Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRELAUNCH TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Prelaunch processing scientific payloads since Challenger - Lessons learned exercise

The 'lessons learned' process that follows each NASA payload-processing operation is described with attention given to the development of a knowledge base from the results. The process is based on the subjective evaluation of operations problems by test-team members following a mission. The lessons learned from four Space Shuttle missions - STS-26R, -29R, -30R, and -30 - are examined with categorizations of incidents which is based on operational, documentation, hardware, and software categories. Recommendations for ways to address the incidents are categorized similarly, with operational categories such as admonitory, documentation modifications, and support changes. A basic numerical dataset is developed based on the results, and the data show that STS-26R had the highest number of incidents. The process is found to be an effective educational tool in payload-processing operations because it disseminates key individual experiences.

Schuiling, R. L.↗

Manned space flight nuclear system safety. Volume 3: Reactor system preliminary nuclear safety analysis. Part 2: Accident Model Document (AMD)

The Accident Model Document is one of three documents of the Preliminary Safety Analysis Report (PSAR) - Reactor System as applied to a Space Base Program. Potential terrestrial nuclear hazards involving the zirconium hydride reactor-Brayton power module are identified for all phases of the Space Base program. The accidents/events that give rise to the hazards are defined and abort sequence trees are developed to determine the sequence of events leading to the hazard and the associated probabilities of occurence. Source terms are calculated to determine the magnitude of the hazards. The above data is used in the mission accident analysis to determine the most probable and significant accidents/events in each mission phase. The only significant hazards during the prelaunch and launch ascent phases of the mission are those which arise form criticality accidents. Fission product inventories during this time period were found to be very low due to very limited low power acceptance testing.

Source record↗

S-NPP ATMS Instrument Prelaunch and On-Orbit Performance Evaluation

The first of a new generation of microwave sounders was launched aboard the Suomi-National Polar-Orbiting Partnership satellite in October 2011. The Advanced Technology Microwave Sounder (ATMS) combines the capabilities and channel sets of three predecessor sounders into a single package to provide information on the atmospheric vertical temperature and moisture profiles that are the most critical observations needed for numerical weather forecast models. Enhancements include size/mass/power approximately one third of the previous total, three new sounding channels, the first space-based, Nyquist-sampled cross-track microwave temperature soundings for improved fusion with infrared soundings, plus improved temperature control and reliability. This paper describes the ATMS characteristics versus its predecessor, the advanced microwave sounding unit (AMSU), and presents the first comprehensive evaluation of key prelaunch and on-orbit performance parameters. Two-year on-orbit performance shows that the ATMS has maintained very stable radiometric sensitivity, in agreement with prelaunch data, meeting requirements for all channels (with margins of ~40% for channels 1-15), and improvements over AMSU-A when processed for equivalent spatial resolution. The radiometric accuracy, determined by analysis from ground test measurements, and using on-orbit instrument temperatures, also shows large margins relative to requirements (specified as <1.0K for channels 1, 2, and 16-22 and <0.75 K for channels 3-15). A thorough evaluation of the performance of ATMS is especially important for this first proto-flight model unit of what will eventually be a series of ATMS sensors providing operational sounding capability for the U.S. and its international partners well into the next decade.

temperature↗

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. The full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes.

Schwabacher, Mark↗

Fusion of Test and Analysis: Artemis I Booster to Mobile Launcher Interface Validation

NASA is in the midst of bold and exciting next steps in human exploration and spaceflight. The designs of the new Space Launch System (SLS), the Orion spacecraft and the Exploration Ground Systems (EGS) for vehicle processing and launch are essentially complete and there has been significant progress in manufacturing and assembly of specific hardware for the Artemis I and Artemis II missions. Equally as important, the program level and integrated system level testing and analyses are also well underway to support integrated verification, validation, and Certificate of Flight Readiness (CoFR) for Artemis I. Testing and analysis are key to addressing technical challenges faced by the Artemis missions. Building block approaches are required that provide the right balance between component, element, and/or system level testing that satisfies verification and validation objectives where uncertainties are quantified and minimized. Artemis I is a system of systems that requires a fusion of test and analysis that adeptly characterizes critical interfaces between major program elements. An example of this fusion involves characterizing the interface between the SLS booster and the Mobile Launcher (ML) Vertical Support Post (VSP) interfaces. Proper characterization of this interface represents a number of challenges beginning with the fact that it is a mating of ground support structure in the form of a civil structure to flight hardware. Both sides of the interface are built to different construction standards, but are governed by interface requirements to ensure compatibility when mated. From past program experience, the flexibility at the booster to ML interface is critical in developing accurate prelaunch stacking and cryogenic preloads, squat loads, and pad separation release of preloads and squat loads. This same premise holds for Artemis I. To characterize the asymmetric characteristics at this interface, careful consideration of static forces due to gravity loading with the commensurate effects due to leveling during booster stacking (i.e., spacing and shimming) and nonlinear geometric forces are necessary for inclusion in pre-test assessments. This paper will look at these issues for the upcoming Booster Pull Test in which two boosters will be installed on the ML and one of these boosters will undergo static lateral loading followed afterwards with dynamic excitation into resonance and free-decay. This paper evaluates the booster to ML interface characteristics by characterizing the interface flexibility between the booster aft skirt and the ML VSP interfaces. Furthermore, this paper methodically evaluates the effect of the following on the test outcome: gravitational effects on the booster and ML, the effects of VSP leveling, spacing, and shimming under gravitational loading during booster stacking, the effect of geometric nonlinear follower force due to cg offset as booster is laterally displaced, and the system coupling between the booster under test, ML, and the second booster. Simulated results for a static load pull and dynamic excitation provide insight into the differences in measurement responses when boundary conditions and geometric conditions are included and not included.

Joel W Sills Jr.↗

Study and development of a cryogenic heat exchanger for life support systems

A prototype cryogenic heat exchanger for removal of waste heat from a spacecraft environmental control life support system was developed. The heat exchanger uses the heat sink capabilities of the cryogenic propellants and, hence, can operate over all mission phases from prelaunch to orbit, to post landing, with quiescent periods during orbit. A survey of candidate warm fluids resulted in the selection of E-2, a fluorocarbon compound, because of its low freezing point and high boiling point. The final design and testing of the heat exchanger was carried out, however, using Freon-21, which is similar to E-2 except for its low boiling point. This change was motivated by the desire for cost effectiveness of the experimental program. The transient performance of the heat exchanger was demonstrated by an analog simulation of the heat sink system. Under the realistic transient heat load conditions (20 sec ramp from minimum to maximum Freon-21 inlet temperature), the control system was able to maintain the warm fluid outlet temperature within + or - 3 F. For a 20-sec ramp from 0 F to -400 F in the hydrogen inlet temperature, at maximum heat load, the warm fluid outlet temperature was maintained within + or - 7 F.

Soliman, M. M.↗

An Induced Environment Contamination Monitor for the Space Shuttle

The Induced Environment Contamination Monitor (IECM), a set of ten instruments integrated into a self-contained unit and scheduled to fly on shuttle Orbital Flight Tests 1 through 6 and on Spacelabs 1 and 2, is described. The IECM is designed to measure the actual environment to determine whether the strict controls placed on the shuttle system have solved the contamination problem. Measurements are taken during prelaunch, ascent, on-orbit, descent, and postlanding. The on-orbit measurements are molecular return flux, background spectral intensity, molecular deposition, and optical surface effects. During the other mission phases dew point, humidity, aerosol content, and trace gas are measured as well as optical surface effects and molecular deposition. The IECM systems and thermal design are discussed. Preflight and ground operations are presented together with associated ground support equipment. Flight operations and data reduction plans are given.

Miller, E. R.↗

Origin and development of ablator for Space Shuttle external tank

The Space Shuttle External Tank (ET) represents the largest element of the Space Shuttle transportation system. The ET is the fuel tank which contains cryogenic propellants, including liquid oxygen and liquid hydrogen. The task of providing a suitable Thermal Protection System (TPS) which is mass producible for the ET represented a challenge for the aerospace industry. The difficulties were compounded by stringent insulation and ablation requirements for the materials to maintain their integrity over a wide range of operating temperatures during prelaunch and ascent. Attention is given to the configuration of the Space Shuttle system, the configuration of the external tank, the initial ET TPS concept, TPS materials and processes concepts, design rationale, TPS materials structural considerations, material and processes development, development tests, material/process verification, and flight results.

Ronquillo, L.↗

Aeroelastic Ground Wind Loads Analysis Tool for Launch Vehicles

Launch vehicles are exposed to ground winds during rollout and on the launch pad that can induce static and dynamic loads. Of particular concern are the dynamic loads caused by vortex shedding from nearly-cylindrical structures. When the frequency of vortex shedding nears that of a lowly-damped structural mode, the dynamic loads can be more than an order of magnitude greater than mean drag loads. Accurately predicting vehicle response to vortex shedding during the design and analysis cycles is difficult and typically exceeds the practical capabilities of modern computational fluid dynamics codes. Therefore, mitigating the ground wind loads risk typically requires wind-tunnel tests of dynamically-scaled models that are time consuming and expensive to conduct. In recent years, NASA has developed a ground wind loads analysis tool for launch vehicles to fill this analytical capability gap in order to provide predictions for prelaunch static and dynamic loads. This paper includes a background of the ground wind loads problem and the current state-of-the-art. It then discusses the history and significance of the analysis tool and the methodology used to develop it. Finally, results of the analysis tool are compared to wind-tunnel and full-scale data of various geometries and Reynolds numbers.

Ivanco, Thomas G.↗

STS-105 Mission Highlights Resource Tape: Flight Days 1-3

An overview of the STS-105 mission is given through footage of each flight day. Scenes from flight days one through three show activities such as astronaut prelaunch procedures (breakfast, suit-up, and boarding Discovery), the launch from multiple vantage points, and various on-orbit activities. Expedition 3 (E3) Commander Frank Culbertson, Jr. and Flight Engineer Mikhail Turin perform the H-Reflex Experiment, an experiment to test the effects of microgravity on the human spinal cord. As Discovery approaches the International Space Station (ISS), the Expedition 2 (E2) crew, Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms, are seen working in the Destiny Laboratory Module aboard ISS. Discovery docks to the space station and the three crews (STS-105, E2, and E3) greet each other after the hatches between the orbiter and ISS are opened. As Discovery passes over the United States, Utah, Wyoming, South Dakota, and Minnesota are seen through patchy clouds. Footage from flight days 4-13 can be found on 'STS-105 Mission Highlights Resource Tape: Flight Days 4-6' (internal ID 2002046549), 'STS-105 Mission Highlights Resource Tape: Flight Days 7-9' (internal ID 2002046552), and 'STS-105 Mission Highlights Resource Tape: Flight Days 10-13' (internal ID 2002046551).

Source record↗

Progress Towards a 2012 Landsat Launch

The Landsat Data Continuity Mission (LDCM) is on schedule for a December 2012 launch date. The mission is being managed by an interagency partnership between NASA and the U.S. Geological Survey (USGS). NASA leads the development and launch of the satellite observatory while leads ground system development. USGS will assume responsibility for operating the satellite and for collecting, archiving, and distributing the LDCM data following launch. When launched the satellite will carry two sensors into orbit. The Operational Land Imager (OLI) will collect data for nine shortwave spectral bands with a spatial resolution of 30 m (with a 15 m panchromatic band). The Thermal Infrared Sensor (TIRS) will coincidently collect data for two thermal infrared bands with a spatial resolution of 100 m. The OLI is fully assembled and tested and has been shipped by it?s manufacturer, Ball Aerospace and Technology Corporation, to the Orbital Sciences Corporation (Orbital) facility where it is being integrated onto the LDCM spacecraft. Pre-launch testing indicates that OLI will meet all performance specification with margin. TIRS is in development at the NASA Goddard Space Flight Center (GSFC) and is in final testing before shipping to the Orbital facility in January, 2012. The ground data processing system is in development at the USGS Earth Resources Observation and Science (EROS) Center. The presentation will describe the LDCM satellite system, provide the status of system development, and present prelaunch performance data for OLI and TIRS. The USGS has committed to renaming the satellite as Landsat 8 following launch.

Irons, Jim↗

Lidar Technology at the Goddard Laser and Electro-Optics Branch

The Laser and Electro-Optics Branch at Goddard Space flight Center was established about three years ago to provide a focused center of engineering support and technology development in these disciplines with an emphasis on spaced based instruments for Earth and Space Science. The Branch has approximately 15 engineers and technicians with backgrounds in physics, optics, and electrical engineering. Members of the Branch are currently supporting a number of space based lidar efforts as well as several technology efforts aimed at enabling future missions. The largest effort within the Branch is support of the Ice, Cloud, and land Elevation Satellite (ICESAT) carrying the Geoscience Laser Altimeter System (GLAS) instrument. The ICESAT/GLAS primary science objectives are: 1) To determine the mass balance of the polar ice sheets and their contributions to global sea level change; and 2) To obtain essential data for prediction of future changes in ice volume and sea-level. The secondary science objectives are: 1) To measure cloud heights and the vertical structure of clouds and aerosols in the atmosphere; 2) To map the topography of land surfaces; and 3) To measure roughness, reflectivity, vegetation heights, snow-cover, and sea-ice surface characteristics. Our efforts have concentrated on the GLAS receiver component development, the Laser Reference Sensor for the Stellar Reference System, the GLAS fiber optics subsystems, and the prelaunch calibration facilities. We will report on our efforts in the development of the space qualified interference filter [Allan], etalon filter, photon counting detectors, etalor/laser tracking system, and instrument fiber optics, as well as specification and selection of the star tracker and development of the calibration test bed. We are also engaged in development work on lidar sounders for chemical species. We are developing new lidar technology to enable a new class of miniature lidar instruments that are compatible with small Discovery-class orbiters now in the NASA planetary program. The purpose of the lidar is to continuously profile the water vapor and dust in the Mars atmosphere from orbit in order to quantify its dynamics, their relationship in the diurnal cycles, and to infer water vapor exchange with the Mars surface. To remotely measure the water-vapor height profiles, we will use the differential absorption lidar (DIAL) technique. We are also developing a laser sensor for measuring the total column content of CO2 in the atmosphere of the earth. CO2 is the principal greenhouse gas and has increased by roughly 80 ppm in the last century and a half. We will report our efforts in the development of the laser transmitter and photon counting detector components for a Mars Orbiting DIAL system and for the CO2 sounder.

Heaps, William S.↗

Cross-Calibration of Earth Observing System Terra Satellite Sensors MODIS and ASTER

The Advanced Spaceborne Thermal Emissive and Reflection Radiometer (ASTER) and Moderate Resolution Imaging Spectrometer (MODIS) are two of the five sensors onboard the Earth Observing System's Terra satellite. These sensors share many similar spectral channels while having much different spatial and operational parameters. ASTER is a tasked sensor and sometimes referred to a zoom camera of the MODIS that collects a full-earth image every one to two days. It is important that these sensors have a consistent characterization and calibration for continued development and use of their data products. This work uses a variety of test sites to retrieve and validate intercalibration results. The refined calibration of Collection 6 of the Terra MODIS data set is leveraged to provide the up-to-date reference for trending and validation of ASTER. Special attention is given to spatially matching radiance measurements using prelaunch spatial response characterization of MODIS. Despite differences in spectral band properties and spatial scales, ASTER-MODIS is an ideal case for intercomparison since the sensors have nearly identical views and acquisitions times and therefore can be used as a baseline of intercalibration performance of other satellite sensor pairs.

MODIS↗

LANDSAT-2 launch and flight activation. Launch through orbit 50 and orbit adjust operation

The results of the analysis conducted on the telemetry data from the prelaunch, launch, and flight activation phases of LANDSAT-2 spacecraft are presented according to subsystems and interrelationships that exist between subsystems. Subsystem characteristics are included along with the flight evaluation results. Flight data are compared to baseline data established at the 20 C plateau during thermal vacuum testing of the spacecraft. Evaluation guidelines are derived from the specifications developed from the LANDSAT program objectives: (1) acquisition of multispectral images of the surface of the earth; and (2) use of the LANDSAT-2 receiving, frequency translating, and transmitting equipment as a relay system to gather data from fixed earth-based sensor platforms which are operated by individual investigators. Data are presented on the first 50 orbits of the spacecraft.

Source record↗

LANDSAT 9 Thermal Infrared Sensor 2 Spectral Response Test: Updates and Perspective

The Thermal Infrared Sensor 2 (TIRS-2) pre-launch spectral characterization at telescope and detector subsystem level provided a strong indication that the spectral response requirements will be met. Confidence in the validity of these results was strengthened through comparison to component-level measurements. This work reviews the modifications to the test setup to reduce spectral response uncertainties further in preparation for instrument-level testing. We developed a methodology to improve alignment repeatability of the upgraded system. Preliminary indications show that the spectral response will contribute a relatively small amount to the overall TIRS-2 radiometric uncertainty budget, which is expected to meet its radiometric requirements. Through spectral response testing, as part of a comprehensive pre-launch test program, TIRS-2 is expected to achieve the performance necessary for a variety of environmental applications.

spectral response↗

New Global Ocean Color Sensor: OCI on PACE

- OCI will provide TOA radiances at ~1km spatial resolution, from 340nm (315nm?) to 2260nm, hyperspectral from 340nm to 890nm, 2 day global coverage - OCI will continue and enhance NASA’s earth system data records for ocean color (heritage sensors: SeaWiFS, MODIS, VIIRS) - OCI flight unit is close to being ready for testing (planned for March 2022 to September 2022) - OCI ETU (Engineering Test Unit) completed testing summer 2021, results look promising (see next presentation) - On-orbit calibration will combine successful trending approaches from previous sensors (2 solar diffusers, QVD, lunar gain trending, spectral trending) - New calibration approaches for OCI: large QVD, dim diffuser for linearity trending, lunar hysteresis trending - OCI will be characterized prelaunch with an ambitious goal of 0.5% relative uncertainty; absolute uncertainty will be about 2% (before vicarious calibration); expected on-orbit gain trending accuracy is 0.2% or better - More info on PACE and OCI can be found at https://pace.oceansciences.org/

radiometer↗

Advanced GPS Technology For Automated/Autonomous Shuttle Missions

Test flights of a GPS receiver to replace TACAN began in 1996. Each orbiter has one GPS receiver. After RTF, ramp-up to single string GPS use will commence. Endeavour is undergoing TACAN removal and upgrade to three string GPS. GPS is not used for ascent and is powered on prelaunch to support an emergency landing. GPS has limited use for orbital operations and is not used for Rendezvous and docking. GPS will supplement or replace TACAN, but cannot be used as an MLS replacement. GPS enhances Shuttle navigation and improves safety. State-of-the-art GPS receivers have capabilities that would be useful in supporting automated/autonomous missions.

Goodman, John L.↗

Operational support considerations in Space Shuttle prelaunch processing

This paper presents an overview of operational support for Space Shuttle payload processing at the John F. Kennedy Space Center. The paper begins with a discussion of the Shuttle payload processing operation itself. It discusses the major organizational roles and describes the two major classes of payload operations: Spacelab mission payload and vertically-installed payload operations. The paper continues by describing the Launch Site Support Team and the Payload Processing Test Team. Specific areas of operational support are then identified including security and access, training, transport and handling, documentation and scheduling. Specific references for further investigatgion are included.

Schuiling, Roelof L.↗