Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Building Intelligence with Layered Defense Using Security-Constrained Optimization and Security Risk Detection (BUILD-SOS): A Probabilistic Approach

In this project, we employ a layered protection strategy incorporating advanced optimization and detection techniques using a probabilistic approach. The probabilistic approach is not only applied when detecting cyber attacks, but also incorporated in control strategies, which greatly increases the attacking difficulties. Hackers need to understand both probabilistic detection algorithms and uncertainty modeling methods in control in order to execute any effective attacks. The end-to-end solutions enable us to provide Building Intelligence with Layered Defense using Security-Constrained Optimization and Security Risk Detection (BUILD-SOS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Probabilistic physics of failure approach to fusion systems & Risk-efficiency optimization of nuclear co-generation [Slides]

An overview of the progress made towards two separate summer internship projects: a probabilistic physics of failure approach to fusion systems and a risk efficiency optimization of nuclear co-generation. Original version summarized the progress through end of June, and the revision version summarizes the progress through the entire internship to August 1st.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

A quantitative risk assessment framework for fault reactivation in underground hydrogen storage: Coupled simulation and deep learning approach

Underground hydrogen storage (UHS) is emerging as a critical solution for large-scale energy storage. However, like all subsurface fluid injection activities, UHS poses the risk of injection-induced fault reactivation. Accurate risk assessment is essential to ensuring the safety and efficiency of UHS operations. This study presents the development of deep-learning surrogate models for fault reactivation prediction in UHS, trained on a comprehensive database of fully coupled fluid flow-geomechanics simulations. Our findings reveal that analytical models often yield unreliable estimates, with errors up to 54% in the allowable injection pressure, potentially leading to a 40% reduction in UHS operational capacity. The developed surrogate models were incorporated into a quantitative risk assessment (QRA) framework, enabling probabilistic evaluation of fault reactivation risk while accounting for uncertainties in the input variables. Site-specific features, such as horizontal stress gradients, fault’s dip and strike angles, and operational parameters like bottom-hole injection pressure and well-fault distance, were identified as the primary drivers of fault reactivation across various stress regimes. Whereas other hydraulic, geological, and poroelastic reservoir properties were found to have a secondary impact. Notably, we observed that the risk of fault reactivation for a critically oriented fault with a static friction coefficient greater than 0.55 remains below 10% in a normal faulting stress regime. However, the risk significantly increases as the stress regime transitions from normal to strike-slip and ultimately to reverse faulting conditions. These findings underscore the importance of rigorous site characterization and comprehensive QRA evaluations to optimize UHS performance and minimize geomechanical risks.

25 ENERGY STORAGE↗

Surrogate Modeling For Efficiently Accurately and Conservatively Estimating Measures of Risk

We present a surrogate modeling framework for conservatively estimating measures of risk from limited realizations of an expensive physical experiment or computational simulation. We adopt a probabilistic description of risk that assigns probabilities to consequences associated with an event and use risk measures, which combine objective evidence with the subjective values of decision makers, to quantify anticipated outcomes. Given a set of samples, we construct a surrogate model that produces estimates of risk measures that are always greater than their empirical estimates obtained from the training data. These surrogate models not only limit over-confidence in reliability and safety assessments, but produce estimates of risk measures that converge much faster to the true value than purely sample-based estimates. We first detail the construction of conservative surrogate models that can be tailored to the specific risk preferences of the stakeholder and then present an approach, based upon stochastic orders, for constructing surrogate models that are conservative with respect to families of risk measures. The surrogate models introduce a bias that allows them to conservatively estimate the target risk measures. We provide theoretical results that show that this bias decays at the same rate as the L 2 error in the surrogate model. Our numerical examples confirm that risk-aware surrogate models do indeed over-estimate the target risk measures while converging at the expected rate.

97 MATHEMATICS AND COMPUTING↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

Probabilistic Groundwater Modeling of the RDX Plume at Los Alamos National Laboratory to Support Risk Assessment - 20359

A plume of the contaminant hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) with concentrations greater than the New Mexico tap water drinking standard (9.66 ppb) is present in the regional aquifer near the southwestern boundary of Los Alamos National Laboratory (LANL). A risk assessment is performed for exposure to regional aquifer groundwater, with long-term predictions of RDX concentrations provided by a calibrated, probabilistic, numerical fate and transport model. The structure of the model is hierarchical, with the RDX Regional Aquifer (RA) groundwater model acting as the primary tool for analysis of downgradient RDX concentrations. The RA model is deeply informed by the conceptual site model (CSM) and is calibrated using site RDX concentration data and hydraulic head measurements, along with other analyses. The model is calibrated using data through December 2019. Where data are scarce other lines of evidence are used to inform inputs, including the multiphase RDX Vadose Zone (VZ) model and Pipe and Disk analytical screening tool. Model inputs are described with informative prior distributions using a robust approach to development that incorporates all available lines of evidence for every parameter used as an input to the RA model. Calibration is performed using a classical nonlinear optimization routine, which is then used to initialize a Bayesian calibration. The Bayesian calibration constrains the uncertainty in the classical calibration, ultimately providing posterior distributions for all model parameters. The challenges of the calibration include high-dimensional parameter space, including spatially heterogeneous hydraulic conductivities, comparatively sparse data, and low RDX concentrations. Posterior parameter distributions developed in the calibration process are then used for stochastic predictive model runs into the future. The result of the forward runs is spatially and temporally explicit estimates of head and concentration with uncertainty at all points in space and time. The probabilistic modeling approach presented here includes innovative computational and statistical methods that leverage high-performance computing (HPC) resources. It makes use of prior modeling work performed at the chromium plume site in the central LANL area, with extensive updates. The risk assessment will ultimately be used to support decision-making at the site, using multiple appropriately weighted sources of information, as well as uncertainty, sensitivity, and value-of-information analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

Wildfire Risk Evaluation Framework for Grid Operations and Planning

The United States (US) environmental protection agency's (EPA's) climate change indicators for wildfires show a long-term trend of increased annual wildfire activity, larger wildfire size, and more variable dynamics in wildfire behavior. This has caused more frequent preemptive public safety power shutoff (PSPS) events in the regions with recognized high wildfire risk. These preemptive power shutoffs attempt to prevent the ignition of a wildfire but it nonetheless renders the transmission line non-operational, which often sheds load of downstream communities. As wildfires and PSPS events become more frequent, it is crucial to find the communities most at risk of load shedding. To that end, this paper proposes the wildfire risk evaluation of the system (WiRES) framework, which is a performance-based framework that translates extreme weather-related and PSPS event probabilities into a cumulative probability of a non-operational transmission line. This study also provides a geospatial visualization tool that breaks down the entire western electrical coordinating council (WECC) region into 50 km grid cells which can be used to 1) filter out transmission lines with higher than a threshold outage probability, and 2) graphically discover the affected regions and their biophysical and socioeconomic metrics. %such as the social vulnerability index, population density, gross domestic product, etc. Lastly, an impact assessment study is conducted which connects the results of the proposed framework to python and powerworld-based contingency analysis to highlight the applicability of the framework.

Wildfire, Resilience, Extreme Events, Grid Reslien↗

NRAP-Open-IAM: NRAP Open Source Integrated Assessment Model

Note: This is the last version (a2.6.1) of NRAP-Open-IAM released during NRAP Phase II in 2022. The latest version of NRAP-Open-IAM is available here: https://edx.netl.doe.gov/dataset/phase-iii-nrap-open-iam NRAP-Open-IAM is an open-source software product that enables quantification of containment effectiveness and leakage risk at storage sites in the context of system uncertainties and variability. NRAP-Open-IAM represents the next-generation in a line of systems-based computational models developed for quantitative geological carbon storage (GCS) risk assessment. The model comprises a set of reduced-order and analytical models of various components of the GCS system, potential leakage pathways, receptors of concern including impact to groundwater resources and the atmosphere, a framework to support stochastic simulation, time stepping, uncertainty quantification, other analytical functionality for scenario and risk-performance evaluation, and a basic graphical user interface to support scenario development, data input simulation definition, and basic post-processing and results display. As the NRAP Open-IAM functionality continues to evolve, we continue to add to its capability to develop quantitative, probabilistic, and time-dependent profiles of the evolution of risk at a GCS site and evaluate the influence of uncertain parameters on uncertainty in predicted risk. It can be used to quantify the dynamics of reservoir saturation plume and pressure-affected area, for evaluation of the area of potential groundwater impact (i.e., Area of Review) and monitoring requirements to support cost and regulatory analysis, and for consideration of different post-injection site care and closure scenarios. This submission contains the current version of NRAP-Open-IAM available for evaluation and testing. To use the NRAP-Open-IAM, download the source code (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/4c24a3da-3b40-4ffe-9892-c807ae9f8760) then open the NRAP-Open-IAM user's guide (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669) to read more about the tool. Installation instructions for Windows, Mac, and Linux can be found in the "installers" folder of the extracted NRAP-Open-IAM folder and describe setup of environment (e.g., Python libraries) needed for proper work of the tool. Test of installation can be done by running "python openiam_setup_tests.py" in the "setup" folder. The installation test also runs a test suite to see if the NRAP-Open-IAM has been installed correctly. To run the test suite separately, run "python iam_test.py" in the "test" folder. User's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669 Developer's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/3bc6ee7d-609d-4eb6-80ba-fa6130ee0313 Reservoir simulation data used in some examples distributed with NRAP-Open-IAM: - Kimberlina: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/eb62cece-61b2-4037-9b6d-32407dde2ab8 - Kimberlina (compartmentalized): https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/366f9530-3b32-4b84-affe-ab2df1d9a8b5 - FutureGen 2.0: https://edx.netl.doe.gov/dataset/futuregen-2-0-1008-simulation-reservoir-lookup-table NRAP-Open-IAM GitLab repository: https://gitlab.com/NRAP/OpenIAM Related publications: - Bacon, D., Yonkofski, C., Brown, C., Demirkanli, D. and Whiting, J., 2019. Risk-based post injection site care and monitoring for commercial-scale carbon storage: Reevaluation of the FutureGen 2.0 site using NRAP-Open-IAM and DREAM. International Journal of Greenhouse Gas Control 90: 102784. - Bacon, D. Demirkanli, D., and White, S., 2020. Probabilistic risk-based Area of Review (AoR) determination for a deep-saline carbon storage site. International Journal of Greenhouse Gas Control 102: 103153. - Harp, D., Oldenburg, C., and Pawar, R., 2019. A metric for evaluating conformance robustness during geologic CO2 sequestration operations. International Journal of Greenhouse Gas Control 85: 100-108. - Lackey, G., Vasylkivska, V., Huerta, N., King, S., and Dilmore, R., 2019. Managing well leakage risks at a geologic carbon storage site with many wells, International Journal of Greenhouse Gas Control, 88 :182-194. - Vasylkivska, V., Dilmore, R., Lackey, G., Zhang, Y., King, S., Bacon, D., Chen, B., Mansoor, K., and Harp, D., 2021. NRAP-Open-IAM: A flexible open-source integrated assessment model for geologic carbon storage risk assessment and management, Environmental Modelling & Software, 143: 105114. Presentations: - Chen, B., Harp, D., and Pawar, R., A data assimilation approach (ES-MDA) coupling with NRAP-Open-IAM for quantifying uncertainty reduction in geological CO2 sequestration. AGUFM 2019: T44A-02. - Chen, B., and Harp, D., Improving risk analysis precision for geologic CO2 sequestration by quantifying the uncertainty reduction before and after acquiring monitoring data. 14th Greenhouse Gas Control Technologies Conference, Melbourne, Australia, 2018, pp. 21-26. - Harp, D., National Risk Assessment Partnership Task 2: Containment Assurance. No. LA-UR-19-28654, Los Alamos National Laboratory (LANL), Los Alamos, NM (United States), 2019. - Vasylkivska, V., King, S., Bacon, D., Harp, D., Chen, B., Mansoor, K., Onishi, T., Yang, Y., Zhang, Y., and Keating, E., NRAP-Open-IAM: An open-source integrated assessment model, poster, Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting, Pittsburgh, PA, August 13-16, 2018. - Vasylkivska, V., Lackey, G., King, S., Wentworth, A., Huerta, N., Creason, C., DiGiulio, J., Yang, Y., and Dilmore, R., Long-term risk analysis of a geologic CO2 storage project during the post-injection period, SIAM Conference on Computational Science and Engineering, Spokane, WA, February 25-March 1, 2019. - Vasylkivska, V., Overview of the NRAP-Open-IAM tool for carbon storage (beta release), 2019 Annual NRAP Tool Users Meeting, Pittsburgh, PA, August 27, 2019. - Vasylkivska, V., Bacon, D., Chen, B., Dilmore, R., Harp, D., King, S., Lackey, G., Lindner, E., Liu, G., Mansoor, K. and Zhang, Y., NRAP-Open-IAM: A new, open-source code for integrated assessment of geologic carbon storage containment effectiveness and leakage risk, poster, American Geophysical Union Fall Meeting 2020 (virtual meeting), December 2020. - Vasylkivska, V., NRAP open-source integrated assessment model and relevant application, oral presentation, NRAP workshop "NRAP Tools for Geologic Carbon Storage Risk-Based Decision Making" held in conjunction with Groundwater Protection Council (GWPC) 2021 Annual Forum (virtual meeting), Salt Lake City, UT, September 2021. - Vasylkivska, V., NRAP-Open-IAM: open-source integrated assessment model, digital poster/demonstration, software demonstration session, 2022 Carbon Management Project Review Meeting, August 16, 2022

AoR↗

Probabilistic Solar Power Forecasting Using Bayesian Model Averaging

There is rising interest in probabilistic forecasting to mitigate risks from solar power uncertainty, but the numerical weather prediction (NWP) ensembles readily available to system operators are often biased and underdispersed. We propose a Bayesian model averaging (BMA) post-processing method suitable for forecasting power from utility-scale photovoltaic (PV) plants at multiple time horizons up to at least the day-ahead timescale. BMA is a kernel dressing technique for NWP ensembles in which the forecast is a weighted sum of member-specific probability density functions. We tailor BMA for utility-scale PV forecasting by modeling power clipping at the AC inverter rating and advance the theory of BMA with a new beta kernel parameterization that accommodates theoretical constraints not previously addressed. BMA is demonstrated for a case study of 11 utility-scale PV plants in Texas, forecasting at hourly resolution for the complete year 2018. BMA's mixture-model approach mitigates underdispersion of the raw ensemble to significantly improve forecast calibration, while consistently outperforming an ensemble model output statistics (EMOS) parametric approach from the literature. At 4-hour lead time, the BMA post-processing achieves continuous ranked probability skill scores of 2--36% over the raw ensemble, with consistent performance at multiple lead times suitable for power system operations.

14 SOLAR ENERGY↗

Risk assessment of wellbore leakage during underground hydrogen storage

The expansion of renewable energy sources would require large-scale energy storage options to overcome the intermittent nature of these sources. Underground hydrogen storage (UHS) in depleted hydrocarbon reservoirs offers a scalable and practical energy storage solution. These reservoirs are chosen for their availability and large capacity, but the unique properties of hydrogen raise concerns about potential leakage pathways, particularly through wellbores. In this study, we develop and apply, for the first time, reduced-order models (ROMs) specifically designed for efficient leakage risk prediction in UHS systems operating in depleted hydrocarbon reservoirs. Using 3,000 high-fidelity simulation scenarios, we examine the influence of 11 key parameters, including reservoir and aquifer depths, wellbore permeability and porosity, initial saturations of water, oil and gas fractions (hydrogen, light, intermediate, and heavy hydrocarbons), reservoir pressure multiplier, and the aquifer-to-reservoir volume ratio, to simulate leakage behavior over a 1,000-year timescale. We train ROMs using a two-step classification-regression approach, achieving R 2 values exceeding 99 % across all targets. These ROMs effectively capture the leakage evolution and identify critical controls of leakage, guiding the design of mitigation strategies. Results indicate that gas leakage occurs in about 27 % of scenarios as early as five years post-operation, reaching volumes of up to 106 ft3. Oil leakage is less frequent (~17 %) and typically begins decades later. Our findings also show that hydrogen often migrates first, owing to its smaller molecular size and higher buoyancy, followed by heavier hydrocarbons. Over time, these heavier components contribute significantly to the total leaked volume, reinforcing the need for targeted monitoring and remediation strategies. Our analysis highlights that deeper storage reservoirs, shallower aquifers, and low-permeability wellbores significantly reduce leakage risks. In conclusion, this work offers a robust framework for risk-informed UHS deployment, supporting energy security through reliable large-scale hydrogen storage while safeguarding environmental integrity.

08 HYDROGEN↗

Operating Dynamic Reserve Dimensioning Using Probabilistic Forecasts

The rapid integration of variable energy sources (VRES) into power grids increases variability and uncertainty of the net demand, making the power system operation challenging. Operating reserve is used by system operators to manage and hedge against such variability and uncertainty. Traditionally, reserve requirements are determined by rules-of-thumb (static reserve requirements, e.g., NERC Reliability Standards), and more recently, dynamic reserve requirements from tools and methods which are in the adoption process (e.g., DynADOR, DRD, and RESERVE, among others). While these methods/tools significantly improve the static rule-of-thumb approaches, they rely exclusively on deterministic data (i.e., best guess only). Consequently, these methods disregard the probabilistic uncertainty thresholds associated with specific days and their weather conditions (i.e., best guess plus probabilistic uncertainty). This work presents practical approaches to determine the operating reserve requirements leveraging the wealth information from probabilistic forecasts. Proposed approaches are validated and tested using actual data from the CAISO system. Furthermore, results show the benefits in terms of risk reduction of considering the probabilistic forecast information into the dimensioning process of operating reserve requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Estimating the Likelihood of GHG Concentration Scenarios From Probabilistic Integrated Assessment Model Simulations

The climate scenarios that form the basis for current climate risk assessments have no assigned probabilities, and this impedes the analysis of future climate risks. This paper proposes an approach to estimate the probability of carbon dioxide (CO 2 ) concentration scenarios used in key climate change modeling experiments. It computes the CO 2 emissions compatible with the concentrations prescribed by Coupled Model Intercomparison Project Phase 5 (CMIP5) and CMIP6 experiments. The distribution of these compatible cumulative emissions is interpreted as the likelihood of future emissions given a concentration pathway. Using Bayesian analysis, the probability of each pathway can be estimated from a probabilistic sample of future emissions. The approach is demonstrated with five probabilistic CO 2 emission simulation ensembles from four Integrated Assessment Models (IAM), leading to independent estimates of the likelihood of the CO 2 concentration of Representative Concentration Pathways (RCP) and Shared Socioeconomic Pathways (SSP). Results suggest that SSP5-8.5 is unlikely for the second half of the 21st century, but offer no clear consensus on which of the remaining scenarios is most likely. Estimates of likelihoods of CO 2 concentrations associated with RCP and SSP scenarios are affected by sampling errors, differences in emission sources simulated by the IAMs, and a lack of a common experimental framework for IAM simulations. These shortcomings, along with a small IAM ensemble size, limit the applicability of the results presented here. Novel joint IAM and the Earth System Model experiments are needed to deliver actionable probabilistic climate risk assessments.

54 ENVIRONMENTAL SCIENCES↗

Risk-Informed Condition Evaluation of Solar-centered Energy Generation and Distribution Networks through Bayesian Learning and Inference

We develop a methodology based on Bayesian inference over Probabilistic Graphical Models (PGMs) to understand and quantify risk in solar-centered grids using targeted measurements and learned system behavior. Being non-prescriptive but, rather, able to infer system behavior and, ultimately, address risk queries from data, our machine learning-type paradigm is tailored for diverse topologies and threat scenarios often associated with distributed energy generation and photovoltaic distributed energy resources (PV-DERs) in particular. We describe algorithmic processes for: (i) learning the structure of PGMs that result from attack-prone PV-DER-proliferated distribution systems, (ii) quantifying cause-effect relationships, and (iii) evaluating risk queries based on diverse evidence. The contributions are illustrated on a residential grid subject to output impairment attacks on its PV-DER infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗