Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

The Propulsive Small Expendable Deployer System (ProSEDS)

This Annual Report covers the following main topics: 1) Updated Reference Mission. The reference ProSEDS (Propulsive Small Expendable Deployer System) mission is evaluated for an updated launch date in the Summer of 2002 and for the new 80-s current operating cycle. Simulations are run for nominal solar activity condition at the time of launch and for extreme conditions of dynamic forcing. Simulations include the dynamics of the system, the electrodynamics of the bare tether, the neutral atmosphere and the thermal response of the tether. 2) Evaluation of power delivered by the tether system. The power delivered by the tethered system during the battery charging mode is computed under the assumption of minimum solar activity for the new launch date. 3) Updated Deployment Control Profiles and Simulations. A number of new deployment profiles were derived based on the latest results of the deployment ground tests. The flight profile is then derived based on the friction characteristics obtained from the deployment tests of the F-1 tether. 4) Analysis/estimation of deployment flight data. A process was developed to estimate the deployment trajectory of the endmass with respect to the Delta and the final libration amplitude from the data of the deployer turn counters. This software was tested successfully during the ProSEDS mission simulation at MSFC (Marshall Space Flight Center) EDAC (Environments Data Analysis Center).

Lorenzini, Enrico C.↗

Hydrocarbon Rocket Technology Impact Forecasting

Ever since the Apollo program ended, the development of launch propulsion systems in the US has fallen drastically, with only two new booster engine developments, the SSME and the RS-68, occurring in the past few decades.1 In recent years, however, there has been an increased interest in pursuing more effective launch propulsion technologies in the U.S., exemplified by the NASA Office of the Chief Technologist s inclusion of Launch Propulsion Systems as the first technological area in the Space Technology Roadmaps2. One area of particular interest to both government agencies and commercial entities has been the development of hydrocarbon engines; NASA and the Air Force Research Lab3 have expressed interest in the use of hydrocarbon fuels for their respective SLS Booster and Reusable Booster System concepts, and two major commercially-developed launch vehicles SpaceX s Falcon 9 and Orbital Sciences Antares feature engines that use RP-1 kerosene fuel. Compared to engines powered by liquid hydrogen, hydrocarbon-fueled engines have a greater propellant density (usually resulting in a lighter overall engine), produce greater propulsive force, possess easier fuel handling and loading, and for reusable vehicle concepts can provide a shorter turnaround time between launches. These benefits suggest that a hydrocarbon-fueled launch vehicle would allow for a cheap and frequent means of access to space.1 However, the time and money required for the development of a new engine still presents a major challenge. Long and costly design, development, testing and evaluation (DDT&E) programs underscore the importance of identifying critical technologies and prioritizing investment efforts. Trade studies must be performed on engine concepts examining the affordability, operability, and reliability of each concept, and quantifying the impacts of proposed technologies. These studies can be performed through use of the Technology Impact Forecasting (TIF) method. The Technology Impact Forecasting method is a normative forecasting technique that allows the designer to quantify the effects of adding new technologies on a given design. This method can be used to assess and identify the necessary technological improvements needed to close the gap that exists between the current design and one that satisfies all constraints imposed on the design. The TIF methodology allows for more design knowledge to be brought to the earlier phases of the design process, making use of tools such as Quality Function Deployments, Morphological Matrices, Response Surface Methodology, and Monte Carlo Simulations.2 This increased knowledge allows for more informed decisions to be made earlier in the design process, resulting in shortened design cycle time. This paper will investigate applying the TIF method, which has been widely used in aircraft applications, to the conceptual design of a hydrocarbon rocket engine. In order to reinstate a manned presence in space, the U.S. must develop an affordable and sustainable launch capability. Hydrocarbon-fueled rockets have drawn interest from numerous major government and commercial entities because they offer a low-cost heavy-lift option that would allow for frequent launches1. However, the development of effective new hydrocarbon rockets would likely require new technologies in order to overcome certain design constraints. The use of advanced design methods, such as the TIF method, enables the designer to identify key areas in need of improvement, allowing one to dial in a proposed technology and assess its impact on the system. Through analyses such as this one, a conceptual design for a hydrocarbon-fueled vehicle that meets all imposed requirements can be achieved.

Stuber, Eric↗

Time-domain finite elements in optimal control with application to launch-vehicle guidance

A time-domain finite element method is developed for optimal control problems. The theory derived is general enough to handle a large class of problems including optimal control problems that are continuous in the states and controls, problems with discontinuities in the states and/or system equations, problems with control inequality constraints, problems with state inequality constraints, or problems involving any combination of the above. The theory is developed in such a way that no numerical quadrature is necessary regardless of the degree of nonlinearity in the equations. Also, the same shape functions may be employed for every problem because all strong boundary conditions are transformed into natural or weak boundary conditions. In addition, the resulting nonlinear algebraic equations are very sparse. Use of sparse matrix solvers allows for the rapid and accurate solution of very difficult optimization problems. The formulation is applied to launch-vehicle trajectory optimization problems, and results show that real-time optimal guidance is realizable with this method. Finally, a general problem solving environment is created for solving a large class of optimal control problems. The algorithm uses both FORTRAN and a symbolic computation program to solve problems with a minimum of user interaction. The use of symbolic computation eliminates the need for user-written subroutines which greatly reduces the setup time for solving problems.

Bless, Robert R.↗

Performance of Solar Electric Powered Deep Space Missions Using Hall Thruster Propulsion

Power limited, low-thrust trajectories were assessed for missions to Jupiter, Saturn, and Neptune utilizing a single Venus Gravity Assist (VGA) and a primary propulsion system based on either a 3-kW high voltage Hall thruster, of the type being developed by the NASA In-Space Propulsion Technology Program, or an 8-kW variant of this thruster. These Hall thrusters operate with specific impulses below 3,000 seconds. A trade study was conducted to examine mission parameters that include: net delivered mass (NDM), beginning-of-life (BOL) solar array power, heliocentric transfer time, required launch vehicle, number of operating thrusters, and throttle profile. The top performing spacecraft configuration was defined to be the one that delivered the highest mass for a range of transfer times. In order to evaluate the potential future benefit of using next generation Hall thrusters as the primary propulsion system, comparisons were made with the advanced state-of-the-art (ASOA), 7-kW, 4,100 second NASA's Evolutionary Xenon Thruster (NEXT) for the same mission scenarios. For the BOL array powers considered in this study (less than 30 kW), the results show that the performance of the Hall thrusters, relative to NEXT, is largely dependant on the performance capability of the launch vehicle, and that at least a 10 percent performance gain, equating to at least an additional 200 kg dry mass at each target planet, is achieved over the higher specific impulse NEXT when launched on an Atlas 551.

Witzberger, Kevin E.↗

Parametric Study for Increasing On-Station Duration via Unconventional Aircraft Launch Approach

The need for better atmospheric predictions is causing the atmospheric science community to look for new ways to obtain longer, higher-resolution measurements over several diurnal cycles. The high resolution, in-situ measurements required to study many atmospheric phenomena can be achieved by an Autonomous Aerial Observation System (AAOS); however, meeting the long on-station time requirements with an aerial platform poses many challenges. Inspired by the half-scale drop test of the deployable Aerial Regional-scale Environmental Survey (ARES) Mars airplane, a study was conducted at the NASA Langley Research Center to examine the possibility of increasing on-station time by launching an airplane directly at the desired altitude. The ARES Mars airplane concept was used as a baseline for Earth atmospheric flight, and parametric analyses of fundamental configuration elements were performed to study their impact on achieving desired on-station time with this class of airplane. The concept involved lifting the aircraft from the ground to the target altitude by means of an air balloon, thereby unburdening the airplane of ascent requirements. The parameters varied in the study were aircraft wingspan, payload, fuel quantity, and propulsion system. The results show promising trends for further research into aircraft-payload design using this unconventional balloon-based launch approach.

Kuhl, Christopher A.↗

Preliminary design for a proposed Saturn mission with a second Galileo spacecraft

A study has been performed to assess the feasibility of using a second Galileo spacecraft for a Titan-probe/Saturn-orbiter mission that would be launched on a Shuttle/Centaur in the early 1990s. The interplanetary transfer is accomplished by means of a Delta-V earth-gravity-assist trajectory with a 3-year flight time from launch to earth flyby. Just prior to arrival at Saturn, the Titan probe is released, and the orbiter is used to relay data from the probe back to earth as it performs a close gravity-assist flyby of Titan. The orbiter then conducts a satellite tour containing multiple encounters with Saturn's satellites. Discussed in detail are the optimal trajectory design, Saturn approach trajectory design (Titan flyby, probe relay, and initial orbit selection), satellite tour design, and mission performance.

D'Amario, Louis A.↗

Inspection of the Math Model Tools for On-Orbit Assessment of Impact Damage Report

In Spring of 2005, the NASA Engineering Safety Center (NESC) was engaged by the Space Shuttle Program (SSP) to peer review the suite of analytical tools being developed to support the determination of impact and damage tolerance of the Orbiter Thermal Protection Systems (TPS). The NESC formed an independent review team with the core disciplines of materials, flight sciences, structures, mechanical analysis and thermal analysis. The Math Model Tools reviewed included damage prediction and stress analysis, aeroheating analysis, and thermal analysis tools. Some tools are physics-based and other tools are empirically-derived. Each tool was created for a specific use and timeframe, including certification, real-time pre-launch assessments, and real-time on-orbit assessments. The tools are used together in an integrated strategy for assessing the ramifications of impact damage to tile and RCC. The NESC teams conducted a peer review of the engineering data package for each Math Model Tool. This report contains the summary of the team observations and recommendations from these reviews.

Harris, Charles E.↗

Calculating Launch Vehicle Flight Performance Reserve

This paper addresses different methods for determining the amount of extra propellant (flight performance reserve or FPR) that is necessary to reach orbit with a high probability of success. One approach involves assuming that the various influential parameters are independent and that the result behaves as a Gaussian. Alternatively, probabilistic models may be used to determine the vehicle and environmental models that will be available (estimated) for a launch day go/no go decision. High-fidelity closed-loop Monte Carlo simulation determines the amount of propellant used with each random combination of parameters that are still unknown at the time of launch. Using the results of the Monte Carlo simulation, several methods were used to calculate the FPR. The final chosen solution involves determining distributions for the pertinent outputs and running a separate Monte Carlo simulation to obtain a best estimate of the required FPR. This result differs from the result obtained using the other methods sufficiently that the higher fidelity is warranted.

Hanson, John M.↗

Launch summary for 1978 - 1982

Data pertinent to the launching of space probes, soundings rockets, and satellites presented in tables include launch date, time, and site; agency rocket identification; sponsoring country or countries; instruments carried for experiments; the peak altitude achieved by the rockets; and the apoapsis and periapsis for satellites. The experimenter or institution involved in the launching is also cited.

Hills, H. K.↗

Neptune Polar Orbiter with Probes

The giant planets of the outer solar system divide into two distinct classes: the gas giants Jupiter and Saturn, which consist mainly of hydrogen and helium; and the ice giants Uranus and Neptune, which are believed to contain significant amounts of the heavier elements oxygen, nitrogen, and carbon and sulfur. Detailed comparisons of the internal structures and compositions of the gas giants with those of the ice giants will yield valuable insights into the processes that formed the solar system and, perhaps, other planetary systems. By 2012, Galileo, Cassini and possibly a Jupiter Orbiter mission with microwave radiometers, Juno, in the New Frontiers program, will have yielded significant information on the chemical and physical properties of Jupiter and Saturn. A Neptune Orbiter with Probes (NOP) mission would deliver the corresponding key data for an ice giant planet. Such a mission would ideally study the deep Neptune atmosphere to pressures approaching and possibly exceeding 1000 bars, as well as the rings, Triton, Nereid, and Neptune s other icy satellites. A potential source of power would be nuclear electric propulsion (NEP). Such an ambitious mission requires that a number of technical issues be investigated, however, including: (1) atmospheric entry probe thermal protection system (TPS) design, (2) probe structural design including seals, windows, penetrations and pressure vessel, (3) digital, RF subsystem, and overall communication link design for long term operation in the very extreme environment of Neptune's deep atmosphere, (4) trajectory design allowing probe release on a trajectory to impact Neptune while allowing the spacecraft to achieve a polar orbit of Neptune, (5) and finally the suite of science instruments enabled by the probe technology to explore the depths of the Neptune atmosphere. Another driving factor in the design of the Orbiter and Probes is the necessity to maintain a fully operational flight system during the lengthy transit time from launch through Neptune encounter, and throughout the mission. Following our response to the recent NASA Research Announcement (NRA) for Space Science Vision Missions for mission studies by NASA for implementation in the 2013 or later time frame, our team has been selected to explore the feasibility of such a Neptune mission.

Bienstock, Bernard↗

The hard X-ray burst spectrometer event listing 1980-1987

This event listing is a comprehensive reference for the Hard X-ray bursts detected with the Hard X-ray Burst Spectrometer on the Solar Maximum Mission from the time of launch 14 February 1980 to December 1987. Over 8600 X-ray events were detected in the energy range from 30 to approx. 600 keV with the vast majority being solar flares. The listing includes the start time, peak time, duration and peak rate of each event.

Dennis, B. R.↗

The hard X-ray burst spectrometer event listing, 1980 - 1985

This event listing is a comprehensive reference for the hard X-ray bursts detected with the Hard X-Ray Burst Spectrometer on the Solar Maximum Mission from the time of launch on February 14, 1980 to September 1985. Over 8000 X-ray events were detected in the energy range from 30 to approx. 500 keV with the vast majority being solar flares. The listing includes the start time, peak time, duration and peak rate of each event.

Dennis, B. R.↗

The hard X-ray burst spectrometer event listing 1980, 1981 and 1982

A comprehensive reference for the hard X-ray bursts detected with the Hard X-Ray Burst Spectrometer on the Solar Maximum Mission for the time of launch on February 14, 1980 to March 1983 is provided. Over 6300 X-ray events were detected in the energy range from 30 to approx 500 keV with the vast majority being solar flares. The listing includes the start time, peak time, duration and peak rate of each event.

Dennis, B. R.↗

The complete Hard X Ray Burst Spectrometer event list, 1980-1989

This event list is a comprehensive reference for all Hard X ray bursts detected with the Hard X Ray Burst Spectrometer on the Solar Maximum Mission from the time of launch on Feb. 14, 1980 to the end of the mission in Dec. 1989. Some 12,776 events were detected in the energy range 30 to 600 keV with the vast majority being solar flares. This list includes the start time, peak time, duration, and peak rate of each event.

Dennis, B. R.↗

Follow That Satellite: EO-1 Maneuvers into Closed Formation With Landsat-7

As the Landsat-7 spacecraft continued NASA's historic program of earth imaging, begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of Landsat-7 instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind Landsat-7 on the same World Reference System path. From that formation hundreds of near coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with Landsat-7 where instrument validation was to occur plus a summary of completing the formation acquisition. EO-1 is required to operate one minute +/- 6 seconds behind Landsat-7 during the period of co-fly imaging with a cross track separation of within + 3 kilometers. This separation time can also be stated as a one minute +/- 6 seconds time difference in the Mean Local Time (MLT) at the descending nodes. Achieving the required MLT is heavily dependent on the time of launch. The EO-1 launch window, which had to accommodate the dual payloads of EO-1 and SAC-C, was very limited ranging from 0 to 22 seconds over the 16 day Landsat-7 WRS repeat cycle during which EO-1 was launched. Each EO-1 launch opportunity that occurred on a different day of a Landsat-7 16 day repeat cycle required a separate and distinct maneuver profile. These profiles varied significantly in duration and amount of onboard propellant required to achieve them. EO-1 launched on a day judged to have "medium" resource requirements for achieving the formation with Landsat-7. To phase EO-1 one minute behind Landsat-7 in the along track direction, a series of altitude adjusts separated by specific drift intervals were executed. Additional maneuvers slightly changed the EO-1 inclination to maintain the MLT requirements. Orbit maneuvers were planned and executed within errors of less than 1.5 percent and propellant usage was near nominal consuming 3.4 kilograms out of a launch and early orbit budget of 11 kilograms. The pre-launch 3 -sigma propellant budget allowed for 1+ years of EO-1 mission life. The success of the EO-1 launch and early orbit operations provided sufficient propellant for nearly 4 years of on orbit operations. Special action taken during the EO-1 maneuver period involved some maneuver re-planning to reduce concerns about a potential close approach between EO-1 and Landsat-7. The result of this re-planning was a safer close approach and improvement in future formation acquisition planning.

DeFazio, Robert↗

Algorithm Aligns Gyrocompass In Twisting And Swaying Vehicle

Algorithm proposed for use with strapdown inertial sensors synthesizes gyrocompass and repeatedly refines alignment of synthetic gyrocompass to maintain accuracy until time of departure. In original application, inertial sensors located in spacecraft twisting and swaying in wind on launching pad, and time of departure is time of launch. Also possible to devise terrestrial version of algorithm for use in aircraft, ground vehicle, or vessel. Algorithm includes local-level-navigator, coarse-alignment, and fine-alignment subalgorithms.

Reddy, Narotham S.↗

Methodology for the systems engineering process. Volume 3: Operational availability

A detailed description and explanation of the operational availability parameter is presented. The fundamental mathematical basis for operational availability is developed, and its relationship to a system's overall performance effectiveness is illustrated within the context of identifying specific availability requirements. Thus, in attempting to provide a general methodology for treating both hypothetical and existing availability requirements, the concept of an availability state, in conjunction with the more conventional probability-time capability, is investigated. In this respect, emphasis is focused upon a balanced analytical and pragmatic treatment of operational availability within the system design process. For example, several applications of operational availability to typical aerospace systems are presented, encompassing the techniques of Monte Carlo simulation, system performance availability trade-off studies, analytical modeling of specific scenarios, as well as the determination of launch-on-time probabilities. Finally, an extensive bibliography is provided to indicate further levels of depth and detail of the operational availability parameter.

Nelson, J. H.↗

Simultaneous measurements of auroral particles and electric currents by a rocket-borne instrument system - Introductory remarks

A rocket-borne experiment package has been designed to obtain simultaneous in situ measurements of the pitch angle distributions and energy spectra of primary auroral particles, the flux of neutral hydrogen at auroral energies, the electric currents flowing in the vicinity of the auroral arc as determined from vector magnetic data, and the modulation of precipitating electrons in the frequency range 0.5-10 MHz. The experiment package was launched by a Nike-Tomahawk rocket from Poker Flat, Alaska, at 0722 UT on Feb. 25, 1972, over a bright auroral band. This paper is intended to serve as an introduction to the detailed discussion of results given in the companion papers. As such it includes a brief review of the general problem, a discussion of the rocket instrumentation, a delineation of the auroral and geomagnetic conditions at the time of launch, and comments on the overall payload performance.

Anderson, H. R.↗