Search NASA⌕ Search

SEARCH · Search NASA

Results for “Team X”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

X-29A flight control system performance during flight test

An account is given of flight control system performance results for the X-29A forward-swept wing 'Advanced Technology Demonstrator' fighter aircraft, with attention to its software and hardware components' achievement of the requisite levels of system stability and desirable aircraft handling qualities. The Automatic Camber Control Logic is found to be well integrated with the stability loop of the aircraft. A number of flight test support software programs developed by NASA facilitated monitoring of the X-29A's stability in real time, and allowed the test team to clear the envelope with confidence.

Chin, J.↗

Science Planning for Multi-Spacecraft Coordinated Observations

Fulfilling the promise of an era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with a unique opportunity to simultaneously observe with multiple observatories. Yet scheduling multiple observatories simultaneously is highly inefficient when compared to single observatory observations. Thus, programs using multiple observatories are limited not due to scientific restrictions, but due to operational inefficiencies. Each year, a number of proposals are accepted by a space-based observatory for conduction of astronomical observations and gathering of science data for the study of galactic events. Since each space-based observatory uses a set of instruments designed to operate in specific energy regions, most such studies are conducted by submitting observation proposals to multiple observatories, with requests to coordinate among themselves. To assure that the proposed observations can be scheduled, each observatory's staff has to check that the observations are valid and meet all the constraints for their own observatory; in addition, they have to verify that the observations satisfy the constraints of the other observatories. Thus, coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. In order to exploit new paradigms for observatory operation, the Goddard Space Flight Center's Advanced Architectures and Automation Branch has developed a prototype tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the science planning of coordinated observations for multiple spacecraft, as well as to increase the scheduling probability of observations. However, VOLT is also useful for single observatory planning to optimize observatory control. Three space-based missions are interested in using VOLT (the Hubble Space Telescope, the Chandra X-Ray Observatory, and the Far Ultraviolet Spectroscopic Explorer). The VOLT team members have collaborated with these missions to gather requirements and obtain feedback on their mission planning processes. VOLT has been developed as a cross-platform Java client application for use by scientists and observatory science planning staff to visualize scheduling options and constraints. It also supports a lightweight graphical user interface for remote viewing via a Web front end. Additionally, it uniquely supports the ability to interact with multiple, diverse scheduling packages in order to determine windows of opportunity for observations and visually portray the constraints of each observation request. VOLT enables science data capture scenarios which are currently either impossible, or which require extensive time and manpower to coordinate amongst multiple observatories. it supports early detection of planning conflicts by generating coordinated solutions based on observatory schedulability and constraints. The project development approach has included frequent prototype demonstrations to our interested missions to obtain feedback after each release of the software. We will present an overview of our lessons learned in infusing the VOLT tool into the operations of the missions we have collaborated with and a brief demonstration of the software.

Maks, Lori↗

Large Area X-ray Spectroscopy Mission

The Large Area X-ray Spectroscopy (LAXS) mission study concept has evolved strongly over the last year culminating in the merging of LAXS with the Goddard Space Flight Center (GSFC) proposal for a similar mission, the Next Generation X-ray Observatory (NGXO, PI: Nick White). The resulting merger, re-named the High Throughput X-rays Spectroscopy (HTXS) Mission has also expanded by the inclusion of another SAO proposed new mission concept proposal, the Hard X-Ray Telescope (PI: Paul Gorenstein). The resultant multi-instrument mission retains much of heritage from the LAXS proposal, including the use of multiple satellites for robustness. These mergers resulted from a series of contacts between various team members, via e-mail, telecons, and in-person meetings. The impetus for the mergers was the fundamental similarity between the missions, and the recognition that all three proposal teams had significant contributions to make in the effort to define the next stage in the X-ray exploration of the universe. We have enclosed four items that represent some of the work that has occurred during the first year of the study: first, a presentation at the Leicester meeting, second a presentation that was made to Dan Goldin following the merging of LAXS and NGXO, third a copy of the first announcement for the Workshop, and finally the interim report that was prepared by the HTXS study team towards the end of the first year. This last document provides the foundation for the HTXS Technology Roadmap that is being generated. The HTXS roadmap will define the near-term goals that the merged mission must achieve over the next few years. A web site has been developed and populated that contains much of the material that has been generated over the past year.

Tananbaum, Harvey↗

X-33 Base Region Thermal Protection System Design Study

The X-33 is an advanced technology demonstrator for validating critical technologies and systems required for an operational Single-Stage-to-Orbit (SSTO) Reusuable Launch Vehicle (RLV). Currently under development by a unique contractor/government team led by Lockheed- Martin Skunk Works (LMSW), and managed by Marshall Space Flight Center (MSFC), the X-33 will be the prototype of the first new launch system developed by the United States since the advent of the space shuttle. This paper documents a design trade study of the X-33 base region thermal protection system (TPS). Two candidate designs were evaluated for thermal performance and weight. The first candidate was a fully reusable metallic TPS using Inconel honeycomb panels insulated with high temperature fibrous insulation, while the second was an ablator/insulator sprayed on the metallic skin of the vehicle. The TPS configurations and insulation thickness requirements were determined for the predicted main engine plume heating environments and base region entry aerothermal environments. In addition to thermal analysis of the design concepts, sensitivity studies were performed to investigate the effect of variations in key parameters of the base TPS analysis.

Lycans, Randal W.↗

Remote Plant Food Production Capability X-Hab

As human space exploration expands to long-duration missions, plant production capability serves as a solution to reduce the mass of consumables necessary to support human metabolic requirements and promote positive crew psychological health. A capability to remotely grow plants for a long-duration space mission could allow crops to be produced before a crew arrives at a staged habitat and could enable plant health to be maintained through remote operation with minimal local crew support. The University of Colorado Boulder was awarded a grant in the summer of 2012 to build a system capable of remote plant production as part of the NASA and National Space Grant Foundation eXploration Habitat (X-Hab) 2013 Academic Innovation Challenge. This report is presented as a review of the Robotic Gardening System that was designed and developed to meet the requirements outlined in the challenge. Each subsystem of the Robotic Gardening System is presented in detail. Included in this report are the design methodologies used, lessons learned throughout the design and development processes, and options or ideas for continued development and future upgrades. In addition to being a review of the Robotic Gardening System and its subsystems, this document is meant to aid with the continued development of this system in conjunction with other projects, such as team member Heather Hava’s NASA Space Technology Research Fellowship (NSTRF) work, X-Hab 2013-14 Plants Anywhere: Growing Plants in Free Habitat Spaces, and Dr. Nikolaus Correll’s NASA Early Career Professionals Fellowship.

Daniel Zukowski↗

Fabrication of a Hybrid Transition Edge Sensor Array for Lynx

Lynx is a proposed NASA X-Ray telescope flight mission aimed at achieving state-of-the-art angular and energy resolution with a 100 kilopixel array to probe the hot energetic young universe in unprecedented detail. To achieve these goals, our team plans on leveraging our current work in development of the focal plane for the Athena X-Ray Integral Field Unit (X-IFU) while advancing the state-of-the-art in transition edge sensor (TES) X-ray detector technology. The TES is an optimal technology for achieving both high energy and fine angular resolution at the same time because pixel features can be made extremely small and the absorber which dominates the heat capacity can be tuned to meet resolution requirements. Specifically, the proposed mission concept calls for a hybrid detector of three different arrays fabricated in the same planar process in one focal plane and optimized for different science goals. The main arrays consist of 5x5 hydras, 25 pixels of 4 micron thick Au absorbers each with a different thermal link to one common TES. The outer array has absorbers on a 50-micron pitch for most of the 5 arc-minute field-of-view, and the inner array has 25-micron absorbers for the central 1 arc-minute region. A high resolution array consisting of single pixel 1 micron thick Au absorbers on 50-micron pitch will lie off to the side. Reading out an array of this magnitude will likely require improvements in indium bump bonding to superconducting flexible wiring. Fabrication of absorbers of two different sizes requires electroplating through a photoresist mold by careful tuning of the current density to achieve uniform flat absorbers on a fine pitch scale, followed by ion milling to yield narrow streets separating the pixels while preserving high quantum efficiency. We report on progress made at fabricating the hybrid array with different absorber sizes and thicknesses. Further, we also report on ongoing work to adequately heat sink the pixels with backside wire bonding and copper coating. We also report on work to improve detector pixel yield and top side indium bump bonding to flexible wiring.

Focal plane array↗

Validation of GOSAT Data Products; Interim Report on the GOSAT/TANSO Project

The Orbiting Carbon Observatory-2 (OCO-2) Team has continued working closely with the Greenhouse Gases Observing Satellite (GOSAT) team to (i) conduct vicarious calibration experiments in Railroad Valley, NV, U.S.A., (ii) retrieve estimates of X CO2 from OCO-2 and GOSAT TANSO-FTS data, and (iii) validate these products using internationally recognized standards. The OCO-/GOSAT relationship was reinforced in March 2015 with the signing a new Memorandum of Understanding between NASA and the GOSAT and GOSAT-2 partners. Over the past year, while the GOSAT team has been finalizing the V201 product, the OCO-2 team has focused primarily on the delivery of the OCO-2 product, providing new opportunities for cross calibration of the OCO-2 and GOSAT instruments and cross validation of their products. These efforts are just now producing results. Members of the OCO-2 team have also continued the analysis of the GOSAT V161.161 data and the ACOS B3.5 products. Those efforts have produced 2 new refereed publications and several others in review. The OCO-2 now preparing to reprocess the entire GOSAT TANSO-FTS data record using the GOSAT V201 product and OCO-2 B7 algorithm to produce a 7-year, multi-satellite climate data record for X(sub CO2).

Wennberg, Paul↗

Technical Progress on the Ares I-X Flight Test

Ares I-X will be NASA's first test flight for a new human-rated launch vehicle since 1981, and the team is well on its way toward completing the vehicle's design and hardware fabrication for an April 2009 launch. This uncrewed suborbital development test flight gives NASA its first opportunities to: gather critical data about the flight dynamics of the integrated launch vehicle; understand how to control its roll during flight; better characterize the stage separation environments during future flight; and demonstrate the first stage recovery system. The Ares I-X Flight Test Vehicle (FTV) incorporates a mix of flight and mockup hardware. It is powered by a four-segment solid rocket booster, and will be modified to include a fifth, spacer segment; the upper stage, Orion crew exploration vehicle, and launch abort system are simulator hardware to make the FTV aerodynamically similar to the same size, shape, and weight of Ares I. The Ares IX first stage includes an existing Shuttle solid rocket motor and thrust vector control system controlled by an Ascent Thrust Vector Controller (ATVC) designed and built by Honeywell International. The avionics system will be tested in a dedicated System Integration Laboratory located at Lockheed Martin Space Systems (LMSS) in Denver, Colorado. The Upper Stage Simulator (USS) is made up of cylindrical segments that will be stacked and integrated at Kennedy Space Center (KSC) for launch. Glenn Research Center is already building these segments, along with their internal access structures. The active Roll Control System (RoCS) includes two thruster units harvested from Peacekeeper missiles. Duty cycle testing for RoCS was conducted, and fuel tanking and detanking tests will occur at KSC in early 2008. This important flight will provide valuable experience for the ground operations team in integrating, stacking, and launching Ares I. Data from Ares I-X will ensure the safety and reliability of America's newest launch vehicle.

Davis, S.R.↗

TRMM .25 deg x .25 deg Gridded Precipitation Text Product

Since the launch of the Tropical Rainfall Measuring Mission (TRMM), the Precipitation Measurement Missions science team has endeavored to provide TRMM precipitation retrievals in a variety of formats that are more easily usable by the broad science community than the standard Hierarchical Data Format (HDF) in which TRMM data is produced and archived. At the request of users, the Precipitation Processing System (PPS) has developed a .25 x .25 gridded product in an easily used ASCII text format. The entire TRMM mission data has been made available in this format. The paper provides the details of this new precipitation product that is designated with the TRMM designator 3G68.25. The format is packaged into daily files. It provides hourly precipitation information from the TRMM microwave imager (TMI), precipitation radar (PR), and TMI/PR combined rain retrievals. A major advantage of this approach is the inclusion only of rain data, compression when a particular grid has no rain from the PR or combined, and its direct ASCII text format. For those interested only in rain retrievals and whether rain is convection or stratiform, these products provide a huge reduction in the data volume inherent in the standard TRMM products. This paper provides examples of the 3G68 data products and their uses. It also provides information about C tools that can be used to aggregate daily files into larger time samples. In addition, it describes the possibilities inherent in the spatial sampling which allows resampling into coarser spatial sampling. The paper concludes with information about downloading the gridded text data products.

Stocker, Erich↗

Industry Inputs into Future NASA Project Planning

NASA is currently formulating its plans for follow-on related work that builds upon knowledge gained in ATD related activities and collaborative engagements with the aviation community. The NASA Air Traffic Management - eXploration (ATM-X) project has the desire to continue this engagement with the aviation industry and capture industry inputs to continue development of their plans and is supporting this outreach with the ATD-2 team.

ATD↗

Overview of the X-33 Extended Flight Test Range

On July 1, 1996, the National Aeronautics and Space Administration signed a Cooperative Agreement No. NCC8-115 with Lockheed Martin Skunk Works to develop and flight test the X-33, a scaled version of a reusable launch vehicle. The development of an Extended Test Range, with range instrumentation providing continuous vehicle communications from Edwards Air Force Base Ca. to landing at Malmstrom Air Force Base Montana, was required to flight test the mach 15 vehicle over 950 nautical miles. The cooperative agreement approach makes Lockheed Martin Skunk Works responsible for the X-33 program. When additional Government help was required, Lockheed "subcontracted" to NASA Field Centers for certain work. It was through this mechanism that Dryden Flight Research Center became responsible for the Extended Test Range. The Extended Test Range Requirements come from two main sources: 1) Range Safety and 2) Lockheed Martin Skunk Works. The range safety requirements were the most challenging to define and meet. The X-33 represents a vehicle that launches like a rocket, reenters the atmosphere and lands autonomously like an aircraft. Historically, rockets have been launched over the oceans to allow failed rockets to be destroyed using explosive devices. Such approaches had to be reconsidered for the X-33 flying over land. Numerous range requirements come from Lockheed Martin Skunk Works for interface definitions with the vehicle communication subsystems and the primary ground operations center, defined the Operations Control Center. Another area of considerable interest was the reentry plasma shield that causes "blackout" of the radio frequency signals, such as the range safety commands. Significant work was spent to analyze and model the blackout problem using a cooperative team of experts from across the country. The paper describes the Extended Test Range a, an unique Government/industry team of personnel and range assets was established to resolve design issues and accomplish the X-33 requirements. The paper will also provide an overview of the technical approaches used to meet program requirements. The advances used to develop the extended test range will be discussed to show how other hypersonic and Access to Space programs can benefit from the development of the extended test range. Acknowledgment: The work described in this paper was NASA supported through cooperative agreement NCC8-115 with Lockheed Martin Skunk Works.

Mackall, D.↗

Mission X: Train Like an Astronaut Challenge

The Mission X: Train Like an Astronaut Challenge was developed in 2011 to encourage proper exercise and nutrition at an early age by teaching young people to live and eat like space explorers. The strong correlation between an unhealthy childhood diet and adolescent fitness, and the onset of chronic diseases as an adult is the catalyst for Mission X. Mission X is dedicated to assisting people on a global scale to live healthier lifestyles and learn about human space exploration. The Mission X: Train Like an Astronaut 2015 (MX15) International Challenge hosted almost 40,000 children on 800 teams, 28 countries affiliated with 12 space agencies. The MX15 website included 17 languages. MX15, the fifth annual international fitness challenges sponsored by the NASA Human Research Program worked with the European Space Agency and other space agencies from around the world. In comparison to MX14, MX15 expanded to include four additional new countries, increased the number of students by approximately 68% and the number of teams by 29%. Chile' and South Korea participated in the new fall Astro Charlie Walk Around the Earth Challenge. Pre-challenge training materials were made more readily available from the website. South Korea completed a prospective assessment of the usability of the MX content for improving health and fitness in 212 preschool children and their families. Mission X is fortunate to have the support of the NASA, ESA and JAXA astronaut corps. In MX15, they participated in the opening and closing events as well as while on-board the International Space Station. Italian Astronaut Samantha Cristoretti participated as the MX15 Astronaut Ambassador for health and fitness providing the opening video and other videos from ISS. United Kingdom Astronaut Tim Peake and US Astronaut Kate Rubins have agreed to be the MX Ambassadors for 2016 and 2017 respectively. The MX15 International Working Group Face-to-Face meeting and Closing Event were held at the Agenzia Spaziale Italiana (ASI) in Rome, Italy. A record number of twenty-eight countries participated. Austria and Norway have offered to host the 2016 and 2017 working group meetings. MX16 planning began with the working group meetings and areas of improvement will include another second early challenge to accommodate countries in the Southern Hemisphere, recommended changes to the MX website, development of a more defined approach to metrics, a change to the format of future MX International Working Group meetings, and proposed new activities to be developed by the MX International Educator Working Group. We look forward to welcoming many new participants in 2016!

Lloyd, Charles W.↗

Ares I-X Flight Test Development Challenges and Success Factors

The NASA Constellation Program's Ares I-X rocket launched successfully on October 28, 2009 collecting valuable data and providing risk reduction for the Ares I project. The Ares I-X mission was formulated and implemented in less than four years commencing with the Exploration Systems Architecture Study in 2005. The test configuration was founded upon assets and processes from other rocket programs including Space Shuttle, Atlas, and Peacekeeper. For example, the test vehicle's propulsion element was a Shuttle Solid Rocket Motor. The Ares I-X rocket comprised a motor assembly, mass and outer mold line simulators of the Ares I Upper Stage, Orion Spacecraft and Launch Abort System, a roll control system, avionics, and other miscellaneous components. The vehicle was 327 feet tall and weighed approximately 1,800,000 pounds. During flight the rocket reached a maximum speed of Mach 4.8 and an altitude of 150,000 feet. The vehicle demonstrated staging at 130,000 feet, tested parachutes for recovery of the motor, and utilized approximately 900 sensors for data collection. Developing a new launch system and preparing for a safe flight presented many challenges. Specific challenges included designing a system to withstand the environments, manufacturing large structures, and re-qualifying heritage hardware. These and other challenges, if not mitigated, may have resulted in test cancellation. Ares I-X succeeded because the mission was founded on carefully derived objectives, led by decisive and flexible management, implemented by an exceptionally talented and dedicated workforce, and supported by a thorough independent review team. Other major success factors include the use of proven heritage hardware, a robust System Integration Laboratory, multi-NASA center and contractor team, concurrent operations, efficient vehicle assembly, effective risk management, and decentralized element development with a centralized control board. Ares I-X was a technically complex test that required creative thinking, risk taking, and a passion to succeed.

Askins, Bruce↗

Galileo Institute for Astronomy (IFA) charge-coupled device (CCD) system

A fully portable self-contained charge-coupled device system has been constructed for shared use with the Galileo Project Imaging Team. The detector currently incorporated in the system is a Texas Instruments 500 x 500 three-phase CCD that has been thinned to operate in the backside illuminated mode. The detector and camera mainframe electronics were provided by the Jet Propulsion Laboratory. The support electronics and control interfaces necessary to operate the mainframe were constructed. The data system, which is built around a DeAnza Visacom VC-5000 Image Processor with an imbedded LSI-11 minicomputer, was also integrated. The capability to do image processing in real-time at the telescope has proved to be extremely valuable. The overall system read noise has been measured at 25 electrons. Full-well capacity is 40,000 electrons. Some results from laboratory tests and initial observing runs at the Mauna Kea 2.2-m telescope are presented.

Hlivak, R. J.↗

X-33 Phase 2

In response to Clause 17 of the Cooperative Agreement NCC8-115, Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. Contract award was announced on July 2, 1996 and the first milestone was hand delivered to NASA MSFC on July 17, 1996. The first year has been one of growth and progress as all team members staffed up and embarked on the technical adventure of the 20th century... the ultimate goal . . a Single Stage to Orbit (SSTO) Reuseable Launch Vehicle (RLV).

Source record↗

X-33

In response to the Cooperative Agreement, Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. The first milestone was hand delivered to NASA MSFC. The second year has been one of significant accomplishment in which team members have demonstrated their ability to meet vital benchmarks while continuing on the technical adventure of the 20th century.

Source record↗

X-33 Flight Operations Center

In response to Clause 17 of the Cooperative Agreement NCC8-115, Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. Contract award was announced on July 2, 1996 and the first milestone was hand delivered to NASA MSFC on July 17, 1996. With the dedication of the launch site, and continuing excellence in technological achievement, the third year of the Cooperative Agreement has been one of outstanding accomplishment and excitement.

Source record↗

[X-33 Systems]

Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. This portion of the report is comprised of a status report of Allied-Signal Aerospace's contribution to the program. The following is a summary of the work reviewed under their portion of the agreement: (1) Communication Systems; (2) Environmental Control Systems- Active Thermal Control System (ATCS), Purge and Vent System, Hydrogen Detection System (HDS), Avionics Bay Inerting System (ABIS), and Flush Air Data System (FADS); (2) Landing Systems; (3) Power Management and Generation Systems; (4) Flight Control Actuation System (FCAS)- Electric Power Control & Distribution System (EPCDS), and Battery Power System (BPS); and (5) Vehicle Management Systems (VMS)- VMS Hardware, VMS Software Development Activities, and System Integration Laboratory (SIL).

Source record↗