Search NASA⌕ Search

SEARCH · Search NASA

Results for “OUTAGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Human Factors Principles in Information Dashboard Design - 278

Refueling outages remain one of the largest opportunities for improving capacity factor and reducing costs available to commercial nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical method currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While methods like this are useful, there is still considerable uncertainty during a typical outage whether bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper is a case study of how new technology, in combination with established human-factors and user-centered design knowledge, can be used to support Outage Control Center (OCC) personnel decision making. In particular, we describe recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the human factors principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy's Advanced Outage Control Center project (AOCC). This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts

nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators.

99 GENERAL AND MISCELLANEOUS↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗

Planning for Seattle at the Convergence of Resilience and Energy

Grid reliability metrics obscure important temporal, spatial, and categorical considerations for increasing energy resilience. Systemwide or feeder-level outage metrics do not identify which kinds of services are affected by outages, where, and for how long. These outage metrics indicate the impacts of outages but cannot measure the consequences to customers that could result from those outages. The consequences of power outages for surrounding community members are caused by disruptions to electricity-dependent critical services, rather than to electricity itself. Power outages can decrease a community's access to healthcare, fuel, safe indoor temperatures, and provisions like food and water. This project developed critical service access, a new consequence-focused resilience metric that quantifies the relative access to critical services provided to households by distribution infrastructure during normal conditions and major disruptions. We use a spatially granular grid analysis that facilitates targeted resilience interventions; dividing feeders into isolatable sections and combining those sections with the critical service access metric allows us to identify where energy improvements like solar-plus-storage microgrids could create the most benefits for community members by protecting access to food, fuel, health, shelter, and public safety services. We identify locations in a South Seattle study area that could be high priorities for resilience investment and summarize their potential neighborhood-scale resilience benefits. This analysis was complemented by direct feedback from study area residents collect through a survey and focus groups. Results can help utilities understand how and where long power outages can create real consequences for customers, set strategic targets based on that understanding, and measure the potential benefits of energy resilience upgrades for more informed decisions.

14 SOLAR ENERGY↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-tlie-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

28 EE - Advanced Manufacturing Office (EE-5A)↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-the-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Chattanooga Electric Power Board Case Study Distribution Automation

In 2009, the U.S. Department of Energy under the American Recovery and Reinvestment Act (ARRA) awarded a grant to the Chattanooga, Tennessee, Electric Power Board (EPB) as part of the Smart Grid Investment Grant Program. The grant had the objective “to accelerate the transformation of the nation’s electric grid by deploying smart grid technologies.” This funding award enabled EPB to expedite the original smart grid implementation schedule from an estimated 10-12 years to 2.5 years. With this funding, EPB invested heavily in distribution automation technologies including installing over 1,200 automated circuit switches and sensors on 171 circuits. For utilities considering a commitment to distribution automation, there are underlying questions such as the following: “What is the value?” and “What are the costs?” This case study attempts to answer these questions. The primary benefit of distribution automation is increased reliability or reduced power outage duration and frequency. Power outages directly impact customer economics by interfering with business functions. In the past, this economic driver has been difficult to effectively evaluate. However, as this case study demonstrates, tools and analysis techniques are now available. In this case study, the impact on customer costs associated with power outages before and after the implementation of distribution automation are compared. Two example evaluations are performed to demonstrate the benefits: 1) a savings baseline for customers under normal operations1 and 2) customer savings for a single severe weather event. Cost calculations for customer power outages are performed using the US Department of Energy (DOE) Interruption Cost Estimate (ICE) calculator2. This tool uses standard metrics associated with outages and the customers to calculate cost impact. The analysis shows that EPB customers have seen significant reliability improvements from the implementation of distribution automation. Under normal operations, the investment in distribution automation has enabled a 43.5% reduction in annual outage minutes since 2012. This has led to an estimated total savings of $26.8 million per year. Examining a single severe weather event3, the distribution automation was able to restore power to 40,579 (nearly 56%) customers within 1–2 seconds and reduce outage minutes by 29.0%. This saved customers an estimated $23.2 million over the course of the storm.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Oak Ridge National Laboratory EAGLE-I TM : Modeling Electric Utility County Customers for Situational Awareness

During natural hazard events (hurricanes, wildfires, earthquakes, etc.) and recent man-made events (e.g., cyber attacks), the exchange of near real-time, spatially refined data within the response community is critical. The EAGLE-I$^{TM}$ platform is one tool that facilitates this data for decision makers within the energy sector. While much information can be collected and integrated into the system directly, other pertinent data must be augmented by other derived data products to enhance the information and allow for a consistent evaluation of on-the-ground conditions. One such data set that requires the addition of other derived data is the electric utility customer outage data that is aggregated to the county level within the EAGLE-I application. Without a county customer data set, outages can only be compared on total counts, which gives greater importance to higher population outages. Including an electric utility customer data set at the county level allows for these outage counts to be converted to percent outages and brings a consistent classification of outages and equal importance to all outages. To achieve this, several available data sets were combined and spatial disaggregation techniques were employed to model customer estimates at the county scale. This paper presents the approach to produce this data for the United States and lessons learned from working with these disparate data sets. Data validation is provided, where possible, and limitations of the model and possible improvements are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Establishing nationwide power system vulnerability index across US counties using interpretable machine learning

Power outages have become increasingly frequent, intense, and prolonged in the US due to climate change, aging electrical grids, and rising energy demand. However, largely due to the absence of granular spatiotemporal outage data, we lack data-driven evidence and analytics-based metrics to quantify power system vulnerability. This limitation has hindered the ability to effectively evaluate and address vulnerability to power outages in US communities. Here, in this work, we collected ∼179 million power outage records at 15-min intervals across 3022 US contiguous counties (96.15 % of the area) from 2014 to 2023. We developed a power system vulnerability assessment framework based on three dimensions (intensity, frequency, and duration) and applied interpretable machine learning models (XGBoost and SHAP) to compute Power System Vulnerability Index (PSVI) at the county level. Our analysis reveals a consistent increase in power system vulnerability across the US counties over the past decade. We identified 318 counties across 45 states as hotspots for high power system vulnerability, particularly in the West Coast (California and Washington), the East Coast (Florida and the Northeast area), the Great Lakes megalopolis (Chicago-Detroit metropolitan areas), and the Gulf of Mexico (Texas). Our heterogeneity analysis indicates that urban counties and those located along regional transmission boundaries tend to exhibit significantly higher vulnerability. Our results highlight the significance of the proposed PSVI for evaluating the vulnerability of communities to power outages. The findings underscore the widespread and pervasive impact of power outages across the country and offer crucial insights to support infrastructure operators, policymakers, and emergency managers in formulating policies and programs aimed at enhancing the resilience of the US power infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid power plants: An effective way of decreasing loss-of-load expectation

Diversifying variable renewable resources by combining wind, solar photovoltaic, and battery assets in a hybrid power plant can increase renewable energy usage efficiency and improve system flexibility, particularly in distributed energy systems. However, the resilience impact of these systems, particularly outage mitigation, can be difficult to quantify due to uncertainty in resource, energy demand, and outage occurrence. Here, this study outlines a framework to quantify the incremental benefit of hybrid power plant assets for reducing loss-of-load expectation during random outage events. Hybrid power plant performance during outages (considering varying duration and severity) is simulated using a Monte Carlo methodology to reflect uncertainty associated with renewable resource, load demand, and outage timing. Results demonstrate the additional incremental value from increasingly hybrid designs, in which relative capacities of wind, solar photovoltaic, and storage assets contribute to lower loss-of-load expectation than the constituent technologies would alone. The value of added wind or solar capacity increases as the plant composition approaches an equal split. The value of added battery capacity depends on the outage duration and severity, but the first 50 MWh of added storage capacity is the most valuable for reducing the loss-of-load expectation for all plant designs.

14 SOLAR ENERGY↗

Availability Assessment Based Case-Sensitive Power System Restoration Strategy

Increasingly frequent severe weather events in recent years threaten the security of power systems and result in major power outages throughout the world. The development of reasonable power system restoration (PSR) solutions is therefore urgently needed to speed up the recovery of the power supply while at the same time steering clear of vulnerable and risky equipment. This paper aims to develop a case-sensitive PSR model for power transmission systems that can adjust restoration solutions according to the evaluated availability of outage equipment in specific blackout scenarios and weather conditions. A novel PSR model that integrates the startup of generating units, formulation of the restoration network, renewable energy sources, and availability assessment of devices is proposed. A reformulated model is also proposed to relieve the computational burden of complex PSR problems. The availability of outage equipment is comprehensively assessed based on historical operating records, fault diagnosis results, and weather conditions. The assessed availability results are sensitive to the characteristics of real blackout cases and will support system operators generate case-sensitive PSR solutions while mitigating the vulnerable equipment. The feasibility and effectiveness of the proposed PSR model and its reformulations are verified through case studies.

availability assessment↗

SPALLOOP

Boiler tubes in steam power plants experience tube blockages due to exfoliation of oxide grown on the inner side of the tubes. In extreme cases, significant tube blockages can lead to forced power plant outages. It is thus desired to predict through modeling the amount of tube blockage in order to inform power plant operators of possible forced outages. SpalLoop solves for the stress-strain equations in an axisymmetric geometry, tracking the stress/strain evolution during boiler operation including outages for the entire boiler tube length. At each operational outage, i.e., temperature excursions down to room temperature, the amount of exfoliated area for the entire tube loop is estimated the amount of tube blockage is predicted based assumed blockage geometry and site. The SpaLLoop code contains modules developed for oxide growth, stress analysis, tube loop geometry, blockage area by taking into account the following phenomena and features, (a) Plant operation schedule with periodic alternate full-load and partial-load regimes and shut-downs, i.e., temperature excursions from high-load to room temperature, (b) axisymmetric formulation for cylindrical tubes, (c) oxide growth in a temperature gradient with multiple oxide layers, (d) geometry of a boiler tube with a single tube loop or two tube loops, (e) temperature variation along the tube length based on hot gas temperature distribution outside the tube and inlet steam temperature, (f) non-uniform oxide growth along the tube length according to the local steam tube temperature, (g) exfoliated area module: at each operational outage considered, the amount of exfoliated area and exfoliated volume along the tube is estimated, (h) blockage module: at each operational outage considered, the exfoliated volume/mass for each tube loop is estimated from which the amount of tube blockage is predicted based on given blockage geometry (length, location, and geometry). The computer program is written in FORTRAN90. Its modular structure was sought for allowing the best flexibility in updating the program by implementing new constitutive equations due to availability of new material property data and/or new physical phenomena.

Sabau, Adrian↗

Integration of equitable resilience metrics into climate-informed electric utility planning processes: phase one

Working together, Sandia National Laboratories, Southern California Edison (SCE) - an Investor-Owned Utility (IOU) - and the California Public Utilities Commission (CPUC) are studying how electric utilities can use equity and resilience metrics to help inform the prioritization and sequencing of resilience-driven infrastructure investments. To this end, this project evaluated “Social Burden,” an equitable resilience metric which measures the potential impact of disruptions in access to non-electric critical services on people and estimates community resilience to these disruptions. The Social Burden was expanded to incorporate SCE’s existing equity metric and applied to evaluate the potential impacts from a range of climate-informed hypothetical outage scenarios developed under SCE’s 2022 Climate Adaptation Vulnerability Assessment. One baseline (“blue-sky”) state and eight different outage scenarios were evaluated to measure the potential impacts of the outages on non-electric infrastructure, critical services, and people. Key findings include: 1) the Social Burden framework is flexible enough to adapt to and build upon existing utility equity and/or resilience metrics, 2) Social Burden results highlight the high degree of non-electric service redundancy within the SCE service area with most (6/8) hypothetical outage scenarios predicted to increase people’s Social Burden by less than 10%; however, 3) access to critical services and people’s ability to obtain them is unequal and spatially clustered, meaning that there are some hypothetical outage scenarios (2/8) that will exert a higher toll on communities directly experiencing the outage as well as some nearby communities with pre-existing vulnerabilities. The report concludes with recommendations for potential use cases of the expanded Social Burden metric and identifies priority follow-on work. Potential use cases may include incorporating equity into IOU’s prioritization of climate resilience investments. Additionally, Social Burden analysis may provide additional data and insights to augment grid planning, potentially by identifying additional needs and/or prioritizing previously identified needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Modeling & Analysis of a Small Hydropower Plant and Battery Energy Storage System Connected as a Microgrid

Puget Sound Energy (PSE) is a utility with headquarters in Bellevue, WA that provides electric and gas service to customers in many regions of western Washington State. PSE is undertaking the implementation of a battery energy storage system pilot project in Glacier, WA, a small town located in the North Cascade Mountains near Mt. Baker Ski Area. Glacier experiences power outages that are both somewhat frequent and lengthy (roughly 2.8 outages per year with a duration of 7.5 hours average). The primary cause of the outages is faults on a long 55 kV transmission line that serves the town of Glacier from the Kendall substation. This approximately 10-mile long line is shown in the upper left of Figure 1 below. The Kendall-Glacier transmission line extends through an area of heavy forest with few reasonable options for increasing the line’s reliability. The substation in Glacier (also shown on figure below) serves over 1000 customers that are mostly residential but includes over 50 small businesses. The town has approximately 250 year-round residents, and a peak in visitors during the winter ski season when storms are also more likely to cause power outages. Figure 1: Proposed Microgrid in Glacier, WA Given the reliability challenges in Glacier, PSE is assessing the feasibility of a 2MW/4.4MWh battery energy storage system (BESS) that would allow for improved reliability. The BESS would also allow for the ability to investigate other applications for utility-scale energy 5 storage. This energy storage system is being considered for operation in “planned islanding” and “microgrid” mode. “Planned islanding” indicates use of the BESS to provide power to part or potentially all of the load in the town of Glacier during an outage. “Microgrid” indicates utilization (during an outage) of the BESS in parallel with Nooksack Falls Hydroelectric Power Plant, a small (nameplate 1.5 MW/2000 HP) hydro power plant less than 10 miles from the town of Glacier. Nooksack is a run-of river small hydro generation plant with a gross head of 226 ft. The site has a 5-foot diameter penstock which enters the powerhouse and goes into a pelton turbine with six runners on one shaft. It was originally constructed by Stone & Webster in 1906, which makes it the second oldest operating power generation facility in Western Washington. It was placed on the National Register of Historic places in December of 1988. The plant operated until 1997 when a fire destroyed the generator. The project continued operations in 2003 after the replacement of the generator and other updates.

13 HYDRO ENERGY↗