At least 199 records · Page 11

LSMS–L35, Miniature Crane for Payload Offloading and Manipulation: Development, and Application

The Lightweight Surface Manipulation System (LSMS) is a robotic agent for autonomous surface construction activities on planetary surfaces, that was designed at NASA Langley Research Center and has over a decade of research and development. The LSMS is a key component to achieving many goals of the NASA Artemis program. The LSMS is lightweight, structurally efficient system that can be easily packaged for launch and deployment on-surface, capable of a suite of surface activities enabled by modular end-effectors at the wrist. The focus of recent development work has been on using the LSMS for payload offloading and handling from lunar landers. Discussed in the paper is the development of the LSMS-L35 hardware (35 kg wrist lifting capacity on the lunar surface), designed to integrate with a Commercial Lunar Payload Services (CLPS) lander to offload payloads to the surface. The LSMS-L35 hardware development is part of a larger effort to enable autonomous payload handling and manipulation.

Iok M. Wong↗

Prediction of force and acceleration control spectra for Space Shuttle orbiter sidewall-mounted payloads

The development of force and acceleration control spectra for vibration testing of Space Shuttle (STS) orbiter sidewall-mounted payloads requiresreliable estimates of the sidewall apparent weight and free (i.e. unloaded) vibration during lift-off. The feasibility of analytically predicting these quantities has been investigated through the development and analysis of a finite element model of the STS cargo bay. Analytical predictions of the sidewall apparent weight were compared with apparent weight measurements made on OV-101, and analytical predictions of the sidewall free vibration response during lift-off were compared with flight measurements obtained from STS-3 and STS-4. These analysis suggest that the cargo bay finite element model has potential application for the estimation of force and acceleration control spectra for STS sidewall-mounted payloads.

Hipol, Philip J.↗

The attached payload facility: A technology development facility for International Space Station

An alliance between three constructors was created in order to supply the International Space Station with commercial attached payload services to NASA, other governmental agencies, and commercial customers. This alliance will develop, own, and operate a family of experiment carriers and will provide complete experiment analytical and physical integration for use in the Shuttle payload bay, SPACEHAB module rooftop, and the International Space Station.

Overmyer, Carolyn↗

Payload test philosophy

The implications of STS development for payload testing at the Goddard Space Flight Center are reviewed. The biggest impact of STS may be that instead of testing the entire payload, most of the testing may have to be limited to the subsystem or subassembly level. Particular consideration is given to the Goddard protoflight concept in which the test is geared to the design qualification levels, the test durations being those that are expected during the actual launch sequence.

Arman, A.↗

Real-Time Payload Operations on the International Space Station

This paper will focus on the challenges that Payload Operations have faced as Payload Utilization has evolved over the last three years of real-time experience. Specifically the paper will focus on the planning challenges and the constant battle over program allocation between core systems and payloads, the process of developing and implementing crew training in a centralized location that is being support by a payload development community spread out all over the US, the unique challenges associated with deployed pressurized payload payloads that are not located within an ISPR, and the importance of documenting specific requirements that the payload development community must implement to get through the crew reviews associated with training and procedures. The authors will focus on specific lessons learned and improvements that have been made in both the streamlining of the processes and the associated documentation.

Cissom, Rick D.↗

Integration and Test of Shuttle Small Payloads

Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Integration and Test for Small Shuttle Payloads

Recommended approaches for shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of small shuttle payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of the NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration, and interface testing; and (7) Postflight operations. This paper is of special interest to those payload projects which have small budgets and few resources: That is, the truly 'faster, cheaper, better' projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Community Outreach - Spot Robot Presentation

Los Alamos National Laboratory has recently obtained a Spot robot from Boston Dynamics to evaluate its suitability for work in and around laboratory facilities. Spot is a highly mobile quadruped robot capable of up to 90 minutes of operation. It can be outfitted with payloads up to 35 lbs. and supports both Boston Dynamics developed equipment, third party payloads, or custom developed payloads. One existing Boston Dynamics attachment is a robot arm that allows the robot to directly interact with its environment, open doors, turn valves, etc.

42 ENGINEERING↗

Payload influences on technology development and utilization of the Space Shuttle extravehicular mobility unit

Historical EVA approaches are examined. The considered data emphasize the overall importance of EVA for Shuttle payload operations. Twenty requirement categories related to crew protection, crew performance, and payload protection are listed in a table. Attention is given to a preliminary assessment of payload related requirements, an evaluation of the natural thermal environment in the case of the Shuttle orbiter bay, and the ability of the extravehicular mobility unit (EMU) to protect the crewman from induced or natural radiation as found in the Van Allen radiation belt South Atlantic anomaly. On the basis of the evaluation it appears very likely that design improvements alone can make the EMU meet payload requirements without requiring significant technology advances.

Patrick, J. W.↗

Hardware impacts to software development strategies - The history of the development of the Mars Observer Payload Data Subsystem embedded real-time software

Ways in which parallel hardware development and high level requirements changes have influenced Mars Observer Payload Data Subsystem (PDS) flight software development are discussed. Particular attention is given to ways in which the evolving hardware product and changing requirements have led to repeated modification to software requirements, design, code, and test tools and a delay in the closure of corresponding phases of the software development life cycle. Design and implementation problems which were encountered during the PDS software development effort are described.

Elson, Anne B.↗

Norton-Thevenin Receptance Coupling (NTRC) as a Payload Design Tool

The NASA Engineering and Safety Center (NESC) is funding a study to develop an alternate method for performing coupled loads analysis called Norton-Thevenin Receptance Coupling (NTRC). NTRC combines Receptance Coupling (RC), a frequency-domain synthesis method and Norton-Thevenin (NT) theory, an impedance based approach for simulating the interaction between dynamic systems. The goal of developing the NTRC method is to provide a tool that payload developers can use to reduce the conservatism in defining preliminary design loads, assess the impact of design changes between formal load cycles, and to perform trade studies for design optimization with a minimum amount of data required from the launch vehicle (LV) provider. NTRC also has the ability to perform parametric loads analysis where many different design configurations can be evaluated. This will result in cost and schedule benefits to the payload developer that are currently not possible under the standard coupled loads analysis (CLA) flow where typically only 2-3 official load cycles are performed by the LV provider over the life of a payload program. NTRC is not envisioned as a replacement for the official load cycles performed by the LV provider but rather as a means to address the types of design issues faced by the payload developer before and between official load cycles.The presentation provides an overview of the NTRC methodology and discusses how NTRC can be used to replicate the results from a standard LV CLA. The presentation covers the benchmarking that has been performed as part of the NESC study to demonstrate the accuracy of the technique for both frequency and time domain dynamic analyses. Future plans for benchmarking the NTRC approach against CLA results for NASAs Space Launch System (SLS) and commercial launch vehicles are discussed and the role that NTRC is envisioned to play in the payload development cycle.

Structural Dynamics↗

Remote Advanced Payload Test Rig (RAPTR) Portable Payload Test System for the International Space Station

The RAPTR was developed to test ISS payloads for NASA. RAPTR is a simulation of the Command and Data Handling (C&DH) interfaces of the ISS (MIL-STD1553B, Ethernet and TAXI) and is designed for rapid testing and deployment of payload experiments to the ISS. The ISS's goal is to reduce the amount of time it takes for a payload developer to build, test and fly a payload, including payload software. The RAPTR meets this need with its user oriented, visually rich interface.

De La Cruz, Melinda↗

Spot Robot Staffing Augmentation in Process Modeling and Analysis (E-2) [Slides]

In September 2021 E-2 obtained its first Spot robot from Boston Dynamics to evaluate their suitability for work in and around laboratory facilities. Spot is a highly mobile quadruped robot capable of up to 90 minutes of operation. They can be outfitted with payloads up to 30 pounds and support Boston Dynamics-developed equipment, third party payloads, or custom-developed payloads. The platform showed immediate promise resulting in the procurement of a total of four units by the end of FY22 (Trinity, Gadget, Crossroads, and Sandstone).

42 ENGINEERING↗

Remote Advanced Payload Test Rig (RAPTR) Portable Payload Test System for the International Space Station (ISS)

The RAPTR was developed to test ISS payloads for NASA. RAPTR is a simulation of the Command and Data Handling (C&DH) interfaces of the ISS (MIL-STD 1553B, Ethernet and TAXI) and is designed to facilitate rapid testing and deployment of payload experiments to the ISS. The ISS Program's goal is to reduce the amount of time it takes a payload developer to build, test and fly a payload, including payload software. The RAPTR meets this need with its user oriented, visually rich interface. Additionally, the Analog and Discrete (A&D) signals of the following payload types may be tested with RAPTR: (1) EXPRESS Sub Rack Payloads; (2) ELC payloads; (3) External Columbus payloads; (4) External Japanese Experiment Module (JEM) payloads. The automated payload configuration setup and payload data inspection infrastructure is found nowhere else in ISS payload test systems. Testing can be done with minimal human intervention and setup, as the RAPTR automatically monitors parameters in the data headers that are sent to, and come from the experiment under test.

Calvert, John↗

Electronic collection system for spacelab mission timeline requirements

This paper describes the Functional Objective Requirements Collection System (FORCS) software tool that has been developed for use by Principal Investigators (PI's) and Payload Element Developers (PED's) on their own personal computers to develop on-orbit timelining requirements for their payloads. The FORCS tool can be used either in a totally stand-alone mode, storing the information in a local file on the user's personal computer hard disk or in a remote mode where the user's computer is linked to a host computer containing the integrated database of the timeline requirements for all of the payloads on a mission. There are a number of features incorporated in the FORCS software to assist the user. The user may move freely back and forth between the various forms for inputting the data. Several methods are used to input the information, depending on the type of the information. These methods range from filling in text boxes, using check boxes and radio buttons, to inputting information into a spreadsheet format. There are automated features provided to assist in developing the proper format for the data, ranging from limit checking on some of the parameters to automatic conversion of different formats of time data inputs to the one standard format used for the timeline scheduling software.

Lindberg, James P.↗

The Extension of ISS Resources for Multi-Discipline Subrack Payloads

The EXpedite the processing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette M.↗

EXPRESS Rack: The Extension of International Space Station Resources for Multi-Discipline Subrack Payloads

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette↗

A 20k Payload Launch Vehicle Fast Track Development Concept Using an RD-180 Engine and a Centaur Upper Stage

A launch vehicle concept to deliver 20,000 lb of payload to a 100-nmi orbit has been defined. A new liquid oxygen/kerosene booster powered by an RD-180 engine was designed while using a slightly modified Centaur upper stage. The design, development, and test program met the imposed 40-mo schedule by elimination of major structural testing by increased factors of safety and concurrent engineering concepts. A growth path to attain 65,000 lb of payload is developed.

Toelle, Ronald↗