Search NASA⌕ Search

SEARCH · Search NASA

Results for “Manhattan Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Data Driven Analysis for Modernization Program Management

NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Deactivation and Downgrade of Enriched Uranium Facilities at the Y-12 National Security Complex

Buildings 9206 and 9212 at the Y-12 National Security Complex are both Hazard Category 2 nuclear facilities from the Manhattan Project era that supported various missions over the decades, including the processing of enriched uranium. The production mission for Building 9206 ended in the 1990s, while Building 9212 is still an active production facility. The disposition process for contaminated excess facilities is generally described in the U.S. Department of Energy (DOE) Guide DOE O 430.1A, Life Cycle Asset Management, which provides guidance on facility surveillance and maintenance, deactivation, decommissioning, and transition in supplemental guides DOE G 430.1-2 through 430.1-5. Historically, production facilities similar to Buildings 9206 and 9212 have not always been cleaned out and deactivated prior to being excessed, which significantly complicates the decommissioning phase. Many legacy facilities were shut down before the formal DOE guidance was established. This paper presents the practical application and implementation of the DOE guidance for the nuclear deactivation of Buildings 9206 and 9212, and summarizes the lessons learned for application across the DOE enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities with NSUF for Nuclear Energy R&D

The Nuclear Science User Facilities (NSUF) is one of a diverse number of U.S. Department of Energy (DOE) user facilities established to provide researchers with the most advanced tools of modern science. The idea of a user facility has been around since the Manhattan Project, when the first of the large government-owned R&D facilities was built. Currently there are over 50 such facilities in the US, but only one devoted to nuclear energy R&D. The NSUF was established in 2007 to open INL capabilities to outside users through a competitive process. The intent was to provide access to these capabilities to a broader range of researchers that represented significant intellectual capital. The combined nuclear energy community would then be able to address the important issues relevant to the mission of the DOE-NE with respect to irradiation effects in nuclear fuels and materials. The NSUF is fairly unique in that it is no longer composed of a single self-contained facility but represents a consortium of facilities distributed across the U.S. at a number of institutions. The NSUF is centered at and managed from the Idaho National Laboratory (INL), where it was originally founded, but it also coordinates activities at more than twelve NSUF partner facilities that include eight universities, plus the three Idaho universities that are part of the Center for Advanced Energy Studies (CAES), four national laboratories, and one nuclear industry vendor. The NSUF goal is to produce the highest quality research results to increase understanding of advanced nuclear energy technologies important to DOE-NE and support national priorities by adapting to the needs of DOE-NE programs, industry, and new innovative concepts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Successful Characterization Strategies for the Active High Risk Y-12 National Security Complex 9201-5 (Alpha-5) Facility, Oak Ridge, TN - 12164

Building 9201-5 (Alpha 5) was completed in May 1944 and served as a production facility for National Nuclear Security Administration (NNSA) Y-12 Weapons Plant. During the Manhattan Project, it functioned as a uranium enrichment facility. The facility was renovated and altered over the years, converting the calutrons to support other missions. Alpha 5 consists of 4 floors and a basement measuring approximately 600,000 square feet. The facility contains various pieces of equipment remaining from legacy operations. A significant amount (approximately 200,000 kgs) of mercury (Hg) has been spilled in the facility over the operational history of the building. To further complicate matters, beryllium (Be) contamination in 9201-5 is found throughout approximately sixty percent of the facility. Concentrations varying from very low (< 0.2 micrograms (μg)/100 cm{sup 2}) to areas where concentrations are relatively high, approximately 600 μg/100 cm{sup 2}, in regulated beryllium areas. The primary site related contaminants (SRCs) for the waste in this facility are enriched uranium, depleted uranium, beryllium and mercury. This facility represents the highest environmental risk for DOE-ORO EM and NNSA at Y-12 and must be quickly addressed to minimize impacts to future Y-12 missions, as well as human health and the environment. As part of the American Recovery and Reinvestment Act (ARRA), approximately 700,000 cubic feet of legacy material was removed in 2010 and 2011. In addition, characterization of the 9201-5 facility was scheduled in the winter and spring of 2011. This activity was initiated in January 2011 and was completed in July 2011. Heavy schedule pressure was further complicated by the fact that this building has active utility, security and process systems. Given these complex variables, a unique, out of the box characterization strategy was forged in an effort to bound radiological and chemical contaminants, as well as providing the appropriate level of quality to ensure that this data could be used to develop waste profiles when deactivation, decontamination and demolition (D and D) activities are authorized at a future date. The characterization strategy involved a hybrid model of statistically-based and biased sampling events. To achieve the desired results, traditional intrusive sampling and laboratory analysis, as well as a number of field-based characterization methodologies (e.g., X-ray Fluorescence [XRF], Lumex and Non-Destructive Assay [NDA]) were utilized. Results were captured and synthesized into meaningful, usable conclusions in a facility characterization report that will more accurately aid D and D cost estimates for future remedial actions. This massive characterization campaign involved over 1,200 separate sample locations using 4 separate characterization methods and was successfully completed to meet a performance-based milestone within 8 months of initiation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iodine Speciation Across the Length of the Hanford 200-UP-1 Operable Unit Radioiodine Plume and Biogeochemical Drivers of Speciation - 17270

In 1943, construction began on the first of nine nuclear reactors at the Hanford Site to produce plutonium for the development of atomic weapons for the Manhattan Project during World War II and throughout the Cold War. Over a production period lasting from 1944 to 1987, approximately 110,000 tons of nuclear fuel was processed. During the production period, billions of gallons of liquid nuclear waste and millions of tons of solid waste were produced. Approximately 4.7 Ci of radioiodine (I-129) was discharged to liquid disposal sites, during disposition of the waste. Following percolation of the liquid waste through the vadose zone, three large I-129 groundwater plumes have formed beneath Central Plateau Facilities including both 200 East and 200 West Areas. Analysis of I-129 plumes in the 200-ZP-1 Operable Unit (OU) (200 West Area) showed iodine speciation that was dominated by iodate even though iodide was thought to be dominant species in waste. Experimental results demonstrated that iodate interacts with calcite via a co-precipitation and/or adsorption mechanism. From sorption experiments performed on Hanford sediments, iodate interacted more strongly than iodide during adsorption experiments. These results would indicate that iodate migration would be retarded compared to iodide, but results from groundwater samples obtained from eight wells in the 200 ZP-1 OU did not support this hypothesis. Due to different chemical processes used during plutonium processing, iodine species in other plumes such as in the 200-UP-1 OU (200 West Area) may be different. In addition, species distribution may change longitudinally between the source area and the distal end of the plume. Groundwater samples will be taken at a location near the source, in the middle of the plume and at the distal end of the plume. These samples will be analyzed for iodine speciation using ion chromatography coupled to an inductively coupled plasma mass spectrometer. Results from the different samples will be compared to give an initial determination of species distribution at different locations along the plume. Data generated from these samples can then be used to inform the conceptual model that is being developed for iodine as part of an evaluation of remediation options for the 200-UP-1 OU. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Road to 2020: Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA): Cleanup of the East Tennessee Technology Park - 17425

Uranium enrichment activities at the 890-ha (2,200-acre) East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, date back to the World War II Manhattan Project. The site produced nuclear fuel for weapons and reactors for four decades. Because of these operations, ETTP has a legacy of radiologically and chemically contaminated buildings, soil, sediment, and groundwater that required remedial action to reduce the risk to human health and the environment. Since the early 1990's, the DOE Oak Ridge Office of Environmental Management (OREM) has directed the environmental cleanup of this contaminated site through the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process. Cleanup activities have included the demolition of contaminated facilities and structures, including five gaseous diffusion buildings; remediation of contaminated soils; disposal of associated waste; and treatment of contaminated groundwater. In August 2016, DOE realized its Vision 2016, demolition of all five gaseous diffusion buildings at ETTP. This milestone marked the first time that an entire uranium enrichment complex has been demolished. The landmark cleanup included deactivation and demolition of 418,064 m{sup 2} (4.5 million ft{sup 2}) of radiologically and chemically contaminated facilities, and disposal of more than 55,000 truckloads of debris. Fulfillment of Vision 2016 was a major step toward completing ETTP cleanup by 2020. To attain 2020 cleanup, DOE and its cleanup contractor, URS - CH2M Oak Ridge LLC (UCOR), must complete demolition of the following areas: - Poplar Creek Facilities; - K-731 Switch House; - Building K-1037; - Central Neutralization Facility; - K-1200 Complex; - Toxic Substances Control Act Incinerator facilities; - Balance of Site Facilities. In addition, DOE will complete all remedial actions in accordance with current Records of Decision (RODs); as well as cleanup activities involving surface water, sediment, and groundwater that will be addressed in a final site-wide ROD. All waste, including soils, debris, and rubble from demolition and remediation activities, will be dispositioned. Final cleanup of ETTP further advances DOE's goal for re-industrialization of the site as a private sector industrial park. With risks reduced, hazards removed, and the environment restored, DOE can transfer usable ETTP building and land assets to the community for redevelopment and reuse. A history center, equipment building, viewing tower, and wayside exhibits will tell the story of the site, honoring its contributions to the nation's defense and energy needs. Approximately 1,214 ha (3,000 acres) of adjoining lands, now the Black Oak Ridge Conservation Easement (BORCE), will be used for conservation and recreational purposes, including green-ways and trail systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and Mission Capability at Hanford - 19048

As Hanford celebrates its 75. anniversary, the challenge to complete the cleanup mission and simultaneously prepare for new nuclear operations puts increasing pressure on an infrastructure system that in some places is nearly the same age. While the cleanup mission began in earnest in 1989 and continues today, completing construction of the country's largest Waste Treatment and Immobilization Plant will put nuclear operations back into the Hanford footprint. Ensuring that the infrastructure originally built to support plutonium production as part of the Manhattan Project is the right size and reliable for the remaining missions is a delicate balance of funding priorities, strategy and a predictable project delivery. The DOE Richland Operations Office (DOE-RL) and other sites across the DOE complex have recognized the need for increased investment in site infrastructure. Combined with this increasing need is the funding reality of variable fiscal budgets that creates challenges for even the best strategists. The current Hanford infrastructure priority list has approximately 100 reliability projects with a combined value over $380 million dollars. At current funding levels, there is a 10 to 15-year backlog. To meet this challenge head on, DOE-RL and Mission Support Alliance (MSA) regularly evaluate project priorities and ongoing maintenance actions to ensure the highest risk systems are addressed. This is done by integrating historical and operational knowledge, system health reports, and maintenance records then coordinating with the Facility Information Management System (FIMS). Sometimes with decades old infrastructure, it can seem as if everything is a number one priority. Recently, in a random testing of approximately 20% of the wooden power poles on site, approximately 92% of the poles were found to be in satisfactory condition with 8% percent failing. MSA Electrical Utilities group immediately replaced one pole, found to have only 8% strength remaining. This type of severely degraded infrastructure is not conducive to reliable mission execution. Given the historical prioritization of funding for cleanup, then operations, followed by infrastructure, it is not surprising that the commitment of funds on infrastructure projects such as sewer collection systems or replacing old electrical transformers has been hard fought. The acknowledgement and re-prioritization of limited funds will work towards creating a more reliable and sustainable infrastructure portfolio that will support and even enhance the cleanup and operations missions. This paper/presentation will outline Hanford's approach to executing reliability projects that will serve the remaining missions on site for years to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Technical Standard for Radiological Characterization of DAW - 19552

Since the Manhattan Project, the U.S. Department of Energy (DOE) and its predecessor agencies have performed a wide mission involving nuclear materials and weapons development, production, testing, and modernization. While the initial mission components relied heavily upon reactor physics and chemistry, the environmental programs have increasingly relied upon development of more accurate and effective measurement methodologies to determine the radiological and chemical properties of the unique waste streams that were generated during the weapons production and testing mission. During the ongoing site cleanup program, the DOE laboratories and former production sites have developed a wide range of site-specific processes and procedures for conducting radiological characterization of dry active waste (DAW) that is managed as low-level radioactive waste. This has resulted in a Complex-wide variability among sites with respect to the methodologies and instrumentation used to characterize individual waste streams. The DAW-type waste was selected for development of a characterization standard since it is a simple, voluminous, and repetitive waste stream with a substantial knowledge base, established experience history at multiple site locations, and the potential for realization of programmatic benefits though standardization. Implementation of a consistent, standardized approach to DAW characterization will take advantage of multiple applications for a technology that is both mature and stable. The DAW characterization process is repetitive and lends itself to implementation at a wide range of operating locations - resulting in economies of scale, compliance with regulatory requirements, and consistent implementation of procedures which support design, operations, maintenance, and management of facilities, activities and environmental restoration programs. In response to a request from DOE, the Energy Facility Contractors Group (EFCOG) Waste Management Working Group (WMWG) is supporting the development of a new DOE Technical Standard for Radiological Characterization of DAW. The purpose of the proposed new standard is to provide a technical resource that integrates and enhances the utilization of current site-specific methodologies and processes. An EFCOG/WMWG technical team has prepared a Technical Basis Document (TBD) to support the development and utilization of the new standard. The TBD provides detailed reference information for use by site personnel when implementing the guidance to be provided in the standard. It also provides the rationale for and details concerning the recommended technical approaches for radiological characterization of representative DAW-type waste streams. The TBD is an essential resource and will be included as an appendix to the proposed standard. Formulation of the new standard will draw upon the information contained in the TBD in order to integrate and improve the utilization of current site-specific methodologies and processes. It will also include a comparison of current radiological characterization methodologies to determine which ones are most reliable and effective in producing relevant and valid data. In view of the long history and participation by several agencies in the regulation of nuclear programs, existing Voluntary Consensus Standards have also been identified in the TBD and will be referenced for relevancy and applicability to the new proposed standard. A Project Justification Statement (PJS) was also developed by the EFCOG/WMWG Team. Following internal Team review and approval by EFCOG, the draft PJS was submitted through Argonne National Laboratory (ANL) and the DOE Argonne Site Office Technical Standards Managers for review and approval by the DOE Argonne Site Office Manager. After resolution of comments and approval by the Manager, the PJS will be submitted to the DOE/HQ Technical Standards Program Manager (TSPM) for formal coordination. Following resolution of technical comments received during the PJS coordination process and receipt of a technical standards project number assigned by the TSPM, the Team will confirm the overall preparation schedule and develop an Internal Draft Technical Standard for coordination with the DOE Argonne Site Office. Following comment resolution, the Team will then prepare a Coordination Draft for submittal to the DOE Technical Standards RevCom review process and will respond to comments generated during this Complex-wide review. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear waste reduction: Exploring new pathways one step at a time

In my home country of Venezuela, nuclear energy is not a topic that attracts much attention. The government briefly oversaw some nuclear energy programs during the 1950s, but currently there are no active nuclear power facilities in the country. In fact, the Venezuelan government signed and ratified the treaty of the prohibition of nuclear weapons in 2021, which states that Venezuela has never owned, possessed or controlled nuclear weapons or programs of any kind. When I moved to the United States, however, nuclear energy became an extremely relevant topic. In the 1940s, the U.S. government established and oversaw the Manhattan Project to build atomic bombs for use in World War II. After the war, the government encouraged scientists to use this information on nuclear reactions to develop nuclear energy for peaceful civilian purposes instead.1 During these early days of nuclear research, there were no formal regulatory standards for nuclear waste management. Policies usually were self-regulated and often created based on existing policies of disposal for non-nuclear waste.2 As a result, there were instances of nuclear waste leaching into the environment and affecting local communities. So, much research has been conducted since then to characterize and store nuclear waste safely and securely.3 I first became interested in nuclear energy during my undergraduate studies when I worked on a project involving ligand synthesis to help extract actinides from nuclear waste. I then studied electrochemistry in molten salt systems for nuclear energy applications during my Ph.D. As I approached graduation, I started looking into national laboratories that have programs involving nuclear energy and waste management. At Idaho National Laboratory (INL), the focus is more on applied processes and how nuclear energy can be innovated to realize next-generation reactor design and technologies. This focus led me to apply for a Seaborg distinguished postdoctoral position at INL, for which I was chosen based on my proposal of a way to improve nuclear waste recycling. To understand my proposal, we must familiarize ourselves with the makeup of nuclear waste. After uranium dioxide is used as nuclear fuel in a reactor, the fuel matrix is then characterized by various fission products, including rare earth elements, alkali and alkaline earths, and actinides. Some of these fission products can potentially be recovered through pyroprocessing, 4 which involves the electrochemical dissolution of the used nuclear fuel in a molten chloride salt mixture at high temperatures. Though some of the fission products can be easily recovered—for example, uranium is reduced onto an inert cathode by applied potentials—numerous other fission products such as rare earth elements are difficult to recover due to their multivalent oxidation states and side reactions.5 To improve the recovery efficiency of rare earth elements specifically, I proposed investigating the fundamental interactions between rare earth elements in the molten chloride salt and their metallic form (Figure 1). The kinetic pathways and the chemical reactions of these elements, which will be elucidated through spectro-electrochemistry at high temperatures, will give insights on how the recovery efficiency can be improved. Although my research focuses on fundamental science, it will benefit the applied process by generating new scientific knowledge and closing the gap for efficient recycling of the waste: one step at a time.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SAFETY AT FLUOR HANFORD (A) CASE STUDY - PREPARED BY THUNDERBIRD SCHOOL OF GLOBAL MANAGEMENT

By November of 1997, Fluor Hanford (Fluor) had been the site manager of the Hanford nuclear reservation for a year. The Hanford site had been established as part of the Manhattan Project in the 1940s that gave birth to the atomic bomb. Hanford produced two thirds of U.S. plutonium during the Cold War period. The Hanford site was half the size of Rhode Island and occupied 586 square miles in southeastern Washington State. The production of plutonium for more than 40 years left a huge legacy of chemical and radiological contamination: 80 square miles of contaminated groundwater; 2,300 tons of spent nuclear fuel stored in underwater basins; 20 tons of plutonium-laced contaminated materials; and 500 contaminated facilities. The cleanup involved a challenging combination of radioactive material handling within an infrastructure constructed in the 1940s and 1950s. The cleanup that began in 1988 was expected to take 30 years or more. Improving safety at Hanford had already proven to be a significant challenge. As the new site manager at Hanford, Fluor Hanford inherited lower- and mid-level managers and thousands of unionized employees, many of whom were second or third generation Hanford employees. These employees had seen many contractors come and go over the years. Some of the managers who had worked with the previous contractor saw Fluor's emphasis on safety as getting in the way of operations. Union-management relations were fractious. Hanford's culture was described as 'production driven-management told everyone what to do, and, if you didn't do it, there were consequences'. Worker involvement in designing and implementing safety programs was negligible. Fluor Hanford also was having trouble satisfying its client, the Department of Energy (DOE). The DOE did not see a clear path forward for performance improvements at Hanford. Clearly, major change was necessary, but how and where should it be implemented?

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MANHATTAN: The View From Los Alamos of History's Most Secret Project

This presentation covers the political and scientific events leading up to the creation of the Manhattan Project. The creation of the Manhattan Project’s three most significant sites--Los Alamos, Oak Ridge, and Hanford--is also discussed. The lecture concludes by exploring the use of the atomic bombs at the end of World War II. The presentation slides include three videos. The first is a short clip of the 100-ton Test. The 100-Ton Test was history’s largest measured blast at that point in time; it was a pre-test for Trinity, the world’s first nuclear detonation. The second clip features views of Trinity followed a short statement by the Laboratory’s first director, J. Robert Oppenheimer. The final clip shows Norris Bradbury talking about arms control.

99 GENERAL AND MISCELLANEOUS↗

Alternative D and D Planning Tool - 12466

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began cleanup of the East Tennessee Technology Park (ETTP). UCOR's $2.2 billion contract has an initial five-year term and a four-year option period for completing the cleanup of ETTP and performing surveillance and maintenance and waste management operations at both the Oak Ridge National Laboratory and the Y-12 National Security Complex. ETTP D and D work includes disposition of large, complex, contaminated, Manhattan Project-era facilities such as the K-25 and K-27 uranium enrichment facilities. At ETTP, UCOR views the D and D process as a 'Waste Factory' with waste production lines from the point-of-generation to the point-of-disposal. Safely transforming vertically-standing buildings into horizontally-lying waste in a disposal facility is the primary cleanup objective. Whereas a factory produces widgets, D and D produces waste-lots of waste. In support of the Waste Factory view, UCOR is developing a systems planning tool to help better plan how to effect cleanup by improving waste planning, uniting waste generator with waste dis-positioner, and represent the 'waste factory' in a computer model that allows the D and D and waste management teams to better understand available disposal paths, waste uncertainties and potential consequences, driving variables, and sensitivity to changes. Any model of reality represents a compromise. Part of the Waste Factory Model's value may be in providing standardization and relative direction for assisting decision making as opposed to absolute cost or schedule answers. From that relative direction, management can commission detailed planning and estimating. Also, the model's output credibility is tied directly to its input quality. That is why, as discussed above, the Waste Factory Model's key informational component will be the standardized waste streams (e.g., Structure/Debris disposed at EMWMF) and associated standardized unit costs. The model development process generally, and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗