Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Component Importance and Interdependence Analysis for Transmission, Distribution and Communication Systems

For critical infrastructure restoration planning, the real-time scheduling and coordination of system restoration efforts, the key in decision-making is to prioritize those critical components that are out of service during the restoration. For this purpose, there is a need for component importance analysis. While it has been investigated extensively for individual systems, component importance considering interdependence among transmission, distribution and communication (T&D&C) systems has not been systematically analyzed and widely adopted. In this study, we propose a component importance assessment method in the context of interdependence between T&D&C networks. Analytic methods for multilayer networks and a set of metrics have been applied for assessing the component importance and interdependence between T&D&C networks based on their physical characteristics. The proposed methodology is further validated with integrated synthetic Illinois regional transmission, distribution, and communication (T&D&C) systems, the results reveal the unique characteristics of component/node importance, which are strongly affected by the network topologies and cross-domain node mapping.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Summary Describing Integration of ERM Methodology into Supervisory Control Framework with Software Package Documentation; Advanced Reactor Technology Milestone: M4AT-16PN2301052

This project involved the development of enhanced risk monitors (ERMs) for active components in Advanced Reactor (AdvRx) designs by integrating real-time information about equipment condition with risk monitors. Health monitoring techniques in combination with predictive estimates of component failure based on condition and risk monitors can serve to indicate the risk posed by continued operation in the presence of detected degradation. This combination of predictive health monitoring based on equipment condition assessment and risk monitors can also enable optimization of maintenance scheduling with respect to the economics of plant operation. This report summarizes PNNL’s multi-year project on the development and evaluation of an ERM concept for active components while highlighting FY2016 accomplishments. Specifically, this report provides a status summary of the integration and demonstration of the prototypic ERM framework with the plant supervisory control algorithms being developed at Oak Ridge National Laboratory (ORNL), and describes additional case studies conducted to assess sensitivity of the technology to different quantities. Supporting documentation on the software package to be provided to ONRL is incorporated in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modeling and Optimization Methods for Controlling and Sizing Grid-connected Energy Storage: A Review

Purpose of Review Energy storage is capable of providing a variety of services and solving a multitude of issues in today's rapidly evolving electric power grid. This paper reviews recent research on modeling and optimization methods for optimally controlling and sizing grid-connected battery energy storage systems (BESSs). Open issues and promising research directions are discussed. Recent Findings Recent studies on BESS dispatch, evaluation, and sizing focus on advanced modeling and optimization methods to maximize stacked value streams from multiple services. BESS models have been improved to better represent operational characteristics or capture degradation effects. Different solution methods and optimization techniques have been proposed to improve the benefits and cost-effectiveness of BESSs, using deterministic approaches prevalently but with impressive progress in capturing and addressing uncertainties. Summary Recent progress in BESS scheduling and sizing better supports planning and operational decision-making in different use cases, which is highly important to advance the deployment of BESSs. Additional research is required to properly model the trade-off between short-term benefits and service life with multiple degradation effects explicitly considered in the decision-making process. Advanced methods are to be developed for effectively determining optimal BESS sizes that maximize overall benefits within a varying lifetime considering diversified system, conditions as well as uncertainties at planning and operational stages.

Wu, Di↗

Shared Use Travel Behavior for Improving Rural Mobility: Insights from Greene County, Pennsylvania

Rural communities are considered disadvantaged communities as they suffer from a lack of transport options. Thus, rural regionsprovide less accessibility for commuters to reach their destination as opposed to urban regions. However, the issues of transport disadvantageand shared use mobility in rural areas within the United States (US) have not been well investigated. Furthermore, transport disadvantagediffers between communities and regions across the globe; thus, there is a need to study the behavioral choices of rural commuters within theUS context. This study contributes by analyzing the behavioral choices of rural communities within the US through a case study site ofWaynesburg, Pennsylvania, for adopting a shared use shuttle service. K-means clusters showed that trips from the survey data were a goodrepresentation of real trips from Ecolane. Furthermore, random parameter-based binary logit models were calibrated using data collected fromstudents, faculty, and residents in Waynesburg, Greene County, to study the behavioral choices of commuters. The findings for the faculty andstudents group revealed that prior experience with shared services increases the likelihood of using a shared shuttle. An important personalcharacteristic of inconvenience showed a higher propensity toward using existing modes as opposed to a shared shuttle. Such commutersvalue personal vehicles as more convenient as they have childcare responsibilities and varying schedules for work that require them to moveback and forth across locations, thus making a shared shuttle less attractive for them. The socioeconomic factors of age and gender show ahigher propensity for using shared shuttles. Furthermore, the findings from this study could be helpful for agencies in improving rural mobility andconsidering such shared mobility services for rural communities

42 ENGINEERING↗

New Generator Technology

New generator technology project is driven by the need to be able to remotely deploy generator technology where it is needed, when it is needed. Both the military and aid programs that provide assistance after disasters could use the ability to deploy energy generation that fits the needs of the situation. Currently, pre-specified generators are deployed, sometime more than half way around the world to provide electricity. Through our Phase-I to Phase III DARPA grant, we will provide a mechanism where a 3d print station and raw materials could be shipped to a deployment site and remotely deployed personnel. These remote personnel can collaborate with engineers at a home location where 3d print plans can be optimized for the remote purpose. The plans can then be sent electronically to the remote location for printing, much like NASA sent the plans for a socket wrench to the International Space Station for printing in . If multiple generators need to be deployed at different remote locations, within miles of each other the printer rig can be moved to print the generators where they are needed. 3d printing is growing in the field of manufacturing. 3d printing has matured to the point where many types of materials are now available for many types of manufacturing. Both magnetic and electrically conductive material materials have recently been developed which can now lead to 3d printing of engines and generators. Our project will provide a successful printer rig that can be remotely deployed, to print a generator design in the field as well as provide a process for deploying the printed generator as well. This Systems Engineering Management Plan(SEMP) will provide the planning required for a Phase I DARPA grant that may also include goals for Phase II and Phase II grants. The SEMP provides a proposed project schedule, references, system engineering processes, specialty engineering system deployment and product support sections. Each section will state how our company will provide the necessary services to make this project succeed.

3D printing, manufacturing, generator technology, ↗

A Managed Tokens Service for Securely Keeping and Distributing Grid Tokens

Fermilab is transitioning authentication and authorization for grid operations to using bearer tokens based on the WLCG Common JWT (JSON Web Token) Profile. One of the functionalities that Fermilab experimenters rely on is the ability to automate batch job submission, which in turn depends on the ability to securely refresh and distribute the necessary credentials to experiment job submit points. Thus, with the transition to using tokens for grid operations, we needed to create a service that would obtain, refresh, and distribute tokens for experimenters' use. This service would avoid the need for experimenters to be experts in obtaining their own tokens and would better protect the most sensitive long-lived credentials. Further, the service needed to be widely scalable, as Fermilab hosts many experiments, each of which would need their own credentials. To address these issues, we created and deployed a Managed Tokens Service. The service is written in Go, taking advantage of that language's native concurrency primitives to easily be able to scale operations as we onboard experiments. The service uses as its first credentials a set of kerberos keytabs, stored on the same secure machine that the Managed Tokens service runs on. These kerberos credentials allow the service to use htgettoken via condor_vault_storer to store vault tokens in the HTCondor credential managers (credds) that run on the batch system scheduler machines (HTCondor schedds); as well as downloading a local, shorter-lived copy of the vault token. The kerberos credentials are then also used to distribute copies of the locally-stored vault tokens to experiment submit points.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Dynamic Path Scheduling through Extensions to Generalized Multiprotocol Label Switching (GMPLS) (Final Report)

The major accomplishments of the project are the successful software implementation of the Phase I scheduling algorithms for GMPLS Label Switched Paths (LSPs) and the extension of the IETF Path Computation Element (PCE) Protocol to support scheduling extensions. In performing this work, we have demonstrated the theoretical work of Phase I, analyzed key issues, and made relevant extensions. Regarding the software implementation, we developed a proof of concept prototype as part of our Algorithm Evaluation System (AES). This implementation uses the Linux operating system to provide software portability and will be the foundation for our commercial software. To demonstrate proof of concept, we have implemented LSP scheduling algorithms to support two of the key GMPLS switching technologies (Lambda and Packet) and support both Fixed Path (FP) and Switched Path (SP) routing. We chose Lambda and Packet because we felt it was essential to include both circuit and packet switching technologies as well as to address all-optical switching in the study. As conceptualized in Phase I, the FP algorithms use a traditional approach where the LSP uses the same physical path for the entire service duration while the innovative SP algorithms allow the physical path to vary during the service duration. As part of this study, we have used the AES to conduct a performance analysis using metro size networks (up to 32 nodes) that showed that these algorithms are suitable for commercial implementation. Our results showed that the CPU time required to compute an LSP schedule was small compared to expected inter-arrival time between LSP requests. Also, when the network size increased from 7 to 15 to 32 nodes with 10, 26, and 56 TE links, the CPU processing time showed excellent scaling properties. When Fixed Path and Switched Path routing were compared, SP provided only modestly better performance with respect to LSP completion rate, service duration, path length, and start time deviation. In addition, the SP routing required somewhat more CPU time than the FP routing. However, when the allowable range for the start time is increased, the CPU time for SP increased less rapidly than FP such that the CPU processing times became comparable. Therefore, SP routing may scale better than FP routing. The Path Computation Element Working Group is a complementary working group to the GMPLS working group (CCAMP) in the IETF and is developing standards to discover, manage, and access elements that compute routes for GMPLS for LSPs. The algorithms used to compute the routes are not subject to standardization. Since the PCE supports only standard GMPLS LSPs, it does not support scheduled LSPs. Therefore, it is a natural extension of our Phase I work to introduce this enhancement into the PCE. In addition, the PCE adds another dimension to our product line because the PCE by itself may be a product with a standard interface.

97 MATHEMATICS AND COMPUTING↗

Codevision 0.x

CodeVision (formerly MassAV) is a malware analysis workflow system and repository. It began as a simple tool for analyzing a large malware corpus using multiple COTS antivirus engines in parallel. It has since evolved into a unified interface for collecting, storing and analyzing malicious executable code using a variety of COTS and GOTS backends. Not only can CodeVision receive samples from users via its command-line and web interfaces, but it can also operate on continuous network data feeds (e.g., perimeter e-mail attachments, HTTP downloads). The modular analysis framework and simple API give developers the ability to integrate custom and off-the-shelf analysis tools with ease. The system manages scheduling and dependencies, allowing modules to be chained together into analysis-driven workflows. The system is designed as a distributed, load-balanced web service, an architecture that allows it to scale horizontally by adding additional nodes.

Anderson, Blake↗

Next Generation Integrated Environment for Collaborative Work Across Internets

We are now well-advanced in our development, prototyping and deployment of a high performance next generation Integrated Environment for Collaborative Work. The system, aimed at using the capability of ESnet and Internet2 for rapid data exchange, is based on the Virtual Room Videoconferencing System (VRVS) developed by Caltech. The VRVS system has been chosen by the Internet2 Digital Video (I2-DV) Initiative as a preferred foundation for the development of advanced video, audio and multimedia collaborative applications by the Internet2 community. Today, the system supports high-end, broadcast-quality interactivity, while enabling a wide variety of clients (Mbone, H.323) to participate in the same conference by running different standard protocols in different contexts with different bandwidth connection limitations, has a fully Web-integrated user interface, developers and administrative APIs, a widely scalable video network topology based on both multicast domains and unicast tunnels, and demonstrated multiplatform support. This has led to its rapidly expanding production use for national and international scientific collaborations in more than 60 countries. We are also in the process of creating a 'testbed video network' and developing the necessary middleware to support a set of new and essential requirements for rapid data exchange, and a high level of interactivity in large-scale scientific collaborations. These include a set of tunable, scalable differentiated network services adapted to each of the data streams associated with a large number of collaborative sessions, policy-based and network state-based resource scheduling, authentication, and optional encryption to maintain confidentiality of inter-personal communications. High performance testbed video networks will be established in ESnet and Internet2 to test and tune the implementation, using a few target application-sets.

97 MATHEMATICS AND COMPUTING↗

RL-HEMS: Reinforcement Learning Based Home Energy Management System for HVAC Energy Optimization

Heating, ventilation, and air conditioning (HVAC) is one of the major energy consumers in the residential sector. It is important to be able to monitor and control the energy consumed to provide utility services such as load shaping while satisfying the comfort and economic constraints of the homeowner. The objective of this work is to create the optimal schedule for HVAC operation to reduce the cost while satisfying the home-owner and equipment’s constraints using a model-free Reinforcement Learning (RL)-based optimization. The specific goal is to find the right balance between reducing energy cost, consumption, and customer comfort level. Our research effort addresses this optimization problem using multiple components: the development of initial learning test-bed and implementation of RL techniques on a real home. This will enable the rapid evaluation of the RL techniques and provide an early baseline to train before implementation on site. The RL algorithm is designed to learn the energy use patterns and generate the optimized schedule for HVAC within an acceptable time-interval to satisfy the homeowner’s comfort and minimize the energy usage. Our preliminary results are promising and we have observed a 17% reduction in the total cost and a 15% reduction in the power utilization using our RL-based HVAC model—RL-HEMS.

Kotevska, Olivera↗

Endangered species act impacts on office of legacy management activities at the Rocky Flats, Colorado, Site - 15268

The Endangered Species Act was passed by Congress in 1973 to protect and recover imperiled species and the ecosystems they rely on. The Preble's meadow jumping mouse (Preble's mouse, Zapus hudsonius preblei) was discovered living along the streams at the Rocky Flats Site on the Front Range of Colorado, in the early 1990's during baseline ecological monitoring. In 1998, the Preble's mouse was classified as a federally listed threatened species under the Endangered Species Act. As a result, the mouse and its habitat are protected and Section 7 consultation with the US Fish and Wildlife Service (US FWS) is required before activities may be conducted in Preble's mouse habitat. This requirement has the potential to impact Rocky Flats project schedules and costs since approval from US FWS is needed prior to conducting activities. To reduce the need to consult with US FWS for projects on a case-by-case basis, a programmatic approach was taken. A master list of ongoing activities and other potential future activities was developed and evaluated in a Programmatic Biological Assessment (PBA) that was written for site activities. The PBA that was approved in 2004 worked well during closure, but did not address many ongoing, postclosure US DOE Office of Legacy Management activities. As a result, the PBA was rewritten in 2013 to address postclosure routine and project-specific activities. The use of a programmatic approach has reduced the time and costs associated with getting individual US FWS approvals, which has in turn minimized impacts to schedules. The programmatic approach could prove useful for other US DOE sites with federally listed species. (authors)

54 ENVIRONMENTAL SCIENCES↗

Restoration Strategy for Active Distribution Systems Considering Endogenous Uncertainty in Cold Load Pickup

Cold load pickup (CLPU) phenomenon is identified as the persistent power inrush upon a sudden load pickup after an outage. Under the active distribution system (ADS) paradigm, where distributed energy resources (DERs) are extensively installed, the decreased outage duration can induce a strong interdependence between CLPU pattern and load pickup decisions. In this paper, we propose a novel modelling technique to tractably capture the decision-dependent uncertainty (DDU) inherent in the CLPU process. Subsequently, a two-stage stochastic decision-dependent service restoration (SDDSR) model is constructed, where first stage searches for the optimal switching sequences to decide step-wise network topology, and the second stage optimizes the detailed generation schedule of DERs as well as the energization of switchable loads. Further, to tackle the computational burdens introduced by mixed-integer recourse, the progressive hedging algorithm (PHA) is utilized to decompose the original model into scenario-wise subproblems that can be solved in parallel. The numerical test on modified IEEE 123-node test feeders has verified the efficiency of our proposed SDDSR model and provided fresh insights into the monetary and secure values of DDU quantification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysics and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Software-Defined Network for End-to-end Networked Science at the Exascale

Domain science applications and workflow processes are currently forced to view the network as an opaque infrastructure into which they inject data and hope that it emerges at the destination with an acceptable Quality of Experience. There is little ability for applications to interact with the network to exchange information, negotiate performance parameters, discover expected performance metrics, or receive status/troubleshooting information in real time. The work we presen here is motivated by a vision for a new smart network and smart application ecosystem that will provide a more deterministic and interactive environment for domain science workflows. The Software-Defined Network for End-to-end Networked Science at Exascale (SENSE) system includes a model-based architecture, implementation, and deployment which enables automated end-to-end network service instantiation across administrative domains. An intent based interface allows applications to express their high-level service requirements, an intelligent orchestrator and resource control systems allow for custom tailoring of scalability and real-time responsiveness based on individual application and infrastructure operator requirements. This allows the science applications to manage the network as a first-class schedulable resource as is the current practice for instruments, compute, and storage systems. Deployment and experiments on production networks and testbeds have validated SENSE functions and performance. Emulation based testing verified the scalability needed to support research and education infrastructures. Key contributions of this work include an architecture definition, reference implementation, and deployment. This provides the basis for further innovation of smart network services to accelerate scientific discovery in the era of big data, cloud computing, machine learning and artificial intelligence.

97 MATHEMATICS AND COMPUTING↗

Software-defined network for end-to-end networked science at the exascale

Domain science applications and workflow processes are currently forced to view the network as an opaque infrastructure into which they inject data and hope that it emerges at the destination with an acceptable Quality of Experience. There is little ability for applications to interact with the network to exchange information, negotiate performance parameters, discover expected performance metrics, or receive status/troubleshooting information in real time. The work presented here is motivated by a vision for a new smart network and smart application ecosystem that will provide a more deterministic and interactive environment for domain science workflows. The Software-Defined Network for End-to-end Networked Science at Exascale (SENSE) system includes a model-based architecture, implementation, and deployment which enables automated end- to-end network service instantiation across administrative domains. An intent based interface allows applications to express their high-level service requirements, an intelligent orchestrator and resource control systems allow for custom tailoring of scalability and real-time responsiveness based on individual application and infrastructure operator requirements. This allows the science applications to manage the network as a first-class schedulable resource as is the current practice for instruments, compute, and storage systems. Deployment and experiments on production networks and testbeds have validated SENSE functions and performance. Emulation based testing verified the scalability needed to support research and education infrastructures. Key contributions of this work include an architecture definition, reference implementation, and deployment. This provides the basis for further innovation of smart network services to accelerate scientific discovery in the era of big data, cloud computing, machine learning and artificial intelligence.

47 OTHER INSTRUMENTATION↗

Extending I/O through High Performance Data Services

The complexity of HPC systems has increased the burden on the developer as applications scale to hundreds of thousands of processing cores. Moreover, additional efforts are required to achieve acceptable I/O performance, where it is important how I/O is performed, which resources are used, and where I/O functionality is deployed. Specifically, by scheduling I/O data movement and by effectively placing operators affecting data volumes or information about the data, tremendous gains can be achieved both in the performance of simulation output and in the usability of output data. Previous studies have shown the value of using asynchronous I/O, of employing a staging area, and of performing select operations on data before it is written to disk. Leveraging such insights, this paper develops and experiments with higher level I/O abstractions, termed 'data services', that manage output data from 'source to sink': where/when it is captured, transported towards storage, and filtered or manipulated by service functions to improve its information content. Useful services include data reduction, data indexing, and those that manage how I/O is performed, i.e., the control aspects of data movement. Our data services implementation distinguishes control aspects - the control plane - from data movement - the data plane, so that both may be changed separably. This results in runtime flexibility not only in which services to employ, but also in where to deploy them and how they use I/O resources. The outcome is consistently high levels of I/O performance at large scale, without requiring application change.

97 MATHEMATICS AND COMPUTING↗

Probabilistic Modeling of Commercial Building Occupancy Patterns Using Location-Based Map Data: Preprint

Considering occupancy patterns is crucial to simulate buildings' energy use. Current energy models use inputs that simplify the actual diversity in occupancy into static occupancy patterns and are not able to represent the numerous variations in occupancy patterns between buildings and across different locations. Recently, inferring occupancy schedules from metered electricity consumption data was used to model occupancy in commercial buildings. However, the translation from metered data to occupancy schedules requires many assumptions that might not capture the reality, and the process is hindered by the availability of data from advanced metering infrastructure. With the development of information technologies, occupancy modeling should not be limited to traditional approaches. The prevalence of social networks and location services with real-time user feedback provides publicly accessible data via Maps Application Programming Interfaces (APIs) such as Google Maps, SafeGraph, Mapbox, Foursquare, etc. This paper presents an automated framework for modeling parametric occupancy patterns using such APIs to calibrate commercial district buildings' energy models. This process includes three main steps: data extraction and processing, parametric schedules generation, and schedules integration. We demonstrated this framework in districts where we used maps API to generate more accurate behavioral patterns for operations and electric vehicle charging events. We used these patterns to determine differences in energy use across key sociodemographic and spatial parameters. The presented method has the potential for worldwide applications. Users can utilize this framework to extract data for selected locations of interest to create more realistic behavioral patterns for commercial facilities across different districts.

building energy modeling↗

Plutonium Finishing Plant (PFP) 241-Z Liquid Waste Treatment Facility Deactivation and Demolition

Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique within the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site. The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site. All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individuals confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗