is traced from its beginnings to the taking of the series of plates with the 48 inch Schmidt telescope at Mount Palomar covering 77% of the sky with 936 plates. The design goal for the automation is the documentation of the proper motions of stars from tenth through twentieth red magnitude. A typical scanning time for a pair of 14 inch star plates is projected to be about 45 minutes with the total processing time estimated at between one and two years for the complete set of plates.

Luyten, W. J.↗

Digital image processing for the earth resources technology satellite data.

This paper discusses the problems of digital processing of the large volumes of multispectral image data that are expected to be received from the ERTS program. Correction of geometric and radiometric distortions are discussed and a byte oriented implementation is proposed. CPU timing estimates are given for a System/360 Model 67, and show that a processing throughput of 1000 image sets per week is feasible.

Will, P. M.↗

SEASAT study documentation

The proposed spacecraft consists of a bus module, containing all subsystems required for support of the sensors, and a payload module containing all of the sensor equipment. The two modules are bolted together to form the spacecraft, and electrical interfaces are accomplished via mated connectors at the interface plane. This approach permits independent parallel assembly and test operations on each module up until mating for final spacecraft integration and test operations. Proposed program schedules recognize the need to refine sensor/spacecraft interfaces prior to proceeding with procurement, reflect the lead times estimated by suppliers for delivery of equipment, reflect a comprehensive test program, and provide flexibility for unanticipated problems. The spacecraft systems are described in detail along with aerospace ground equipment, ground handling equipment, the launch vehicle, imaging radar incorporation, and systems tests.

Source record↗

Structure of the quasi-perpendicular laminar bow shock

It was found that low solar wind parameters M (less than or around 2.5) and beta (much less than 1) and high angles to the local shock normal, theta (greater than or around 65 deg), produced oblique laminar shock profiles as expected from theory, with marginal or vanishing upstream standing whistlers probably damped by acoustic or other plasma wave instabilities. The whistler mode appeared to dominate the electromagnetic spectrum. The laminar shock ramp thickness was several hundred kilometers and equal to (2-4)c/omega-pi. Composition of the shock as an accumulation of near-standing waves and an evidently reproducible varying flux pattern was discernible. Electron thermalization occurred early in, or just before, the magnetic ramp, while proton thermalization appeared to occur later in the ramp. Instantaneous shock velocities derived from the standing whistler wavelength were consistent with average velocities derived from the elapsed time estimates and were as high as 200 km/sec.

Greenstadt, E. W.↗

Pi2 pulsations in the magnetosphere

Several substorms were observed at Explorer 45 in November and December 1971, and January and February 1972, while the satellite was in the evening quadrant near L = 5. These same substorms were identified in ground level magnetograms from auroral zone and low latitude stations. The satellite vector magnetic field records and rapid run ground magnetograms were examined for evidence of simultaneous occurrence of Pi2 magnetic pulsations. Pulsations which began abruptly were observed at the satellite during 7 of the 13 substorms studied and the pulsations occurred near the estimated time of substorm onset. These 7 pulsation events were also observed on the ground and 6 were identified in station comments as Pi2. All of the events observed were principally compressional waves, that is, pulsations in field magnitude. There were also transverse components elliptically polarized counter-clockwise looking along the field line. Periods observed ranged from 40 to 200 sec with 80 sec often the dominant period.

Lin, C. C.↗

User's guide to program FLEXSTAB

A manual is presented for correctly submitting program runs in aerodynamics on the UNIVAC 1108 computer system. All major program modules are included. Control cards are documented for the user's convenience, and card parameters are included in order to provide some idea as to reasonable time estimates for the program modules.

Cavin, R. K., III↗

Optical pulse timing resolution

This correspondence evaluates the performance of the maximum likelihood (ML) and several suboptimal arrival time estimators for optical pulses. The performance analysis of a 'sliding window' counter followed by a threshold detector is achieved by deriving an expression for the first-crossing density of the output of the counter.

Lee, G.↗

A Technique for Measuring Rotocraft Dynamic Stability in the 40 by 80 Foot Wind Tunnel

An on-line technique is described for the measurement of tilt rotor aircraft dynamic stability in the Ames 40- by 80-Foot Wind Tunnel. The technique is based on advanced system identification methodology and uses the instrumental variables approach. It is particulary applicable to real time estimation problems with limited amounts of noise-contaminated data. Several simulations are used to evaluate the algorithm. Estimated natural frequencies and damping ratios are compared with simulation values. The algorithm is also applied to wind tunnel data in an off-line mode. The results are used to develop preliminary guidelines for effective use of the algorithm.

Gupta, N. K.↗

A variable optical target simulator

A crucial experiment, relative to determining the ability of an imaging seeker to track a target and generate accurate terminal guidance, requires an optical device which can provide imagery that grows in size as a real-time estimate of true missile flight conditions. The basic components of an Optical Contrast TV Imaging Seeker are reviewed to establish the need for an optical target simulator. An optomechanical device called a Variable Optical Target Simulator (VOTS) which generates end game scene situations is discussed. The organization of optical components and their control for providing an image which grows in size as a linear estimate of real world situations is presented.

Kulas, C. E.↗

An initial assessment of the performance achieved by the Seasat-1 radar altimeter

The results of an initial on-orbit engineering assessment of the performance achieved by the radar altimeter system flown on SEASAT-1 are presented. Additionally, the general design characteristics of this system are discussed and illustrations of altimeter data product are provided. The instrument consists of a 13.5 GHz monostatic radar system that tracks in range only using a one meter parabolic antenna pointed at the satellite nadir. Two of its unique features are a linear FM transmitter with 320 MHz bandwidth which yields a 3.125 nanosecond time delay resolution, and microprocessor implemented closed loop range tracking, automatic gain control (AGC), and real time estimation of significant wave height (SWH). Results presented show that the altimeter generally performed in accordance with its orginal performance requirments of measuring altitude to a precision of less the 10 cm RMS, significant wave height to an accuracy of + or - 0.5 m or 10%, whichever is greater, and ocean backscatter coefficient to an accuracy of + or - 1 db, all over an SWH range of 1 to 20 meters.

Townsend, W. F.↗

An initial assessment of the performance achieved by the Seasat-1 radar altimeter

This paper describes the results of an initial on-orbit engineering assessment of the performance achieved by the radar altimeter system flown on Seasat-1. Additionally, the general design characteristics of this system are discussed and illustrations of altimeter data products are provided. The instrument consists of a 13.5-GHz monostatic radar system that tracks in range only using a 1-m parabolic antenna pointed at the satellite nadir. Two of its unique features are a linear FM transmitter with 320-MHz bandwidth, which yields a 3.125-ns time-delay resolution, and microprocessor-implemented closed-loop range tracking, automatic gain control (AGC), and real-time estimation of significant wave height (SWH). Results presented herein show that the altimeter generally performed in accordance with its original performance requirements of measuring altitude to a precision of less than 10-cm rms, SWH to an accuracy of plus or minus 0.5 m or 10 percent whichever is greater, and ocean backscatter coefficient to an accuracy of plus or minus 1 dB, all over an SWH range of 1 to 20 m.

Townsend, W. F.↗