Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Acceptance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

189 records · Page 11

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 1

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore fuel product. The long-term EnCore ® fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 2

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore ® fuel product. The long-term EnCore fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15 N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of the Mobile Systems for Conditioning of Disused Sealed Radioactive Sources in Serbia - 20105

Sealed radioactive sources (SRS) are being used worldwide in the field of medicine, agriculture, industry and research. They can be found in mobile as well as stationary devices. SRS contains radioactive material that is (a) permanently sealed in a capsule or (b) closely bounded and in a solid form. The capsule or material of an SRS should be strong enough to maintain leak tightness under the conditions of use and purpose for which the source was designed, also in case of accidents. In this case only emitted radiation is utilized. Firstly, the hazard from external radiation has to be considered, but the possibility of contamination due to fracture of the capsule should not be disregarded. The radioactive sources are composed of the radiating isotope contained in the filling medium, the single or double isotope holder that partially or totally surrounds the filling medium, the outer cover that contains the parts mentioned above and the capsule closed airtightly by welding or using some other method. The capsule must be tested for leakage periodically. If the SRS is no longer needed (e.g. replaced by a different technique) or it becomes useless for the intended application (e.g. the activity becomes too weak, the equipment containing the source works poorly or becomes obsolete, the source is damaged or leaking) it is considered disused. Disused sealed radioactive sources (DSRS) are typically conditioned and disposed if a facility is available. If the disposal option is not available, conditioned DSRS should be stored under proper conditions. In some cases, the radionuclide(s) in DSRS can be recovered/recycled or the DSRS can be repurposed for other applications. Conditioning of DSRS ensures containment of the radioactive material, provides confinement for leaking sources, provides sufficient radiation shielding, reduces storage/disposal volume by allowing consolidation of multiple sources into a single storage/disposal container, facilitates transport operations and contributes to safety and security as well. Typically, conditioning technologies are deployed either as permanently installed stationary systems in centralized or mobile on-site waste processing facilities, or in a mobile configuration. Centralized stationary facilities provide a single processing location for multiple users that requires transport of the waste to the facility. On the other hand, mobile systems may be provided for the selection and application of the optimum technology for a specific waste stream (such as DSRS) by bringing the process to the point where the waste is generated. In addition, mobile systems could offer additional flexibility by sharing equipment among multiple waste generating sites for processing campaigns that vary in duration, from very short periods to several years. The term 'mobile processing system' refers to any radioactive waste processing system or component which is designed to be transportable and which is not considered permanently installed. Two mobile system for conditioning of disused sealed radioactive sources are developed in the Public Company Nuclear Facilities of Serbia. Development of these mobile systems was supported by SRB9005 national project via Technical Cooperation of the IAEA. The first mobile system, built inside the 20 feet ISO container, will be used for conditioning of DSRS category 3 to 5. The second mobile system, built inside the 7 m long vehicle (Iveco Daily Van), will be used for dismantling of ionizing smoke detectors mostly with Am-241 sources. Designs of the mobile systems were defined in cooperation with two companies from Belgium (Belgoprocess and Leniko) and a Croatian company Ekoteh as well as with the support of the IAEA experts. The generic safety assessment and operational procedures for the mobile systems are developed. Based on safety assessment the acceptance criteria and operational limits and conditions are established. Operational procedures include: (a) equipment and material requirements, (b) assembling procedure of the mobile unit, (c) procedure for acceptance of devices for dismantling and conditioning, (d) dismantling procedure for devices to recover the DSRS, (e) characterization of DSRS, (f) encapsulation procedure of DSRS, (g) disassembling procedure of the mobile unit, and (h) keeping records, identification and traceability. In addition, radiation safety, health safety, security and emergency preparedness plans are prepared. The generic safety assessment and operational procedures could be updated with site specific requirements, DSRS inventory, and different needs for future customers. Developed mobile systems could be used in all situations when it is feasible to perform conditioning of DSRS on the spot in the county and worldwide. Development of these mobile units was just the first step to create the Reference Center for Radioactive Waste Treatment and Disused Radioactive Sources Conditioning for Small Facilities which can become a regional training center in the future, and/or as a tool for comprehensive national search and secure programmes. In the next phases development of e-learning platforms and blended learning packages as well as application for the IAEA Qualified Technical Centre (QTC) for the management of DSRS is foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Analysis of Exposure during Transportation of Waste to the Nevada National Security Site (NNSS) - 20445

Safety is a priority for the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program. This commitment to safety is integrated into requirements and work procedures at DOE sites across the U.S. that generate low-level radioactive waste, mixed low-level radioactive waste, and classified waste that is transported to the Nevada National Security Site (NNSS) for permanent disposal. Generators of this waste are responsible for ensuring it is packaged and transported in a safe and compliant manner. These generators and their contracted commercial carriers must comply with U.S. Department of Transportation (DOT) regulations; the Nevada National Security Site Waste Acceptance Criteria (NNSSWAC); and other applicable federal, state, and local regulations and requirements. This includes packaging and shipping the waste to meet DOT regulatory radiation dose limits to ensure public safety during transportation. NNSS waste generators have a solid safety record for complying with these stringent regulations as demonstrated by the fact that no shipments exceeding DOT dose rate limits were received at the NNSS Area 5 Radioactive Waste Management Complex (RWMC) during FY 2014 through FY 2018. A 2005 study conducted by the Desert Research Institute validated shipments to the NNSS comply with DOT radiation dose limits. In response to recent Nevada stakeholder requests for an updated study, an analysis was conducted to verify and provide evidence that the public continues to be safe from exposure to radioactive waste shipment to the NNSS. Radiation exposure from radioactive waste shipments in transit to the NNSS was evaluated. Three studies were performed: 1. Confirm compliance of waste shipments to the DOT radiation limits using dose rate surveys taken at the generator site and at the disposal site. 2. Estimate the dose to the public from waste shipments using the dosimetry results for disposal site personnel by comparing time of exposure for various individuals/scenarios. 3. Estimate the truck driver dose using the receipt dose rate surveys and time of exposure, and from dosimetry results. Study 1 confirmed compliance with the DOT dose rate limits for a sample of waste shipments (123 of 1,038) received during fiscal year (FY) 2017. Study 2 showed that the average annual radiation equivalent dose for disposal site personnel during FY 2017 was approximately 6.7% [0.415 mSv (41.5 millirem)] of the annual average dose that a person living in the U.S. receives from all sources [6.2 mSv (620 mrem)]. Maximum dose to a member of the public, a person resting/sleeping in an adjacent truck at a rest area to a waste shipment, was 0.0166 mSv (1.66 mrem), which is less than the dose received from a person taking a round trip from the east coast to the west coast of the continental U.S. on an airplane [0.07 mSv (7 mrem) per round trip]. Study 3 showed that the truck driver who made the most shipments of radioactive waste to the NNSS, who drove the most hours (estimated time of exposure 2,520 hours), during FY 2017 had a total dose of 0.15 mSv (15 mrem), which was obtained from their personal dosimeter. The annual dose recorded for disposal site personnel, the dose estimates for the public, and the truck driver dose were all a small percentage of the average radiation dose a person receives from all sources (e.g., background and medical radiation). At these levels, risk should only be described qualitatively. Radiation exposure from radioactive waste shipments to the NNSS were shown to be compliant with the DOT dose rate limits, safe, and very low (i.e., within background levels). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E-Area Low-Level Waste Facility Inadvertent Human Intruder Limits and Doses in Support of the PA2022

This report documents the inadvertent human intruder (IHI) analysis for the E-Area Low-Level Waste Facility (ELLWF) at the Savannah River Site (SRS), near Aiken, South Carolina. This analysis supports the revised ELLWF Performance Assessment (PA), complying with the Department of Energy standard for operation of low-level waste disposal facilities (USDOE, 2017). The ELLWF is an operating waste disposal facility and is scheduled to continue accepting waste to 2065. One task of the revised PA is to establish waste inventory limits for the various disposal units at ELLWF. This is done by modeling future contaminant release and transport through applicable pathways to human receptors, comparing predicted doses per disposed curie with applicable performance measures, to obtain inventory limits which will assure that doses to receptors do not exceed performance measures. This report documents results of modeling future doses to one class of receptor, the inadvertent human intruder. It is assumed that after site closure, public knowledge of the site is lost, and IHIs will engage in activities on the ELLWF that will disrupt the closure cap, causing dose to the IHI. Following USDOE (2017), six different stylized exposure scenarios are considered, simulating activities by an IHI which could result in a radiological dose. The six scenarios are: • Acute – Basement Construction: IHI constructs a basement and encounters waste during excavation which is inadvertently mixed with clean soil and diluted. • Acute – Well Drilling: IHI drills a water well through waste and is exposed to drill cuttings mixed with clean soil that are brought to the surface. • Acute – Discovery: IHI begins constructing a basement but stops when encountering the riprap in the final closure cap and is exposed to photon radiation from unexcavated material residing in the undisturbed waste zone. • Chronic – Agriculture: Resident IHI is exposed to waste that was excavated for basement construction and mixed with native soil in the intruder’s vegetable garden. • Chronic – Post-Drilling: Resident IHI is exposed to waste from drill cuttings mixed with native soil and scattered in the garden area. • Chronic – Residential: Resident IHI is exposed to external radiation while in home located above waste with shielding provided by the concrete basement floor and any soil or engineered material remaining between the basement and waste. Dose calculations are performed using the SRNL Dose Toolkit (Aleman, 2023), following the approach of Smith et al (2019). Calculations are performed separately for 27 of the 33 disposal units (DUs) at ELLWF and are radionuclide specific. The results of the IHI analysis include: • Dose Factors: mrem per disposed curie (acute) and mrem/yr per disposed curie (chronic) for each parent radionuclide, for each DU. • Inventory Limits: in curies, for each parent radionuclide, for each DU. • Estimated Dose to IHI: mrem (acute) and mrem/yr (chronic), for each DU, given its projected closure inventory without inventory biases applied. Most DU-specific IHI inventory limits are in the range of 10 3 to 10 7 curies per nuclide. The lowest inventory limits are associated with gamma-emitters such as Sn-126, Ra-226, Th-232, and Cm-248. Radionuclides with short half-lives such as Pu-241, and nuclides which are pure beta emitters or which decay by electron capture, such as Ni-59 and Ni-63, have the highest limits. For the 27 evaluated DUs, predicted IHI doses are shown in Table ES-1. The maximum acute dose is 1.18 mrem, at ST23, much less than the DOE performance measure of 500 mrem (USDOE, 2017). The highest chronic dose is 37.2 mrem/yr at ST02, below the DOE performance measure of 100 mrem/yr. Also shown are estimated inventory sums of fractions (SOFs) at closure in 2065, for groundwater (GW) and IHI pathways. For each DU, the inventory is constrained by the GW pathway. For most DUs, the IHI SOFs are approximately 1000 times lower than the GW SOF values, and the IHI pathway does not drive risk for any disposal unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗