Search NASA⌕ Search

SEARCH · Search NASA

Results for “Inspection and maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

This report covers flight evaluation of composite inboard ailerons on the L-1011 under Contract NAS 1-15069 for a period of five years. This is the fourth annual report of the maintenance evaluation program, and covers the period from May 1985 when the third yearly inspections were completed, through July 1986. Four shipsets of graphite/epoxy composite inboard ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta aircraft and two TWA aircraft. A fifth shipset of composite ailerons was installed in 1980 on Lockheed's flight test L-1011. One instance of minor damage was observed on one of the composite ailerons and was repaired. No other maintenance actions have occurred on any of the composite parts except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 12,051]en1] to 14,046 hours, after approximately 4 years of service.

Stone, R. H.↗

Acoustic Emission-Based Health Monitoring of Space Launch System Structures

This report documents the technical accomplishments of the project, “Acoustic Emission- Based Health Monitoring of Space Launch System Structures,” sponsored by the National Aeronautics and Space Administration (Award No. NNM13AA12G). As the project title suggests, the goal of the project was to develop a structural health monitoring (SHM) system for Space Launch System (SLS) vehicles based on acoustic emission (AE) or AE-like signals. Such a system will enhance SLS reliability by identifying the damage locations and type of damage when the damage is initiated. This SHM system would also lead to reduced maintenance costs by enabling ground support equipment to inspect only SLS elements or parts that are likely to be damaged. Finally, it will facilitate lean designs that meet tolerance levels specified by barely detectable damage. By avoiding excess conservatism in this manner, this SHM system will further reduce manufacturing costs of SLS vehicles.

Adams, D. O.↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Health Monitoring of Composite Material Structures using a Vibrometry Technique

Large composite material structures such as aircraft and Reusable Launch Vehicles (RLVS) operate in severe environments comprised of vehicle dynamic loads, aerodynamic loads, engine vibration, foreign object impact, lightning strikes, corrosion, and moisture absorption. These structures are susceptible to damage such as delamination, fiber breaking/pullout, matrix cracking, and hygrothermal strain. To ensure human safety and load-bearing integrity, these structures must be inspected to detect and locate often invisible damage and faults before becoming catastrophic. Moreover, nearly all future structures will need some type of in-service inspection technique to increase their useful life and reduce maintenance and overall costs. Possible techniques for monitoring the health and indicating damage on composite structures include: c-scan, thermography, acoustic emissions using piezoceramic actuators or fiber-optic wires with gratings, laser ultrasound, shearography, holography, x-ray, and others. These techniques have limitations in detecting damage that is beneath the surface of the structure, far away from a sensor location, or during operation of the vehicle. The objective of this project is to develop a more global method for damage detection that is based on structural dynamics principles, and can inspect for damage when the structure is subjected to vibratory loads to expose faults that may not be evident by static inspection. A Transmittance Function Monitoring (TFM) method is being developed in this project for ground-based inspection and operational health monitoring of large composite structures as a RLV. A comparison of the features of existing health monitoring approaches and the proposed TFM method is given.

Schulz, Mark J.↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Computational materials reliability assessment of hydrogen fueled gas turbine power generation engines

The use of blended fuel sources in land based gas turbine engines drives variations in the resulting operational profile (temperatures and pressures) which can impact engine reliability. Furthermore, variability in the manufacture of components affects the resulting microstructure which directly impacts material performance and reliability. Currently, data-driven models are typically used for maintaining and inspecting fleets of engines. Without explicitly capturing material and operational sources of variability conservatism must be used in developing component-level reliability models. Therefore, there exists an opportunity to use information from materials-scale physics models to better inform reliability modeling and reduce conservatism; the impact is more cost-efficient operation and maintenance of current and future fleets. Specifically, this work establishes a computational framework for evaluating the probabilistic high temperature creep performance of hot-section Ni-based superalloys where uncertainty comes from both microstructural and operational variability. A novel high-fidelity physics model which phenomenologically captures grain-boundary sensitive phenomena has been established. A probabilistic calibration procedure was used to calibrate the model and capture uncertainty in the parameterized model coefficients. A design of experiments methodology was established for identifying informative microstructural digital representations for suitable for forward model evaluation. Results show that training a machine-learning surrogate using this design criteria outperforms random selection of microstructural representations. Finally, two surrogate models were developed: (1) a deterministic surrogate model which predicts the local field response given microstructure, constitutive model parameters, and operating conditions (stress, temperature) and (2) a probabilistic model, where uncertainty comes from constitutive law uncertainty, built using denoising diffusion probabilistic models which samples responses given (1) microstructure and (2) operating conditions. These surrogate models enable partner Siemens Energy to rapidly perform UQ analysis specific to creep deformation across a range of microstructures and operating conditions. The impact is that these ML and physics codes can be used to establish more advanced reliability models for the inspection, servicing, and maintenance of land based gas turbine engines.

36 MATERIALS SCIENCE↗

Maritime Fuel Cell Generator Project: 2018 – 2023

This report summarizes activity in the Maritime Fuel Cell (MarFC) Generator Project from 2018 – 2023. FY 2018 saw the implementation of upgrades and repairs, making the unit more reliable and operator friendly. In FY2019 the team engaged the Scripps Institution of Oceanography (SIO) to use the MarFC to provide zero-emission shore power to the research vessel R/V Robert Gordon Sproul while in port at the Nimitz Marine Facility in San Diego, CA. In FY2020, the MarFC unit was shipped to San Diego, CA. A fueling contract with IGX was established to support MarFC operations at SIO, with renewable hydrogen provided by the California State University Los Angeles (CSULA) hydrogen station. The project team (Sandia, Cummins/Hydrogenics) provided training to SIO staff on the technical details of the MarFC, the safe use of hydrogen in general and the MarFC in particular. The first fueling of the unit at the SIO pier was successfully completed by IGX. The first powering of a vessel with fuel-cell shore power was conducted with the R/V Robert Gordon Sproul. While the mechanical systems (lights, AC, ventilation, hydraulics, pumps and cranes) were powered without incident, problems arose when powering the computer systems. Inspections carried out in FY2021 revealed the MarFC needed routine maintenance. Maintenance was performed and the unit was upgraded. The MarFC was turned on after the year pause, and initial test data on power levels and stability were collected. FY2022 was a year spent repairing, upgrading and testing the MarFC unit. Spikes in power and voltage were observed above 60 kW that could potentially extend below 60 kW with time. Such spikes could cause problems with the Sproul electrical systems. These age-related problems, the extended time for the Sproul spent in dry dock for scheduled upgrades, and the associated need to reschedule the vessel’s high-priority science missions made it no longer possible to deploy the unit at SIO. After due consideration, the decision was made by DOE, MARAD and the project team to cease the deployment, remove the MarFC from SIO, and not pursue further deployment activities. On December 2, 2022, the MarFC unit was removed from the Scripps Nimitz Marine Facility and shipped to Fridley, Michigan. The Cummins/Hydrogenics plan for the unit is to assess the condition of the MarFC subcomponents, and then use it as a training/learning system for technical employees new to hydrogen fuel-cell technology. After summarizing project activity from 2018 – 2023, this report provides a review of lessons learned. This report provides next steps in contemplating a follow-on project that would further advance the use of fuel-cell-based shore power in a marine setting. A comparison is made of the project results to the original objectives. This report ends with an accounting of presentations stemming from the project, and a list of references.

08 HYDROGEN↗

JSC flight experiment recommendation in support of Space Station robotic operations

The man-tended configuration (MTC) of Space Station Freedom (SSF) provides a unique opportunity to move robotic systems from the laboratory into the mainstream space program. Restricted crew access due to the Shuttle's flight rate, as well as constrained on-orbit stay time, reduces the productivity of a facility dependent on astronauts to perform useful work. A natural tendency toward robotics to perform maintenance and routine tasks will be seen in efforts to increase SSF usefulness. This tendency will provide the foothold for deploying space robots. This paper outlines a flight experiment that will capitalize on the investment in robotic technology made by NASA over the past ten years. The flight experiment described herein provides the technology demonstration necessary for taking advantage of the expected opportunity at MTC. As a context to this flight experiment, a broader view of the strategy developed at the JSC is required. The JSC is building toward MTC by developing a ground-based SSF emulation funded jointly by internal funds, NASA/Code R, and NASA/Code M. The purpose of this ground-based Station is to provide a platform whereby technology originally developed at JPL, LaRC, and GSFC can be integrated into a near flight-like condition. For instance, the Automated Robotic Maintenance of Space Station (ARMSS) project integrates flat targets, surface inspection, and other JPL technologies into a Station analogy for evaluation. Also, ARMSS provides the experimental platform for the Capaciflector from GSPC to be evaluated for its usefulness in performing ORU change out or other tasks where proximity detection is required. The use and enhancement of these ground-based SSF models are planned for use through FY-93. The experimental data gathered from tests in these facilities will provide the basis for the technology content of the proposed flight experiment.

Berka, Reginald B.↗

Characterizing GEO Titan Transtage Fragmentations using Ground-based Measurements

In a continued effort to better characterize the Geosynchronous Orbit (GEO) environment, NASA's Orbital Debris Program Office (ODPO) utilizes various ground-based optical assets to acquire photometric and spectral data of known debris associated with fragmentations in or near GEO. The Titan IIIC Transtage upper stage is known to have fragmented four times. Two of the four fragmentations were in GEO while a third Transtage fragmented in GEO transfer orbit. The forth fragmentation occurred in Low Earth Orbit. In order to better assess what may be causing these fragmentations, the NASA ODPO recently acquired a Titan Transtage test and display article that was previously in the custody of the 309th Aerospace Maintenance and Regeneration Group (AMARG) in Tucson, Arizona. After initial inspections at AMARG demonstrated that the test article was of sufficient fidelity to be of interest, the test article was brought to JSC to continue material analysis and historical documentation of the Titan Transtage. The Transtage will be a subject of forensic analysis using spectral measurements to compare with telescopic data; as well, a scale model will be created to use in the Optical Measurement Center for photometric analysis of an intact Transtage, including a BRDF. The following presentation will provide a review of the Titan Transtage, the current analysis that has been done to date, and the future work to be completed in support of characterizing the GEO and near GEO orbital debris environment.

Cowardin, H.↗

Characterizing GEO Titan IIIC Transtage Fragmentations Using Ground-Based and Telescopic Measurements

In a continued effort to better characterize the Geosynchronous Orbit (GEO) environment, NASA's Orbital Debris Program Office (ODPO) utilizes various ground-based optical assets to acquire photometric and spectral data of known debris associated with fragmentations in or near GEO. The Titan IIIC Transtage upper stage is known to have fragmented four times. Two of the four fragmentations were in GEO while a third Transtage fragmented in GEO transfer orbit. The forth fragmentation occurred in Low Earth Orbit. In order to better assess and characterize these fragmentations, the NASA ODPO acquired a Titan Transtage test and display article previously in the custody of the 309th Aerospace Maintenance and Regeneration Group (AMARG) in Tucson, Arizona. After initial inspections at AMARG demonstrated that the test article was of sufficient fidelity to be of interest, the test article was brought to JSC to continue material analysis and historical documentation of the Titan Transtage. The Transtage has been subject to two separate spectral measurement campaigns to characterize the reflectance spectroscopy of historical aerospace materials. These data have been incorporated into the NASA Spectral Database, the goal being to enable comparison with telescopic data and potential material identification. A LIDAR scan has been completed and a scale model has been created for use in the Optical Measurement Center for photometric analysis of an intact Transtage, including a BRDF. An historical overview of the Titan IIIC Transtage, the current analysis that has been done to date, and the future work to be completed in support of characterizing the GEO and near GEO orbital debris environment will be discussed in the subsequent presentation.

Cowardin, H.↗

Characterizing GEO Titan IIIC Transtage Fragmentations using Ground-Based and Telescopic Measurements

In a continued effort to better characterize the geosynchronous orbit (GEO) environment, NASA's Orbital Debris Program Office (ODPO) utilizes various ground-based optical assets to acquire photometric and spectral data of known debris associated with fragmentations in or near GEO. The Titan IIIC Transtage upper stage is known to have fragmented four times. Two of the four fragmentations were in GEO while the Transtage fragmented a third time in GEO transfer orbit. The forth fragmentation occurred in low Earth orbit. To better assess and characterize these fragmentations, the NASA ODPO acquired a Titan Transtage test and display article previously in the custody of the 309th Aerospace Maintenance and Regeneration Group (AMARG) in Tucson, Arizona. After initial inspections at AMARG demonstrated that it was of sufficient fidelity to be of interest, the test article was brought to NASA Johnson Space Center (JSC) to continue material analysis and historical documentation. The Transtage has undergone two separate spectral measurement campaigns to characterize the reflectance spectroscopy of historical aerospace materials. These data have been incorporated into the NASA Spectral Database, with the goal of using telescopic data comparisons for potential material identification. A Light Detection and Ranging (LIDAR) system scan also has been completed and a scale model has been created for use in the Optical Measurement Center (OMC) for photometric analysis of an intact Transtage, including bidirectional reflectance distribution function (BRDF) measurements. An historical overview of the Titan IIIC Transtage, the current analysis that has been done to date, and the future work to be completed in support of characterizing the GEO and near GEO orbital debris environment will be discussed in the subsequent presentation.

Cowardin, Heather↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An experiment to assess the cost-benefits of code inspections in large scale software development

This experiment (currently in progress) is designed to measure costs and benefits of different code inspection methods. It is being performed with a real development team writing software for a commercial product. The dependent variables for each code unit's inspection are the elapsed time and the number of defects detected. We manipulate the method of inspection by randomly assigning reviewers, varying the number of reviewers and the number of teams, and, when using more than one team, randomly assigning author repair and non-repair of detected defects between code inspections. After collecting and analyzing the first 17 percent of the data, we have discovered several interesting facts about reviewers, about the defects recorded during reviewer preparation and during the inspection collection meeting, and about the repairs that are eventually made. (1) Only 17 percent of the defects that reviewers record in their preparations are true defects that are later repaired. (2) Defects recorded at the inspection meetings fall into three categories: 18 percent false positives requiring no author repair, 57 percent soft maintenance where the author makes changes only for readability or code standard enforcement, and 25 percent true defects requiring repair. (3) The median elapsed calendar time for code inspections is 10 working days - 8 working days before the collection meeting and 2 after. (4) In the collection meetings, 31 percent of the defects discovered by reviewers during preparation are suppressed. (5) Finally, 33 percent of the true defects recorded are discovered at the collection meetings and not during any reviewer's preparation. The results to date suggest that inspections with two sessions (two different teams) of two reviewers per session (2sX2p) are the most effective. These two-session inspections may be performed with author repair or with no author repair between the two sessions. We are finding that the two-session, two-person with repair (2sX2pR) inspections are the most expensive, taking 15 working days of calendar time from the time the code is ready for review until author repair is complete, whereas two-session, two-person with no repair (2sX2pN) inspections take only 10 working days, but find about 10 percent fewer defects.

Porter, A.↗

AI-Enabled Robots for Automated Nondestructive Evaluation and Repair of Power Plant Boilers. Final Report

Boiler failure could cause loss of life and safety issues, cost hundreds of thousands of dollars in equipment repairs, property damage and production losses, and drive up the cost of electric power. Boiler maintenance is challenging and risky for inspectors working on scaffolding in confined hazardous spaces inside of a boiler and sometimes the space is hard to access. The operation is also time-consuming due to the large area of vertical structures for inspection and the tremendous effort needed for scaffolding. Recently, the use of robotics (e.g., drones and crawlers) in power plants for maintenance is growing rapidly. However, the existing robotics solutions show two notable technological gaps: no live repair capability, and no Artificial Intelligence (AI) for smart autonomy. The objective of this project is to develop an integrated autonomous robotic platform that is equipped with compact non-destructive evaluation (NDE) sensors to perform live inspection, operates onboard repair devices to perform live repair, and uses AI for intelligent data fusion and predictive analysis for automated and smart spatiotemporal inspection, analysis and repair of the furnace walls in coal-fired boilers. The approach to achieve the objective includes developing NDE sensors with signal processing techniques, designing and evaluating repair devices for robots based on fusion and solid-state technologies, and an autonomous robotic platform that can attach to and navigate on boiler furnace walls using magnetic drive tracks. The robot is also powered by AI to automate data gathering (e.g., 3D mapping and damage localization) and predictive analysis. This project has advanced the state-of-the-art by providing technological breakthroughs including compact NDE and repair tools for robots, AI capabilities for smart autonomy, and a robotic platform for automated boiler maintenance. This project has great potential to result in significant benefits including limiting or eliminating the need to send operators to assess difficult-to-access or hazardous areas, enabling automated live inspection and repair, avoiding time consuming scaffolding (especially for partial maintenance during unplanned outage), collecting comprehensive and well-organized data smartly, and avoiding or limiting the need for onsite or remote piloting technicians. The impacts can be tremendous in terms of the time and cost savings, reducing the risk for human operators, and increasing boiler reliability, usability, and efficiency. In addition, by developing the new technologies on the autonomous inspection and repair robot, by involving multiple undergraduate and graduate students working together with the faculty members on this project, and by generating knowledge and building up collaborations with industrial partners, this effort will significantly update the education capabilities, support long-term fundamental research, and maintain the leadership of Colorado School of Mines and Michigan State University in energy fields.

20 FOSSIL-FUELED POWER PLANTS↗

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

Flight service evaluation of composite inboard ailerons on the L-1011 under Contract NAS 1-15069 for a period of five years is discussed. The period from July 1984, when the second yearly inspections were completed, through June 1985 is covered. Four shipsets of graphite/epoxy composite inboard ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta aircraft and two TWA aircraft. A fifth shipset of composite ailerons were installed in 1980 on Lockheed's flight test L-1011. This aircraft is now inactive and inspections were therefore not performed this year. No visible damage was observed on any of the composite ailerons, and no maintenance action has occurred on any of the composite parts except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 8787 to 10,804 hours, after approximately 3 years of service.

Stone, R. H.↗

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

Flight service evaluation of composite inboard ailerons on the L-1011 are covered. Four shipsets of graphite/epoxy composite inboard ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta aircraft and two TWA aircraft. A fifth shipset of composite ailerons were installed in 1980 on Lockheed's flight test L-1011. A visual inspection was also conducted on these components. No visible damage was observed on any of the composite ailerons, and no maintenance action has occurred on any of the parts except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 2886 to 4190 hours, after approximately 1 year of service.

Stone, R. H.↗

Space Shuttle Main Engine Joint Data List Applying Today's Desktop Technologies to Facilitate Engine Processing

Boeing-Rocketdyne's Space Shuttle Main Engine (SSME) is the world's first large reusable liquid rocket engine. The space shuttle propulsion system has three SSMEs, each weighing 7,400 lbs and providing 470,000 lbs of thrust at 100% rated power level. To ensure required safety and reliability levels are achieved with the reusable engines, each SSME is partially disassembled, inspected, reassembled, and retested at Kennedy Space Center between each flight. Maintenance processing must be performed very carefully to replace any suspect components, maintain proper engine configuration, and avoid introduction of contaminants that could affect performance and safety. The long service life, and number, complexity, and pedigree of SSME components makes logistics functions extremely critical. One SSME logistics challenge is documenting the assembly and disassembly of the complex joint configurations. This data (joint nomenclature, seal and fastener identification and orientation, assembly sequence, fastener torques, etc.) must be available to technicians and engineers during processing. Various assembly drawings and procedures contain this information, but in this format the required (practical) joint data can be hard to find, due to the continued use of archaic engineering drawings and microfilm for field site use. Additionally, the release system must traverse 2,500 miles between design center and field site, across three time zones, which adds communication challenges and time lags for critical engine configuration data. To aid in information accessibility, a Joint Data List (JDL) was developed that allows efficient access to practical joint data. The published JDL has been a very useful logistics product, providing illustrations and information on the latest SSME configuration. The JDL identifies over 3,350 unique parts across seven fluid systems, over 300 joints, times two distinct engine configurations. The JDL system was recently converted to a web-based, navigable electronic manual that contains all the required data and illustrations in expanded view format using standard PC products (Word, Excel, PDF, Photoshop). The logistics of accurately releasing this information to field personnel was greatly enhanced via the utilization of common office products to produce a more user-friendly format than was originally developed under contract to NASA. This was done without reinventing the system, which would be cost prohibitive on a program of this maturity. The brunt of the joint part tracking is done within the logistics organization and disseminated to all field sites, without duplicating effort at each site. The JDL is easily accessible across the country via the NASA intranet directly at the SSME workstand. The advent of this logistics data product has greatly enhanced the reliability of tracking dynamic changes to the SSME and greatly reduces engineering change turnaround time and potential for errors. Since the inception of the JDL system in 1997, no discrepant parts have propagated to engine assembly operations. This presentation focuses on the challenges overcome and the techniques used to apply today's desktop technologies to an existing logistics data source.

Jacobs, Kenneth↗