Search NASA⌕ Search

SEARCH · Search NASA

Results for “HOSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Molten Salt Test Loop (MSTL) system customer interface document.

The National Solar Thermal Test Facility at Sandia National Laboratories has a unique test capability called the Molten Salt Test Loop (MSTL) system. MSTL is a test capability that allows customers and researchers to test components in flowing, molten nitrate salt. The components tested can range from materials samples, to individual components such as flex hoses, ball joints, and valves, up to full solar collecting systems such as central receiver panels, parabolic troughs, or linear Fresnel systems. MSTL provides realistic conditions similar to a portion of a concentrating solar power facility. The facility currently uses 60/40 nitrate %E2%80%9Csolar salt%E2%80%9D and can circulate the salt at pressure up to 40 bar (600psi), temperature to 585%C2%B0C, and flow rate of 44-50kg/s(400-600GPM) depending on temperature. The purpose of this document is to provide a basis for customers to evaluate the applicability to their testing needs, and to provide an outline of expectations for conducting testing on MSTL. The document can serve as the basis for testing agreements including Work for Others (WFO) and Cooperative Research and Development Agreements (CRADA). While this document provides the basis for these agreements and describes some of the requirements for testing using MSTL and on the site at Sandia, the document is not sufficient by itself as a test agreement. The document, however, does provide customers with a uniform set of information to begin the test planning process.

Gill, David Dennis↗

Blender Pump Fuel Survey: CRC Project E-95-2

With the increasing fuel diversity in the marketplace, the Coordinating Research Council and the U.S. Department of Energy's National Renewable Energy Laboratory conducted a survey of mid-level ethanol blends (MLEBs) in the market. A total of 73 fuel samples were collected from 20 retail stations. To target Class 4 volatility, the fuel samples were collected primarily in the midwestern United States in the month of February. Samples included the gasoline (E0), Flex Fuel, and every MLEB that was offered from each of the 20 stations. Photographs of each station were taken at the time of sample collection, detailing the pump labeling and configuration. The style and labeling of the pump, hose, and dispenser nozzle are all important features to prevent misfueling events. The physical location of the MLEB product relative to the gasoline product can also be important to prevent misfueling. In general, there were many differences in the style and labeling of the blender pumps surveyed in this study. All samples were analyzed for volatility and ethanol content. For the MLEB samples collected, the fuels tended to be lower in ethanol content than their indicated amount; however, the samples were all within 10 vol% of their indicated blend level. One of the 20 Flex Fuel samples was outside of the allowable limits for ethanol content. Four of the 20 Flex Fuel samples had volatility below the minimum requirement for Class 4.

30 DIRECT ENERGY CONVERSION↗

Physical Property Measurements of Laboratory Prepared Saltstone Grout

The Saltstone Production Facility (SPF) built two new Saltstone Disposal Units (SDU), SDU 3 and SDU 5, in 2013. The variable frequency drive (VFD) for the grout transfer hose pump tripped due to high current demand by the motor during the initial radioactive saltstone transfer to SDU 5B on 12/5/2013. This was not observed during clean cap processing on July 5, 2013 to SDU 3A, which is a slightly longer distance from the SPF than is SDU 5B. Saltstone Design Authority (SDA) is evaluating the grout pump performance and capabilities to transfer the grout processed in SPF to SDU 3/5. To assist in this evaluation, grout physical properties are required. At this time, there are no rheological data from the actual SPF so the properties of laboratory prepared samples using simulated salt solution or Tank 50 salt solution will be measured. The physical properties of grout prepared in the laboratory with de-ionized water (DI) and salt solutions were obtained at 0.60 and 0.59 water to premix (W/P) ratios, respectively. The yield stress of the DI grout was greater than any salt grout. The plastic viscosity of the DI grout was lower than all of the salt grouts (including salt grout with admixture). When these physical data were used to determine the pressure drop and fluid horsepower for steady state conditions, the salt grouts without admixture addition required a higher pressure drop and higher fluid horsepower to transport. When 0.00076 g Daratard 17/g premix was added, both the pressure drop and fluid horsepower were below that of the DI grout. Higher concentrations of Daratard 17 further reduced the pressure drop and fluid horsepower. The uncertainty in the single point Bingham Plastic parameters is + 4% of the reported values and is the bounding uncertainty. Two different mechanical agitator mixing protocols were followed for the simulant salt grout, one having a total mixing time of three minutes and the other having a time of 10 minutes. The Bingham Plastic parameters were essentially the same for the salt grout without admixture. When Daratard 17 was added, the Bingham Plastic yield stress increased for the 10 minute mix. The simulant salt used in this task had similar physical properties of the Tank 50 3Q13 salt grout and is recommended for future use, if the salt solution in Tank 50 does not change. The design basis physical properties used to size the pumps and mixers at SPF were obtained from DPST-85-312. The grouts characterized in this report are bounded by the design basis density and Bingham Plastic yield stress. The opposite is true for the plastic viscosity. Steady state pressure drop calculations were performed for the design basis values using the flow rate for the clean cap and salt grouts and they bound the pressure drop of the grouts characterized in this report. A comparison of the lab prepared samples to PI ProcessBook data, specifically average pressure drop, indicate that the lab prepared samples are more viscous in nature than what is processed in the facility. This difference could be due to the applied shear rates which could be lower in the lab as compared to the facility and that fact the SPF added flush water, making this comparison more difficult. A perfunctory review of the PI ProcessBook data was discussed. It may be possible that the frequency that the distributed control system alters the grout pump speed to maintain grout hopper volume can negatively affect the efficiency of the grout pump.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Cooled Mirror Design

This design is intended to replace the current mirror setup being used for the NorthStar Moly 99 project in order to monitor the target coupon. The existing setup has limited movement for camera alignment and is difficult to align properly. This proposed conceptual design for a water cooled mirror will allow for greater thermal transfer between the mirror and the water block. It will also improve positioning of the mirror by using flexible vacuum hosing and a ball head joint capable of a wide range of motion. Incorporating this design into the target monitoring system will provide more efficient cooling of the mirror which will improve the amount of diffraction caused by the heating of the mirror. The process of aligning the mirror for accurate position will be greatly improved by increasing the range of motion by offering six degrees of freedom.

42 ENGINEERING↗

Contaminant Stabilization Technology Gap Report

After an intentional radiological release or nuclear power plant (NPP) accidental release, there may be a large area that is contaminated. Re-suspension and tracking of contamination may create issues with containing the contaminated area and create additional exposure to responders. There is a need for technologies/methodologies to reduce resuspension and tracking. Current radiological particle containment relies on securing the area, setting up a single egress and ingress route, and minimizing the amount of contaminated equipment and vehicles leaving the contaminated zone. The re-suspension and tracking of contamination greatly hampers the ability to conduct first response activities in that zone therefore technologies that can reduce these spreading mechanisms are needed. In the NPP decommissioning industry, coatings are employed to reduce the spread of contamination. These coatings may not be readily available in the quantities needed for early response. Responders need containment methodologies that can be employed with existing equipment and materials on site using techniques such as fire hosing, street sweepers, and painting. A review by Parra et al. (2009) provided a good overview of fixative/stabilization materials, which formed the basis (in addition to a literature search) for a list of potential technologies presented to stakeholders in the initial stages of this work. Advantages and disadvantages were identified for each of the technologies, which were grouped into tiers based on the time-frame they would be available following a radiological release. Stakeholders then ranked containment technologies in terms of their preference and interest in use and availability. The final part of this task is to gather more information on the stakeholder-selected technologies and identify technical gaps that need to be filled with experimental research before technical procedures can be developed for containment technology use in the field.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical Solution to the Pneumatic Transient Rod System at ACRR

The ACRR pulse is pneumatically driven by nitrogen in a system of pipes, valves and hoses up to the connection of the pneumatic system and mechanical linkages of the transient rod (TR). The main components of the TR pneumatic system are the regulator, accumulator, solenoid valve and piston-cylinder assembly. The purpose of this analysis is to analyze the flow of nitrogen through the TR pneumatic system in order to develop a motion profile of the piston during the pulse and be able to predict the pressure distributions inside both the cylinder and accumulators. The predicted pressure distributions will be validated against pressure transducer data, while the motion profile will be compared to proximity switch data. By predicting the motion of the piston, pulse timing will be determined and provided to the engineers/operators for verification. The motion profile will provide an acceleration distribution to be used in Razorback to more accurately predict reactivity insertion into the system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Determination of Kicker Vacuum Requirements

This note examines the effect of elevated vacuum pressures in the kicker region of the DARHT 2nd Axis which can lead to changes in the beam tune due to the long pulse length. The kicker uses Rexolite as an insulator supporting the electrodes. Rexolite is hygroscopic resulting is a large outgassing rate and prolonged pump down times after exposure to atmospheric conditions. LAMDA [1] is used to simulate the effect of ionization of the residual gas resulting in partial space charge neutralization and changes to the tune between the beginning and end of the pulse. The effect of the ion-hose instability is also examined. The purpose of this note is to establish/validate the required pressure in the downstream transport.

42 ENGINEERING↗

High Energy Storage Capacity Low Cost Iron Flow Battery

A new flow battery was proposed that utilizes low cost materials: iron as the only active element, cheap aqueous electrolytes, and inexpensive separators. During charging, ferrous iron (Fe 2+ ) is oxidized to ferric iron (Fe 3+ ) at the positive electrode while it (Fe 2+ ) is reduced to form iron metal (Fe 0 ) at the negative electrode. Because iron is plated at the negative electrode during charging, conventional electrode structures couple the energy storage capacity and the power rating of the battery. In order to decouple the energy and power ratings and regain the economic advantages of a flow battery, a slurry electrode design was proposed for use as the negative electrode. The slurry electrode is made by flowing electrically conductive particles in an electrolyte containing the dissolved iron species. On charging, iron is plated onto the particles. The particles can then carry the iron metal out of the cell to be stored in external reservoirs. This project looked to develop a slurry for the negative electrode of the all-iron flow battery that can operate at 200 mA/cm 2 with <100 mV overpotential, be pumped with parasitic energy costs < 10%, and promote plating on the particles. A scalable and stackable cell design of 1100 cm 2 was developed. The project was initially under contract in mid-January 2013. The project was converted from a one-year proof of concept seedling to an additional two-year program, then extended with an 18-month plus-up, and finally with an additional 6-month approved cost-overrun. During the seeding project, the concept of plating on carbon particles in a slurry was demonstrated. However, this was accomplished with high-cost multi-walled carbon nanotubes as the slurry material. The following two-year program discovered several low-cost carbon blacks that could also be used in this application. These findings were supported by an analysis that demonstrated the effectiveness of the carbon that takes into account not just the effective electronic conductivity of the slurry, but also the surface area per volume of the slurry. It was demonstrated that stable, flowable slurries could be created with these carbons, even when the carbons where fully loaded with iron during charging. During the two-year program, laboratory-scale 50 cm 2 single-cells demonstrated charge-discharge cycling at current densities of 150 mA/cm 2 and energy efficiencies of >50%. Meanwhile, cost modeling continued to show promise for this energy storage approach. Following the conversion period, the overall objective of the nominally 18-month plus up period was to close the technical gap of a 25X scale-up and reduce risk to enable commercial investment required to develop a slurry iron flow battery product. A specific objective was to demonstrate 150 cycles of performance exceeding 70% energy efficiency with a 10-cell stack of 1156 cm 2 cells operating at 100 mA/cm 2 . The 10-cell short stack was designed to have a power delivery rating of approximately 1 kW, which represents a size commensurate with the requirements of our commercialization partner at that time. A complete battery support system for the full-size cell was designed, fabricated, and tested. This includes pumps (multiple types were considered, and constant volume hose pumps were found to be acceptable for performance and cost), electrolyte rebalance reactor, and sensors and control systems. The support system proved to be well-behaved and worked well. A new low-cost membrane was developed for this system based on a microporous polymer support with a layer of hydrogel polymer. The membrane had low resistivity, and significantly reduced pressure driven fluid flow across the membrane (as compared to the un-coated microporous support). This membrane approach was scaled-up in conjunction with a commercial toll coating company, and a large amount of membrane was manufactured to support large cell and stack testing. A new concept for an electrolyte rebalance reactor to react hydrogen gas from the negative electrolyte (from plating inefficiency) with excess ferric ion in the positive electrolyte was developed. This design was very simple, low cost, and effective. The full scale 1156 cm 2 single-cell was designed, modeled, fabricated and tested. Modeling showed that uniform flow-distribution should be obtained with the designed flow distributor. The design took into consideration the need to stack the cells, and components were fabricated for a ten-cell stack. Testing of the cell for charge and discharge demonstrated current densities of 50 mA/cm 2 with efficiencies of 50%. However, optimization and long cycling could not be accomplished because the slurry electrode would plug within the cell and block the flow. This would shut down the cell after several charge-discharge cycles. Various approaches were pursued to address this problem with some progress. However, there was not adequate time to find solutions to the problem although several promising approaches were identified for future work. The final deliverable for this proposed 18-month effort was to be a 1 kW, 6 kWh slurry flow battery, with complete balance of plant, ready for testing at an ARPA-E ‘Charges’ site with an estimated capital cost less than $\$ $45/kWh for a six-hour system (excluding power electronics). The deliverable milestone was not achieved for reasons mentioned above related to the slurry plugging. At the completion of this project, it was determined that the cost targets are achievable. The cost estimate for a 1 MW system with a one-hour capacity was estimated at $\$ $140/kWh (including power electronics) and for a six-hour system was estimated at $\$ $40/kWh (including power electronics). These costs include the battery, the balance of plant, the power conditioning and a concrete pad. This program resulted in three patents including the slurry-based iron flow battery, the rebalance reactor, and the membrane separator. At the time of this report, slurry-based iron flow battery patents have been issued in the US, China, Japan, Korea, and Europe. The other patent applications were under various stages of examination. A licensee was identified and the company initiated a scale-up and development program to take this technology to the marketplace, and CWRU staff have transferred their know-how and knowledge base to the company. This technology will enhance the economic and energy security of the United States by enabling the use of intermittent renewable energy technology, such as wind and solar power, as dispatchable resources. This report summarizes the results of this research and development program.

25 ENERGY STORAGE↗

Pressure Safety Data Package for Remote Balloon Launcher (RBL)

The Barrow Hydrogen Fill System is intended for use by the authorized Sandia National Laboratories personnel and its contractors who are involved in research relating to the deployment of weather balloons for the Department of Energy's Atmospheric Radiation Measurement Program (ARM) https://www.arm.gov/ and The National Weather Service (NWS) https://www.weather.gov/. Hydrogen is supplied from a hydrogen generation shelter and outdoor storage tank. The balloons are filled and released by a remote balloon launcher (RBL) commercially available from Vaisala. The RBL was designed to be used with helium or hydrogen and has be recently inspected by Vaisala for hydrogen operation. This system is composed of a pressure regulator, ball valves, pressure relief valves, tubing, hose. All pressurized components are "off the shelf items and have a minimum pressure rating of 300 psi and are assembled using "Best Practices" and trained pressure component installers. Non pressurized components are comprised of industry recommended components and are assembled using "Best Practices" techniques.

42 ENGINEERING↗

Hydrogen Refueling Reference Station Lot Size Analysis for Urban Sites

Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) is a project initiated by the DOE in 2015 and executed by Sandia National Laboratories and the National Renewable Energy Laboratory to address R&D barriers to the deployment of hydrogen fueling infrastructure. One key barrier to the deployment of fueling stations is the land area they require (i.e. "footprint"). Space is particularly a constraint in dense urban areas where hydrogen demand is high but space for fueling stations is limited. This work presents current fire code requirements that inform station footprint, then identifies and quantifies opportunities to reduce footprint without altering the safety profile of fueling stations. Opportunities analyzed include potential new methods of hydrogen delivery, as well as alternative placements of station technologies (i.e. rooftop/underground fuel storage). As interest in heavy-duty fueling stations and other markets for hydrogen grows, this study can inform techniques to reduce the footprint of heavy-duty stations as well. This work characterizes generic designs for stations with a capacity of 600 kg/day hydrogen dispensed and 4 dispenser hoses. Three base case designs (delivered gas, delivered liquid, and on-site electrolysis production) have been modified in 5 different ways to study the impacts of recently released fire code changes, colocation with gasoline refueling, alternate delivery assumptions, underground storage of hydrogen, and rooftop storage of hydrogen, resulting in a total of 32 different station designs. The footprints of the base case stations range from 13,000 to 21,000 ft 2 . A significant focus of this study is the NFPA 2 requirements, especially the prescribed setback distances for bulk gaseous or liquid hydrogen storage. While the prescribed distances are large in some cases, these setback distances are found to have a nuanced impact on station lot size; considerations of the delivery truck path, traffic flow, parking, and convenience store location are also important. Station designs that utilize underground and rooftop storage can reduce footprint but may not be practical or economical. For example, burying hydrogen storage tanks underground can reduce footprint, but the cost savings they enable depend on the cost of burial and the cost land. Siting and economic analysis of station lot sizes illustrate the benefit of smaller station footprints in the flexibility and cost savings they can provide. This study can be used as a reference that provides examples of the key design differences that fueling stations can incorporate, the approximate sizes of generic station lots, and considerations that might be unique to particular designs.

08 HYDROGEN↗

TA-55 Forensic Support Operations Cross-Training Exercise

As part of the annual FBI/LANL training schedule, a joint training exercise was conducted during the week of 10FEB2020 with FBI HEAT members and LANL Fissile Material Handlers (FMHs). The joint training exercise was conducted in a non-radiological area to reduce cost and ensure the test object would not be contaminated. The exercise test object was fabricated by LANL using surrogate materials to represent an object containing Special Nuclear Material (SNM). Working with Jim Blankenship and Kevin Swearingen, functional requirements of the test object included the following: unclassified, disassembly (to include screws), and moderately heavy. To meet the objectives, the test object was fabricated by welding a custom aluminum box (8” x 8” x 12”) with a lid which was secured by four (4) screws. The custom box housed a track and field shot put (16 lbs.) that was anchored by a hose clamp. The intent of the training was to disassemble the test object and conduct traditional forensic determinations on the parts. This lessons learned report documents all of the associated aspects related to the joint training effort.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cathode to Target Simulations for Scorpius: I. Simulation Codes and Models

The new Scorpius linear induction electron accelerator is under development for multi-pulse flash radiography of large, explosively-driven hydrodynamic experiments. Beam physics from the cathode to the target was examined with computer simulations, including envelope, ray-trace, and particle-in cell (PIC) codes. Beam instabilities investigated included beam breakup (BBU), image displacement, diocotron, parametric envelope, ion hose, and the resistive wall instability. Beam corkscrew motion and emittance growth from beam mismatch were also studied. The results of these simulations is documented in a series of reports. In this report the computer codes and physical models used for these simulations are described. The conclusion of this study is that Scorpius will produce and accelerate a beam with radiographic quality equivalent to the present accelerators at Los Alamos National Laboratory if the same engineering standards and construction details are upheld.

43 PARTICLE ACCELERATORS↗

Atomistic Materials Modeling of High-Pressure Hydrogen Interactions in Ethylene Propylene Diene Monomer (EPDM) Rubber

Elastomeric rubbers serve a vital role as sealing materials in the hydrogen storage and transport infrastructure. With applications including O-rings and hose-liners, these components are exposed to pressurized hydrogen at a range of temperatures, cycling rates, and pressure extremes. Cyclic (de)pressurization is known to degrade these materials through the process of cavitation. This readily visible failure mode occurs as a fracture or rupture of the material and is due to the oversaturated gas localizing to form gas bubbles. Computational modeling in the Hydrogen Materials Compatibility Program (H-Mat), co-led by Sandia National Laboratories and Pacific Northwest National Laboratory, employs multi-scale simulation efforts to build a predictive understanding of hydrogen-induced damage in materials. Modeling efforts within the project aim to provide insight into how to formulate materials that are less sensitive to high-pressure hydrogen-induced failure. In this document, we summarize results from atomistic molecular dynamics simulations, which make predictive assessments of the effects of compositional variations in the commonly used elastomer, ethylene propylene diene monomer (EPDM).

08 HYDROGEN↗

Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (Final Report)

This document presents final technical findings for the project Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (FE0031782). The project is part of the U.S. Department of Energy Oil and Gas Program to develop and advance technologies that can significantly improve the recovery efficiencies of unconventional oil and gas resources. The overall objective of this project is to improve the ultimate recovery from unconventional oil and gas (UOG) resources in the United States by developing a method for using unrefined natural gas liquids (NGLs) as treatment fluids to improve hydrocarbon production. Horizontal extended-lateral drilling coupled with high volume hydraulic fracturing has significantly increased production from UOG resources in the U.S. However, the recovery efficiency is low compared to the estimated oil and gas in place. Recent data indicate that less than 10% of the oil in the liquid-rich UOG reservoirs is produced. Alternative completion methods using NGLs could increase production (Battelle, 2016; Wan et al., 2013; Wan, 2013; Downey et al, 2021); however, field validation tests are needed to develop an approach that is economical, efficient, and compatible in the UOG setting to advance towards commercial deployment. This project aims to develop and field test a method to improve recovery of oil resources in UOG shale plays by using Y-Grade NGLs, or a similar combination of NGLs, as treatment fluids. Refined NGLs have been used as a hydraulic treatment fluid in UOG plays for decades and are shown to be particularly effective because their miscibility with oil allows oil to flow more freely; however, the use of Y-Grade (unrefined) NGLs has not been studied. The use of Y-Grade NGLs would be advantageous over refined NGLs because Y-Grade NGLs do not require infrastructure or investment in refining and are already being produced from many UOG reservoirs. The concept was tested and monitored in the field at a commercial well site owned by project partner Hopco, Ltd. The project team, which consists of multiple oil and gas operators, Linde Gas North America LLC (Linde) and the Ohio Division of Geological Survey (ODGS), has extensive experience with oil and gas production in the Appalachian basin and the ability to work together quickly to solve technical issues and research needs. A key part of the proposed work was the use of existing wells for field testing and monitoring. A total of four wells (three vertical and one horizontal) were available for this project. One of the vertical wells was utilized as the test well for the NGL treatment test. A nearby vertical well was used for microseismic monitoring. The remaining vertical well and the horizontal well provided a baseline for typical UOG production in the oil window of the Utica/Point Pleasant (UPP). Major technical tasks of the project include characterization of the geotechnical properties of the UPP with an emphasis on the field site; design and planning for the NGLs testing; field testing and monitoring; analysis and integration of field data; and economic and resource/reserve assessment. The Shoman monitoring well and Doughty NGL treatment well were successfully plugged back during September-October 2020 in preparation for treatment and monitoring. A nitrogen diagnostic fracture injection test (DFIT) was completed on the Doughty well on July 22, 2021, consisting of 133,000 scf (91 Bbl.) of nitrogen. A nitrogen foam frac was completed in the Utica-Point Pleasant interval on August 17, 2021 with funding from outside sources. A microseismic monitoring array was installed in the Shoman well and monitored microseismic activity during the Doughty well frac job. Y-Grade NGL injection commenced on August 26, 2021. A total of 215 Bbl. was injected but the job was shut down due to a small leak on the suction hose on the pump truck. The Y-Grade treatment resumed on August 27, 2021 and an additional 726 Bbl. of Y-Grade NGL was injected at a well head pressure of 3850 psi. Total volume of injected Y-Grade over the two days of injection was 941 Bbl. The well was shut-in for 17 days following injection to allow the Y-Grade NGLs to soak on the formation. Y-Grade treatment flow back commenced on 9/13/2021 on a weekly basis. Production data, including surface pressures, oil, nitrogen, natural gas, and flow times was measured and recorded. Periodic gas samples were collected and analyzed to determine composition of flowback gas. As of July 2022, the treatment well had produced 726 Bbl of oil and 2,888 mcf gas. In August 2022, tubing and packer in the well were removed and a pump was installed to enhance oil recovery. Currently, the operator is producing the well about 2 days a week for a few hours. The performance of the NGL treatment test was evaluated based on reservoir simulations of the treatment process, processing of well testing data, analysis of micro seismic monitoring data, and production data analysis. This analysis suggested that oil production in the small test would continue through 2025. Upscaling the treatment to a horizontal Utica Point-Pleasant well would allow more oil recovery, but the process would involve more investment, services, and operational support. An economic analysis was conducted for scenarios aimed at upscaling the NGL treatment process for more typical horizontal UPP wells in the Appalachian Basin.

02 PETROLEUM↗

Center for Tokamak Transients Simulations

The major goals for the Center for Tokamak Transients Simulations (CTTS) were to develop detailed numerical simulations of disruptive transients in tokamak experiments and to use them in theoretical studies of the thermal-quench (TQ) and current-quench (CQ) phases of disruption. The University of Wisconsin-Madison component of CTTS contributed relevant development for the NIMROD code (https://nimrodteam.org) and applied it to disruptions that involve global vertical displacement. Code-development contributions include boundary conditions that represent sheath effects which occur when tokamak plasma is in contact with the surrounding vessel wall during vertical displacement events (VDEs). We also implemented a reduced model of energetic runaway electrons (REs) to simulate the effect of these energetic electrons on the CQ phase of tokamak disruptions. Our computations of VDEs include 2D and 3D verification through benchmarks with two other widely used macroscale plasma simulation codes, M3D-C1 and JOREK. Over nonlinear evolution to the final termination of plasma current, the 2D simulation results on magnetic axis location, toroidal current, and halo current track each other well. With the 3D benchmark computation, all three codes found the same qualitative behavior of the asymmetric instabilities having increasing growth rate after contact with the wall, followed by nonlinear excitation of other toroidal harmonics. Our NIMROD computations for an idealized configuration show agreement with an analytical assessment by V. D. Pustovitov [Nucl. Fusion 55, 113032 (2015)] that the plasma and non-ideal wall remain in force-balance such that net forces only result from magnetic stresses over the outer surface of the wall. Our study of the influence of boundary conditions on VDEs shows that extended-MHD simulations of VDEs are sensitive to electron energy transport to the wall and that boundary conditions on flow are only significant to the extent that they influence the electron energy transport. Resistive-MHD NIMROD simulations of the tokamak discharges in the Madison Symmetric Torus show that magnetic perturbations of poloidal wavenumber m=3 lead to chaotic magnetic topology over the edge region, which helps deconfine energetic electrons. A second area of RE study shows that the coupled resistive MHD/reduced RE model reproduces the resistive-hose particle-beam instability. With respect to educational opportunities, this effort involved and supported four graduate students at the University of Wisconsin-Madison and one postdoctoral associate. The results of this study have been disseminated through journal publications, conference presentations, technical reports, and PhD dissertations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Autonomous Fueling System for Heavy-Duty Fuel Cell Electric Trucks

The motivation for this project stemmed from the challenges associated with rapidly refueling heavy-duty hydrogen fuel cell electric trucks (FCETs). Current manual refueling processes for fast refueling involve large, heavy equipment (e.g., hoses three times heavier than standard) and pose ergonomic risks and potential for equipment damage. The goal was to develop and test an autonomous fueling system to improve ergonomics, enhance safety, increase equipment durability through design improvements, and potentially speed up the fueling process. This project aimed to add to the understanding of autonomous systems in the context of heavy-duty hydrogen refueling, evaluating the technical effectiveness of potential concepts. A successfully developed system would benefit the public by facilitating the adoption of zero-emission heavy-duty transport, reducing reliance on manual labor for a physically demanding task, and potentially improving the safety and efficiency of hydrogen refueling infrastructure. The major accomplishment during the project's active period was the completion of the system-level architecture task. This involved establishing a detailed list of system requirements covering interfaces, environmental conditions, regulatory compliance, industry standards, safety, security, performance capabilities, and optional features. Five key use cases for the autonomous system were also identified. However, due to internal restructuring at Nikola, the necessary resources could not be allocated to continue the project. Consequently, Nikola opted to discontinue the project. The award was mutually terminated by Nikola and the DOE.

08 HYDROGEN↗

Enabling real-time adaptation of machine learning models at x-ray Free Electron Laser facilities with high-speed training optimized computational hardware

The emergence of novel computational hardware is enabling a new paradigm for rapid machine learning model training. For the Department of Energy’s major research facilities, this developing technology will enable a highly adaptive approach to experimental sciences. In this manuscript we present the per-epoch and end-to-end training times for an example of a streaming diagnostic that is planned for the upcoming high-repetition rate x-ray Free Electron Laser, the Linac Coherent Light Source-II. We explore the parameter space of batch size and data parallel training across multiple Graphics Processing Units and Reconfigurable Dataflow Units. We show the landscape of training times with a goal of full model retraining in under 15 min. Although a full from scratch retraining of a model may not be required in all cases, we nevertheless present an example of the application of emerging computational hardware for adapting machine learning models to changing environments in real-time, during streaming data acquisition, at the rates expected for the data fire hoses of accelerator-based user facilities.

97 MATHEMATICS AND COMPUTING↗

Components of aircraft life support systems interact with each other and the user

The life support system in a tactical aircraft provides necessary supplemental oxygen to the aircrew. However, interactions among its various components may generate unexpected breathing loads. We focus here on the interactions between a regulator and breathing mask commonly used together in the U.S. Navy, the CRU-103 regulator and MBU 23/P mask, and some effects of the interactions on the user. The data reported were collected during a larger research effort examining potential physiological and cognitive effects of low regulator inlet pressures. Seventeen participants completed a series of tasks under mild exercise while breathing 40% O 2 (balance N 2 ) from an MBU-23/P mask supplied by a CRU-103 regulator with supply pressures 10, 6, 4, and 2 psig (CRU-103 specifications are for inlet pressures from 5 to 120 psig). Variables measured included flow to the mask and pressures at the regulator supply, in the hose to the mask, and in the mask. In addition to restricting inspiratory flow, low inlet pressure to the CRU-103 caused a counterintuitive overshoot in gas delivery pressure at end-inspiration, a mean increase of 1.5 cm H 2 O between the 10- and 2 psig conditions. The added pressure to the exhalation valve increased the expiratory threshold, the pressure to start expiratory flow, by approximately 2 cm H 2 O, increasing the effort needed to exhale.

60 APPLIED LIFE SCIENCES↗