Search NASA⌕ Search

SEARCH · Search NASA

Results for “ISOS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Assessment of Seasonal Energy Performance for Room Air Conditioners in Multiple Climates

This report provides a general approach for adopting a seasonal energy efficiency metric by examining the climate-specific temperature bin distribution for air conditioner use, the seasonal energy efficiency results according to International Standards Organization (ISO) 16358 by climate region, and the relationships in seasonal energy efficiency across regional metrics. This approach could make the seasonal efficiency metric values comparable with those from other countries with standards consistent with ISO 16358. Policy action and market transformation can be accelerated and effectively harmonized with other regional or international efforts by adopting a seasonal energy efficiency metric. The framework and methodology described in this report have been applied in the following publications: Shaffie et al. 2022, Park et al. 2021, Park et al. 2019, and UNEP 2019a.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

System Study: Isolation Condenser 1998-2020

This report presents an unreliability evaluation of the isolation condenser (ISO) system at four U.S. boiling water reactors. Demand, run hours, and failure data from calendar year 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

System Study: Isolation Condenser 1998-2022

This report presents an unreliability evaluation of the isolation condenser (ISO) system at three U.S. commercial operating boiling water reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the ISO results.

99 GENERAL AND MISCELLANEOUS↗

Distributed Wind and Impacts of FERC Order No. 2222 Implementation

In September of 2020, FERC issued Order No. 2222, directing ISOs to adjust their long-standing tariffs and participation models to enable the operation of distributed energy resource (DER) aggregators in wholesale energy markets. The rule sought to bring wholesale markets under its jurisdiction up to speed with existing expansion of DERs across the United States and to capture the potential benefits that these technologies can provide. This report describes the implementation of FERC Order No. 2222 and the compliance plans that have been submitted so far, attempt to understand the potential impact the rule may have on distributed wind, and provide opportunities for future work to analyze and encourage deployment under these policy conditions. There is an information gap for the type of market interactions distributed wind may have or how it could be best deployed in DER aggregations under future market conditions. There is significant potential for profitable deployment of distributed wind in states that are served by ISOs and covered under Order No. 2222. Distributed wind and other DERs provide local energy that does not need to travel those distances and avoids the losses typically associated with long-distance energy transmission. Deployment of distributed wind can benefit communities that exist away from large load centers by providing local, clean, and affordable energy. Aggregating DERs that include distributed wind could provide these benefits across multiple far-ranging communities if they have access to participate in wholesale markets. A new baseline valuation of distributed wind in areas covered by Order No. 2222 is required to accurately gauge where it is profitable and how it can compete or complement existing or future DER deployment, including as part of an aggregate.

17 WIND ENERGY↗

Nuclear Materials Packaging, Transportation, and Systems Analysis Group Software Quality Assurance Plan: ANSYS Mechanical Finite Element Analysis Software Version 2023R1

ANSYS Inc. develops and markets engineering simulation software and services used in the aerospace, automotive, manufacturing, electronics, biomedical, energy, defense, and many other industries. ANSYS is dedicated to engineering simulation and is the world’s leading software provider. ANSYS was founded in 1970 and is headquartered in Canonsburg, Pennsylvania. ANSYS provides an engineering analysis tool combining structural, thermal, computational fluid dynamics, acoustic, and electromagnetic simulation capabilities. ANSYS has two main programs, which use the same solvers: (1) Mechanical APDL (ANSYS Design Parametric Language), a Fortran-based coding platform, and (2) ANSYS Workbench, which uses a graphical user interface to aid in finite element analysis implementation. This plan covers both APDL and Workbench. The ANSYS computer program is a large-scale, multipurpose finite element program that can be used to solve several classes of engineering analyses. The analysis capabilities of ANSYS include the ability to solve static and dynamic structural analyses, steady-state and transient heat transfer problems, mode-frequency and buckling eigenvalue problems, static or time-varying magnetic analyses, and various types of field and coupled-field applications. The program contains many special features that allow nonlinearities or secondary effects such as plasticity, large strain, hyperelasticity, creep, swelling, large deflections, contact, stress stiffening, temperature dependency, material anisotropy, and radiation to be included in the solution. As ANSYS has been developed, other special capabilities such as substructuring, submodeling, random vibration, kinetostatics, kinetodynamics, free convection fluid analysis, acoustics, magnetics, piezoelectrics, coupled-field analysis, and design optimization have been added to the program. These capabilities contribute further to making ANSYS a multipurpose analysis tool for varied engineering disciplines. The ANSYS program has been in commercial use for over 50 years and has been used extensively in the aerospace, automotive, construction, electronic, energy services, manufacturing, nuclear, plastics, oil, and steel industries. Additionally, many consulting firms and hundreds of universities have used ANSYS for analysis, research, and educational purposes. ANSYS is recognized worldwide as one of the most widely used and capable programs of its type. Ansys design analysis software is the first created within a quality system with ISO 9001 certification, the internationally accepted quality standard. Product development, testing, maintenance and support processes also meet the United States Nuclear Regulatory Commission's quality requirements, as they have for nearly four decades. The Quality Assurance Service Agreement is suitable for the customers working in the nuclear industry who need to meet specific federal regulations including 10CRF50 Appendix B and provisions of 10CFR21. ANSYS has retained its original International Organization for Standardization (ISO) 9001 accreditation certificate since1995-05-04, It’s current certificate is valid until 2027-05-29.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Software Quality Assurance Plan ANSYS LSDYNA Version 2023R1

ANSYS Inc. develops and markets engineering simulation software and services used in the aerospace, automotive, manufacturing, electronics, biomedical, energy, defense, and many other industries. ANSYS is dedicated to engineering simulation and is the world’s leading software provider. ANSYS was founded in 1970 and is headquartered in Canonsburg, Pennsylvania. ANSYS provides an engineering analysis tool combining structural, thermal, computational fluid dynamics, acoustic and electromagnetic simulation capabilities. ANSYS LS-DYNA is the most used explicit simulation program capable of simulating the response of materials to short periods of severe loading. Its many elements, contact formulations, material models, and other controls can be used to simulate complex models with control over all the details of the problem. ANSYS LS-DYNA has a vast array of capabilities to simulate extreme deformation problems using its explicit solver. Engineers can tackle simulations involving material failure and look at how the failure progresses through a part or through a system. Models with large amounts of parts or surfaces interacting with each other are also easily handled, and the interactions and load passing between complex behaviors are modeled accurately. Using computers with higher numbers of CPU cores can drastically reduce solution times. In addition, many consulting firms and hundreds of universities use ANSYS for analysis, research, and educational purposes. ANSYS is recognized worldwide as one of the most widely used and capable programs of its type. ANSYS has successfully passed over 100 customer quality system audits against American Society of Mechanical Engineers (ASME) NQA-1 and 10 CFR Part 50, Appendix B, since the company was founded, over 60 of which have been since 1997. ANSYS has successfully passed over 100 International Organization for Standardization (ISO) 9001 assessments. ANSYS design analysis software is the first created within a quality system with ISO 9001 certification, which is the internationally accepted quality standard. Product development, testing, maintenance, and support processes also meet the US Nuclear Regulatory Commission’s (NRC’s) quality requirements, as they have for nearly four decades. ANSYS staff perform more than 60,000 software verification tests before releasing each new product. ASME NQA-1-2012 (Subpart 2.7 is specific to software) is the industry- and NRC-accepted approach (consensus standard) for meeting 10 CFR Part 50, Appendix B, requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Radiation Research Laboratory (SRRL) Core Project Final Report: Fiscal Years 2022-2024

The Solar Radiation Research Laboratory (SRRL) at the National Laboratory of the Rockies (NLR) is a world-leading solar calibration and measurement facility and maintains and disseminates the World Radiation Reference (essentially the W/m2) for the United States that is essential for traceable and accurate measurements of solar radiation at all solar generation facilities. SRRL operates two calibration facilities that meet International Standards Organization-17025 (ISO-17025) standards and provide unique high-quality calibrations to NREL and other U.S. Department of Energy laboratories. The Baseline Measurement System (BMS) at SRRL provides a high-quality record of solar irradiance and surface meteorological conditions. SRRL capabilities are used to develop (1) improved methods for the calibration of solar radiometers; (2) new standards through the ISO, the International Electrotechnical Commission (IEC), and the American Standards for Testing of Materials (ASTM) International; (c) solar radiation and meteorological models; and (d) advanced instrumentation and methods for operating solar measurement stations. The SRRL datasets are also critical for the validation of new models and datasets, such as the National Solar Radiation Database (NSRDB). The research and development of solar radiation measurement systems and resource modeling techniques are essential for advancing the scientific basis for producing reliable resource data. Specifically, the spatial, temporal, and spectral (wavelength dependency) characteristics of the solar resource are required in several different time frames for various project phases.

14 SOLAR ENERGY↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cloud-Based Demonstration of the Eastern Interconnection Situational Awareness Monitoring System (ESAMS)

This report describes a cloud-based implementation and field demonstration of the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS). ESAMS was developed to support the detection and source localization of forced oscillations using synchrophasor measurements from tie-lines connecting areas served by different reliability coordinators (RCs), so that RCs could better coordinate their response to wide-area events. A previous effort had identified deployment barriers associated with hosting shared situational awareness tools at a single RC. To address these barriers, ESAMS was migrated to Amazon Web Services and evaluated in a six-month field demonstration. ISO New England (ISO-NE) and PJM streamed data to the platform using AWS Direct Connect and a site-to-site VPN, respectively. The resulting multi-utility measurement footprint enabled regional source localization across major portions of the U.S. Eastern Interconnection and supported routine identification of oscillation events. During the final three months of the trial, 24 events above 2 MW/MVAR were detected. The largest detected oscillation approached a 25 MW peak-to-peak amplitude, and the longest persisted intermittently for more than 11 hours. The demonstration also assessed operational considerations—including data transfer volumes, end-to-end latency, and cloud computing costs—and found that network and compute requirements were modest relative to typical cloud capabilities while providing performance comparable to prior on-premises deployments. Overall, the results indicate that cloud hosting can provide a practical path to shared interconnection-wide oscillation monitoring. The cloud ESAMS demonstration establishes a foundation for broader utility participation and for building future wide-area analytics that leverage measurements across organizational boundaries.

Follum, James D.↗

Defect And Damage Characterization Of Additively Manufactured Titanium Alloy Ti-5553 Using Traditional Computed Tomography Volume Segmentation And Machine Learning Algorithms

The mechanical response of a component is affected by defects, such as porosity, arising from the laser powder bed fusion (LPBF) fabrication process. Thus, it is important to develop accurate and efficient inspection methods for identifying porosity. In this work, porosity identified in an X-ray computed tomography (XCT) volume of a Ti-5553 coupon was compared to pores identified in a serial sectioned volume that represented the ground truth. The porosity of the XCT scan was identified using contrast-based, ISO-based, and machine learning (ML) methods for segmentation. Large inherent porosity was easy to identify, but the ISO thresholding still struggled due to the intensity gradient resulting from both the beam hardening in XCT and the uneven lighting of the serial sectioning panels. Further, the results show that ML-based methods were better suited for identifying small pores and reducing the amount of false positives. Additionally, high strain-rate impact testing was done on some of the XCT samples as well as post-mortem XCT inspection, and the same suite of segmentation and quantification tools were used to identify the large spallation cavities. The comparison of porosity pre- and post-mortem provides insight on the influence of the LPBF porosity on the formation of spall cavities.

36 MATERIALS SCIENCE↗

Characterization of the Nucleus, Morphology, and Activity of Interstellar Comet 2I/Borisov by Optical and Near-infrared GROWTH, Apache Point, IRTF, ZTF, and Keck Observations

We present visible and near-infrared (NIR) photometric and spectroscopic observations of interstellar object (ISO) 2I/Borisov taken from 2019 September 10 to 2019 December 20 using the GROWTH, the Apache Point Observatory Astrophysical Research Consortium 3.5 m, and the NASA Infrared Telescope Facility 3.0 m combined with pre- and postdiscovery observations of 2I obtained by the Zwicky Transient Facility from 2019 March 17 to 2019 May 5. Comparison with imaging of distant solar system comets shows an object very similar to mildly active solar system comets with an outgassing rate of ∼10{sup 27} mol s{sup −1}. The photometry, taken in filters spanning the visible and NIR range, shows a gradual brightening trend of ∼0.03 mag day{sup −1} since 2019 September 10 UTC for a reddish object becoming neutral in the NIR. The light curve from recent and prediscovery data reveals a brightness trend suggesting the recent onset of significant H{sub 2}O sublimation with the comet being active with super volatiles such as CO at heliocentric distances >6 au consistent with its extended morphology. Using the advanced capability to significantly reduce the scattered light from the coma enabled by high-resolution NIR images from Keck adaptive optics taken on 2019 October 4, we estimate a diameter for 2I’s nucleus of ≲1.4 km. We use the size estimates of 1I/’Oumuamua and 2I/Borisov to roughly estimate the slope of the ISO size distribution, resulting in a slope of ∼3.4 ± 1.2, similar to solar system comets and bodies produced from collisional equilibrium.

79 ASTRONOMY AND ASTROPHYSICS↗

Detailed Compositional Comparison of Hydrogenated Vegetable Oil with Several Diesel Fuels and Their Effects on Engine-Out Emissions

The Coordinating Research Council (CRC) is actively involved in developing and applying advanced analytical techniques to the chemical characterization of transportation fuels. Here, this article complements a 2017 CRC project to quantify and compare the effects of a commercially available renewable diesel fuel (hydrotreated vegetable oil [HVO]) and an ultralow sulfur diesel (ULSD) fuel on engine-out gaseous and particulate matter (PM) emissions from a light-duty vehicle. Results showed that the combustion of HVO fuel had an advantage over ULSD in terms of lowering engine-out emissions (THC, CO, NO x , etc.). Furthermore, this advantage is strongly related to the fuel composition. This article summarizes the results of advanced and comprehensive analytical tests on the same ULSD and HVO fuels and attempts to connect some of the engine-out emissions results to fuel composition and specific chemical structures. A variety of test methods, generally unavailable in combination, were employed, such as one-dimensional (1D) and two-dimensional (2D) gas chromatography (GC), nuclear magnetic resonance spectroscopy (NMR), and high-pressure solid-liquid phase transition experiments. In summary, the ULSD sample was found to have representation across the expected set of hydrocarbon classes typical for the sample type. Interestingly, a high content of cycloparaffins (>50 wt%) and a very low content of diaromatics (~2 wt%) were present. While not without precedent, these are higher and lower, respectively, than typically found for commercial ULSD compositions. In contrast, HVO was found to consist of only two hydrocarbon classes: n-paraffins (~10 wt%) and iso-paraffins (~90 wt%), both predominantly in a narrow carbon atom number range (i.e., C14–C18). HVO engine-out emissions results for the LA-92 and steady-state testing can be tracked to the narrow carbon atom number range of the n-paraffins and iso-paraffins, which result in a high cetane number fuel having a narrow distillation range. Previously, the low-temperature operability of HVO has been a concern, but that appears not be the case for this particular HVO. HVO and ULSD were evaluated at pressures up to ~275 MPa and found to have comparable solid-liquid equilibria despite significant compositional differences.

09 BIOMASS FUELS↗