Search NASA⌕ Search

SEARCH · Search NASA

Results for “Qualification & Certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

189 records · Page 11

Pre-Demonstration Development of Controlled-Release Corrosion Inhibitors and Healing Agents as Alternatives to Hexavalent Chromium

This Limited Scope Study was directed to achieve the following objectives: (1) Scale-up of materials that can meet MIL-PRF-23377 (solvent-based primer). (2) Provide evidence of resistance to aircraft alkaline cleaners and de-icing fluids. (3) Provide formulation for initial ecological and toxicity screening. (4) Submit an interim report that will provide the basis for a future ESTCP (the Dept. of Defense's (DoD's) Environmental Security Technology Certification Program) demonstration effort.The encapsulation procedure for two corrosion inhibitors was scaled up from lab scale to 2.0 kilograms. This scale will accommodate high volume production of coatings with encapsulated corrosion inhibitors for large surface areas during a follow-on ESTCP demonstration effort. Test results provided evidence of resistance to alkaline cleaners and aircraft de-icing fluids and compliance with MIL-PRF-23377. All the MIL-PRF-23377 requirements were met with the exception of the adhesion requirement, in top coated panels, and the flexibility requirement. Work on solving these two problems will be done prior to validation and demonstration of the technology. An initial ecological and toxicity screening identified several factors that were not critical to the acceptance of the encapsulated corrosion inhibitor. This new technology will lead to environmentally friendly alternatives to hexavalent chromium that will enable DoD to protect its assets. Field demonstration, licensing, qualification, and commercialization will allow its real world utilization. Abstract for Appendix A. Toxicology Report: Corrosion controls a significant problem for military equipment. Many surface treatment materials currently in use on items of military or aerospace materiel contain chromium (VI) as a component, a source of significant human health and environmental hazard. The formulation under evaluation contains no chromium. Most of the proposed components are low to moderate toxicity and are not a significant concern. Two of the formulation components are associated with some cancer hazard - 2-mercaptobenzothiazole and formaldehyde, but both find widespread use in industry and additional investigation is not required for this project.

Calle, Luz Marina↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015 and 2016, completing hardware and testing that brings NASA closer to a new era of deep space exploration. Programmatically, SLS completed Critical Design Review (CDR) in 2015. A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just five years after program start, every major element has amassed development and flight hardware and completed key tests that will lead to an accelerated pace of manufacturing and testing in 2016 and 2017. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The existing fleet of RS-25 engines is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with a fifth propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major 2015-2016 accomplishments were two booster qualification hotfire tests, a series of RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the completion of welding for all qualification and flight EM-1 core stage components and testing of flight avionics, completion of core stage structural test stands, casting of the EM-1 solid rocket motors, additional testing of RS-25 engines and flight engine controllers This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Lyles, Garry↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Test Report for the Qualification Testing of the ORNL-SFC-W-1 Special Form Capsule

Three prototypes the ORNL-SFC-W-1 special form capsules (SFCs) of the same design were evaluated to determine if the requirements of Title 49, Code of Federal Regulations (CFR), Part 173.469, Tests for Special Form Class 7 (Radioactive) Materials, were met. The results of the special form tests are documented in this test report. This report describes the special form testing activities performed on the three ORNL-SFC-W-1 capsules. The test units were designated as TU-1, TU-2 and TU-3. TU-1 was subjected to leak testing, impact testing and percussion testing. TU-1 was leak tested using the leak rate test specified in 49 CFR 173.469(a)(4)(i). The impact test was conducted according to the requirements in 49 CFR 173.469 (b)(1). The percussion test that was carried out on TU-1 was conducted in accordance with 49 CFR 173.469 (b)(2). Both TU-2 and TU-3 were subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469(b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests as specified in American National Standards Institute (ANSI) N14.5-2014.The measured leak rates were converted to standard condition leak rates as specified in American Society for Testing and Measurement (ASTM) E 493. The determined standardized leak rates obtained from the test and the calculations for all the test units met the requirements for special form certification. The testing was performed under the direction of the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP).

42 ENGINEERING↗

Mars2020 Entry, Descent, and Landing Instrumentation 2 (MEDLI2) Do No Harm Test Series

A total of seventeen instrumented thermal sensor plugs, eight pressure transducers, two heat flux sensors, and one radiometer are planned to be utilized on the Mars 2020 missions thermal protection system (TPS) as part of the Mars Entry, Descent, and Landing Instrumentation II (MEDLI2) project. Of the MEDLI2 instrumentation, eleven instrumented thermal plugs and seven pressure transducers will be installed on the heatshield of the Mars 2020 vehicle while the rest will be installed on the backshell. The goal of the MEDLI2 instrumentation is to directly inform the large performance uncertainties that contribute to the design and validation of a Mars entry system. A better understanding of the entry environment and TPS performance could lead to reduced design margins enabling a greater payload mass-fraction and smaller landing ellipses. To prove that the MEDLI2 system will not degrade the performance of the Mars 2020 TPS, an Aerothermal Do No Harm (DNH) test series was designed and conducted. Like Mars 2020s predecessor, Mars Science Laboratory (MSL), the heatshield material will be Phenolic Impregnated Carbon Ablator (PICA); the Mars 2020 entry conditions are enveloped by the MSL design environments, therefore the development and qualification testing performed during MEDLI is sufficient to show that the similar MEDLI2 heatshield instrumentation will not degrade PICA performance. However, given that MEDLI did not include any backshell instrumentation, the MEDLI2 team was required to design and execute a DNH test series utilizing the backshell TPS material (SLA-561V) with the intended flight sensor suite. To meet the requirements handed down from Mars 2020, the MEDLI2 DNH test series emphasized the interaction between the MEDLI2 sensors and sensing locations with the surrounding backshell TPS and substrucutre. These interactions were characterized by performing environmental testing of four 12 by 12 test panels, which mimicked the construction of the backshell TPS and the integration of the MEDLI2 sensors as seen in Figure 1. The testing included thermal vacuumcycling, random vibration, shock, and arc jet testing. The test panels were fabricated by Lockheed Martin, establishing techniques that will be utilized during the Mars 2020 vehicle installation. Each test panel included one thermal sensor plug (two embedded thermocouples), one heat flux sensor, and multiple pressure port holes for evaluation.This presentation will discuss the planning and execution of the MEDLI2 DNH test series. Selected highlights and results of each environmental test will be presented, and lessons learned will be addressed that will feed forward into the planning for the MEDLI2 flight system certification testing.

backshell↗

MELDI2 Do No Harm Test Series

Mars 2020 will fly the Mars Entry, Descent, and Landing Instrumentation II (MEDLI2) sensor suite consisting of a total of seventeen instrumented thermal sensor plugs, eight pressure transducers, two heat flux sensors, and one radiometer embedded in the thermal protection system (TPS). Of the MEDLI2 instrumentation, eleven instrumented thermal plugs and seven pressure transducers will be installed on the heatshield of the Mars 2020 vehicle while the rest will be installed on the backshell. The goal of the MEDLI2 instrumentation is to directly inform the large performance uncertainties that contribute to the design and validation of a Mars entry system. A better understanding of the entry environment and TPS performance could lead to reduced design margins enabling a greater payload mass-fraction and smaller landing ellipses. To prove that the MEDLI2 system will not degrade the performance of the Mars 2020 TPS, an Aerothermal Do No Harm (DNH) test series was designed and conducted. Like Mars 2020's predecessor, Mars Science Laboratory (MSL), the heatshield material will be Phenolic Impregnated Carbon Ablator (PICA); the Mars 2020 entry conditions are enveloped by the MSL design environments, therefore the development and qualification testing performed during MEDLI is sufficient to show that the similar MEDLI2 heatshield instrumentation will not degrade PICA performance. However, given that MEDLI did not include any backshell instrumentation, the MEDLI2 team was required to design and execute a DNH test series utilizing the backshell TPS material (SLA-561V) with the intended flight sensor suite. To meet the requirements handed down from Mars 2020, the MEDLI2 DNH test series emphasized the interaction between the MEDLI2 sensors and sensing locations with the surrounding backshell TPS and substrucutre. These interactions were characterized by performing environmental testing of four 12" by 12" test panels, which mimicked the construction of the backshell TPS and the integration of the MEDLI2 sensors as seen in Figure 1. The testing included thermal vacuum/ cycling, random vibration, shock, and arc jet testing. The test panels were fabricated by Lockheed Martin, establishing techniques that will be utilized during the Mars 2020 vehicle installation. Each test panel included one thermal sensor plug (two embedded thermocouples), one heat flux sensor, and multiple pressure port holes for evaluation. This presentation will discuss the planning and execution of the MEDLI2 DNH test series. Selected highlights and results of each environmental test will be presented, and lessons learned will be addressed that will feed forward into the planning for the MEDLI2 flight system certification testing.

Heatshield↗

In-Situ Monitoring Assisted Large-Scale Additive Manufacturing of Mild Steel and 316L Alloys for Nuclear Application

The Advanced Materials and Manufacturing Technologies (AMMT) Program is aimed at developing cross-cutting technologies in support of a broad range of nuclear reactor parts, and to maintain U.S. leadership in materials and manufacturing technologies for nuclear energy applications. The overarching vision of the AMMT program is to accelerate the development, qualification, demonstration and deployment of advanced materials and manufacturing technologies to enable reliable and economical nuclear energy. One of its three goals is to target big challenges and game-changing technologies, to realize the mission and vision of AMMT program. Based on this context, this multi-year work package focuses on understanding the current state of large-scale additive manufacturing (AM) technology for the deposition of 316L stainless steel materials for final components and mild steel for use in nuclear manufacturing processes. The targeted AM modality is directed energy deposition (DED), capable of fabricating components on the size scale of meters including valves, pumps, impellers. etc. that are challenging or difficult to source, especially when developing new systems or replacing obsolete components. Accordingly, the current writeup aims at providing a baseline literature survey on structure-property relationships in mild steel and 316L alloys. Also, information on preliminary trials to date involving these two alloys show tremendous potential of printing parts having complex geometry and thin- walled structures, such as nuclear valve and Hot isostatic Press (HIP) can, using wire based (Wire Arc Additive Manufacturing and Hybrid Additive Manufacturing) as well as blown powder DED machines. All of this is aimed towards (i) demonstrating the ability to fabricate large components for pressure boundary applications relevant to the nuclear community and nuclear manufacturing technology, and (ii) understanding the effect of different manufacturing technology on AM can production and post HIPed material for nuclear applications. Another target of this writeup is to compile various in-situ monitoring tools that have been incorporated for different DED AM modalities, in order to understand process variability during the entire fabrication process. This can be correlated with processing-structure-property response surfaces and would add confidence around process quality verification and ultimately component certification for nuclear applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Service Life Extension of the Propulsion System of Long-Term Manned Orbital Stations

One of the critical non-replaceable systems of a long-term manned orbital station is the propulsion system. Since the propulsion system operates beginning with the launch of station elements into orbit, its service life determines the service life of the station overall. Weighing almost a million pounds, the International Space Station (ISS) is about four times as large as the Russian space station Mir and about five times as large as the U.S. Skylab. Constructed over a span of more than a decade with the help of over 100 space flights, elements and modules of the ISS provide more research space than any spacecraft ever built. Originally envisaged for a service life of fifteen years, this Earth orbiting laboratory has been in orbit since 1998. Some elements that have been launched later in the assembly sequence were not yet built when the first elements were placed in orbit. Hence, some of the early modules that were launched at the inception of the program were already nearing the end of their design life when the ISS was finally ready and operational. To maximize the return on global investments on ISS, it is essential for the valuable research on ISS to continue as long as the station can be sustained safely in orbit. This paper describes the work performed to extend the service life of the ISS propulsion system. A system comprises of many components with varying failure rates. Reliability of a system is the probability that it will perform its intended function under encountered operating conditions, for a specified period of time. As we are interested in finding out how reliable a system would be in the future, reliability expressed as a function of time provides valuable insight. In a hypothetical bathtub shaped failure rate curve, the failure rate, defined as the number of failures per unit time that a currently healthy component will suffer in a given future time interval, decreases during infant-mortality period, stays nearly constant during the service life and increases at the end when the design service life ends and wear-out phase begins. However, the component failure rates do not remain constant over the entire cycle life. The failure rate depends on various factors such as design complexity, current age of the component, operating conditions, severity of environmental stress factors, etc. Development, qualification and acceptance test processes provide rigorous screening of components to weed out imperfections that might otherwise cause infant mortality failures. If sufficient samples are tested to failure, the failure time versus failure quantity can be analyzed statistically to develop a failure probability distribution function (PDF), a statistical model of the probability of failure versus time. Driven by cost and schedule constraints however, spacecraft components are generally not tested in large numbers. Uncertainties in failure rate and remaining life estimates increase when fewer units are tested. To account for this, spacecraft operators prefer to limit useful operations to a period shorter than the maximum demonstrated service life of the weakest component. Running each component to its failure to determine the maximum possible service life of a system can become overly expensive and impractical. Spacecraft operators therefore, specify the required service life and an acceptable factor of safety (FOS). The designers use these requirements to limit the life test duration. Midway through the design life, when benefits justify additional investments, supplementary life test may be performed to demonstrate the capability to safely extend the service life of the system. An innovative approach is required to evaluate the entire system, without having to go through an elaborate test program of propulsion system elements. Evaluating every component through a brute force test program would be a cost prohibitive and time consuming endeavor. ISS propulsion system components were designed and built decades ago. There are no representative ground test articles for some of the components. A 'test everything' approach would require manufacturing new test articles. The paper outlines some of the techniques used for selective testing, by way of cherry picking candidate components based on failure mode effects analysis, system level impacts, hazard analysis, etc. The type of testing required for extending the service life depends on the design and criticality of the component, failure modes and failure mechanisms, life cycle margin provided by the original certification, operational and environmental stresses encountered, etc. When specific failure mechanism being considered and the underlying relationship of that mode to the stresses provided in the test can be correlated by supporting analysis, time and effort required for conducting life extension testing can be significantly reduced. Exposure to corrosive propellants over long periods of time, for instance, lead to specific failure mechanisms in several components used in the propulsion system. Using Arrhenius model, which is tied to chemically dependent failure mechanisms such as corrosion or chemical reactions, it is possible to subject carefully selected test articles to accelerated life test. Arrhenius model reflects the proportional relationship between time to failure of a component and the exponential of the inverse of absolute temperature acting on the component. The acceleration factor is used to perform tests at higher stresses that allow direct correlation between the times to failure at a high test temperature to the temperatures to be expected in actual use. As long as the temperatures are such that new failure mechanisms are not introduced, this becomes a very useful method for testing to failure a relatively small sample of items for a much shorter amount of time. In this article, based on the example of the propulsion system of the first ISS module Zarya, theoretical approaches and practical activities of extending the service life of the propulsion system are reviewed with the goal of determining the maximum duration of its safe operation.

Kamath, Ulhas↗