Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Methods”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Air Launched Vehicle Exergy Analysis During Aircraft Boost Phase

The analysis of air launched vehicles carrying payloads to low earth orbit is complex. The integration of the aircraft flight phase and the launch vehicle flight phase requires the integration of systems functioning from different energy relationships. System exergy balance provides a relationship to integrate the efficiency of the aircraft launcher and the efficiency of the launch vehicle in a single, integrated system assessment. The exergy balance of the aircraft flight phase can be calculated with the launch vehicle included as part of the vehicle mass. As exergy balance allows for separate of the masses, different velocities, and different propulsion systems to continue the mission analysis after separation through payload orbital insertion and aircraft landing. This paper presents the initial assessment of the aircraft launch phase up to separation of the launch vehicle. Showing the method of integration afforded by the system exergy balance relationship.

Lane, Joshua↗

Methods of Performing Large Scale, Multidimensional Parametric Studies for Space Launch System Mission Analysis

Optimizing a large number of trajectories over a wide range of parameters is a difficult and computationally intensive, particularly when the parametric space has a large number of dimensions. Solving parametric studies like these require good initial conditions for each optimization case, which results in a significant amount of manual interaction and human judgment and can be time consuming. The Space Launch System (SLS) uses POST2 (Program to Optimize Simulated Trajectories II) to simulate different ascent trajectories and perform mission analysis. SLS mission analysis currently uses two types of large scale, multidimensional parameter spaces. The qualifying factor between these spaces is the grid density, which determines the set of applicable solution methodologies. One type has a relatively low number of dimensions (2-3), but a large number of grid coordinates (2000- 4000), whereas the second type has a relatively low number of grid coordinates (150-350), but a higher number of dimensions (7-10).

Stein, W. B.↗

Enhancements to an Atmospheric Ascent Guidance Algorithm

Enhancements to an advanced ascent guidance algorithm for rocket-powered launch vehicles are described. A general method has been developed for conveniently and efficiently handling the common case of (asymmetric) launch vehicles with unbalanced thrust and aerodynamic moments. The new part of this development concerns the treatment of endo-atmospheric flight. An alternative method for handing the transversality conditions has been developed that eliminates the need for a priori elimination of the constant multipliers that adjoin the terminal state constraints to the performance index. As a result, new constraints can be formulated and implemented with relative ease. The problem of burn-coast-burn trajectory optimization is treated using a modified multiple shooting technique.

Dukeman, Greg A.↗

Proposed techniques for launching instrumented balloons into tornadoes

A method is proposed to introduce instrumented balloons into tornadoes by means of the radial pressure gradient, which supplies a buoyancy force driving to the center. Presented are analytical expressions, verified by computer calculations, which show the possibility of introducing instrumented balloons into tornadoes at or below the cloud base. The times required to reach the center are small enough that a large fraction of tornadoes are suitable for the technique. An experimental procedure is outlined in which a research airplane puts an instrumented, self-inflating balloon on the track ahead of the tornado. The uninflated balloon waits until the tornado closes to, typically, 750 meters; then it quickly inflates and spirals up and into the core, taking roughly 3 minutes. Since the drive to the center is automatically produced by the radial pressure gradient, a proper launch radius is the only guidance requirement.

Grant, F. C.↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - Cola Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation, where the ISS would be unable to react to a conjunction with a newly launched object following the end of the launch Collision Avoidance (COLA) process. Once an object is launched, there is a finite period of time required to track, catalog, and evaluate that new object as part of standard onorbit COLA screening processes. Additionally, should a conjunction be identified, there is an additional period of time required to plan and execute a collision avoidance maneuver. While the computed prelaunch probability of collision with any object is extremely low, NASA/JSC has requested that all US launches take additional steps to protect the ISS during this "COLA gap" period. This paper details a geometric-based COLA gap analysis method developed by the NASA Launch Services Program to determine if launch window cutouts are required to mitigate this risk. Additionally, this paper presents the results of several missions where this process has been used operationally.

Hametz, Mark E.↗

A survey of load methodologies for shuttle orbiter payloads

Loads methods currently being used to design planetary spacecraft to be launched on the shuttle orbiter are summarized. Experiences gained from expendable launch vehicle payloads are used to develop methodologies for the space shuttle orbiter payloads. The objectives for the development of a new methodology for the shuttle payloads are to reduce the cost and schedule for the payload load analysis by decoupling the payload analysis from the launch vehicle to the maximum extent possible. Methods are described for payload member load estimation or obtaining upper bounds for dynamic loads, as well as load prediction or calculating actual transient member load time histories.

Chen, J. C.↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

Variable Structure Control of a Hand-Launched Glider

Variable structure control system design methods are applied to the problem of aircraft spin recovery. A variable structure control law typically has two phases of operation. The reaching mode phase uses a nonlinear relay control strategy to drive the system trajectory to a pre-defined switching surface within the motion state space. The sliding mode phase involves motion along the surface as the system moves toward an equilibrium or critical point. Analysis results presented in this paper reveal that the conventional method for spin recovery can be interpreted as a variable structure controller with a switching surface defined at zero yaw rate. Application of Lyapunov stability methods show that deflecting the ailerons in the direction of the spin helps to insure that this switching surface is stable. Flight test results, obtained using an instrumented hand-launched glider, are used to verify stability of the reaching mode dynamics.

Anderson, Mark R.↗

The Pegasus air-launched space booster payload interfaces and processing procedures for small optical payloads

Pegasus and the PegaStar integrated spacecraft bus are described, and an overview of integration and launch operations is provided. Payload design issues include payload volume and mass capability, payload interfaces, and design loads. Vehicle and payload processing issues include integration and handling methods, facilities, contamination control, and launch operations. It is noted that Pegasus provides small satellite users with a cost-effective means for delivering payloads into the specific orbits at the optimal time to meet the most demanding mission requirements. PegaStar provides a flexible cost-effective means for providing long-term on-orbit support while minimizing total program risk and cost.

Mosier, Marty↗

JANNAF 28th Propellant Development and Characterization Subcommittee and 17th Safety and Environmental Protection Subcommittee Joint Meeting

This volume contains 37 unclassified/unlimited-distribution technical papers that were presented at the JANNAF 28th Propellant Development & Characterization Subcommittee (PDCS) and 17th Safety & Environmental Protection Subcommittee (S&EPS) Joint Meeting, held 26-30 April 1999 at the Town & Country Hotel and the Naval Submarine Base, San Diego, California. Volume II contains 29 unclassified/limited-distribution papers that were presented at the 28th PDCS and 17th S&EPS Joint Meeting. Volume III contains a classified paper that was presented at the 28th PDCS Meeting on 27 April 1999. Topics covered in PDCS sessions include: solid propellant rheology; solid propellant surveillance and aging; propellant process engineering; new solid propellant ingredients and formulation development; reduced toxicity liquid propellants; characterization of hypergolic propellants; and solid propellant chemical analysis methods. Topics covered in S&EPS sessions include: space launch range safety; liquid propellant hazards; vapor detection methods for toxic propellant vapors and other hazardous gases; toxicity of propellants, ingredients, and propellant combustion products; personal protective equipment for toxic liquid propellants; and demilitarization/treatment of energetic material wastes.

Cocchiaro, James E.↗

Wallops Ship Surveillance System

Approved as a Wallops control center backup system, the Wallops Ship Surveillance Software is a day-of-launch risk analysis tool for spaceport activities. The system calculates impact probabilities and displays ship locations relative to boundary lines. It enables rapid analysis of possible flight paths to preclude the need to cancel launches and allow execution of launches in a timely manner. Its design is based on low-cost, large-customer- base elements including personal computers, the Windows operating system, C/C++ object-oriented software, and network interfaces. In conformance with the NASA software safety standard, the system is designed to ensure that it does not falsely report a safe-for-launch condition. To improve the current ship surveillance method, the system is designed to prevent delay of launch under a safe-for-launch condition. A single workstation is designated the controller of the official ship information and the official risk analysis. Copies of this information are shared with other networked workstations. The program design is divided into five subsystems areas: 1. Communication Link -- threads that control the networking of workstations; 2. Contact List -- a thread that controls a list of protected item (ocean vessel) information; 3. Hazard List -- threads that control a list of hazardous item (debris) information and associated risk calculation information; 4. Display -- threads that control operator inputs and screen display outputs; and 5. Archive -- a thread that controls archive file read and write access. Currently, most of the hazard list thread and parts of other threads are being reused as part of a new ship surveillance system, under the SureTrak project.

Smith, Donna C.↗

Attitude-dependent launch window analysis for the Hubble Space Telescope Mission

Launch window analysis for Space Shuttle missions determines the launch times which will ensure that all payload and Shuttle requirements for the mission are met. Attitude and pointing analysis determines Shuttle Orbiter attitudes that meet various communication, viewing, and thermal requirements for the Orbiter and its payloads. Historically, launch window analysis and attitude and pointing analysis for Shuttle missions have been done separately, without directly influencing each other. However, methods have been developed to consider simultaneously dependencies between launch window and attitude and pointing requirements if they arise. These methods were developed from the launch window analysis for STS-31, the Hubble Space Telescope (HST) deployment mission. To release the HST, the Orbiter attitude had to remain inertially fixed while pointing the HST at the Sun. The Orbiter release attitude and the HST release time were determined from the position of the Sun and varied with launch time and launch date. The launch window analysis for STS-31 centered on how to determine the range of launch times for a given launch date that would allow the Shuttle to release the HST and simultaneously satisfy communication, attitude, and lighting requirements for the deployment operations. Discussed here are how the HST deployment requirements determined the launch window and how the Orbiter release attitude affected the launch window.

Lenio, James A.↗

Use of Probabilistic Engineering Methods in the Detailed Design and Development Phases of the NASA Ares Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program called Constellation to send crew and cargo to the international Space Station, to the moon, and beyond. As part of the Constellation program, a new launch vehicle, Ares I, is being developed by NASA Marshall Space Flight Center. Designing a launch vehicle with high reliability and increased safety requires a significant effort in understanding design variability and design uncertainty at the various levels of the design (system, element, subsystem, component, etc.) and throughout the various design phases (conceptual, preliminary design, etc.). In a previous paper [1] we discussed a probabilistic functional failure analysis approach intended mainly to support system requirements definition, system design, and element design during the early design phases. This paper provides an overview of the application of probabilistic engineering methods to support the detailed subsystem/component design and development as part of the "Design for Reliability and Safety" approach for the new Ares I Launch Vehicle. Specifically, the paper discusses probabilistic engineering design analysis cases that had major impact on the design and manufacturing of the Space Shuttle hardware. The cases represent important lessons learned from the Space Shuttle Program and clearly demonstrate the significance of probabilistic engineering analysis in better understanding design deficiencies and identifying potential design improvement for Ares I. The paper also discusses the probabilistic functional failure analysis approach applied during the early design phases of Ares I and the forward plans for probabilistic design analysis in the detailed design and development phases.

Fayssal, Safie↗

Development of Advanced Manufacturing Approaches for Single-Piece Launch Vehicle Structures

Advanced, near-net shape manufacturing methods have the potential to enable production of structures with fewer welds and reduced machining requirements. Two such methods that are suitable for the manufacturing of single-piece, stiffened barrel-shaped structures are presented. The first solution deployed existing manufacturing technology to produce a thick-walled barrel with integrally machined stiffeners. In this study, an 8-ft. diameter barrel was produced and subjected to a buckling test. Data on the manufacturing and testing of this barrel are provided and compared against the traditional multi-piece weld construction approach. The single-piece barrel resulted in a 28% greater load carrying capacity than the welded barrel. A second solution utilized a novel flow-forming technique to produce the barrel and stiffeners in one process without the need for welding or machining. This is an emerging manufacturing method known as the Integrally Stiffened Cylinder (ISC) process. This innovative process is being evaluated for launch vehicle and commercial aircraft manufacturing. The one-piece, stiffened ISC barrels, which have been successfully fabricated at 10 ft. in diameter, offer a direct replacement for conventional multi-piece, welded or riveted structures. A cost-benefit analysis for launch vehicle cryogenic propellant tanks estimated that the ISC process offers up to a 50% reduction in manufacturing costs and a 10% reduction in mass.

integrally stiffened cylinder (ISC)↗

Computational Prediction of Pressure and Thermal Environments in the Flame Trench With Launch Vehicles

One of the key objectives for the development of the 21st Century Space Launch Com- plex is to provide the exibility needed to support evolving launch vehicles and spacecrafts with enhanced range capacity. The launch complex needs to support various proprietary and commercial vehicles with widely di erent needs. The design of a multi-purpose main ame de ector supporting many di erent launch vehicles becomes a very challenging task when considering that even small geometric changes may have a strong impact on the pressure and thermal environment. The physical and geometric complexity encountered at the launch site require the use of state-of-the-art Computational Fluid Dynamics (CFD) tools to predict the pressure and thermal environments. Due to harsh conditions encountered in the launch environment, currently available CFD methods which are frequently employed for aerodynamic and ther- mal load predictions in aerospace applications, reach their limits of validity. This paper provides an in-depth discussion on the computational and physical challenges encountered when attempting to provide a detailed description of the ow eld in the launch environ- ment. Several modeling aspects, such as viscous versus inviscid calculations, single-species versus multiple-species ow models, and calorically perfect gas versus thermally perfect gas, are discussed. The Space Shuttle and the Falcon Heavy launch vehicles are used to study di erent engine and geometric con gurations. Finally, we provide a discussion on traditional analytical tools which have been used to provide estimates on the expected pressure and thermal loads.

thermal↗

Practical aspects of transfer from GTO to lunar orbit

This paper is a presentation of some practical aspects of orbital transfer from Geosynchronous Transfer Orbit (GTO) to close, near-circular orbits of the Moon. The intent is to identify the important parameters affecting the problem and to bound (approximately) the range of required delta V for a spacecraft that has been placed in GTO. The basic geometric relationships are described and the dynamics are simulated by use of the Zero-Sphere-of Influence Patched Conic method. It is found that the inclination of the transfer orbit to the Earth-Moon plane is relatively unimportant while the position of the line of apsides with respect to the Moon's orbit is the main geometric parameter of interest. It is shown that this parameter can be controlled by selecting the time of day for launch and that two launch windows of approximately 45 minutes duration are available each day of the year if use is made of the recommended phasing orbit transfer. The phasing orbit transfer not only provides twice-daily launch windows, but also provides a mechanism for efficacious correction of GTO injection errors. Delta V penalties for out-of-plane transfer and for late launch are evaluated and the method is recommended for use as an affordable means of achieving lunar orbit.

Uphoff, Chauncey↗