Search NASA⌕ Search

SEARCH · Search NASA

Results for “Stochastic programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

An Ensemble Optimization Framework for Coupled Design of Hydropower Contracts and Real-Time Reservoir Operating Rules

Often, revenues from hydropower generation depend on the operator's ability to provide firm power in the presence of uncertain inflows. The primary options available for optimizing revenue are negotiation of a firm power contract before operations begin and adjustment of the reservoir release during operations. Contract and release strategy optimization are closely coupled and most appropriately analyzed with stochastic real-time control methods. Here we use an ensemble-based approach to stochastic optimization that provides a convenient way to construct nonparametric revenue probability distributions to explore the implications of uncertainty. The firm power contract is a simplified bilateral fixed price agreement that partially insulates operator and buyer from price fluctuations. The release control laws and firm energy target are jointly optimized to maximize the operator's expected revenue. Revenue probability distributions and related spill performance statistics indicate that predictive operating strategies such as stochastic dynamic programming and model predictive control can give significantly better performance than standard deterministic operating rules. The performance obtained from batch optimization with perfect inflow information establishes a convenient upper bound on potential revenue and provides a baseline for assessing the significance of differences between real-time operating strategies. Sensitivity analysis indicates that the benefits of predictive operational strategies are greatest for reservoirs with medium nondimensional residence times and less important for reservoirs with large residence times. Overall, probabilistic analysis of the coupled hydropower contract-operations problem provides a realistic way to assess revenue and risk for reservoirs that must provide firm power when inflows are uncertain.

13 HYDRO ENERGY↗

Value of Probabilistic Weather Forecasts: Assessment by Real-Time Optimization of Irrigation Scheduling

This paper presents a modeling framework for real-time decision support for irrigation scheduling using the National Oceanic and Atmospheric Administration's (NOAA's) probabilistic rainfall forecasts. The forecasts and their probability distributions are incorporated into a simulation-optimization modeling framework. In this study, modeling irrigation is determined by a stochastic optimization program based on the simulated soil moisture and crop water-stress status and the forecasted rainfall for the next 1-7 days. The modeling framework is applied to irrigated corn in Mason County, Illinois. It is found that there is ample potential to improve current farmers practices by simply using the proposed simulation-optimization framework, which uses the present soil moisture and crop evapotranspiration information even without any forecasts. It is found that the values of the forecasts vary across dry, normal, and wet years. More significant economic gains are found in normal and wet years than in dry years under the various forecast horizons. To mitigate drought effect on crop yield through irrigation, medium- or long-term climate predictions likely play a more important role than short-term forecasts. NOAA's imperfect 1-week forecast is still valuable in terms of both profit gain and water saving. Compared with the no-rain forecast case, the short-term imperfect forecasts could lead to additional 2.4-8.5% gain in profit and 11.0-26.9% water saving. However, the performance of the imperfect forecast is only slightly better than the ensemble weather forecast based on historical data and slightly inferior to the perfect forecast. It seems that the 1-week forecast horizon is too limited to evaluate the role of the various forecast scenarios for irrigation scheduling, which is actually a seasonal decision issue. For irrigation scheduling, both the forecast quality and the length of forecast time horizon matter. Thus, longer forecasts might be necessary to evaluate the role of forecasts for irrigation scheduling in a more effective way.

54 ENVIRONMENTAL SCIENCES↗

Resilience Enhancement of Distribution Grids Against Extreme Weather Events

This paper proposes a resilience-oriented design (ROD) technique to protect distribution grids against high-impact but low-probability extreme weather events. The problem is formulated as a two-stage stochastic mixed integer problem. The first stage is to make ROD decisions, i.e., hardening existing distribution lines and deploying ROD resources such as back-up distributed generators and automatic switches. The second stage evaluates the system operation cost during a realized extreme weather event and repair cost after the event. A novel modeling strategy is proposed to deal with the decision-dependent uncertainty of distribution line damage status, which is affected by the first-stage hardening decisions. As both stages have binary variables, a modified and computationally efficient progressive hedging algorithm with scenario bundling is introduced. The algorithm performance is evaluated by calculating lower bounds of solutions. In conclusion, the proposed model and algorithms are demonstrated on 34-bus and 123-bus test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Transmission Hardening Planning in a High Renewable Penetration Erra

Hardening components in transmission systems is a practice to improve system resilience against possible disturbances caused by natural disasters. In a power system with a very high penetration of renewable energy, the system hardening will be further complicated by the uncertainty and variability of renewable energy. In this paper, we study the transmission line hardening planing problem in the context of probabilistic power flows injected by the high penetration of renewable energy. We assume that the probabilistic information of renewable energy is incomplete and ambiguous and propose a data-driven approach to approximate the renewable uncertainty sets. We then extend the N - 1 security criteria to multiple simultaneous contingencies and seek to prepare a hardening plan for the worst-case scenarios. A two-stage data-driven stochastic model is formulated by considering the joint worst-case wind output distribution and transmission line contingencies. Then, we apply the Column-and-Constraints generation method to solve the proposed model. To test the effectiveness of the proposed approach, we conduct experiments on 24-bus and 118-bus test systems. We numerically show that the data-driven approach can effectively address the uncertainty ambiguity and the proposed approach can produce effective hardening plans that improve the system resilience.

Column-and-Constraint generation↗

Mitigating the Impacts of Uncertain Geomagnetic Disturbances on Electric Grids: A Distributionally Robust Optimization Approach

Severe geomagnetic disturbances (GMDs) increase the magnitude of the electric field on the Earth’s surface (E-field) and drive geomagnetically-induced currents (GICs) along the transmission lines in electric grids. These additional currents can pose severe risks, such as current distortions, transformer saturation and increased reactive power losses, each of which can lead to system unreliability. Today several mitigation actions (e.g., changing grid topology) exist that can reduce the harmful GIC effects on the grids. Making such decisions can be challenging, however, because the magnitude and direction of the E-field are uncertain and non-stationary. In this paper, we model uncertain E-fields using the distributionally robust optimization (DRO) approach that determines optimal transmission grid operations such that the worst-case expectation of the system cost is minimized. We also capture the effect of GICs on the nonlinear AC power flow equations. For solution approaches, we develop an accelerated column-and-constraint generation (CCG) algorithm by exploiting a special structure of the support set of uncertain parameters representing the E-field. Extensive numerical experiments based on “epri-21” and “uiuc-150” systems, designed for GMD studies, demonstrate (i) the computational performance of the accelerated CCG algorithm, (ii) the superior performance of distributionally robust grid operations that satisfy nonlinear, nonconvex AC power flow equations and GIC constraints, in comparison with standard stochastic programming-based methods during the out-of-sample testing.

42 ENGINEERING↗

Restoration Strategy for Active Distribution Systems Considering Endogenous Uncertainty in Cold Load Pickup

Cold load pickup (CLPU) phenomenon is identified as the persistent power inrush upon a sudden load pickup after an outage. Under the active distribution system (ADS) paradigm, where distributed energy resources (DERs) are extensively installed, the decreased outage duration can induce a strong interdependence between CLPU pattern and load pickup decisions. In this paper, we propose a novel modelling technique to tractably capture the decision-dependent uncertainty (DDU) inherent in the CLPU process. Subsequently, a two-stage stochastic decision-dependent service restoration (SDDSR) model is constructed, where first stage searches for the optimal switching sequences to decide step-wise network topology, and the second stage optimizes the detailed generation schedule of DERs as well as the energization of switchable loads. Further, to tackle the computational burdens introduced by mixed-integer recourse, the progressive hedging algorithm (PHA) is utilized to decompose the original model into scenario-wise subproblems that can be solved in parallel. The numerical test on modified IEEE 123-node test feeders has verified the efficiency of our proposed SDDSR model and provided fresh insights into the monetary and secure values of DDU quantification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Uncertainty Quantification for Capacity Expansion Planning

This report quantifies the uncertainty in output decisions from a Capacity Expansion Planning (CEP) model. The need to understand how uncertainties within CEP models and modeling assumptions affect Quantities of Interest (QoIs) such as expansion and operating costs, as well as expansion decisions remains an ongoing challenge in scientific research and industrial operations. This area of research is particularly important for models which seek to capture how large networks will evolve and operate under increased sources of variable generation, i.e., higher penetration of renewable technologies such as solar and wind generators. Uncertainty quantification (UQ) of CEP models which estimate expansion costs and decisions, and production cost models which estimate operating costs and dispatch decisions, is a key focus of research at NREL. The Regional Energy Deployment System (ReEDS) represents a state-of-the-art CEP model and considers a range of possible grid evolutions in an attempt to identify key drivers, ramifications, and decisions which contribute to better informed investment and policy decisions. However, research to quantify how uncertainties and model assumptions, such as unit commitment (UC), within ReEDS may be affecting its outputs remains challenging due to to size and complexity of the model

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilience Development for Electric Energy Delivery Sytems (ResDEEDS): A Tool for Power System Resilience Planning (Rev. 1)

The INL Resilience Framework is built to be customized to a particular system’s characteristics, resilience goals, and hazards that it is likely to face. The challenge with a framework that is built to be customized is that it requires more effort from the user to understand the framework and apply it correctly to a particular system. The goal of the web application described here is to automate the framework application as much as possible. Inputs from users are standardized into a common format, but the modeling platform used is a modular framework built to adapt to any system. Baseline effects from common hazards are programmed with stochastic variables to allow for quick exploration of hazard impacts, but can be customized down to component-level impact if a user desires a high level of detail and specificity.

17 WIND ENERGY↗

Residuals-based distributionally robust optimization with covariate information

We consider data-driven approaches that integrate a machine learning prediction model within distributionally robust optimization (DRO) given limited joint observations of uncertain parameters and covariates. Our framework is flexible in the sense that it can accommodate a variety of regression setups and DRO ambiguity sets. We investigate asymptotic and finite sample properties of solutions obtained using Wasserstein, sample robust optimization, and phi-divergence-based ambiguity sets within our DRO formulations, and explore cross-validation approaches for sizing these ambiguity sets. Through numerical experiments, we validate our theoretical results, study the effectiveness of our approaches for sizing ambiguity sets, and illustrate the benefits of our DRO formulations in the limited data regime even when the prediction model is misspecified.

97 MATHEMATICS AND COMPUTING↗

Assignment of Freight Traffic in a Large-scale Intermodal Network under Uncertainty

This paper presents a methodology for freight traffic assignment in a large-scale road-rail intermodal network under uncertainty. Network uncertainties caused by natural disasters have dramatically increased in recent years. Several of these disasters (e.g., Hurricane Sandy, Mississippi River Flooding, and Hurricane Harvey) severely disrupted the U.S. freight transportation network, and consequently, the supply chain. To account for these network uncertainties, a stochastic freight traffic assignment model is formulated. An algorithmic framework, involving the sample average approximation and gradient projection algorithm, is proposed to solve this challenging problem. The developed methodology is tested on the U.S. intermodal network with freight flow data from the Freight Analysis Framework. The experiments consider three types of natural disasters that have different risks and impacts on transportation networks: earthquakes, hurricanes, and floods. It is found that for all disaster scenarios, freight ton-miles are higher compared to the base case without uncertainty. The increase in freight ton-miles is the highest under the flooding scenario; this is because there are more states in the flood-risk areas, and they are scattered throughout the U.S.

42 ENGINEERING↗

mpi-sppy: Optimization Under Uncertainty for Pyomo

We introduce a new Pyomo extension for optimization under uncertainty, mpi-sppy. This extension allows for the mixing of, and sharing of information between, various algorithmic approaches for optimization under uncertainty. We will discuss the underlying architecture and assess the performance and scalability of mpi-sppy on various systems, including HPC clusters.

27 ARPA - Advanced Research Projects Agency-Energy↗

Data and Multistage Optimization for the New Grid

Three essential capabilities for using exascale computing resources on next generation power grid applications are: generating large renewable energy datasets, modeling damage and operations during and after extreme events, and employing multi-stage optimization for infrastructure planning. Powerscenarios, developed as part of the ExaSGD project, addresses these capabilities by enabling users to build synthetic wind farms for large test systems using numerical weather prediction-based data sources. We share examples of using Powerscenarios to build out wind farms on the ACTIVSg2000 test system, to enable simulated operations and emergency asset allocation during a hurricane strike, and to compute multi-stage infrastructure buildouts.

economic dispatch↗

Evolution of Scenario Generation Capabilities in the ExaSGD Project

High-fidelity renewable energy scenarios and rare-event high-impact contingencies are essential for modeling operations and infrastructure expansion of the next generation power grids using exascale computing resources. As the ExaSGD project progressed, our capabilities for generating scenarios for modeling wind power output at multiple wind farms significantly improved, evolving from the use of independent random perturbations to importance sampling-based techniques capturing representative spatial-temporal relations. Contingency generation also improved, evolving from standard N-1 techniques to probabilistic models of infrastructure damage resulting from extreme weather events. We review the developments in the realistic intermittent-energy scenario forecasting and extreme-event contingency creation as the ExaSGD project progressed and discuss the future work in these areas.

economic dispatch↗

Stochastic Design Optimization of Microstructural Features Using Linear Programming for Robust Design

Microstructure design can have a substantial effect on the performance of critical components in numerous aerospace applications. However, the stochastic nature of metallic microstructures leads to deviations in material properties from the design point and alters the performance of these critical components. In this paper, a novel stochastic linear programming (LP) methodology is developed for microstructure design accounting for uncertainties in desired properties. The metallic microstructure is represented using a finite element discretized form of the orientation distribution function (ODF). The inverse LP problem solves the mean values and covariance matrix of the ODFs to maximize the mean values of a property, given the statistical constraints on other properties. The highlight is an analytical uncertainty quantification model via a Gaussian distribution to model propagation of microstructural uncertainties to the properties. Examples illustrate maximization of the yield strength and magnetostriction of a galfenol alloy when constrained by uncertainties in a set of stiffness constants.

42 ENGINEERING↗

A Maximin Approach for the Bi-criteria 0-1 Random Fuzzy Programming Problem Based on the Necessity Measure

This paper considers a bi-criteria general 0-1 random fuzzy programming problem based on the degree of necessity which include some previous 0-1 stochastic and fuzzy programming problems. The proposal problem is not well-defined due to including randomness and fuzziness. Therefore, by introducing chance constraint and fuzzy goals for objectives, and considering the maximization of the aspiration level for total profit and the degree of necessity that the objective function's value satisfies the fuzzy goal, the main problem is transformed into a deterministic equivalent problem. Furthermore, by using the assumption that each random variable is distributed according to a normal distribution, the problem is equivalently transformed into a basic 0-1 programming problem, and the efficient strict solution method to find an optimal solution is constructed.

99 GENERAL AND MISCELLANEOUS↗

Discrete Time McKean–Vlasov Control Problem: A Dynamic Programming Approach

We consider the stochastic optimal control problem of nonlinear mean-field systems in discrete time. We reformulate the problem into a deterministic control problem with marginal distribution as controlled state variable, and prove that dynamic programming principle holds in its general form. We apply our method for solving explicitly the mean-variance portfolio selection and the multivariate linear-quadratic McKean–Vlasov control problem.

97 MATHEMATICS AND COMPUTING↗