Study of Saturn 1B facilities and equipment for improved launch control of AAP missions. Volume 2 - Final study report, 1 December 1968 - 1 February 1970
Analysis and results of launch support availability for Saturn 1B facility
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Analysis and results of launch support availability for Saturn 1B facility
The flight payload, its operation, and the support required from the Space Transporatation System (STS) is defined including the flight objectives and requirements, the experiment operations, and the payload configurations. The support required from the STS includes the accommodation of the payload by the orbiter/Spacelab, use of the flight operations network and ground facilities, and the use of the launch site facilities.
The AMPS Flight 2 payload, its operation, and the support required from the Space Transportation System (STS) are described. The definition of the payload includes the flight objectives and requirements, the experiment operations, and the payload configuration. The support required from the STS includes the accommodation of the payload by the orbiter/Spacelab, use of the flight operations network and ground facilities, and the use of the launch site facilities.
NASA's human exploration initiatives will invest in technologies, public/private partnerships, and infrastructure, paving the way for the expansion of human civilization into the solar system and beyond. As it is has been for the past half century, the Kennedy Space Center will be the embarkation point for humankind's journey into the cosmos. Functioning as a next generation space launch complex, Kennedy's launch pads, integration facilities, processing areas, launch and recovery ranges will bustle with the activities of the world's space transportation providers. In developing this complex, KSC teams work through the potential operational scenarios: conducting trade studies, planning and budgeting for expensive and limited resources, and simulating alternative operational schemes. Numerous tools, among them discrete event simulation (DES), were matured during the Constellation Program to conduct such analyses with the purpose of optimizing the launch complex for maximum efficiency, safety, and flexibility while minimizing life cycle costs. Discrete event simulation is a computer-based modeling technique for complex and dynamic systems where the state of the system changes at discrete points in time and whose inputs may include random variables. DES is used to assess timelines and throughput, and to support operability studies and contingency analyses. It is applicable to any space launch campaign and informs decision-makers of the effects of varying numbers of expensive resources and the impact of off nominal scenarios on measures of performance. In order to develop representative DES models, methods were adopted, exploited, or created to extend traditional uses of DES. The Delphi method was adopted and utilized for task duration estimation. DES software was exploited for probabilistic event variation. A roll-up process was used, which was developed to reuse models and model elements in other less - detailed models. The DES team continues to innovate and expand DES capabilities to address KSC's planning needs.
When space vehicles are launched, extreme heat, exhaust, and chemicals are produced and these form a very aggressive exposure environment at the launch complex. The facilities in the launch complex are exposed to this aggressive environment. The vehicle exhaust directly impacts the flame deflectors, making these systems very susceptible to high wear and potential failure. A project was formulated to develop or identify new materials or systems such that the wear and/or damage to the flame deflector system, as a result of the severe environmental exposure conditions during launches, can be mitigated. This report provides a survey of potential protective coatings for the refractory concrete lining on the steel base structure on the flame deflectors at Kennedy Space Center (KSC).
A multi-threaded software application has been developed in-house by the Ground Special Power (GSP) team at NASA Kennedy Space Center (KSC) to separately simulate and fully emulate all units that supply VDC power and battery-based power backup to multiple KSC launch ground support systems for NASA Space Launch Systems (SLS) rocket.
An overview of the Space Transportation System is presented in which aspects of the program operations are discussed. The various mission preparation and prelaunch operations are described including astronaut selection and training, Space Shuttle processing, Space Shuttle integration and rollout, Complex 39 launch pad facilities, and Space Shuttle cargo processing. Also, launch and flight operations and space tracking and data acquisition are described along with the mission control and payload operations control center. In addition, landing, postlanding, and solid rocket booster retrieval operations are summarized. Space Shuttle program management is described and Space Shuttle mission summaries and chronologies are presented. A glossary of acronyms and abbreviations are provided.
Safety guidelines are presented. Waste form, waste processing and payload fabrication facilities, shipping casks and ground transport vehicles, payload primary container/core, radiation shield, reentry systems, launch site facilities, uprooted space shuttle launch vehicle, Earth packing orbits, orbit transfer systems, and space destination are discussed. Disposed concepts and risks are then discussed.
Launch vehicle and facility for manned lunar landing program
The John F. Kennedy Space Center (KSC) maintains several facilities for launching space vehicles. During recent launches it has been observed that the refractory concrete materials that protect the steel-framed flame duct are breaking away from this base structure and are being projected at high velocities. There is significant concern that these projected pieces can strike the launch complex or space vehicle during the launch, jeopardizing the safety of the mission. A qualification program is in place to evaluate the performance of different refractory concretes and data from these tests have been used to assess the performance of the refractory concretes. However, there is significant variation in the test results, possibly making the existing qualification test program unreliable. This paper will evaluate data from past qualification tests, identify potential key performance indicators for the launch complex, and will recommend a new qualification test program that can be used to better qualify refractory concrete.
Live Footage of Discovery's STS-114 Crew Arriving at the Shuttle Landing Facility at Kennedy Space Center is shown. George Diller is the narrator for this event. Commander, Eileen Collins, is seen introducing the STS-114 crew who consists of: Pilot, James Kelley, Mission Specialist, Charles Camarda, Mission Specialist, Wendy Lawrence, Mission Specialist, Soichi Noguchi, Mission Specialist, Steve Robinson, and Mission Specialist Andy Thomas. Each crewmember addresses the news media about their role on this mission.
Satellite Power Stations (SPS) would generate electrical power in space for terrestrial use. Their geosynchronous orbit location permits continuous microwave power transmission to ground receiving antenna farms. Eight approaches to the generation of the electrical power to be transmitted were investigated. Configurations implementing these approaches were developed through an optimization process intended to yield the lowest cost for each. A complete program was baselined for each approach, identifying required production rates, quantities of launches, required facilities, etc. Each program was costed, including the associated launches, orbital assembly, and maintenance operations. The required electric power charges to amortize these costs were calculated. They range from 26 to 82 mills/kWh (ground busbar).
During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).
Ground processing and operation activities for selected automated and sortie payloads are evaluated. Functional flow activities are expanded to identify payload launch site facility and support requirements. Payload definitions are analyzed from the launch site ground processing viewpoint and then processed through the expanded functional flow activities. The requirements generated from the evaluation are compared with those contained in the data sheets. The following payloads were included in the evaluation: Long Duration Exposure Facility; Life Sciences Shuttle Laboratory; Biomedical Experiments Scientific Satellite; Dedicated Solar Sortie Mission; Magnetic Spectrometer; and Mariner Jupiter Orbiter. The expanded functional flow activities and descriptions for the automated and sortie payloads at the launch site are presented.
Pictorial progress of saturn launch vehicle - transportation, launching, test facilities
Saturn V ground support instrumentation systems, emphasizing launcher umbilical tower /LUT/
Transonic, high Reynolds number wind tunnel testing for the Space Launch System (SLS) ascent flight environment was conducted in the National Transonic Facility (NTF) at the NASA Langley Research Center from December 2019 to April 2021. The test was sponsored by the SLS Program and the NASA Engineering & Safety Center with the ob- jective of assessing and characterizing Reynolds number effects on the ascent aerodynamics of the SLS launch vehicle. The cryogenic test article was a 1.75%-scale representation of the SLS Block 1 Cargo configuration that was fabricated mostly out of stainless steel, but with several additive-manufactured components including the Solid Rocket Booster (SRB) attach brackets and the SRB nozzles. This was the first use of additive manufacturing on structural components of a cryogenic model in the NTF, therefore post-fabrication material testing and inspections were performed to satisfy safety requirements. Force & moment and surface pressure data were acquired for Mach numbers between 0.50 and 0.95 over a range of Reynolds numbers based on core stage diameter between 2x10^6 and a maximum of 40x10^6 corresponding to 45% of flight Reynolds number. Additionally, flow visualization data using Pressure Sensitive Paint were acquired with a focus on the SRB forward attach area, which is susceptible to Reynolds number sensitivity at transonic speeds. This pa- per provides an overview of the test campaign including details on the unique test article and the experimental setup and test execution. General test findings and observations are also presented, but the majority of the test results and data analyses are provided in a companion paper.
Transonic, high Reynolds number wind tunnel testing for the Space Launch System (SLS) ascent flight environment was conducted in the National Transonic Facility (NTF) at the NASA Langley Research Center from December 2019 to April 2021. The test was sponsored by the SLS Program and the NASA Engineering & Safety Center with the ob- jective of assessing and characterizing Reynolds number effects on the ascent aerodynamics of the SLS launch vehicle. The cryogenic test article was a 1.75%-scale representation of the SLS Block 1 Cargo configuration that was fabricated mostly out of stainless steel, but with several additive-manufactured components including the Solid Rocket Booster (SRB) attach brackets and the SRB nozzles. This was the first use of additive manufacturing on structural components of a cryogenic model in the NTF, therefore post-fabrication material testing and inspections were performed to satisfy safety requirements. Force & moment and surface pressure data were acquired for Mach numbers between 0.50 and 0.95 over a range of Reynolds numbers based on core stage diameter between 2x10^6 and a maximum of 40x10^6 corresponding to 45% of flight Reynolds number. Additionally, flow visualization data using Pressure Sensitive Paint were acquired with a focus on the SRB forward attach area, which is susceptible to Reynolds number sensitivity at transonic speeds. This paper provides an overview of the test campaign including details on the unique test article and the experimental setup and test execution. General test findings and observations are also presented, but the majority of the test results and data analyses are provided in a companion paper.