Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

Upgrade of the NASA 4STAR (Spectrometer for Sky-Scanning, Sun-Tracking Atmospheric Research) to its Full Science Capability of Sun-Sky-Cloud-Trace Gas Spectrometry in Airborne Science Deployments

The objectives of this task in the AITT (Airborne Instrument Technology Transition) Program are to (1) upgrade the NASA 4STAR (Spectrometer for Sky-Scanning, Sun-Tracking Atmospheric Research) instrument to its full science capability of measuring (a) direct-beam sun transmission to derive aerosol optical depth spectra, (b) sky radiance vs scattering angle to retrieve aerosol absorption and type (via complex refractive index spectra, shape, and mode-resolved size distribution), (c) zenith radiance for cloud properties, and (d) hyperspectral signals for trace gas retrievals, and (2) demonstrate its suitability for deployment in challenging NASA airborne multiinstrument campaigns. 4STAR combines airborne sun tracking, sky scanning, and zenith pointing with diffraction spectroscopy to improve knowledge of atmospheric constituents and their links to air pollution, radiant energy budgets (hence climate), and remote measurements of Earth's surfaces. Direct beam hyperspectral measurement of optical depth improves retrievals of gas constituents and determination of aerosol properties. Sky scanning enhances retrievals of aerosol type and size distribution. 4STAR measurements are intended to tighten the closure between satellite and ground-based measurements. 4STAR incorporates a modular sun-tracking/sky-scanning optical head with fiber optic signal transmission to rack mounted spectrometers, permitting miniaturization of the external optical head, and future detector evolution. 4STAR test flights, as well as science flights in the 2012-13 TCAP (Two-Column Aerosol Project) and 2013 SEAC4RS (Studies of Emissions and Atmospheric Composition, Clouds and Climate Coupling by Regional Surveys) have demonstrated that the following are essential for 4STAR to achieve its full science potential: (1) Calibration stability for both direct-beam irradiance and sky radiance, (2) Improved light collection and usage, and (3) Improved flight operability and reliability. A particular challenge for the AITT-4STAR project has been conducting it simultaneously with preparations for, and execution of, ARISE (Arctic Radiation - IceBridge Sea&Ice Experiment), a NASA airborne science deployment (unplanned when AITT-4STAR was selected for funding) in which 4STAR will deploy to Thule, Greenland, and Fairbanks, Alaska, on the NASA C- 130. This presentation describes progress to date in accomplishing AITT-4STAR goals, and plans for project completion.

Sun-Sky-Cloud-Trace↗

Advances in Discrete-Event Simulation for MSL Command Validation

In the last five years, the discrete event simulator, SEQuence GENerator (SEQGEN), developed at the Jet Propulsion Laboratory to plan deep-space missions, has greatly increased uplink operations capacity to deal with increasingly complicated missions. In this paper, we describe how the Mars Science Laboratory (MSL) project makes full use of an interpreted environment to simulate change in more than fifty thousand flight software parameters and conditional command sequences to predict the result of executing a conditional branch in a command sequence, and enable the ability to warn users whenever one or more simulated spacecraft states change in an unexpected manner. Using these new SEQGEN features, operators plan more activities in one sol than ever before.

discrete event simulation↗

Monitoring Avian Productivity and Survivorship at the Sandia Wetlands at Los Alamos National Laboratory (2014-2019)

Biologists at Los Alamos National Laboratory completed six years (2014–2019) of demographic monitoring of passerines (songbirds) during the breeding season in Los Alamos, New Mexico. We captured songbirds at a mist netting station located in the Sandia Wetlands in Sandia Canyon (Technical Areas 60 and 61). We identified, measured, and then banded captured birds with federal migratory bird bands. Banding operations took place between May and August of each year, with 10 mist netting sessions annually. We conducted this project as part of the implementation of the Biological Resources Management Plan. The project complies with the 2013 Memorandum of Understanding between the United States Fish and Wildlife Service (USFWS) and the United States Department of Energy regarding the implementation of Executive Order 13186. The overall number of birds and species captured was variable, and we saw no decreases over the course of six years in bird species diversity, abundance, or the percentage of breeding birds. Our results indicate that the Sandia Wetlands support numerous species of breeding birds, including species of conservation concern. We did not see a declining trend for the top 10 most-captured species or for any of the species of conservation concern over time; however, we need more years of data to make robust conclusions about population trends through time. Our results indicated that adult recapture rates at the Sandia Wetlands are at least twice as low when compared with estimated adult survival in migratory passerines from peer-reviewed literature. We also did not recapture any birds that were banded as juveniles in subsequent years throughout the entire six-year period. Low recapture rates for adults and the non-existent recapture rates for juveniles should be explored further. To accurately assess individual species survival rates for adults and juveniles using mark-recapture models, we need a longer dataset, which would allow for a more robust analysis.

59 BASIC BIOLOGICAL SCIENCES↗

Remote sensing procurement package: A management report for state and local governments

An overview of the remote sensing procurement process is presented for chief executives, senior administrators, and other local and state officials responsible for purchasing remote sensing products, services, or equipment. Guidelines are provided for planning, organizing, staffing, and implementing such a procurement project. Other sections of the four-volume package are described and their benefits examined.

Source record↗

Building a Decommissioning Army - 19259

It is safe to say that Canada has, for the greater part, seen the end of large-scale commercial nuclear new build projects. In spite of a renaissance in the last decade, and the fact that nuclear is now widely viewed by many as the original green energy, refurbishment projects both underway and scheduled will likely be the last of the megaprojects. In a sense, the future of large-scale nuclear power generation is the end of large scale nuclear power generation. Just as the construction and operation of these facilities has, for decades, employed scores of highly skilled workers, so too will the decommissioning process. Today, Canadian decommissioning activities are first-of-kind (FOAK)projects. There are very few experts in the field and certainly no plan in place to educate and prepare the numbers of workers we will need to safely and successfully execute the programs. It is to this end that I propose a national education centre be created to recruit, educate and mobilize all manner of professionals needed to meet this challenge. In an effort to meet the human and technological needs of the industry in the future, I propose the development of a Canadian Institute where the students study and learn how to decommission a nuclear power plant. The student body of the institute would comprise graduate students with backgrounds in a wide variety of studies such as engineering, physics, chemistry, commerce, environmental studies, and communications. Collectively, their time spent at the institute shall not only prepare them for a career in nuclear but will also vastly improve the technical readiness level of the Canadian nuclear industry to transition from large-scale nuclear utilities to a future of small modular reactors (SMRs) and renewable energy resources. Staff at the institute would be selected from leaders in the industry -those who have shown a passion for nuclear and have demonstrated innovative problem solving and leadership. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reduced Contracting Time To Accelerate Construction: A Streamlined Approach for Speed and Scale

In the fast-paced construction world, efficiency isn't just an advantage - it's a necessity. By implementing the Cooperative Construction Contracting Agreement (CCCA), we are transforming how we approach major projects, replacing traditional multistep contracting with a streamlined, one-step process. This innovative contracting approach saves valuable time and resources, enabling us to accelerate delivery across our portfolio of projects. Under the old model, each construction phase required separate competitive solicitations for design, build, and other services. With the CCCA, we've consolidated these steps, working with a trusted partner from start to finish. This results in significant time savings that translate into faster project execution without compromising quality or safety.

collaborative partnerships↗

Review of NASA's Planned Mars Program

Contents include the following: Executive Summary; Introduction; Scientific Goals for the Exploration of Mars; Overview of Mars Surveyor and Others Mars Missions; Key Issues for NASA's Mars Exploration Program; and Assessment of the Scientific Potential of NASA's Mars Exploration Program.

MARS EXPLORATION↗

Gen 3 Particle Pilot Plant (G3P3) Life Cycle Management Plan (SAND report)

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Life Cycle Management Plan (LCMP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant (G3P3). This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished.

14 SOLAR ENERGY↗

Final Review of FY23 ASC ATDM L2 Milestone, MRT #8541, ATDM Multiphysics Scaling on EAS-3

As displayed in the FY23 ASC Implementation Plan (IP) and the Milestone Reporting Tool (MRT), the milestone description and completion criteria state: Demonstrate the capability to execute mission-relevant calculations with a multiphysics code from the Ristra project at scale on the pre-El Capitan Early Access System 3 (EAS-3). These calculations must use the GPU hardware available on EAS-3, the AMD MI-250s, to achieve any reasonable performance.

97 MATHEMATICS AND COMPUTING↗

Planning and scheduling lessons learned study, executive summary

The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

Robinson, Toni↗

The Hubble Space Telescope servicing missions: Past, present, and future operational challenges

The Hubble Space Telescope (HST) is a complex spacecraft designed to conduct leading edge scientific observations over a planned fifteen year mission lifetime. It was designed for servicing by the Space Shuttle to upgrade systems, replace failed components, and boost into a higher orbit. There are many operational challenges that must be addressed in preparing for and executing a Servicing Mission (SM) which range from both technical to managerial issues. This paper will be exploring the operational challenges faced by the HST Operations and Ground System Project in supporting the First Servicing Mission (FSM) and future Servicing Missions. We give special emphasis to those areas that helped ensure mission success. These areas include training, testing, and contingency planning.

William R Ochs↗

The NASA ISRO SAR (NISAR) Mission - Validation of Science Measurement Requirements

The NASA ISRO Synthetic Aperture Radar (NISAR) is scheduled for launch early in 2024 from the Satish Dhawan Space Centre (SDSC), at Sriharikota, near Chennai, India. This mission is the result of a collaboration between NASA and Indian Space Research Organization (ISRO), where NASA has contributed elements of the mission such as an L-band SAR, and ISRO has contributed other elements, such as an S-band SAR. After successful launch, the NISAR mission will collect left-looking L-band SAR data over most of the Earth’s land areas twice during every 12-day exact repeat orbit. (once while in an ascending orbit direction and once while in a descending orbit direction). NASA and ISRO have individual and joint requirements on the mission that include the performance of the imaging radars onboard the spacecraft. For example, NASA must demonstrate that this L-band SAR will achieve a set of identified science measurement accuracy requirements that span Ecosystem science, Solid Earth science, and Cryosphere science disciplines. Likewise, ISRO has several applications objectives on both the L-band and S-band data from NISAR that the ISRO science team and project will be developing and testing. Pre-launch and post-launch activities have been planned to validate that these requirements are met. Here, we will discuss how the NASA plans are being executed and will present any initial results at the conference.

Chapman, Bruce↗

Hubble Space Telescope On-orbit NiH2 Battery Performance

This paper summarizes the Hubble Space Telescope (HST) nickel-hydrogen (NiH2) battery performance from launch to the present time. Over the life of HST vehicle configuration, charge system degradation and failures together with thermal design limitations have had a significant effect on the capacity of the HST batteries. Changes made to the charge system configuration in order to protect against power system failures and to maintain battery thermal stability resulted in undercharging of the batteries. This undercharging resulted in decreased usable battery capacity as well as battery cell voltage/capacity divergence. This cell divergence was made evident during on-orbit battery capacity measurements by a relatively shallow slope of the discharge curve following the discharge knee. Early efforts to improve the battery performance have been successful. On-orbit capacity measurement data indicates increases in the usable battery capacity of all six batteries as well as improvements in the battery cell voltage/capacity divergence. Additional measures have been implemented to improve battery performance, however, failures within the HST Power Control Unit (PCU) have prevented verification of battery status. As this PCU fault prevents the execution of on-orbit capacity testing, the HST Project has based the battery capacity on trends, which utilizes previous on-orbit battery capacity test data, for science mission and servicing mission planning. The Servicing Mission 38 (SM-3B) in March 2002 replaced the faulty PCU. Following the servicing mission, on-orbit capacity test resumed. A summary of battery performance is reviewed since launch in this paper.

Rao, Gopalakrishna M.↗

Carbon Capture from ArcelorMittal Hot Briquetted Iron Plant Using Air Liquide Cryocap™ FG Technology – FEED Study

The process of steel production is energy and carbon intensive with global average energy consumption of 5.5 MWh/tonne of steel and CO2 emission intensity of 1.83 tonne CO2/tonne of steel. The steel making process has inherent CO2 emissions from mineral conversion and is considered major contributors to the global carbon emissions. The steel industry is responsible for 8% of global carbon emissions. The main objective of this research project is to execute and complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture project that separates 95% of the total CO2 emissions at the ArcelorMittal’s Hot Briquetted Iron (HBI) plant in Portland, TX (Figure 1). The HBI is an ore-based metallic that is used as high-grade feedstock for high-quality steel via an Electric Arc Furnace (EAF) route. The HBI plant produces 2.0 million metric tonnes of high-quality HBI and emits approximately 1 million tonnes CO2/yr. The capture system is a Pressure Swing Adsorption (PSA) system assisted Cryocap™ FG technology (Figure 2). The captured CO2 will be pipeline grade and will be geologically stored in a facility within 10 miles of the CO2 source. The Host Site location in Corpus Christi, TX, is near hydrocarbon processing facilities and near Environmental Justice (EJ) and Qualified Opportunity Zone (QOZ) communities. Due to the location of the Host Site, the retrofit project offers the ability to demonstrate how a workforce focused on the fossil energy sector can be redirected to the clean- energy sector. The Air Liquide Cryocap™ capture technology is a proven technology and has been extensively examined for large industrial applications. It has been shown to be applicable to a variety of industrial applications including the steel industry. Cryocap™ FG (specific setup for Flue Gas application) consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The scope of this study incorporates completing FEED study of the CO2 capture system which includes point-source CO2 capture and balance-of-plant; Business Case Analysis (BCA) outlining the current and projected volumes of the steel plant’s point sources of CO2 and the potential utilization of tax credits, including its projected revenue and duration; Life Cycle Analysis (LCA); Environmental Justice Analysis; Economic Revitalization and Job Creation Outcomes Analysis; and Workforce Readiness Plan. The plant design work was divided into two components: Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL). The ISBL focuses on the capture system, while the OSBL focuses on the utility feeds and ducting from the plant to the capture system. Various design and engineering deliverables will be developed to define commodity quantities, equipment specifications, and labour effort required to execute the project. These FEED study deliverables will be prepared with the intent to develop an overall project capital cost estimate consistent with an AACE Class 3 estimate. The modular approach for the Cryocap™ FG that is being designed for this study integrates compression, PSA, and cryogenic “bricks” to achieve the desired CO2 capture rates. This carbon capture system integrates easily with the existing plant, thus reducing project costs and risks. It is also capable of managing impurities such as nitrogen oxides (NOx), sulfur oxides (SOx), mercury, hydrocarbons, and particulate matter. The capture system has a smaller footprint than amine-based systems. The two-step process uses PSA to preconcentrate the CO2 in the feedstream and then uses the cryogenic portion to purify and compress the resulting high purity CO2 product. This combination of purification and compression (i.e., process intensification) significantly reduces the CAPEX associated with use of a separate compressor commonly utilized for amine solvent-based systems. Successful completion of the FEED study will provide DOE with a detailed understanding of the costs for scaling up this proven capture technology for commercial applications at industrial facilities.

42 ENGINEERING↗

Water Meter Measurement and Verification Best Practice

This measurement and verification (M&V) best practice provides recommended procedures for energy service companies to validate the performance of water metering projects that are executed with water providers under energy performance contracts. This document covers metering projects such as advanced metering infrastructure and automatic meter reading technology. This best practice outlines the basic components of the M&V plan, provides potential performance metrics to consider for metering systems, and describes the procedures to use to verify project performance.

42 ENGINEERING↗

The astronaut and the banana peel: An EVA retriever scenario

To prepare for the problem of accidents in Space Station activities, the Extravehicular Activity Retriever (EVAR) robot is being constructed, whose purpose is to retrieve astronauts and tools that float free of the Space Station. Advanced Decision Systems is at the beginning of a project to develop research software capable of guiding EVAR through the retrieval process. This involves addressing problems in machine vision, dexterous manipulation, real time construction of programs via speech input, and reactive execution of plans despite the mishaps and unexpected conditions that arise in uncontrolled domains. The problem analysis phase of this work is presented. An EVAR scenario is used to elucidate major domain and technical problems. An overview of the technical approach to prototyping an EVAR system is also presented.

Shapiro, Daniel G.↗