Search NASA⌕ Search

SEARCH · Search NASA

Results for “Sustained Lunar Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

NASA Space Launch System Completes Green Run Testing, Begins Assembly

NASA’s Space Launch System (SLS) Program is poised in 2021 to shift its focus to the launch site with the completion of its last major integrated hardware and software test. SLS is NASA’s evolvable super heavy-lift launch vehicle for deep space exploration. Using proven propulsion technologies, SLS will be the most powerful launch vehicle in the world. That capability translates not only into more mass and volume to destinations but also simplified payload design and mission operations and greater opportunity for mission success. These capabilities will be important for the Artemis program, NASA’s plan to return humans to the Moon to stay in a sustainable way in order to develop and test technologies and operations needed for human missions to Mars and other destinations. SLS will anchor the transportation leg of an innovative, sustainable program of lunar exploration with commercial and international partners as the first step of human exploration of deep space. While all major hardware and software efforts made significant progress in 2020 and 2021, the most visible was the Green Run test series of the Artemis I core stage conducted at NASA’s Stennis Space Center (SSC) on the B-2 test stand. The series validated core stage design, performance, workmanship, and readiness for shipment to NASA Kennedy Space Center (KSC) for final processing, integration and launch. The core stage provides the backbone for SLS’ main propulsion system, consisting of two five-segment solid rocket boosters and four RS-25 liquid hydrogen (LH2)/liquid oxygen (LOX) engines. SLS also includes an Interim Cryogenic Propulsion Stage (ICPS) that will insert the Orion crew spacecraft into a lunar trajectory.

John Honeycutt↗

Development Testing and Analysis of the Integrated Gateway-ESPRIT Bipropellant Refuelling System

The Gateway will be humanity’s first space station orbiting the Moon completed by NASA in partnership with ESA and other US and international partners. The Gateway will provide critical support to sustainable human exploration on the moon through the Artemis program. To enable the Lunar Gateway to complete its mission, on orbit refuelling is essential. The ESPRIT Refuelling Module (ERM) will provide the capability to transfer propellants, MMH and MON-3, through the Habitation and Logistics Outpost (HALO) to the Power and Propulsion Element (PPE). The transfer of these propellants carries known risks and hazards. These hazards include overpressure of the propellant lines during priming sequences between modules and during refuelling pause operations. To support the early system development and to mitigate these risks, a collaborative test program between NASA, ESA and Thales Alenia Space was completed at the Thales Alenia Space test facility in Harwell, UK. This test program integrated fluidic breadboards of the ERM, HALO and PPE modules. The objectives of the test program were to demonstrate and characterise critical performance and transient operations, inform refuelling concept of operations and to calibrate and validate numerical models of the refuelling subsystem in EcosimPro. To support the completion of this final objective a detailed model of the integrated breadboard was developed in EcosimPro and key steady-state and transient test cases were simulated. As an industry first, a National Institute of Standards and Technology (NIST) database correlation for Hydrofluoroether (HFE-7000) was used as a mixed oxides of nitrogen (MON-3) simulant with EcosimPro and European Space Propulsion System Simulation (ESPSS) libraries to result in a more accurate analysis for transient phenomenon such as priming. The test and simulation data showed good agreement validating the model for further system analysis as the ERM design progresses.

Refuelling↗

Apollo 6, Anomaly Report No. 6: Abnormal Structural Performance During Launch Phase

Approximately 2 minutes 13 seconds after lift-off of the Apollo 6 mission, abrupt changes of strain, vibration, and acceleration measurements were indicated in the S-IVB, instrument unit, adapter, lunar module, and command and service modules; photographs showed objects coming from the area of the adapter. The adapter, however, continued to sustain the required loads with no impairment of the mission. The investigation was first focused upon the understanding of the coupled vibration modes and characteristics of the launch vehicle and spacecraft.' Extensive test programs were conducted. It was eventually concluded that the adapter failure was not caused by vibration. Extensive study of the airborne photography and other evidence indicated that a large area of the adapter had lost inner facesheet from the honeycomb sandwich panels. Loads and stresses resulting from vibration were determined to be insufficient to initiate such a failure. The investigation was then directed toward determining the range of pressures that could have been trapped in the Apollo 6 adapter sandwich panels, and toward determining the tolerance of the panels to withstand pressure with various degrees of flaws such as adhesive voids and facesheet dents. The degradation effects of moisture and heat exposure on the adhesive strength were also studied and tested. These tests and analyses led to the conclusion that pressure internal to the sandwich panels could have caused the failure, if a large flaw existed. The pressure buildup would have been caused by aerodynamic heating effects on air and moisture trapped in the panel. The probable cause of the failure was found in the original ultrasonic inspection scan record of the affected adapter panel. In the center of the region where the adapter failed, horizontally along the station 709 panel splice, the record contained two thick anomalous lines extending several feet. Without an X-ray record of this region, the significance of this particular scan record cannot be fully understood. However, since all other evidence had indicated that the adhesive had to be weakened in a rather large area to initiate the failure, the investigation was focused intently upon the station 709 splices of other adapters. Sufficient information was developed to verify that deficient assembly techniques have consistently resulted in abnormalities in the structure at this station. These abnormalities were identified in adapters 12, 13, 14, 15, and 16. Before the splice abnormalities were pinpointed, corrective action was taken to reduce pressure "buildup in the honeycomb panels and to reduce heat degrading effects on the adhesive. This was done by drilling vent holes in the inner facesheet and covering the outer facesheet with cork. The adapters having identified abnormalities in the station 709 splice are being repaired, and the contractor is investigating ways of avoiding these -abnormalities in panels yet to be bonded.

Source record↗

VIPER: PATHFINDING IN-SITU RESOURCE UTILIZATION

With the Artemis Program, NASA plans to return humans to the Moon to stay. To help support extended stays on the moon, use of local materials - so-called in-situ resources could be invaluable. Since the moon’s polar regions have confirmed the presence of volatiles, as revealed by LCROSS, LRO and other lunar missions, the next step is to understand the nature and distribution of those candidate resources and how they might be extracted. Recent studies have even indicated that if those volatiles are practically available for harvesting, they could be processed into propellants and human life-support resources, significantly aiding in sustaining humans on the Moon, and eventually and later to sup-port missions to Mars

resource utilization↗

Current NASA In-Situ Resource Utilization (ISRU) Strategic Vision

Perform development to TRL 5/6 through ground demonstration in relevant environment. Perform component/subscale subsystem flight demonstrations on small/mid-size landers. Assess and characterize water in volatiles in lunar polar shadowed regions and craters. Reduce risk of ISRU for mission critical consumables through Integrated End-to-End Flight Demonstrations (pilot scale). Establish initial Human Mission Scale production capability to promote sustainable operations and as anchor for commercial involvement. Identify and characterize polar region environment and resources/volatiles for Science and future Exploration/Commercial applications. Provide ground-truth physical, mineral, and water/volatile resource characteristic information at multiple locations to provide geological context for science-focused theories of volatile placement and initial mining assessments.Test technologies and processes to reduce risk of future extraction/mining systems. Quantify concentration and lateral/vertical distribution of resources/volatiles. Utilize ISRU capabilities to Extend and Enhance Human Lunar Exploration Missions. Provide oxygen (and fuel) to enable reusable human lunar lander (10+ MT/yr O2)Process carbon-based crew waste/trash into gases and propellants; can reduce logistics while minimizing public perception issues (alternative is conversion to radiation shielding). Scavenge unused propellants and hardware from spent landers. Metal extraction from regolith as feedstock for in situ and in space manufacturing demonstrations. Civil engineering and construction aimed at future outpost/infrastructure build-up. Develop and Demonstrate ISRU for Human Mars Missions. ISRU for propellant production (10-15 MT/yr); Liquefy, store, transfer, and refuel ascent vehicle. Use Moon for operational experience and mission validation for Mars: Pre-deployment & remote activation and operation without crew. Storing and transferring mission consumables Landing crew with empty tanks with ISRU propellants already made and waiting. Support/Promote Commercialization of Space. Large scale polar ice mining (100+ MT/yr water)O2/H2 propulsion for landers/cis-lunar transportation with surface and in space depots. In situ construction and energy expansion at mining and human outpost site(s). ISRU Ground Development. Develop and advance ISRU technologies to enable acquisition of resources and processing into mission consumables. Utilize Multi-center collaboration with a portfolio that includes internal NASA work, external contracts, and collaborative agreements/partnerships. Where appropriate, develop lunar ISRU components and subsystems with a Mars-forward application. Engage industry through public-private partnerships to lay the foundation for long-term lunar and space economic development. Spin-in/spin-out technologies for terrestrial applications and industry (mining, oil & gas, alternative energy, construction). Flight Demonstration Path to Operational ISRU. Utilize small demonstrations with near off-the-shelf hardware to obtain critical information quickly on lunar resources and operations. Demonstrate critical technologies and processes that interact with lunar materials and environments. Perform 'pilot plant' demonstrations at architecture relevant scales and durations to reduce the risk for ISRU-provided products for critical human mission applications.

In-situ Resource Utilization↗

Gateway Program Development Progress

This paper provides an overview and status of Gateway, humanity’s first space station to orbit the Moon providing vital support for a sustained, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis missions. As a lunar outpost, Gateway is a destination for deep space crew expeditions and science investigations, a port for deep space transportation, including landers transiting to the lunar surface or spacecraft embarking to deep space destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and is the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of Gateway’s major components in various stages of development. The entire Gateway spacecraft is at preliminary design level of maturity, with some components at or near critical design review. Gateway’s major components are the Power and Propulsion Element; the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; Gateway External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; and an Airlock. This paper will also provide an update on the status of the integration activities necessary to fly and operate this complex, next-generation integrated spacecraft for a minimum 15 year design life, including systems engineering integrated analysis cycles, the autonomous Vehicle System Manager software, verification and validation labs, and common vehicle equipment. Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on the International Space Station, Gateway is an evolution of this extraordinary partnership leveraging the capabilities of each contributor to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple space agencies, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Sean M Fuller↗

Gateway Program Development Progress

This paper provides an overview and status of Gateway, humanity’s first space station to orbit the Moon providing vital support for a sustained, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis missions. As a lunar outpost, Gateway is a destination for deep space crew expeditions and science investigations, a port for deep space transportation, including landers transiting to the lunar surface or spacecraft embarking to deep space destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and is the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of Gateway’s major components in various stages of development. The entire Gateway spacecraft is at preliminary design level of maturity, with some components at or near critical design review. Gateway’s major components are the Power and Propulsion Element; the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; Gateway External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; and an Airlock. This paper will also provide an update on the status of the integration activities necessary to fly and operate this complex, next-generation integrated spacecraft for a minimum 15-year design life, including systems engineering integrated analysis cycles, the autonomous Vehicle System Manager software, verification and validation labs, and common vehicle equipment. Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on the International Space Station, Gateway is an evolution of this extraordinary partnership leveraging the capabilities of each contributor to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple space agencies, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

Robust Exploration and Commercial Missions to the Moon Using NTR LANTR Propulsion and Lunar-Derived Propellants

The nuclear thermal rocket (NTR) has frequently been identified as a key space asset required for the human exploration of Mars. This proven technology can also provide the affordable access through cislunar space necessary for commercial development and sustained human presence on the Moon. In his post-Apollo Integrated Space Program Plan (1970-1990), Wernher von Braun, proposed a reusable nuclear thermal propulsion stage (NTPS) to deliver cargo and crew to the Moon to establish a lunar base before undertaking human missions to Mars. The NTR option was selected by von Braun because it was a demonstrated technology capable of generating both high thrust and high specific impulse (Isp 900 s) twice that of todays best chemical rockets. In NASAs Mars Design Reference Architecture (DRA) 5.0 study, the crewed Mars transfer vehicle used three 25 klbf Pewee engines the smallest and highest performing engine tested in the Rover program along with graphite composite fuel. Smaller, lunar transfer vehicles consisting of a NTPS using three approximately 16.5 klbf Small Nuclear Rocket Engines (SNREs), an in-line propellant tank, plus the payload can enable a variety of reusable lunar missions. These include cargo delivery and crewed lunar landing missions. Even weeklong tourism missions carrying passengers into lunar orbit for a day of sightseeing and picture taking are possible. The NTR can play an important role in the next phase of lunar exploration and development by providing an affordable in-space lunar transportation system (LTS) that can allow initial outposts to evolve into settlements supported by a variety of commercial activities such as in-situ propellant production used to supply strategically located propellant depots and transportation nodes. The utilization of iron-rich volcanic glass or lunar polar ice (LPI) deposits (each estimated at billions of metric tons) for propellant production can significantly reduce the launch mass requirements from Earth and can enable reusable, surface-based lunar landing vehicles (LLVs) using liquid oxygen/hydrogen (LOX/LH2) chemical rocket engines. Afterwards, LOX/LH2 propellant depots can be established in lunar equatorial and polar orbits to supply the LTS. At this point a modified version of the conventional NTR called the LOX-augmented NTR, or LANTR would be introduced into the LTS allowing bipropellant operation and leveraging the mission benefits of refueling with lunar-derived propellants for Earth return. The bipropellant LANTR engine utilizes the large divergent section of its nozzle as an afterburner into which oxygen is injected and supersonically combusted with nuclear preheated hydrogen emerging from the engines choked sonic throat essentially scramjet propulsion in reverse. By varying the oxygen-to-hydrogen mixture ratio, LANTR engines can operate over a range of thrust and Isp values while the reactor core power level remains relatively constant. Eventually, a LANTR-based LTS can enable a rapid commuter shuttle with one-way trip times to and from the Moon ranging from 36 to 24 hours. Even if only 1 of the extracted propellant from identified volcanic glass and polar ice deposits were available for use in lunar orbit, such a supply could support daily commuter flights to the Moon for many thousands of years! An evolutionary mission architecture is outlined and a variety of lunar missions and transfer vehicle designs are examined, along with the increasing demands on propellant production as mission complexity increases. A comparison of vehicle features and engine operating characteristics, for both NTR and LANTR engines, is also provided along with a brief discussion on the propellant production issues associated with using volcanic glass and LPI as source material.

Spacecraft design↗

Recovery of Lunar Surface Access Module Residual and Reserve Propellants

The Vision for Space Exploration calls for human exploration of the lunar surface in the 2020 timeframe. Sustained human exploration of the lunar surface will require supply, storage, and distribution of consumables for a variety of mission elements. These elements include propulsion systems for ascent and descent stages, life support for habitats and extra-vehicular activity, and reactants for power systems. NASA KSC has been tasked to develop technologies and strategies for consumables transfer for lunar exploration as part of the Exploration Technology Development Program. This paper will investigate details of operational concepts to scavenge residual propellants from the lunar descent propulsion system. Predictions on the mass of residuals and reserves are made. Estimates of heat transfer and boiloff rates are calculated and transient tank thermodynamic issues post-engine cutoff are modeled. Recovery and storage options including cryogenic liquid, vapor and water are discussed, and possible reuse of LSAM assets is presented.

Notardonato, William U.↗

Lunar Water ISRU Measurement Study (LWIMS): Establishing a Measurement Plan for Identification and Characterization of a Water Reserve

NASA’s Artemis program aims to achieve a sustainable lunar presence by 2028. To carry out sustained crewed surface operations, In-Situ Resource Utilization (ISRU), which would use lunar resources (e.g., water) to produce mission consumables, will be critical. Water-bearing materials have been identified at both lunar poles, butthe nature and extent of this resource is not well understood. Identification of the presence of water alone is not adequate for ISRU architecture planning and engineering design. The Lunar Water ISRU Measurement Study (LWIMS) assessed and defined the type, amount, and fidelity of the information and measurements needed to select mining locations for lunar water ISRU and to define requirements for ISRU hardware and architecture development. Current ISRU requirements were used to define a water ‘reserve’ in this context. A measurement plan to achieve these goals includes three key elements; a predictive ‘water favorability’ model to identify and map potential deposits, continued assessment of orbital data, and three types of landed missions to make direct ground measurements. Corresponding mission scenarios and instrument suites will depend on risk posture and timelines for ISRU implementation.

In situ resource utilization↗

Thermal Model of Ice Growth in Vacuum for Lunar Water Production

To support NASA’s goal of sustained lunar presence, the use of in-situ resource utilization will reduce launch weight and frequency of resupply missions. With the discovery of water in the permanently shadowed regions of the moon, the prospect of harvesting water has generated particular interest. A more fundamental understanding of water storage and capture in lunar conditions is necessary for effective and efficient water capture and transport. The present study derives a thermal model for ice height, heat flux, chamber pressure, and mass flow rate in sub-atmospheric pressures below the triple point. The thermal model compares ice layer height against the results of the experiment at two pressures (300 Pa and 500 Pa) and temperatures from -18°C to -3°C. The thermal model predicts the trends seen experimentally with an overall root mean square error of 0.1135 cm and coefficient of efficiency of 0.994, indicating the model predicts the experimental results. The thermal model can be utilized to examine the impacts of varying pressure, temperature, and cold plate area to determine the most effective ice growth conditions for efficient capture of water on the lunar surface. The thermal model will provide a useful tool for NASA in the design of the lunar ice tanker and shows the promise of effective capture water on the lunar surface.

Ice growth↗

Thermal Model of Ice Growth in Vacuum for Lunar Water Production

To support NASA’s goal of sustained lunar presence, the use of in-situ resource utilization will reduce launch weight and frequency of resupply missions. With the discovery of water in the permanently shadowed regions of the moon, the prospect of harvesting water has generated particular interest. A more fundamental understanding of water storage and capture in lunar conditions is necessary for effective and efficient water capture and transport. The present study derives a thermal model for ice height, heat flux, chamber pressure, and mass flow rate in sub-atmospheric pressures below the triple point. The thermal model compares ice layer height against the results of the experiment at two pressures (300 Pa and 500 Pa) and temperatures from -18°C to -3°C. The thermal model predicts the trends seen experimentally with an overall root mean square error of 0.1135 cm and coefficient of efficiency of 0.994, indicating the model predicts the experimental results. The thermal model can be utilized to examine the impacts of varying pressure, temperature, and cold plate area to determine the most effective ice growth conditions for efficient capture of water on the lunar surface. The thermal model will provide a useful tool for NASA in the design of the lunar ice tanker and shows the promise of effective capture water on the lunar surface.

Ice growth↗

NASA: 60 Years and Counting...

Sputnik launched on 4 Oct 1057. On July 29, 1958, Eisenhower signed the National Aeronautics and Space Act, the creation of NASA. The Soviets launched the first human into orbit, Yuri Gagarin, on April 12, 1961. On 5 May 1961, Alan Shepard's Freedom 7 Mercury capsule lifted off at 9:34 a.m. from Launch Complex 5 at Cape Canaveral Air Force Station, and flew a suborbital trajectory lasting 15 minutes and 22 seconds, America's first man in space. On 25 May 1961, Kennedy delivered a speech to a joint session of Congress. In that speech, he stated "I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the moon and returning him safely to the earth." The rest, as they say, is history. Project Mercury, the first U.S. program to put humans in space, made 25 flights, six of which carried astronauts between 1961 and 1963. The Gemini program primarily tested equipment and mission procedures and trained astronauts and ground crews for future Apollo missions to the Moon. Exactly eight years, one month and 26 days after President Kennedy challenged Americans to reach for the Moon, Project Apollo landed the first humans on the lunar surface and returned them safely to Earth. In 1973, Skylab expeditions paved the way for the International Space Station. Over 30 years, NASA's space shuttle fleet, ”Columbia, Challenger, Discovery, Atlantis and Endeavour,” flew 135 missions and carried 355 different people to space. The space shuttle carried people into orbit repeatedly; launched, recovered and repaired satellites; conducted cutting-edge research; and built the largest structure in space, the International Space Station. Tragically, NASA lost two crews of seven in the 1986 Challenger accident and the 2003 Columbia accident. The International Space Station is a model for global cooperation and scientific advancements that is enabling growth of private industry in low-Earth orbit and development of new technologies to advance human space exploration. Built between 1998 and 2011, the space station has housed humans continuously since Nov. 2, 2000. NASA has contracted with commercial companies SpaceX, Orbital ATK, and Sierra Nevada Corporation to deliver science investigations, cargo, and supplies to the crews living in space, and soon Boeing and SpaceX will transport astronauts to and from the station. Today, NASA is working on many fronts to advance man's presence in space. NASA's Exploration Campaign will establish U.S. preeminence in cislunar space through the operations and the deployment of a U.S.-led Lunar Orbital Platform-Gateway (LOPG). Together with the Orion and SLS Programs, the LOPG is central to advancing and sustaining human space exploration goals, and is the unifying single stepping off point for human cislunar operations, lunar surface access and missions to Mars. As one might expect, EMC for all this activity is challenging, to say the least. In the next half-hour or so, I will talk about some of those challenges and how the different programs are meeting them.

Scully, Bob↗

Science Off the Earth: an Integrated Approach to Science Operations in the Artemis Era and Beyond

Humanity is standing on the cusp of its next giant leap – an international, sustainable, and commercial return to the moon. Unlike the Apollo missions, the expectation that a permanent human presence will be established is well founded. Initially, crewed missions to the lunar surface are expected to last between 6 and 30 days and occur approximately once per year, however the robust suite of landers and orbiting assets proposed by both commercial and government entities provide an opportunity to conduct science research on the moon and in cis-lunar space, 24x7 for many years. In the 50 years since the conclusion of Apollo, NASA’s crewed space science missions have been evolving. This can be seen clearly from Skylab and the Space Shuttle’s Spacelab to the International Space Station (ISS). Presently aboard the ISS, international crews spend nearly half their time working on experiments while many payloads collect science non-stop with either very limited, or no crew interaction. Additionally, a fleet of orbiting experiments complement and validate those investigations performed on the ISS. As the number, variety, and complexity of these investigation increase, it becomes ever more necessary to integrate across the many entities involved to prevent duplication of effort, ensure complementary results, reduce cost, and create a sustainable environment to conduct groundbreaking scientific research in space. In this paper, we examine how the various elements of the Artemis program including NASA’s Lunar Gateway, Commercial Lunar Payload Services (CLPS) endeavor, the Human Landing Systems (HLS), surface habitats, rovers and many more will be operated to ensure interoperability, maximize science return, and enable success for government, commercial and private partners.

Science Operations↗

Science Off the Earth: An Integrated Approach to Science Operations in the Artemis Era and Beyond

Humanity is standing on the cusp of its next giant leap – an international, sustainable, and commercial return to the moon. Unlike the Apollo missions, the expectation that a permanent human presence will be established is well founded. Initially, crewed missions to the lunar surface are expected to last between 6 and 30 days and occur approximately once per year, however the robust suite of landers and orbiting assets proposed by both commercial and government entities provide an opportunity to conduct science research on the moon and in cis-lunar space, 24x7 for many years. In the 50 years since the conclusion of Apollo, NASA’s crewed space science missions have been evolving. This can be seen clearly from Skylab and the Space Shuttle’s Spacelab to the International Space Station (ISS). Presently aboard the ISS, international crews spend nearly half their time working on experiments while many payloads collect science non-stop with either very limited, or no crew interaction. Additionally, a fleet of orbiting experiments complement and validate those investigations performed on the ISS. As the number, variety, and complexity of these investigation increase, it becomes ever more necessary to integrate across the many entities involved to prevent duplication of effort, ensure complementary results, reduce cost, and create a sustainable environment to conduct groundbreaking scientific research in space. In this paper, we examine how the various elements of the Artemis program including NASA’s Lunar Gateway, Commercial Lunar Payload Services (CLPS) endeavor, the Human Landing Systems (HLS), surface habitats, rovers and many more will be operated to ensure interoperability, maximize science return, and enable success for government, commercial and private partners.

Science Operations↗

The Dust Management Project: Final Report

A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

Hyatt, Mark J.↗

Toward an International Lunar Polar Volatiles Strategy

Fourteen international space agencies are participating in the International Space Exploration Coordination Group (ISECG), working together to advance a long-range human space exploration strategy. The ISECG is a voluntary, non-binding international coordination mechanism through which individual agencies may exchange information regarding interests, objectives, and plans in space exploration with the goal of strengthening both individual exploration programs as well as the collective effort. The ISECG has developed a Global Exploration Roadmap (GER) that reflects the coordinated international dialog and continued preparation for exploration beyond low-Earth orbit - beginning with the Moon and cis-lunar space, and continuing to near-Earth asteroids, and Mars. Space agencies agree that human space exploration will be most successful as an international endeavor, given the challenges of these missions. The roadmap demonstrates how initial capabilities can enable a variety of missions in the lunar vicinity, responding to individual and common goals and objectives, while contributing to building partnerships required for sustainable human space exploration that delivers value to the public.

Gruener, J. E.↗

Integrated Systems and Operational Autonomy for Gateway

The Lunar Gateway space station will be operated with less human oversight and control than any human spacecraft thus far. An autonomous software control architecture has been developed to allow the spacecraft to maintain safe operations of the vehicle during times of no human involvement. The development of these autonomous control functionalities has been both technical and process driven. Given that the Gateway will be built modularly with contributions from all over the world, the systems engineering processes had to be shaped to fit with the contractual and political realities of the construction of the international lunar habitat. This paper will describe these challenges and contributions to the development of human spacecraft for sustainable deep space missions.

J M Badger↗