Propulsion Ground Testing: Planning for the Future

Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre-exiting test facilities. The key words in the previous sentence are 'substantial investment.' In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based on both life cycle cost decisions in an environment in which the more immediate challenge of front-end capital investment oftentimes is the linchpin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

Bruce, Robert↗

Propulsion Ground Testing: Planning for the Future

Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre- existing test capabilities. The key words in the previous sentence are "substantial investment". In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based upon both life cycle cost decisions in an environment in which the more immediate challenge of "front-end" capital investment? Often times is the linch-pin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

Aerospace Systems↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew access to the International Space Station (ISS) and, together with the Ares V Cargo Launch Vehicle (CaLV), serves as one component of a future launch capability for human exploration of the Moon. During the system requirements definition process and early design cycles, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements: the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine, will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle dynamic test (IVDT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, and a highaltitude actuation of the launch abort system (LAS) following separation. The Orion-1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Cockrell, Charles E., Jr.↗

Ares I Integrated Test Approach

This slide presentation reviews the testing approach that NASA is developing for the Ares I launch vehicle. NASA is planning a complete series of development, qualification and verification tests. These include: (1) Upper stage engine sea-level and altitude testing (2) First stage development and qualification motors (3) Upper stage structural and thermal development and qualification test articles (4) Main Propulsion Test Article (MPTA) (5) Upper stage green run testing (6) Integrated Vehicle Ground Vibration Testing (IVGVT) and (7) Aerodynamic characterization testing.

Taylor, Jim↗

Development and Testing of Propulsion Health Management

An Integrated Vehicle Health Management system aims to maintain vehicle health through detection, diagnostics, state awareness, prognostics, and lastly, mitigation of detrimental situations for each of the vehicle subsystems and throughout the vehicle as a whole. This paper discusses efforts to advance Propulsion Health Management technology for in-flight applications to provide improved propulsion sensors measuring a range of parameters, improve ease of propulsion sensor implementation, and to assess and manage the health of gas turbine engine flow-path components. This combined work is intended to enable real-time propulsion state assessments to accurately determine the vehicle health, reduce loss of control, and to improve operator situational awareness. A unique aspect of this work is demonstration of these maturing technologies on an operational engine.

Hunter, Gary W.↗

Feasibility of Conducting J-2X Engine Testing at the Glenn Research Center Plum Brook Station B-2 Facility

A trade study of the feasibility of conducting J-2X testing in the Glenn Research Center (GRC) Plum Brook Station (PBS) B-2 facility was initiated in May 2006 with results available in October 2006. The Propulsion Test Integration Group (PTIG) led the study with support from Marshall Space Flight Center (MSFC) and Jacobs Sverdrup Engineering. The primary focus of the trade study was on facility design concepts and their capability to satisfy the J-2X altitude simulation test requirements. The propulsion systems tested in the B-2 facility were in the 30,000-pound (30K) thrust class. The J-2X thrust is approximately 10 times larger. Therefore, concepts significantly different from the current configuration are necessary for the diffuser, spray chamber subsystems, and cooling water. Steam exhaust condensation in the spray chamber is judged to be the key risk consideration relative to acceptable spray chamber pressure. Further assessment via computational fluid dynamics (CFD) and other simulation capabilities (e.g. methodology for anchoring predictions with actual test data and subscale testing to support investigation.

Schafer, Charles F.↗

Past and Present Large Solid Rocket Motor Test Capabilities

A study was performed to identify the current and historical trends in the capability of solid rocket motor testing in the United States. The study focused on test positions capable of testing solid rocket motors of at least 10,000 lbf thrust. Top-level information was collected for two distinct data points plus/minus a few years: 2000 (Y2K) and 2010 (Present). Data was combined from many sources, but primarily focused on data from the Chemical Propulsion Information Analysis Center s Rocket Propulsion Test Facilities Database, and heritage Chemical Propulsion Information Agency/M8 Solid Rocket Motor Static Test Facilities Manual. Data for the Rocket Propulsion Test Facilities Database and heritage M8 Solid Rocket Motor Static Test Facilities Manual is provided to the Chemical Propulsion Information Analysis Center directly from the test facilities. Information for each test cell for each time period was compiled and plotted to produce a graphical display of the changes for the nation, NASA, Department of Defense, and commercial organizations during the past ten years. Major groups of plots include test facility by geographic location, test cells by status/utilization, and test cells by maximum thrust capability. The results are discussed.

Kowalski, Robert R.↗

Extended Wear Testing of the 12-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the first wear test of the 12 kW Advanced Electric Propulsion System (AEPS) intended to isolate the impact of discharge current on component wear rates. Testing was led by Aerojet Rocketdyne and performed with the AEPS Engineering Test Unit 2 (ETU-2) thruster. In total, approximately 860 hours of operation were accumulated split between operating conditions of 600 V/9 kW, 600 V/11 kW, and 600 V/12 kW. Thruster performance and stability were invariant throughout the wear test for all thruster throttle conditions and shown to be equal to the values previously measured with ETU-2. Inner front pole cover erosion rates were found to be invariant to discharge current as the measurements at all three operating conditions were equal to within the empirical uncertainty. Outer front pole cover erosion rates were found to be equal for the 600 V/9 kW and 600 V/12 kW conditions with operation at 600 V/11 kW yielding elevated erosion rates. Overall, the data shows that the AEPS thruster design has a high probability of meeting lifetime and performance requirements as the design proceeds to flight production and qualification.

Jason D Frieman↗

Extended Wear Testing of the 12-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the first wear test of the 12 kW Advanced Electric Propulsion System (AEPS) intended to isolate the impact of discharge current on component wear rates. Testing was led by Aerojet Rocketdyne and performed with the AEPS Engineering Test Unit 2 (ETU-2) thruster. In total, approximately 860 hours of operation were accumulated split between operating conditions of 600 V/9 kW, 600 V/11 kW, and 600 V/12 kW. Thruster performance and stability were invariant throughout the wear test for all thruster throttle conditions and shown to be equal to the values previously measured with ETU-2. Inner front pole cover erosion rates were found to be invariant to discharge current as the measurements at all three operating conditions were equal to within the empirical uncertainty. Outer front pole cover erosion rates were found to be equal for the 600 V/9 kW and 600 V/12 kW conditions with operation at 600 V/11 kW yielding rates that were comparable to those on the inner front pole cover. Overall, the data shows that the AEPS thruster design has a high probability of meeting lifetime and performance requirements as the design proceeds to flight production and qualification.

HERMeS↗

Low speed wind tunnel test of a propulsive wing/canard concept in the STOL configuration. Volume 1: Test description and discussion of results

A propulsive wing/canard model was tested at STOL operating conditions in the NASA Langley Research Center 4 x 7 meter wind tunnel. Longitudinal and lateral/directional aerodynamic characteristics were measured for various flap deflections, angles of attack and sideslip, and blowing coefficients. Testing was conducted for several model heights to determine ground proximity effects on the aerodynamic characteristics. Flow field surveys of local flow angles and velocities were performed behind both the canard and the wing. This is volume 1 of a 2 volume report. The model, instrumentation, and test procedures are described. An analysis of the data is included.

Stewart, V. R.↗

Results of the Test Program for Replacement of AK-225G Solvent for Cleaning NASA Propulsion Oxygen Systems

Since the 1990's, when the Class I Ozone Depleting Substance chlorofluorocarbon-113 was banned, NASA's propulsion test facilities at Marshall Space Flight Center and Stennis Space Center have relied upon the solvent Asahiklin AK-225 (hydrochlorofluorocarbon-225ca/cb or HCFC-225ca/cb) and, more recently AK-225G (the single isomer form, HCFC-225cb) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of Class II Ozone Depleting Substances, including AK-225G, was prohibited in the United States by the Clean Air Act. In 2012 through 2014, NASA test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility collaborated to seek out, test, and qualify a solvent replacement for AK-225G that is both an effective cleaner and safe for use with oxygen systems. This paper summarizes the tests performed, results, and lessons learned.

Lowrey, Nikki M.↗

Results of the Test Program for Replacement of AK-225G Solvent for Cleaning NASA Propulsion Oxygen Systems

Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon-113 (CFC-113) was banned, NASA's propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon the solvent AsahiKlin AK-225 (hydrochlorofluorocarbon-225ca/cb or HCFC-225ca/cb) and, more recently AK-225G (the single isomer form, HCFC-225cb) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of Class II Ozone Depleting Substances, including AK-225G, was prohibited in the United States by the Clean Air Act. In 2012 through 2014, NASA test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a solvent replacement for AK-225G that is both an effective cleaner and safe for use with oxygen systems. This paper summarizes the tests performed, results, and lessons learned.

Lowrey, Nikki M.↗

Space Shuttle External Tank Project status

The External Tank Project is reviewed with emphasis on the DDT&E and production phases and the lightweight tank development. It is noted that the DDT&E phase is progressing well with the structural and ground vibration test article programs complete, the propulsion test article program progressing well, and the component qualification and verification testing 92% complete. New tools and facilities are being brought on line to support the increased build rate for the production phase. The lightweight tank, which will provide additional payload in orbit, is progressing to schedule with first delivery in early 1982.

Davis, R. M.↗

Systems engineering challenges of the Space Shuttle

Problems encountered during the Space Shuttle's development that were due to the unique configuration of the vehicle are discussed. While conventional rocket space vehicles have been symmetric, greatly simplifying the analysis and integration of constituent elements, the Space Shuttle's combination of a winged orbiter with side-mounted solid rocket boosters and a large propellant tank presented a more complex system for the analysis and testing of ascent flight control, propulsion system, aerothermodynamics and structural dynamics. Attention is given first and second stage flight operations, return-to-launch-site, abort-once-around and abort-to-orbit mission modes, propulsion system and propulsion test development, and the aerothermodynamics of the external propellant tank and Orbiter.

Day, L. E.↗

Materials Test Laboratory activities at the NASA-Johnson Space Center White Sands Test Facility (WSTF)

The NASA Johnson Space Center White Sands Test Facility (WSTF) performs aerospace materials testing and evaluation. Established in 1963, the facility grew from a NASA site dedicated to the development of space engines for the Apollo project to a major test facility. In addition to propulsion tests, it tests materials and components, aerospace fluids, and metals and alloys in simulated space environments.

Stradling, J.↗

Scramjet testing from Mach 4 to 20 - Present capability and needs for the nineties

Consideration is given to the development of testing methods for the National Aerospace Plane (NASP) program, focusing on techniques for simulating and testing scramjet engines and scramjet engine components during flight from Mach 4 to Mach 20. The flight conditions associated with the NASP are outlined and the stagnation temperatures and pressures required to simulate flight up to orbital speeds are presented. The types of test facilities needed for scramjet propulsion testing are discussed, including combustion-heated facilities, electric arc-heated facilities, convection-heated facilities, shock tunnels, and expansion tubes. Issues related to assessing the flow quality in the scramjet ground testing facilities are examined, including uniformity, contamination, dissociation, ionization, nonequilibrium, and turbulence. Direct-connect combustor versus free-jet scramjet engine tests are compared and the capabilities of current and near-future scramjet engine test facilities are evaluated.

Thomas, Scott R.↗