Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

100 Area↗

Engineering Report on the Fission Gas Getter Concept

In 2010, the Department of Energy (DOE) requested that a Brookhaven National Laboratory (BNL)-led team research the possibility of using a getter material to reduce the pressure in the plenum region of a light water reactor fuel rod. During the first two years of the project, several candidate materials were identified and tested using a variety of experimental techniques, most with xenon as a simulant for fission products. Earlier promising results for candidate getter materials were found to be incorrect, caused by poor experimental techniques. In May 2012, it had become clear that none of the initial materials had demonstrated the ability to adsorb xenon in the quantities and under the conditions needed. Moreover, the proposed corrective action plan could not meet the schedule needed by the project manager. BNL initiated an internal project review which examined three questions: 1. Which materials, based on accepted materials models, might be capable of absorbing xenon? 2. Which experimental techniques are capable of not only detecting if xenon has been absorbed but also determine by what mechanism and the resulting molecular structure? 3. Are the results from the previous techniques useable now and in the future? As part of the second question, the project review team evaluated the previous experimental technique to determine why incorrect results were reported in early 2012. This engineering report is a summary of the current status of the project review, description of newly recommended experiments and results from feasibility studies at the National Synchrotron Light Source (NSLS).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Value of Integrated Risk and Issue Management - 17589

Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Value of Integrated Risk and Issue Management - 17516

Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)

99 GENERAL AND MISCELLANEOUS↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 817 Complex (project). The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was developed in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - Chem Mag Loop Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Chem Mag Loop (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - 836 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 836 Complex (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Site 300 Roadway Improvements - 834 Complex Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 834 Complex (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: S300 Roadway Improvements - 854 Complex Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Building 854 Complex (project). The purpose of the SAP was to identify chemicals of concern, describe the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

System Upgrades at the Advanced Test Reactor Help Ensure that Nuclear Energy Research Continues at the Idaho National Laboratory

Fully operational in 1967, the Advanced Test Reactor (ATR) is a first-of-its-kind materials test reactor. Located on the Idaho National Laboratory’s desert site, this reactor remains at the forefront of nuclear science, producing extremely high neutron irradiation in a relatively short time span. The Advanced Test Reactor is also the only U.S. reactor that can replicate multiple reactor environments concurrently. The Idaho National Laboratory and the Department of Energy recently invested over 13 million dollars to replace three of ATR’s instrumentation and control systems. The new systems offer the latest software and technology advancements, ensuring the availability of the reactor for future energy research. Engineers and project managers successfully completed the four year project in March while the ATR was in a scheduled maintenance outage. “These new systems represent state-of-the-art monitoring and annunciation capabilities,” said Don Feldman, ATR Station Manager. “They are comparable to systems currently used for advanced reactor designs planned for construction in the U.S. and in operation in some foreign countries.”

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Measurement of Nuclear Power Plant Construction Performance Using EVMS Model

The Earned Value Management System (EVMS) method integrates three critical elements of project management: scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. Application of earned value management techniques is scalable to individual projects as determined by their size and complexity. Effective management of quality, cost, and time is the utmost objective for any type of construction project. An EVMS model provides an advanced systematic method of controlling these three performance measures in an integrated way. However, the additional management effort required to develop and maintain an effective Work Breakdown Structure (WBS) has been highlighted as a major barrier to application of this concept. This paper examines the influencing attributes that would facilitate effective EVMS implementation including a restructuring of the WBS for nuclear power plant construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Executive summary of major NuMI lessons learned: a review of relevant meetings of Fermilab's DUSEL Beamline Working Group

We have gained tremendous experience with the NuMI Project on what was a new level of neutrino beams from a high power proton source. We expect to build on that experience for any new long baseline neutrino beam. In particular, we have learned about some things which have worked well and/or where the experience is fairly directly applicable to the next project (e.g., similar civil construction issues including: tunneling, service buildings, outfitting, and potential claims/legal issues). Some things might be done very differently (e.g., decay pipe, windows, target, beam dump, and precision of power supply control/monitoring). The NuMI experience does lead to identification of critical items for any future such project, and what issues it will be important to address. The DUSEL Beamline Working Group established at Fermilab has been meeting weekly to collect and discuss information from that NuMI experience. This document attempts to assemble much of that information in one place. In this Executive Summary, we group relevant discussion of some of the major issues and lessons learned under seven categories: (1) Differences Between the NuMI Project and Any Next Project; (2) The Process of Starting Up the Project; (3) Decision and Review Processes; (4) ES&H: Environment, Safety, and Health; (5) Local Community Buy-In; (6) Transition from Project Status to Operation; and (7) Some Lessons on Technical Elements. We concentrate here on internal project management issues, including technical areas that require special attention. We cannot ignore, however, two major external management problems that plagued the NuMI project. The first problem was the top-down imposition of an unrealistic combination of scope, cost, and schedule. This situation was partially corrected by a rebaselining. However, the full, desirable scope was never achievable. The second problem was a crippling shortage of resources. Critical early design work could not be done in a timely fashion, leading to schedule delays, inefficiencies, and corrective actions. The Working Group discussions emphasized that early planning and up-front appreciation of the problems ahead are very important for minimizing the cost and for the greatest success of any such project. Perhaps part of the project approval process should re-enforce this need. The cost of all this up-front work is now reflected in the DOE cost of any project we do. If we are being held to an upper limit on the project cost, the only thing available for compromise is the eventual project scope.

43 PARTICLE ACCELERATORS↗

Knowledge Management Initiatives Used to Maintain Regulatory Expertise in Transportation and Storage of Radioactive Materials - 12177

The U.S. Nuclear Regulatory Commission (NRC) was established in 1974 with the mission to license and regulate the civilian use of nuclear materials for commercial, industrial, academic, and medical uses in order to protect public health and safety, and the environment, and promote the common defense and security. Currently, approximately half (∼49%) of the workforce at the NRC has been with the Agency for less than six years. As part of the Agency's mission, the NRC has partial responsibility for the oversight of the transportation and storage of radioactive materials. The NRC has experienced a significant level of expertise leaving the Agency due to staff attrition. Factors that contribute to this attrition include retirement of the experienced nuclear workforce and mobility of staff within or outside the Agency. Several knowledge management (KM) initiatives have been implemented within the Agency, with one of them including the formation of a Division of Spent Fuel Storage and Transportation (SFST) KM team. The team, which was formed in the fall of 2008, facilitates capturing, transferring, and documenting regulatory knowledge for staff to effectively perform their safety oversight of transportation and storage of radioactive materials, regulated under Title 10 of the Code of Federal Regulations (10 CFR) Part 71 and Part 72. In terms of KM, the SFST goal is to share critical information among the staff to reduce the impact from staff's mobility and attrition. KM strategies in place to achieve this goal are: (1) development of communities of practice (CoP) (SFST Qualification Journal and the Packaging and Storing Radioactive Material) in the on-line NRC Knowledge Center (NKC); (2) implementation of a SFST seminar program where the seminars are recorded and placed in the Agency's repository, Agency-wide Documents Access and Management System (ADAMS); (3) meeting of technical discipline group programs to share knowledge within specialty areas; (4) development of written guidance to capture 'administrative and technical' knowledge (e.g., office instructions (OIs), generic communications (e.g., bulletins, generic letters, regulatory issue summary), standard review plans (SRPs), interim staff guidance (ISGs)); (5) use of mentoring strategies for experienced staff to train new staff members; (6) use of Microsoft SharePoint portals in capturing, transferring, and documenting knowledge for staff across the Division from Division management and administrative assistants to the project managers, inspectors, and technical reviewers; and (7) development and implementation of a Division KM Plan. A discussion and description of the successes and challenges of implementing these KM strategies at the NRC/SFST will be provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗