A framework to collect human reliability analysis data for nuclear power plants using a simplified simulator and student operators

Data scarcity in human reliability analysis (HRA) has been a major challenge in the quantification process. Many institutes have collected HRA data through experiments using full-scope simulators with actual operators. Nevertheless, there are still some limitations to relying solely on full-scope studies. This paper aims to propose how full-scope data collection studies can be supported through the Simplified Human Error Experimental Program (SHEEP). The SHEEP framework was developed by Idaho National Laboratory (INL) to collect HRA data through a simplified simulator and student operators. This paper introduces the major tasks in the SHEEP framework, with a particular focus on differences that arise due to participant type (i.e., student vs. actual operator), based on experiments using a simplified simulator (i.e., the Rancor Microworld). This paper also describes whether the data collected via this approach could support a representative full-scope data collection study (i.e., the HuREX study) based on the experimental data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Panel Session 70: Nuclear Power Plant Waste Management, LLRW Processing Issues

This panel focused on senior utility managers discussing issues with commercial LLW processors. LLW processors had an opportunity to update utilities/NPPs on new or different services or technologies being offered to assist in their radioactive waste management goals, changes to their facility license, revisions to their acceptance guidelines, and emerging compliance issues. Panelists with presentations: UniTech - 'Expanding to Reduce Costs' LLW Processor Update (Gregg Johnstone); Veolia Nuclear Solutions Federal Services - Alaron Nuclear Services (Dave Garber); EnergySolutions Tennessee Processing Facilities (Fred Schulz); Complex Waste Management Issues Services and Treatment Facilities (George M. Taylor)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Rapid Procedure Development Approach for Multi-stage Validation of Novel Nuclear Power Plant Systems

The integration of renewable energy sources into the modern grid introduces variability in generation, challenging nuclear reactors to remain economically viable amid low wholesale electricity prices. To address this, Idaho National Laboratory?s Flexible Plant Operation and Generation program explores alternative revenue streams, including commoditizing excess thermal energy. A Thermal Power Dispatch (TPD) system enables steam extraction from the secondary loop for industrial uses like hydrogen production via high-temperature steam electrolysis.

99 - GENERAL AND MISCELLANEOUS↗

Use of AI for Interpreting Technical Specifications for Power Uprates in Nuclear Power Plants

Powerpoint presentation. Background information provided on power plant uprates. Discussion of the current and proposed approaches to power plant uprates. Explanation of what data is used to draft a LAR. Methods such as retrieval augmented generation (RAG) and fine-tuning are discussed. Use case analysis is performed. Different failure types are examined. Conclusions are drawn from the analysis. Future work is proposed.

97 - MATHEMATICS AND COMPUTING↗

Risk Assessment of Hydrogen Production Coupled to Nuclear Power Plants

Presentation slides curated from previous public INL reports & other open references: - Slide 1 from INL homepage www.inl.gov - Slide 2 from MIT report and NEI report (both are publicly available) - Slide 3 from LWRS portal www.lwrs.inl.gov - Slide 4 from H2@Scale portal https://www.energy.gov/eere/fuelcells/h2scale - Slide 6-8 from INL reports: INL/EXT-20-60104, INL/EXT-20-60104 Rev 1, INL/RPT-23-74319 - Slide 9 from an open journal paper - Slide 10-30 from INL open reports INL/RPT-23-74319 and INL/RPT-22-68155

08 HYDROGEN↗

Improving Reliability of Large Language Models for Nuclear Power Plant Diagnostics [Poster]

Large Language Models (LLMs) struggle out of the box when answering factually about detailed questions, especially in domains that are sparsely represented in their training data. This causes hallucinations and reduces reliability making it difficult for them to be used in practice. This work shows that using RAG techniques can improve factual accuracy and reliability, allowing for the application of LLMs in specialized areas, even when those areas that aren’t extensively covered in their initial training.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Improving Reliability of Large Language Models for Nuclear Power Plant Diagnostics Technical Presentation

Large Language Models (LLMs) struggle out of the box when answering factually about detailed questions, especially in domains that are sparsely represented in their training data. This causes hallucinations and reduces reliability making it difficult for them to be used in practice. This work shows that using RAG techniques can improve factual accuracy and reliability, allowing for the application of LLMs in specialized areas, even when those areas that aren’t extensively covered in their initial training.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Panel Session 57: US Nuclear Power Plant Waste Management - US LLW Disposal Issues

This panel focused on senior utility managers discussing specific disposal site issues with the disposal site operators. Representatives from each of the operating commercial disposal sites began by presenting an update of their facility, license, and waste acceptance criteria (WAC) followed by a panel discussion in response to audience questions. Panelists with presentations: Current and Emerging US NRC Regulatory Topics (Joe Weismann); WCS Update (Dan Burns); EnergySolutions Clive Facility Support for US LLW Disposal Issues (Vern C. Rogers)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Markets and Economics for Thermal Power Extraction from Nuclear Power Plants Aiding the Decarbonization of Industrial Processes

This report analyzes the domestic industrial heat markets which may be plausible for using heat extracted from existing LWRs, contributing to the decarbonization of industry. It conceptualizes ideas for a future energy park centered around an LWR with various participating synergistic industries with extensive heat and material integrations with the LWR. It also presents comparison calculations for energy storage options and the levelized cost of heat from an LWR versus the levelized cost of heat from a conventional natural gas boiler and shows under what circumstances heat from LWRs is competitive with and beats natural gas.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Publication and Endorsement of the ASME/ANS Probabilistic Risk Assessment Standard for Advanced Non-Light Water Reactor Nuclear Power Plants

Due to growing interest in non-light water reactor (NLWR) concepts, the predecessor to the American Nuclear Society (ANS)/American Society of Mechanical Engineers (ASME) Joint Committee on Nuclear Risk Management (JCNRM) initiated development of a NLWR probabilistic risk assessment (PRA) standard in 2006. The developed standard, released for trial use in 2013, was the first integral PRA standard created by the JCNRM, containing requirements ranging from the development of initiating events to the analysis of offsite radiological consequence. Based on feedback from pilot applications of the trial standard, a revised version of the standard was developed and balloted in 2020, with unanimous passage by the JCNRM and formal publication as an American National Standards Institute (ANSI) standard in 2021. The paper provides an overview of the standard and its development process. In addition, the paper reviews the latest status of U.S. Nuclear Regulatory Commission endorsement efforts through Regulatory Guide 1.247.

Fleming, K.↗

Dose Rate Effects on Degradation of Nuclear Power Plant Electrical Cable Insulation at a Common Dose

The intent of this report is to address an identified knowledge gap in relating accelerated aging of nuclear electrical cables to service aging: dose rate effects (DRE). Here, DRE refer to gamma radiation-induced polymer degradation being a function of dose rate in addition to total absorbed dose. The concern raised is that historical qualification conducted at higher dose rates to simulate service lifetime may underestimate insulation degradation that occurs at lower dose rates in service. In the work described herein, common nuclear cable insulation materials—cross-linked polyethylene (XLPE) and ethylene propylene diene elastomer (EPDM)—were subjected to accelerated aging at ambient temperature (26°C) at different gamma dose rates of 100, 200 and 1800 Gy/h for select exposure durations to achieve constant total doses of 170, 210 and 300 kGy to evaluate DRE. First, the cable insulation material types investigated are described. Then, the accelerated aging experimental process involving gamma irradiation applied to the insulation specimens at room temperature and different dose rates is discussed. Then, the experimental characterization techniques used to perform this work are elucidated. These include elongation at break (EAB), mass change, yellowness index (YI), carbonyl index (CI), density, indenter modulus (IM), and relaxation constant (t). Theory of polymer degradation is discussed, and characterization results and discussion are provided. Finally, concluding remarks are made. The findings from this work and cited prior work reveal that DRE are material dependent, even between similar material categories (e.g., XLPE). In the case of the EPDM studied, degradation of ductility was observed to be greater at higher dose rate for the same total dose, indicating accelerated gamma aging to be more conservative than extended aging. Thus, conclusions regarding the conservatism of historical qualification likely require additional consideration for specific materials and conditions in question. The results of this study support the contention that, due to inherent limitations and uncertainties associated with prediction of cable remaining useful life from accelerated aging experiments, trending of installed cable insulation health status will be more practical and useful for safe and efficient cable aging management repair and replace decisions than lifetime prediction from historical qualification. The combination of material robustness demonstrated by the qualification process and ongoing monitoring of cable health status combine to provide confidence in continued safe use of existing nuclear cables. Additional research into effective and efficient condition monitoring methods for non-destructive evaluation of installed cables is needed to support aging cable management, including material studies to inform interpretation of measured results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗