Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

High-lift aerodynamics: Trends, trades, and options

The trend toward the utilization of higher maximum lift coefficient with increased aircraft size and cruise velocities is discussed. The impact of this trend on the need for tradeoffs between cruise performance and takeoff, climb, and landing performance is examined. Theoretical methods for the analysis of the two-dimensional characteristics of flap systems are described and compared with experimental data. Four powered-lift concepts are described to outline some of the options currently being developed. Two jet-flap theories are described which provide analytical methods for estimation of the three-dimensional aerodynamic high-lift performance characteristics of powered lift systems.

Margason, R. J.↗

A Titan exploration study: Science, technology and mission planning options, volume 1

Mission concepts and technology advancements that can be used in the exploration of the outer planet satellites were examined. Titan, the seventh satellite of Saturn was selected as the target of interest. Science objectives for Titan exploration were identified, and recommended science payloads for four basic mission modes were developed (orbiter, atmospheric probe, surface penetrator and lander). Trial spacecraft and mission designs were produced for the various mission modes. Using these trial designs as a base, technology excursions were then made to find solutions to the problems resulting from these conventional approaches and to uncover new science, technology and mission planning options. Several mission modes were developed that take advantage of the unique conditions expected at Titan. They include a combined orbiter, atmosphere probe and lander vehicle, a combined probe and surface penetrator configuration and concepts for advanced remote sensing orbiters.

Tindle, E. L.↗

Hydrogen use projections and supply options

Reference and expanded use projections were developed to estimate future hydrogen demand. The rationale in the development of these projections, which estimate the growth of hydrogen usage of approximately 1 X 10 to the fifteenth power Btu in 1973 to approximately 5.5 X 10 to the fifteenth power for reference use and 22 X 10 to the fifteenth power Btu for expanded use projections in year 2000. Primary energy sources required to produce these demands are discussed in the light of transition from a low merchant to high merchant supply option.

Manvi, R.↗

Options for demonstrating the use of solar energy in california buildings

Three programmatic options for demonstrating the most economically attractive applications of solar energy to buildings located in California are formulated. The unique characteristics of solar energy demonstration programs and the involvement of key decision makers are discussed in detail. The demonstration programs are related to specific purposes. The priority structure used to select the generic projects making up each program is discussed in relationship to the purposes of the program. In addition, some implications of the nature of the demonstration program for management are outlined.

Davis, E. S.↗

Photovoltaic power-system options for the manned space construction base

The function of the proposed manned Space Construction Base (SCB) is to provide a permanent manned orbital facility for the construction and operation of a variety of space experiments, ranging from a space-processing development to on-orbit-constructed microwave radiometers and antennas. A typical SCB system might reach initial operational capability in low earth orbit in 1985, have a 10-year mission duration, and have an initial power requirement of 50 kWe. A summary of the requirements imposed by the SCB on the electrical power system (EPS) is presented in a table. Attention is given to EPS options, baseline power platform system operations, an energy storage system evaluation, advanced-technology NiCd batteries and lifetime, and orbital buildup operations.

Mckhann, G. G.↗

Central Computational Facility CCF communications subsystem options

A MITRE study which investigated the communication options available to support both the remaining Central Computational Facility (CCF) computer systems and the proposed U1108 replacements is presented. The facilities utilized to link the remote user terminals with the CCF were analyzed and guidelines to provide more efficient communications were established.

Hennigan, K. B.↗

MCC level C formulation requirements. Entry guidance and entry autopilot, optional TAEM targeting

The level C software formulations requirements for the entry guidance and the simplified autopilot to be used by the Mission Control Center (MCC) entry processor are presented. The modifications required to functionally simulate optional Terminal Area Energy Management (TAEM) targeting capability (OTT) are incorporated. Implementation of this logic in the MCC must be coordinated with flight software OTT implementation and MCC TAEM guidance OTT. The entry guidance logic is based on the orbiter avionics entry guidance software. Descriptions of the entry guidance detailed formulation requirements, the detailed autopilot formulation requirements, and the targeting routine are given. Also included are a definition of coordinate systems, a list of parameter definitions for the software formulations, and a set of formulation flow charts.

Harpold, J. C.↗

Uranus mission options

Options for delivery of Uranus payloads are covered extensively. Launch energy charts are supplied for ballistic trajectories to Uranus for direct, Jupiter gravity-assist, and Saturn gravity-assist missions launching from 1982 to 1995. Both early reconnaissance (flyby) and orbiter missions are considered. Performance charts for low-thrust, Delta Vega, planetary gravity-assist, and combinations of these modes are plotted in terms of net orbited mass and trip time to Uranus. Discussion and illustration of the effects of the unique Uranus system oritentation on Uranus encounter geometry with trajectory arrival date is covered. Example mission designs are characterized for several delivery modes.

Wallace, R. A.↗

Starprobe - The mission and system options

The current science, mission and system concepts of a Starprobe mission to the sun are summarized for a launch in the late 1980s, arriving at the sun in the early 1990s. Gravitational, optical, and plasma scientific experiments have been studied for this mission to 4 solar radii. The necessarily high energy trajectories rely on Jupiter gravity assist as a means to send sufficient payloads to the sun. New spacecraft subsystem technologies are required to support the scientific data acquisition and return from 4 solar radii and are summarized here. A set of mission and system options to reduce mission cost were investigated and are discussed.

Randolph, J. E.↗

TOPEX satellite option study

The basic design of the fleet satellite communication spacecraft (FLTSATCOM) can easily accommodate any of the three payload options for the ocean dynamic topography experiment (TOPEX). The principal mission requirements as well as the payload accommodations and communications systems needed for launching this payload are reviewed. The existing FLTSATCOM satellite design is identified and the approaches for the proposed propulsion system are described in addition to subsystems for mechanical; power; attitude and velocity control; and telemetry, tracking and control are described. The compatability of FLTSATCOM with the launch vehicle is examined and its capabilities vs TOPEX requirements are summarized. Undetermined changes needed to meet data storage, thermal control, and area to mass ratio requirements are discussed. Cost estimates are included for budgetary and planning purposes. The availability of the described design is assessed based on the continuing production of FLTSATCOM spacecraft during the schedule span planned for TOPEX.

Source record↗

Seattle's System for Evaluating Energy Options

In 1975, the City Council developed a blueprint called "Energy 1990" for meeting Seattle's future electric energy needs. Priorities for addressing or offsetting expected growth in demand are in order: (1) conservation; (2) hydroelectricity; (3) other renewable sources such as wind, biomass, solar, and geothermal energy; (4) abundant nonrenewable resources such as coal, and (5) other renewables. An energy resources planning group was formed and a data base was established. Resource options were investigated and the recommendations were published.

Logie, P.↗

Space station needs, attributes and architectural options study. Briefing material: Final review and executive summary

Advantages and disadvantages were assessed for configuration options for a modular 14' diameter space station, a modular aft cargo carrier and a shuttle derived vehicle. Early, intermediate, and mature configurations were defined as well as power requirements, heat rejection, hydrazine usage, and the external scavenging concept. Subsystems were analyzed for propulsion, attitude control, data processing, and communications. Areas of uncertainties, associated costs and benefits, and the cost by phase of the modular and shuttle derived vehicle configurations were identified. Technologies assessed included solar vs nuclear; gravity gradient vs active control; heat pipe radiators vs fluid loops; distributed processors vs centralized, and modular vs shuttle derived configuration. It was determined that the early space station architecture should include: (1) reusable OTV with aerobraking; (2) TMS with telepresence services; (3) OTV/TMS refueling and servicing capability; and (4) attached research laboratories for life sciences and materials processing.

Source record↗

Space Station needs, attributes and architectural options. Volume 2, book 2, part 1: Mission implementation concepts

The overall configuration and modules of the initial and evolved space station are described as well as tended industrial and polar platforms. The mass properties that are the basis for costing are summarized. User friendly attributes (interfaces, resources, and facilities) are identified for commercial; science and applications; industrial park; international participation; national security; and the external tank option. Configuration alternates studied to determine a baseline are examined. Commonality for clustered 3-man and 9-man stations are considered as well as the use of tethered platforms. Requirements are indicated for electrical, communication and tracking; data management Subsystem requirements for electrical, data management, communication and tracking, environment control/life support system; and guidance navigation and control subsystems are identified.

Source record↗

Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

Source record↗