Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fire management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Los Alamos National Laboratory Floodplain Assessment for Fire Risk Mitigations at the Lower Slobbovia Testing Site in (TA-36)

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take fire pre-suppression actions at Los Alamos National Laboratory (LANL) Technical Area (TA) 36. Constructing a fire break and a fuel break surrounding the Lower Slobbovia explosives testing site in addition to the current vegetation mowing practices would establish a safety perimeter to help prevent fires from spreading away from the firing point. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR 1022), which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Wildfire and power grid nexus in a changing climate

Global wildfire events have had increasingly severe impacts in recent years, particularly in the western USA, driven by extreme fire-weather conditions, fuel accumulation and multiple ignition sources. Wildfires sparked by power lines tend to be larger and more destructive, as they often occur during high winds, which accelerate the spread of fires. Moreover, efforts to contain wildfires frequently result in power outages, causing considerable economic disruption. Here, in this Review, we examine wildfire risks related to power-line-induced ignitions, infrastructure damage, climate-induced environmental impacts, grid operational risks, real-time grid management risks, vegetation management risks, and financial and funding risks in the context of a changing climate and their interdependence with power grid infrastructures. We then explore the resilience of power grids under wildfire threats, looking at risk analysis, prediction and mitigation strategies. The Review also shares practical insights and experiences in the USA to inform researchers, policymakers and industry professionals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Development of Oxy-fuel Combustion Turbines with CO 2 Dilution for Supercritical Carbon Dioxide (sCO 2 ) Based Power Cycles - Phase I Topical Final Report

Supercritical Carbon Dioxide (sCO 2 ) power cycles are a transformational technology for the energy industry, providing a higher efficiency heat source energy conversion for conventional and alternative energy sources. The novel cycle significantly reduces capital costs because of smaller equipment footprints and design modularity and allows for rapid cyclic load and source following to balance solar and wind energy power swings. This topical report outlines progress made to develop an oxy-fuel combustion turbine to significantly improve the state-of-the-art for thermal efficiency and results in a high-pressure stream of CO 2 simplifying carbon capture making the power plant emission-free.The team of Southwest Research Institute® (SwRI®), General Electric Global Research Center (GE-GRC), 8 Rivers, Air Liquide, Electric Power Research Institute, Inc. (EPRI), and Georgia Tech are working to develop a conceptual design for a sCO 2 , coal syngas or natural gas-fired oxy-fuel turbine in the 150-300 MWe size range capable of 1,200°C turbine inlet temperature at 300 bar and exhaust temperatures in the 725-775°C range. This turbine will require cooled turbine nozzles and blades as well as advanced thermal management systems to accommodate these high temperatures. The team represents world leaders in the development of sCO 2 power technologies and has received numerous Department of Energy (DOE) and industry-funded projects to implement pilot scale sCO 2 power cycle component and system level equipment, as well as MW scale pilot plants.

20 FOSSIL-FUELED POWER PLANTS↗

Techno-Economic Analysis of Compressed Air Energy Storage and Hydrogen Production from Variable Renewable Energy

This study presents the techno-economic analysis (TEA) results of integrating electrolysis hydrogen (H 2 ) production, compressed air energy storage (CAES), and H 2 -fired combustion turbines in a high variable renewable energy (VRE) market environment. The inconsistent nature of VRE creates challenges for power producers in maintaining a stable electrical grid as it is increasingly utilized. The mission of the National Energy Technology Laboratory (NETL) is driving innovation and delivering energy solutions, and a multiangle approach involving H 2 production, energy storage, and next-level H 2 -fired combustion turbine generator (CTG) technologies could provide one solution for the nation’s growing electrical grid issues with increasing VRE sources. The H 2 production and CAES concept were investigated due to its ability to provide utility-scale H 2 -fueled power generation with large-scale energy storage capabilities. Two facilities with CAES and natural gas-fired CTGs (in McIntosh, Alabama, and Huntorf, Germany) have been operating for decades. In contrast, this study investigates the potential to replace the natural gas fuel with H 2 fuel. This concept has been publicly presented by both Siemens Energy and Bechtel Global Engineering, Construction & Project Management (Bechtel) at two different power generating levels. The CAES and air expansion/combustion turbine power generation in this study are primarily based on the Siemens Energy system (Bailie, Aug. 10-11, 2021) (Scheller, Feb. 21, 2023). The inclusion of a H 2 turboexpander generator is from Bechtel (Gülen, Sep. 6, 2022). A block flow diagram of the proposed process is illustrated in Exhibit ES-1.

08 HYDROGEN↗

A One-dimensional Heat Transfer Model for a Cooled Airfoil in a Direct-fired Supercritical CO 2 Turbine

A one-dimensional (1-D) heat transfer model was developed to predict the performance of a cooled airfoil for a supercritical carbon dioxide (sCO 2 ) turbine. The model included the effects of film cooling effectiveness, thermal barrier coating thickness, and internal Nusselt number augmentation. Trends for overall cooling effectiveness versus heat load parameter were obtained for over twelve unique thermal management schemes. The study found that adding a thermal barrier coating was the most effective scheme for increasing the airfoil overall cooling effectiveness. Internal cooling technologies have diminishing returns as the heat transfer coefficient augmentation increases past a factor of five, however the sensitivity of overall cooling effectiveness to heat transfer augmentation scales by a factor of 1.3 when a thermal barrier coating is introduced. Film cooling is seen as a long-term research area which will be inevitably explored as direct sCO 2 systems develop a market presence. However, the model indicates that realizable film cooling effectiveness levels yield a smaller improvement in overall cooling effectiveness than a thermal barrier coating.

42 ENGINEERING↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

'I’m here because I want to make a difference.’

If you're at Los Alamos National Laboratory and happen to encounter Matt Johnson, don't be surprised if this busy leader smiles and stops to ask you how he can help. That’s the essence of the type of manager—and person—he is. As the leader of the Pit Technologies division at the Lab, Matt oversees six groups that cover national security manufacturing, operations and professional support. Matt started his career at the Lab in 2002. His first assignments included work with confinement vessels used at firing sites such as Nevada National Security Site. Matt's deep knowledge of high-strength steel made him a perfect fit for the research and fabrication of these explosive-proof containers. Shortly after joining the Lab, Matt accepted the position as the Welding and Joining team leader supporting national security manufacturing, the hydrotest program and welding efforts across the NNSA complex. Over time, Matt made his way across many programs at the Laboratory.

99 GENERAL AND MISCELLANEOUS↗

Persistence and potential of soil organic carbon in nature‐based climate solutions: A review of managed disturbances

Societal Impact Statement Implementing nature-based climate solutions is important for mitigating climate change, which is a global issue, but requires local adjustments in management practices. Using the association between soil carbon and minerals as a proxy for carbon persistence, we evaluated the effect of different management regimes on soil carbon sequestration and loss. We identified areas where management practices that increase carbon inputs should be prioritized and areas where management should focus on avoiding severe disturbances. Using this storage-potential-and-persistence framework to identify how to increase or maintain soil organic carbon storage locally will increase the effectiveness of nature-based climate solutions globally. Summary Increasing soil organic carbon storage could reduce the pace of climate change, but the longevity of this nature-based climate solution depends on the persistence of carbon in soils, not just the input rates into soils. We apply a framework for considering how soil carbon persistence—namely, via the association with minerals—sheds light on soil carbon sequestration. We review how management of disturbances, such as prescribed burning, forestry, and grazing, can change soil carbon storage, persistence, and potential. Past work demonstrated that management of disturbances can sequester soil carbon, but it remains unclear how the potential stabilization of that accrual and vulnerability to loss varies across disturbance types and geographies. We found that there is substantial geographical heterogeneity in the overlap among estimates of carbon accrual, disturbance occurrence, and potential stabilization: Fire-prone grasslands and intensively grazed rangelands occur in areas estimated to have high potential to store mineral-associated organic carbon, and studies also find that adjusted fire and grazing can promote mineral-associated organic carbon. Plantation forestry and burned area span large regions where particulate organic matter is the dominant form, and studies find that particulate organic carbon is disproportionately lost following intense wildfires and forest harvests. Thus, areas with high mineral-associated organic carbon deficits should be prioritized for practices that increase carbon inputs; whereas areas with high proportions of particulate organic carbon should be prioritized for practices that help to avoid severe disturbances. Taken together, the distribution of and changes in persistence mechanisms shed light on the durability of nature-based climate solutions.

fire↗

Methane Exhaust Measurements at Gathering Compressor Stations in the United States

Unburned methane entrained in exhaust from natural gas-fired compressor engines (“combustion slip”) can account for a substantial portion of station-level methane emissions. A novel in-stack, tracer gas method was coupled with Fourier transform infrared (FTIR) species measurements to quantify combustion slip from natural gas compressor engines at 67 gathering and boosting stations owned or managed by nine “study partner” operators in 11 U.S. states. The mean methane emission rate from 63 four-stroke, lean-burn (4SLB) compressor engines was 5.62 kg/h (95% CI = 5.15–6.17 kg/h) and ranged from 0.3 to 12.6 kg/h. The mean methane emission rate from 39 fourstroke, rich-burn (4SRB) compressor engines was 0.40 kg/h (95% CI = 0.37– 0.42 kg/h) and ranged from 0.01 to 4.5 kg/h. Study results for 4SLB engines were lower than both the U.S. EPA compilation of air pollutant emission factors (AP-42) and Inventory of U.S. Greenhouse Gas Emissions and Sinks (GHGI) by 8 and 9%, respectively. Study results for 4SRB engines were 43% of the AP-42 emission factor and 8% of the GHGI emission factor, the latter of which does not distinguish between engine types. Total annual combustion slip from the U.S. natural gas gathering and boosting sector was modeled using measured emission rates and compressor unit counts from the U.S. EPA Greenhouse Gas Reporting Program. Modeled results [328 Gg/y (95% CI = 235–436 Gg/y) of unburned methane] would account for 24% (95% CI = 17–31%) of the 1391 Gg of methane emissions for “Gathering and Boosting Stations”, or 6% of the net emissions for “Natural Gas Systems” (5598 Gg) as reported in the 2020 U.S. EPA GHGI. In conclusion, gathering and boosting combustion slip emissions reported in the 2020 GHGI (374 Gg) fall within the uncertainty of this model.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

AmeriFlux US-xBR NEON Bartlett Experimental Forest (BART)

This is the AmeriFlux version of the carbon flux data for the site US-xBR NEON Bartlett Experimental Forest (BART). Site Description - The Bartlett Experimental Forest is an actively managed forest; managed portions (30%) reflect a range of forest patch sizes and structural distributions. The Bartlett forest has a history of logging dating from colonial times through the beginning of the 20th century. Approximately 70% of the land area has remained uncut since the early 1900s. Natural disturbances include late 19th century fire, beech scale-Nectria complex (beech bark disease) beginning in the 1940s, severe wind disturbance resulting from hurricanes in 1938 and 1954 and a damaging ice storm in 1998.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-xBR NEON Bartlett Experimental Forest (BART)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xBR NEON Bartlett Experimental Forest (BART). This is the FLUXNET version of the carbon flux data for the site US-xBR NEON Bartlett Experimental Forest (BART) produced by applying the standard ONEFlux (1F) software. Site Description - The Bartlett Experimental Forest is an actively managed forest; managed portions (30%) reflect a range of forest patch sizes and structural distributions. The Bartlett forest has a history of logging dating from colonial times through the beginning of the 20th century. Approximately 70% of the land area has remained uncut since the early 1900s. Natural disturbances include late 19th century fire, beech scale-Nectria complex (beech bark disease) beginning in the 1940s, severe wind disturbance resulting from hurricanes in 1938 and 1954 and a damaging ice storm in 1998.

Network), NEON (National Ecological Observatory↗