Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Support Equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Ground support interface to the Spartan data recorder

The Spartan Tape Recorder Ground Support System has proven to be a versatile tool for the testing of the MARS 1400 Tape Recorder. The Tape Ground Support Equipment (TGSE) has two major functions. One function is to monitor the tape recorder during payload operations tests. The second function is to send commands which operate the tape recorder. Both of these functions can only be performed with the aid of the MARS Tape Controller (MTC) connected to the MARS 1400. It contains a Z80 microprocessor and other control electronics. This paper elaborates on the design of the ground support interface to the Spartan data recorder and the MTC.

Barthelme, N.↗

Titan 3E/Centaur D-1T Systems Summary

A systems and operational summary of the Titan 3E/Centaur D-1T program is presented which describes vehicle assembly facilities, launch facilities, and management responsibilities, and also provides detailed information on the following separate systems: (1) mechanical systems, including structural components, insulation, propulsion units, reaction control, thrust vector control, hydraulic systems, and pneumatic equipment; (2) astrionics systems, such as instrumentation and telemetry, navigation and guidance, C-Band tracking system, and range safety command system; (3) digital computer unit software; (4) flight control systems; (5) electrical/electronic systems; and (6) ground support equipment, including checkout equipment.

Source record↗

Spacelab payload accommodation handbook. Appendix A: Avionics interface definition

The Spacelab side of the electrical interface between Spacelab subsystem equipment and experiments is presented. The electrical hardware which interfaces with the experiments is defined and the signal/load characteristics are stated. Major subsystems considered include: electrical power and distribution; command and data management subsystem; orbiter avionics via dedicated connectors of Spacelab; and electrical ground support equipment.

Source record↗

Constellation's First Flight Test: Ares I-X

On October 28, 2009, NASA launched Ares I-X, the first flight test of the Constellation Program that will send human beings to the Moon and beyond. This successful test is the culmination of a three-and-a-half-year, multi-center effort to design, build, and fly the first demonstration vehicle of the Ares I crew launch vehicle, the successor vehicle to the Space Shuttle. The suborbital mission was designed to evaluate the atmospheric flight characteristics of a vehicle dynamically similar to Ares I; perform a first stage separation and evaluate its effects; characterize and control roll torque; stack, fly, and recover a solid-motor first stage testing the Ares I parachutes; characterize ground, flight, and reentry environments; and develop and execute new ground hardware and procedures. Built from existing flight and new simulator hardware, Ares I-X integrated a Shuttle-heritage four-segment solid rocket booster for first stage propulsion, a spacer segment to simulate a five-segment booster, Peacekeeper axial engines for roll control, and Atlas V avionics, as well as simulators for the upper stage, crew module, and launch abort system. The mission leveraged existing logistical and ground support equipment while also developing new ones to accommodate the first in-line rocket for flying astronauts since the Saturn IB last flew from Kennedy Space Center (KSC) in 1975. This paper will describe the development and integration of the various vehicle and ground elements, from conception to stacking in KSC s Vehicle Assembly Building; hardware performance prior to, during, and after the launch; and preliminary lessons and data gathered from the flight. While the Constellation Program is currently under review, Ares I-X has and will continue to provide vital lessons for NASA personnel in taking a vehicle concept from design to flight.

Davis, Stephan R.↗

JWST Telescope Integration and Test Progress

The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. The JWST Optical Telescope Element (Telescope) integration and test program is well underway. The telescope was completed in the spring of 2016 and the cryogenic test equipment has been through two optical test programs leading up to the final flight verification program. The details of the telescope mirror integration will be provided along with the current status of the flight observatory. In addition, the results of the two optical ground support equipment cryo tests will be shown and how these plans fold into the flight verification program.

Matthews, Gary W.↗

Integrated Ground Operations Demonstration Units Testing Plans and Status

Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

Johnson, Robert G.↗

Scientific and Technical Support for the Galileo Net Flux Radiometer Experiment

This report describes work in support of the Galileo Net Flux Radiometer (NFR), an instrument mounted on the Galileo probe, a spacecraft designed for entry into and direct measurements of Jupiter's atmosphere. Tasks originally proposed for the post launch period are briefly as follows: attend and support PSG (Project Science Group) and other project science meetings; support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); organize and maintain documentation; finish NFR calibration measurements, documentation, and analysis; characterize and diagnose instrument anomalies; develop descent data analysis tools; and science data analysis and publication. Because we had the capability to satisfy a project support need we also subsequently proposed and were funded to make ground- based observations of Jupiter during the period surrounding the Galileo arrival at Jupiter, using the Swedish Solar Telescope at La Palma, Canary Islands. The following section (11) provides background information on the NFR instrument.

Sromovsky, Lawrence A.↗

Scientific and Technical Support for the Galileo Net Flux Radiometer Experiment

This report describes work in support of the Galileo Net Flux Radiometer (NFR), an instrument mounted on the Galileo probe, a spacecraft designed for entry into and direct measurements of Jupiter's atmosphere. Tasks originally proposed for the post launch period covered by NCC 2-854 are briefly as follows: attend and support PSG (Project Science Group) and other project science meetings; support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); organize and maintain documentation; finish NFR calibration measurements, documentation, and analysis; characterize and diagnose instrument anomalies; develop descent data analysis tools; and science data analysis and publication. Because we had the capability to satisfy a project support need we also subsequently proposed and were funded to make ground-based observations of Jupiter during the period surrounding the Galileo arrival at Jupiter, using the Swedish Solar Telescope at La Palma, Canary Islands. The following section provides background information on the NFR instrument. Section 3 contains the final report of work done.

Sromovsky, Lawrence A.↗

Launch Processing System - A system to support the Space Shuttle

Kennedy Space Center (KSC) is designing and acquiring a Launch Processing System (LPS), an important part of Ground Support Equipment (GSE), to Support launch site operations in a more efficient way than was done on previous programs. LPS will provide (1) automatic control of GSE and Shuttle systems for test and operations, (2) real time data analysis and information display, and (3) efficient recall of test data and engineering files to support Shuttle ground operations. Modern automation techniques, off-the-shelf components, and modular design are being employed to the maximum to achieve these goals. The cost of acquisition, operations, and maintenance of LPS is of great importance and is considered with each engineering trade.

Paul, H. C.↗

Ground Software Maintenance Facility (GSMF) system manual

The Ground Software Maintenance Facility (GSMF) is designed to support development and maintenance of spacelab ground support software. THE GSMF consists of a Perkin Elmer 3250 (Host computer) and a MITRA 125s (ATE computer), with appropriate interface devices and software to simulate the Electrical Ground Support Equipment (EGSE). This document is presented in three sections: (1) GSMF Overview; (2) Software Structure; and (3) Fault Isolation Capability. The overview contains information on hardware and software organization along with their corresponding block diagrams. The Software Structure section describes the modes of software structure including source files, link information, and database files. The Fault Isolation section describes the capabilities of the Ground Computer Interface Device, Perkin Elmer host, and MITRA ATE.

Derrig, D.↗

Engineering monitoring expert system's developer

This research project is designed to apply artificial intelligence technology including expert systems, dynamic interface of neural networks, and hypertext to construct an expert system developer. The developer environment is specifically suited to building expert systems which monitor the performance of ground support equipment for propulsion systems and testing facilities. The expert system developer, through the use of a graphics interface and a rule network, will be transparent to the user during rule constructing and data scanning of the knowledge base. The project will result in a software system that allows its user to build specific monitoring type expert systems which monitor various equipments used for propulsion systems or ground testing facilities and accrues system performance information in a dynamic knowledge base.

Lo, Ching F.↗

Flight Systems Integration & Test: Lessons Learned for Future Success

This paper offers a comprehensive view of flight system integration and test (I&T) lessons learned related to mishaps and close calls, focusing on what can be done to improve the I&T process to avoid recurrence. Specific areas within the realm of I&T that are covered in this paper include: I&T team communication and training; design of flight and ground systems for I&T; planning and scheduling; configuration management and process documentation; ground support equipment and tools; cleanrooms and contamination; mechanical integration, handling, and deployments; electrical integration and electrostatic discharge; functional testing and troubleshooting; environmental testing and facilities; and launch site operations. To illustrate "real-world" lessons learned for I&T, examples from throughout the history of the U.S. space program are presented. Also presented are some best practices for I&T that can help mitigate mishaps and close calls on the ground or during flight.

Integration & Test↗

Advanced tracking and data relay experiments study: Multimode transponder experiment equipment

Plans and implementation concepts were developed for a series of experiments utilizing a Multimode Transponder mounted in an aircraft working either through a spacecraft or directly with a ground station which would simulate a TDRSS user working through the TDRSS. The purpose of the experiments is to determine the best modulation and encoding techniques for combating RFI in discreet bands. The experiments also determine the feasibility and accuracy of range and range rate measurements with the various modulation and encoding techniques. An analysis of the Multimode Transponder and ground support equipment is presented, and the additional equipment required to perform the experiments described above is determined.

Cnossen, R. S.↗

Analysis of Space Shuttle Ground Support System Fault Detection, Isolation, and Recovery Processes and Resources

As part of the FDIR (Fault Detection, Isolation, and Recovery) Project for the Constellation Program, a task was designed within the context of the Constellation Program FDIR project called the Legacy Benchmarking Task to document as accurately as possible the FDIR processes and resources that were used by the Space Shuttle ground support equipment (GSE) during the Shuttle flight program. These results served as a comparison with results obtained from the new FDIR capability. The task team assessed Shuttle and EELV (Evolved Expendable Launch Vehicle) historical data for GSE-related launch delays to identify expected benefits and impact. This analysis included a study of complex fault isolation situations that required a lengthy troubleshooting process. Specifically, four elements of that system were considered: LH2 (liquid hydrogen), LO2 (liquid oxygen), hydraulic test, and ground special power.

Gross, Anthony R.↗

A Fully Redundant On-Line Mass Spectrometer System Used to Monitor Cryogenic Fuel Leaks on the Space Shuttle

An on-line gas monitoring system was developed to replace the older systems used to monitor for cryogenic leaks on the Space Shuttles before launch. The system uses a mass spectrometer to monitor multiple locations in the process, which allows the system to monitor all gas constituents of interest in a nearly simultaneous manner. The system is fully redundant and meets all requirements for ground support equipment (GSE). This includes ruggedness to withstand launch on the Mobile Launcher Platform (MLP), ease of operation, and minimal operator intervention. The system can be fully automated so that an operator is notified when an unusual situation or fault is detected. User inputs are through personal computer using mouse and keyboard commands. The graphical user interface is very intuitive and easy to operate. The system has successfully supported four launches to date. It is currently being permanently installed as the primary system monitoring the Space Shuttles during ground processing and launch operations. Time and cost savings will be substantial over the current systems when it is fully implemented in the field. Tests were performed to demonstrate the performance of the system. Low limits-of-detection coupled with small drift make the system a major enhancement over the current systems. Though this system is currently optimized for detecting cryogenic leaks, many other gas constituents could be monitored using the Hazardous Gas Detection System (HGDS) 2000.

Griffin, Timothy P.↗

Environmental Control System Development

Since before the first men landed on the moon, human beings have aspired to reach farther into space, to discover and answer the great mysteries that exist beyond imagination. To reach where no one has gone before. To able to see all the wonderful things that can be found in space and that only satellites have revealed to us during all this time. Considering the last trip to the moon, mankind has been evolving and improving their technology to reach destinations whose distances had been impossible to transit. To reach that goal, the National Aeronautics and Space Administration (NASA) has designed and developed the largest and most powerful rocket ever created by the human race, the Space Launch System - better known as the SLS. To be able to send this large rocket to space, Kennedy Space Center (KSC) is doing upgrades to their existing facilities and equipment. At Launch Pad 39B, they are setting up a new Environmental Control System (ECS) developed to supply the rocket with the correct gases and mixtures that will be needed for the rocket to launch. The ECS is similar to an air conditioning unit. The main functionality of it is to supply the SLS with the correct gas mixture for it to launch. Also the ECS has been required to reduce or eliminate the possibility of a complete system failure. The system is part of the Ground Support Equipment (GSE) for the SLS that will be going to the Moon and Mars.

Flores Arroyo, Elvin A.↗

Spacecraft Autonomy and Automation: A Comparative Analysis of Strategies for Cost Effective Mission Operations

The evolution of satellite operations over the last 40 years has drastically changed. October 4, 1957 (during the cold war) the Soviet Union launched the world's first spacecraft into orbit. The Sputnik satellite orbited Earth for three months and catapulted the United States into a race for dominance in space. A year after Sputnik, President Dwight Eisenhower formed the National Space and Aeronautics Administration (NASA). With a team of scientists and engineers, NASA successfully launched Explorer 1, the first US satellite to orbit Earth. During these early years, massive amounts of ground support equipment and operators were required to successfully operate spacecraft vehicles. Today, budget reductions and technological advances have forced new approaches to spacecraft operations. These approaches require increasingly complex, on board spacecraft systems, that enable autonomous operations, resulting in more cost-effective mission operations. NASA's Goddard Space Flight Center, considered world class in satellite development and operations, has developed and operated over 200 satellites during its 40 years of existence. NASA Goddard is adopting several new millennium initiatives that lower operational costs through the spacecraft autonomy and automation. This paper examines NASA's approach to spacecraft autonomy and ground system automation through a comparative analysis of satellite missions for Hubble Space Telescope-HST, Near Earth Asteroid Rendezvous-NEAR, and Solar Heliospheric Observatory-SoHO, with emphasis on cost reduction methods, risk analysis and anomalies and strategies employed for mitigating risk.

Wright, Nathaniel, Jr.↗

KSC ground operations planning for Space Station

At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

Lyon, J. R.↗