Search NASA⌕ Search

SEARCH · Search NASA

Results for “Standardized Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Advanced telemetry systems for payloads. Technology needs, objectives and issues

The current trends in advanced payload telemetry are the new developments in advanced modulation/coding, the applications of intelligent techniques, data distribution processing, and advanced signal processing methodologies. Concerted efforts will be required to design ultra-reliable man-rated software to cope with these applications. The intelligence embedded and distributed throughout various segments of the telemetry system will need to be overridden by an operator in case of life-threatening situations, making it a real-time integration issue. Suitable MIL standards on physical interfaces and protocols will be adopted to suit the payload telemetry system. New technologies and techniques will be developed for fast retrieval of mass data. Currently, these technology issues are being addressed to provide more efficient, reliable, and reconfigurable systems. There is a need, however, to change the operation culture. The current role of NASA as a leader in developing all the new innovative hardware should be altered to save both time and money. We should use all the available hardware/software developed by the industry and use the existing standards rather than inventing our own.

Source record↗

AstroDOME: Standardized, Mass-Produceable, Small NASA Astrophysics Observatories for Big Missions

NASA’s Goddard Space Flight Center is investigating the use of small, commercial off the shelf (COTS) spacecraft to enable breakthrough astrophysics research at radically reduced cost over previous generations of missions. This paper will focus on the Mission Systems perspective of this investigation. It will cover the spacecraft to instrument interface, and lessons learned in early concept payload development. Low-cost COTS spacecraft have proliferated in the last ~5 years. They represent an order of magnitude reduction in the cost of spacecraft bus development and acquisition. They are enabled by the advent of low-cost smallsat launch options in the immediately preceding years, and are seeded by recent distributed and disaggregated missions in other sectors such as telecommunications megaconstellations (e.g. Starlink, OneWeb, Project Kuiper) and ongoing Space Development Agency (SDA) developments. Our study was tasked with developing a standardized, mass-produceable, astrophysics payload which is reconfigurable to different wavelength bands while maintaining a single optics bench design, and a standardized mechanical, electrical, data, and thermal interface to the spacecraft bus, and which may be reconfigured to multiple COTS spacecraft offerings. In this paper we will discuss lessons learned from our case study. We will also present identified keys to mission success for performing cutting edge astrophysics observations while taking advantage of economies of scale with a disaggregated, standardized architecture.

Matthew Marcus↗

Space Shuttle Cargo Integration Coupled Loads Analysis Lessons Learned

When a system experiences a loading environment characterized by rapidly varying forces, such as a rocket launch, a transient analysis is used to analyze the response of the system. The most common transient analysis methodology is the Coupled Loads Analysis (CLA). CLAs are used by the automotive and aerospace industry to analyze cars, trucks, planes, helicopters, spacecraft, etc. The Space Shuttle program used the CLA methodology to assess the compatibility of the payload with the Orbiter and the flight environment. The Space Shuttle Verification Loads Analysis (VLA) was a standardized CLA process that started between ten and thirteen months prior to launch, and included several meetings as well as analysis by both the Space Shuttle Program and the payload developers to verify that the payloads were compatible with the flight loads environment and would not interact negatively with the vehicle. Over the course of the Space Shuttle Program, many improvements were made to the process, which reduced cycle time and improved manifest flexibility. There were several issues which were never fully addressed, but workarounds were developed to keep the process flowing. The lessons learned included automation of some processes and standardization of others, early assessments, improved documentation and better coordination with all stakeholders in the process. Lessons learned also included the limitations in the current process, and what to do to avoid the same issues in the future.

Erica E. Bruno↗

Space Shuttle Cargo Integration Coupled Loads Analysis Lessons Learned

When a system experiences a loading environment characterized by rapidly varying forces, such as a rocket launch, a transient analysis is used to analyze the response of the system. The most common transient analysis methodology is the Coupled Loads Analysis(CLA). CLAs are used by the automotive and aerospace industry to analyze cars, trucks,planes, helicopters, spacecraft, etc. The Space Shuttle program used the CLA methodology to assess the compatibility of the payload with the Orbiter and the flight environment. The Space Shuttle Verification Loads Analysis (VLA) was a standardized CLA process that started between ten and thirteen months prior to launch, and included several meetings as well as analysis by both the Space Shuttle Program and the payload developers to verify that the payloads were compatible with the flight loads environment and would not interact negatively with the vehicle. Over the course of the Space Shuttle Program, many improvements were made to the process, which reduced cycle time and improved manifest flexibility. There were several issues which were never fully addressed, but work-arounds were developed to keep the process flowing. The lessons learned included automation of some processes and standardization of others, early assessments, improved documentation and better coordination with all stakeholders in the process. Lessons learned also included the limitations in the current process, and what to do to avoid the same issues.

ERICA E. BRUNO↗

An Accelerated Development, Reduced Cost Approach to Lunar/Mars Exploration Using a Modular NTR-Based Space Transportation System

The results of integrated systems and mission studies are presented which quantify the benefits and rationale for developing a common, modular lunar/Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. At present NASA's Exploration Program Office (ExPO) is considering chemical propulsion for an 'early return to the Moon' and NTR propulsion for the more demanding Mars missions to follow. The time and cost to develop these multiple systems are expected to be significant. The Nuclear Propulsion Office (NPO) has examined a variety of lunar and Mars missions and heavy lift launch vehicle (HLLV) options in an effort to determine a 'standardized' set of engine and stage components capable of satisfying a wide range of Space Exploration Initiative (SEI) missions. By using these components in a 'building block' fashion, a variety of single and multi-engine lunar and Mars vehicles can be configured. For NASA's 'First Lunar Outpost' (FLO) mission, an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to translunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.5 m length, and 66 t LH2 capacity. The NTR utilizes a UC-ZrC-graphite 'composite' fuel with a specific impulse (Isp) capability of approximately 900 s and an engine thrust-to-weight ratio of approximately 4.3. By extending the size and LH2 capacity of the lunar NTR stage to approximately 20 m and 96 t, respectively, a single launch Mars cargo vehicle capable of delivering approximately 50 t of surface payload is possible. Three 50 klbf NTR engines and the two standardized LH2 tank sizes developed for lunar and Mars cargo vehicle applications would be used to configure the Mars piloted vehicle for a mission as early as 2010. The paper describes the features of the 'common' NTR-based moon/Mars STS, examines performance sensitivities resulting from different 'mission mode' assumptions, and quantifies potential schedule and cost benefits resulting from this modular moon/Mars NTR vehicle approach.

Borowski, S.↗

Structural dynamics payload loads estimates

The development of a full scale payload integration method which reduces the cost of a load cycle and is capable of land long very large systems is discussed. The method solves the coupled booster/payload system equations and does not involve additional approximations as compared to the standard transient analysis. The method is cost effective and directly applicable to the shuttle payload design case.

Engels, R. C.↗

Space Communication and Navigation SDR Testbed, Overview and Opportunity for Experiments

NASA has developed an experimental flight payload (referred to as the Space Communication and Navigation (SCAN) Test Bed) to investigate software defined radio (SDR) communications, networking, and navigation technologies, operationally in the space environment. The payload consists of three software defined radios each compliant to NASAs Space Telecommunications Radio System Architecture, a common software interface description standard for software defined radios. The software defined radios are new technology developments underway by NASA and industry partners launched in 2012. The payload is externally mounted to the International Space Station truss to conduct experiments representative of future mission capability. Experiment operations include in-flight reconfiguration of the SDR waveform functions and payload networking software. The flight system will communicate with NASAs orbiting satellite relay network, the Tracking and Data Relay Satellite System at both S-band and Ka-band and to any Earth-based compatible S-band ground station. The system is available for experiments by industry, academia, and other government agencies to participate in the SDR technology assessments and standards advancements.

Reinhart, Richard C.↗

Preliminary analysis of an integrated logistics system for OSSA payloads. Volume 4: Supportability analysis of the 1.8m centrifuge

Supportability issues for the 1.8 meter centrifuge in the Life Science Research Facility are addressed. The analysis focuses on reliability and maintainability and the potential impact on supportability and affordability. Standard logistics engineering methodologies that will be applied to all Office of Space Science and Applications' (OSSA) payload programs are outlined. These methodologies are applied to the 1.8 meter centrifuge.

Palguta, T.↗

An EXPRESS Rack Overview and Support for Microgravity Research on the International Space Station (ISS)

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System has provided accommodations and facilitated operations for microgravity-based research payloads for over 6 years on the International Space Station (ISS). The EXPRESS Rack accepts Space Shuttle middeck type lockers and International Subrack Interface Standard (ISIS) drawers, providing a modular-type interface on the ISS. The EXPRESS Rack provides 28Vdc power, Ethernet and RS-422 data interfaces, thermal conditioning, vacuum exhaust, and Nitrogen supply for payload use. The EXPRESS Rack system also includes payload checkout capability with a flight rack or flight rack emulator prior to launch, providing a high degree of confidence in successful operations once an-orbit. In addition, EXPRESS trainer racks are provided to support crew training of both rack systems and subrack operations. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes for ISS payload development. The EXPRESS Rack is designed to accommodate multidiscipline research, allowing for the independent operation of each subrack payload within a single rack. On-orbit operations began for the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support high-priority payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Over 50 multi-discipline payloads have now been supported on-orbit by the EXPRESS Rack Program. Sustaining engineering, logistics, and maintenance functions are in place to maintain hardware, operations and provide software upgrades. Additional EXPRESS Racks are planned for launch prior to ISS completion in support of long-term operations and the planned transition of the U.S. Segment to a National Laboratory.

Pelfrey, Joseph J.↗

Dig Hazard Assessment Using a Stereo Pair of Cameras

This software evaluates the terrain within reach of a lander s robotic arm for dig hazards using a stereo pair of cameras that are part of the lander s sensor system. A relative level of risk is calculated for a set of dig sectors. There are two versions of this software; one is designed to run onboard a lander as part of the flight software, and the other runs on a PC under Linux as a ground tool that produces the same results generated on the lander, given stereo images acquired by the lander and downlinked to Earth. Onboard dig hazard assessment is accomplished by executing a workspace panorama command sequence. This sequence acquires a set of stereo pairs of images of the terrain the arm can reach, generates a set of candidate dig sectors, and assesses the dig hazard of each candidate dig sector. The 3D perimeter points of candidate dig sectors are generated using configurable parameters. A 3D reconstruction of the terrain in front of the lander is generated using a set of stereo images acquired from the mast cameras. The 3D reconstruction is used to evaluate the dig goodness of each candidate dig sector based on a set of eight metrics. The eight metrics are: 1. The maximum change in elevation in each sector, 2. The elevation standard deviation in each sector, 3. The forward tilt of each sector with respect to the payload frame, 4. The side tilt of each sector with respect to the payload frame, 5. The maximum size of missing data regions in each sector, 6. The percentage of a sector that has missing data, 7. The roughness of each sector, and 8. Monochrome intensity standard deviation of each sector. Each of the eight metrics forms a goodness image layer where the goodness value of each sector ranges from 0 to 1. Goodness values of 0 and 1 correspond to high and low risk, respectively. For each dig sector, the eight goodness values are merged by selecting the lowest one. Including the merged goodness image layer, there are nine goodness image layers for each stereo pair of mast images.

Rankin, Arturo L.↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Proximity operations analysis: Retrieval of the solar maximum mission observatory

Retrieval of the solar maximum mission (SMM) observatory is feasible in terms of orbiter primary reaction control system (PRCS) plume disturbance of the SMM, orbiter propellant consumed, and flight time required. Man-in-loop simulations will be required to validate these operational techniques before the verification process is complete. Candidate approach and flyaround techniques were developed that allow the orbiter to attain the proper alinement with the SMM for clear access to the grapple fixture (GF) prior grappling. Because the SMM has very little control authority (approximately 14.8 pound-foot-seconds in two axes and rate-damped in the third) it is necessary to inhibit all +Z (upfiring) PRCS jets on the orbiter to avoid tumbling the SMM. A profile involving a V-bar approach and an out-of-plane flyaround appears to be the best choice and is recommended at this time. The flyaround technique consists of alining the +X-axes of the two vehicles parallel with each other and then flying the orbiter around the SMM until the GF is in view. The out-of-plane flyaround technique is applicable to any inertially stabilized payload, and, the entire final approach profile could be considered as standard for most retrieval missions.

Yglesias, J. A.↗

Automation of electromagnetic compatability (EMC) test facilities

Efforts to automate electromagnetic compatibility (EMC) test facilities at Marshall Space Flight Center are discussed. The present facility is used to accomplish a battery of nine standard tests (with limited variations) deigned to certify EMC of Shuttle payload equipment. Prior to this project, some EMC tests were partially automated, but others were performed manually. Software was developed to integrate all testing by means of a desk-top computer-controller. Near real-time data reduction and onboard graphics capabilities permit immediate assessment of test results. Provisions for disk storage of test data permit computer production of the test engineer's certification report. Software flexibility permits variation in the tests procedure, the ability to examine more closely those frequency bands which indicate compatibility problems, and the capability to incorporate additional test procedures.

Harrison, C. A.↗

Human Integration Design Processes (HIDP)

The purpose of the Human Integration Design Processes (HIDP) document is to provide human-systems integration design processes, including methodologies and best practices that NASA has used to meet human systems and human rating requirements for developing crewed spacecraft. HIDP content is framed around human-centered design methodologies and processes in support of human-system integration requirements and human rating. NASA-STD-3001, Space Flight Human-System Standard, is a two-volume set of National Aeronautics and Space Administration (NASA) Agency-level standards established by the Office of the Chief Health and Medical Officer, directed at minimizing health and performance risks for flight crews in human space flight programs. Volume 1 of NASA-STD-3001, Crew Health, sets standards for fitness for duty, space flight permissible exposure limits, permissible outcome limits, levels of medical care, medical diagnosis, intervention, treatment and care, and countermeasures. Volume 2 of NASASTD- 3001, Human Factors, Habitability, and Environmental Health, focuses on human physical and cognitive capabilities and limitations and defines standards for spacecraft (including orbiters, habitats, and suits), internal environments, facilities, payloads, and related equipment, hardware, and software with which the crew interfaces during space operations. The NASA Procedural Requirements (NPR) 8705.2B, Human-Rating Requirements for Space Systems, specifies the Agency's human-rating processes, procedures, and requirements. The HIDP was written to share NASA's knowledge of processes directed toward achieving human certification of a spacecraft through implementation of human-systems integration requirements. Although the HIDP speaks directly to implementation of NASA-STD-3001 and NPR 8705.2B requirements, the human-centered design, evaluation, and design processes described in this document can be applied to any set of human-systems requirements and are independent of reference missions. The HIDP is a reference document that is intended to be used during the development of crewed space systems and operations to guide human-systems development process activities.

Boyer, Jennifer↗

The payload connection - Approaches to onboard data processing for scientific systems on the Space Shuttle

The integration of payload instruments into the Command and Data Management Subsystem (CDMS) of the Space Shuttle Spacelab is discussed. Specific emphasis is on the distributed (self-contained processor) vs centralized (Spacelab Computer) approach to science payload utilization of these control and data handling capabilities. An overview of the Spacelab CDMS is first given. A synopsis of the integration process for Spacelab Missions 1, 2, and 3 is discussed. Three different hardware approaches to payload command and data handling are then categorized from which Spacelab implementations to date are derived. The different types of Spacelab Mission 3 payload CDMS hardware and software being used are discussed, including examples of microprocessors and data acquisition systems. Preliminary costs for Spacelab application software vs other flight software approaches are compared. A standard RAU interface that would permit a range of ECOS services to be provided, yet be implemented as a mass-produceable unit for incorporation into payloads, is proposed, in keeping with the trend toward simplifying the integration effort, standardizing CDMS interfaces, and ultimately lowering cost.

Konkel, C. R.↗

Europa Clipper Payload Verification and Validation: Test and Analysis Program Design

NASA’s Europa Clipper mission – which is planned to launch in the mid-2020s – is designed to investigate the habitability of the jovian moon Europa with a state-of-the-art suite of over 10 sensors and instruments. Now past its project critical design review, Europa Clipper is starting the execution of its verification and validation (V&V) program. The payload V&V function in particular is responsible for designing and coordinating a thorough test and analysis program that will confirm the proper functioning and performance of our payload instruments. Given the large number of instruments to manage, we have developed a suite of standardized tests and analyses that are designed to cover all of the common interfaces across instruments, while allowing for flexibility to support the unique needs of individual instruments. This suite of activities, coordinated and/or performed by the payload team, forms the bulk of our payload verification and validation campaign. This paper provides a detailed summary of the full set of V&V activities in that suite, covering the four categories of activities: analysis of lower-level evidence, analysis via simulation, testing in the system testbeds, and testing in assembly, test, and launch operations (ATLO). We will describe the purpose of each activity type, how the activities are developed, and the review process for each type of activity. We then define the complete list of activities written for each instrument and how subtleties specific to certain instruments are managed. The discussion will provide a comprehensive understanding of the activities in the payload V&V purview and how various interfaces with different levels of the project are managed. This paper also describes key metrics the payload team uses to track V&V progress and some insights into the teaming design and division of labor we use to ensure consistency and completeness across the entire payload suite. Finally, the paper will offer a snapshot of the status of the Payload V&V program prior to instrument delivery and offer insights into the upcoming phase of instrument delivery and the start of ATLO.

Lee, Dennis↗

Optimal boost trajectories for the shuttle vehicle.

Solutions of the optimal boost problem for the MSC April 1970 base line shuttle vehicle show significant payload increases may be achieved by flying optimal pitch profiles. Results consistent with aerodynamic and acceleration constraints indicate payload gains of approximately 2.0 per cent of the total injected weight may be achieved. This corresponds to a real payload increase of about 20 per cent. Trajectory parameters for optimal launches under various conditions and a standard gravity turn launch are presented along with a brief discussion of the problem modeling and assumptions. The data are used to support a number of observations and conclusions and to provide some insight into the methods by which payload gains are achieved.

Sullivan, H. C.↗

Development of NASA's Space Communications and Navigation Test Bed Aboard ISS to Investigate SDR, On-Board Networking and Navigation Technologies

NASA is developing an experimental flight payload (referred to as the Space Communication and Navigation (SCAN) Test Bed) to investigate software defined radio (SDR), networking, and navigation technologies, operationally in the space environment. The payload consists of three software defined radios each compliant to NASA s Space Telecommunications Radio System Architecture, a common software interface description standard for software defined radios. The software defined radios are new technology developments underway by NASA and industry partners. Planned for launch in early 2012, the payload will be externally mounted to the International Space Station truss and conduct experiments representative of future mission capability.

Reinhart, Richard C.↗