Search NASA⌕ Search

SEARCH · Search NASA

Results for “MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

The Project Manager Who Saved His Country

George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

Baniszewski, John↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

Continuous Risk Management: An Overview

Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

Rosenberg, Linda↗

Communicating Risk to Program Managers

Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

Shivers, C. Herbert↗

Management by Trajectory Trade Study of Roles and Responsibilities Between Participants and Automation Report

This report describes a trade study of roles and responsibilities associated with the Management by Trajectory (MBT) concept. The MBT concept describes roles, responsibilities, and information and automation requirements for providing air traffic controllers and managers the ability to quickly generate, evaluate and implement changes to an aircraft's trajectory. In addition, the MBT concept describes mechanisms for imposing constraints on flight operator preferred trajectories only to the extent necessary to maintain safe and efficient traffic flows, and the concept provides a method for the exchange of trajectory information between ground automation systems and the aircraft that allows for trajectory synchronization and trajectory negotiation. The participant roles considered in this trade study include: airline dispatcher, flight crew, radar controller, traffic manager, and Air Traffic Control System Command Center (ATCSCC) traffic management specialists. The proposed allocation of roles and responsibilities was based on analysis of several use cases that were developed for this purpose as well as for walking through concept elements. The resulting allocation of roles and responsibilities reflects both increased automation capability to support many aviation functions, as well as increased flexibility to assign responsibilities to different participants - in many cases afforded by the increased automation capabilities. Note that the selection of participants to consider for allocation of each function is necessarily rooted in the current environment, in that MBT is envisioned as an evolution of the National Airspace System (NAS), and not a revolution. A key feature of the MBT allocations is a vision for the traffic management specialist to take on a greater role. This is facilitated by the vision that separation management functions, in addition to traffic management functions, will be carried out as trajectory management functions. This creates an opportunity for flexibility, allowing the traffic management specialist to carry out tasks that today can only be carried out by the controller currently in contact with the aircraft. This additional tasking for the traffic management specialist comes with requirements for workload management. An increased role for the Data-side (D-side) controller relative to the Radar-side (R-side) controller is a potential approach to mitigating workload for the traffic management specialist, as the D-side controller would have similar ability to perform separation management functions in what today might be considered the "trajectory management" timeframe. This analysis did not distinguish between the D-side and R-side controllers since in many cases the R-side controller works unassisted.

Fernandes, Alicia D.↗

Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working put into place will become visible and will be illusmted in future papers.

risk management↗

Invasive Plant Species Management Plan for Los Alamos National Laboratory (Rev.3)

Native species are plants and animals that continually occupy a natural range without direct or indirect introduction and/or care by humans. They are adapted to the environmental conditions and processes of the ecosystem in which they reside. A species introduced into a novel ecosystem can either exploit that ecosystem and thrive or be unable to survive in that ecosystem (Hobbs et al. 2006). Alien or non-native species are species that are intentionally or accidentally introduced into a novel ecosystem and are capable of living and propagating within the physical parameters of that ecosystem. Invasive species is a species that is non-native (or alien) to the ecosystem under consideration and a noxious species are those whose introduction causes or is likely to cause economic or environmental harm. The term invasive species is applicable to plants and animals alike; however, this invasive species management plan currently focuses on invasive vegetation. Invasive plant species are usually capable of rapid colonization of disturbed ground, such as after a change in wildfire regime intensity and frequency (Reilly et al. 2020) or anthropogenic ground disturbance (Burke and Grime 1996; Hobbs and Huenneke 1992). Climate change facilitates the spread and establishment of many alien species and creates new opportunities for them to become invasive (Turbelin and Catford 2021). As climate change impacts increase in the coming decades, we may see in an increase in invasive species establishment. See a list of definitions of terms pertinent to this document in Appendix A: Definitions. Los Alamos National Laboratory (LANL) hosts populations of non-native and invasive species all typical of the northern New Mexico region (Martin 2004; NMDA 2020). By implementing an invasive species management plan, LANL will have readily accessible management strategies for invasive species that are found on-site. The benefits of managing invasive species include a decrease in wildland fire risks, an increase in soil productivity, an increase in (productive or beneficial) wildlife habitat, an increase in water quantity and quality, and the restoration of impacted areas (Burke and Grime 1996; Hobbs and Huenneke 1992; D’Antonio and Hobbie 2005; MacDougall et al. 2013; Reilly et al. 2020). The aforementioned benefits from invasive species management directly enable the LANL mission by ensuring compliance requirements are met and site-wide programs, such as the Vulnerability Assessment and Resilience Plan, are supported for a mutually beneficial outcome. An example for the LANL site specifically, controlling non-native annual plant species, for example, could reduce the costs associated with stabilizing soils during the stormwater pollution prevention compliance process. Roadway and utility right-of-way areas are another place where an integrated vegetation management strategy would promote low growing perennial plants in a way that is mutually beneficial to habitat and the institution through lowered maintenance costs. There is also an economic benefit to managing invasive species. In one nationwide study, invasive plants had an estimated impact cost of $190.45 billion (Fantel-Lepczyk et al. 2022). Investing in preventative measures and surveillance could help to offset future control and management costs of invasive species that have the potential to become established. The State of New Mexico has developed plant species lists and recommendations through the New Mexico Department of Agriculture’s Noxious Weeds Management Act, Article 7D (NM Statute § 76-7D-4 2021); however, effective invasive species management must rely on local knowledge of the site and region. Los Alamos County (LAC) has already compiled a target invasive plant species list and species-specific management objectives (Martin 2004). Therefore, the New Mexico Noxious Weed List and the LAC invasive plant species list, as well as management objectives from those documents, are integrated into LANL’s invasive plant species management plan.

54 ENVIRONMENTAL SCIENCES↗

NASA Risk Management Handbook: Version 2.0, Part 1

The purpose of this handbook is to provide an in-depth reference for the practice of risk management in NASA, updating the guidance offered in its original version, NASA/SP-2011-3422 (November 2011), and closely aligning the updated guidance with the current NASA Procedural Requirements for Agency Risk Management, NPR 8000.4, and the parent NASA Policy Directive for NASA Governance and Strategic Management, NPD 1000.0. NPD 1000.0 introduces with emphasis the concept of “Risk Leadership,” making it a fundamental tenet and pillar of the risk management culture that it advocates for the Agency. NPR 8000.4 applies this concept and establishes Risk Management (RM) requirements for the Agency as an integrated enterprise, as well as the RM requirements for portfolio elements within the enterprise. Such elements include the various programs and projects that contribute to the Agency’s objectives and the various institutional activities carried out by entities that contribute to mission support. The present version of the handbook also emphasizes the integration of risk management processes across activity and project life cycles and their coordination and interaction with day-to-day programmatic and organizational functions. Areas of application of risk assessment and management that were not covered with specific guidance in the preceding version are addressed in this version with in-depth examples. The handbook is structured into two parts, whose chapters are in turn organized in a sequential order intended to facilitate a gradual and progressive introduction of the reader to risk management principles and practices. Part 1 of the handbook is dedicated to the introduction of the basic foundations of the NASA integrated risk management framework, the related fundamental risk concepts, the description of the risk management and decision processes that are to be implemented within the framework, the discussion of the risk assessment techniques that should be utilized in support of such processes, and the management and organizational interactions and interfaces that should be enabled to implement an effective integration of risk management activities within the Agency. Part 2 provides self-contained, end-to-end examples of application of the processes and techniques introduced in Part 1, in the context of both programmatic (i.e., project and/or mission related) and institutional activities.

Uncertainty↗

NASA Risk Management Handbook: Version 2.0, Part 2

The purpose of this handbook is to provide an in-depth reference for the practice of risk management in NASA, updating the guidance offered in its original version, NASA/SP-2011-3422 (November 2011), and closely aligning the updated guidance with the current NASA Procedural Requirements for Agency Risk Management, NPR 8000.4, and the parent NASA Policy Directive for NASA Governance and Strategic Management, NPD 1000.0 (January 2020). NPD 1000.0 introduces with emphasis the concept of “Risk Leadership,” making it a fundamental tenet and pillar of the risk management culture that it advocates for the Agency. NPR 8000.4 applies this concept and establishes Risk Management (RM) requirements for the Agency as an integrated enterprise, as well as the RM requirements for portfolio elements within the enterprise. Such elements include the various programs and projects that contribute to the Agency’s objectives and the various institutional activities carried out by entities that contribute to mission support. The present version of the handbook also emphasizes the integration of risk management processes across activity and project life cycles and their coordination and interaction with day-to-day programmatic and organizational functions. Areas of application of risk assessment and management that were not covered with specific guidance in the preceding version are addressed in this version with in-depth examples. The handbook is structured into two parts, whose chapters are in turn organized in a sequential order intended to facilitate a gradual and progressive introduction of the reader to risk management principles and practices. Part 1 of the handbook is dedicated to the introduction of the basic foundations of the NASA integrated risk management framework, the related fundamental risk concepts, the description of the risk management and decision processes that are to be implemented within the framework, the discussion of the risk assessment techniques that should be utilized in support of such processes, and the management and organizational interactions and interfaces that should be enabled to implement an effective integration of risk management activities within the Agency. Part 2 provides self-contained, end-to-end examples of application of the processes and techniques introduced in Part 1, in the context of both programmatic (i.e., project and/or mission related) and institutional activities.

Risk Leadership↗

Identifying management opportunities to combat climate, land, and marine threats across less climate exposed coral reefs

Conserving coral reefs is critical for maintaining marine biodiversity, protecting coastlines, and supporting livelihoods in many coastal communities. Climate change threatens coral reefs globally, but researchers have identified a portfolio of coral reefs (bioclimatic units [BCUs]) that are relatively less exposed to climate impacts and strongly connected to other coral reef systems. These reefs provide a proactive opportunity to secure a long-term future for coral reefs under climate change. To help guide local management efforts, we quantified marine cumulative human impact (CHI) from climate, marine, and land pressures (2013 and from 2008 to 2013) in BCUs and across countries tasked with BCU management. Additionally, we created a management index based on common management measures and policies for each pressure source (climate, marine, and land) to identify a country's intent and commitment to effectively manage these pressures. Twenty-two countries (79%) had increases in CHI from 2008 to 2013. Climate change pressures had the highest proportional contribution to CHI across all reefs and in all but one country (Singapore), but 18 BCUs (35%) and nine countries containing BCUs (32%) had relatively high land and marine impacts. There was a significant positive relationship between climate impact and the climate management index across countries (R 2 = 0.43, p = 0.02), potentially signifying that countries with greater climate impacts are more committed to managing them. However, this trend was driven by climate management intent in Fiji and Bangladesh. Our results can be used to guide future fine-scale analyses, national policies, and local management decisions, and our management indices reveal areas where management components can be improved. Cost-effectively managing local pressures (e.g., fishing and nutrients) in BCUs is essential for building a climate-ready future that benefits coral reefs and people.

59 BASIC BIOLOGICAL SCIENCES↗

Unmanned Aerial Systems Traffic Management (UTM): Safely Enabling UAS Operations in Low-Altitude Airspace

Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS flight operations. Given this, and understanding that the FAA faces a mandate to modernize the present air traffic management system through computer automation and significantly reduce the number of air traffic controllers by FY 2020, the FAA maintains that a comprehensive, yet fully automated UAS traffic management (UTM) system for low-altitude airspace is needed. The concept of UTM is to begin by leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today. Building on its legacy of work in air traffic management (ATM), NASA is working with industry to develop prototype technologies for a UAS Traffic Management (UTM) system that would evolve airspace integration procedures for enabling safe, efficient low-altitude flight operations that autonomously manage UAS operating in an approved low-altitude airspace environment. UTM is a cloud-based system that will autonomously manage all traffic at low altitudes to include UASs being operated beyond visual line of sight of an operator. UTM would thus enable safe and efficient flight operations by providing fully integrated traffic management services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning re-routing, separation management, sequencing spacing, and contingency management. UTM removes the need for human operators to continuously monitor aircraft operating in approved areas. NASA envisions concepts for two types of UTM systems. The first would be a small portable system, which could be moved between geographical areas in support of operations such as precision agriculture and public safety. The second would be a Persistent system, which would support low-altitude operations in an approved area by providing continuous automated coverage. Both would require persistent communication, navigation, and surveillance (CNS) coverage to track, ensure, and monitor conformance. UTM is creating an airspace management tool that allows the ATM system to accommodate the number of UAS that will operate in the low altitude airspace. The analogy is just because we have a car, whether its autonomous or someone is driving, does not diminish the need for a road or road signs or rules of the road.

traffic management↗