Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

186 records · Page 11

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

Plutonium Oxidation State Distribution in the Presence of WIPP-Relevant Organics and Iron Corrosion Products

The oxidation state and solubility of plutonium (Pu) in high ionic strength synthetic WIPP (Waste Isolation Pilot Plant) brines as a function of pC H+ in the presence and absence of WIPP-relevant organic ligands (EDTA [Ethylenediaminetetraacetic acid], oxalate, citrate, acetate) and iron corrosion products (magnetite and metallic iron) at 𝑇 = 23 ± 2 ∘C was thoroughly studied by long-term batch solubility experiments (between approximately 800-1,100 days) from an undersaturation approach. The oxidation state of Pu in the WIPP environment has been a topic of interest since the initial Compliance Certification Application (CCA). This study aims to investigate the solubility of Pu under the expected WIPP conditions and to determine the oxidation state of the solid phase that will control the solubility. One of the most important results of this study is that the Pu oxidation state was analyzed both from the surface area of the corrosion products and in the precipitated solid. The analysis of the Pu oxidation state on the surface of the iron mineral from the ongoing undersaturated experiments is more relevant to the performance assessment of nuclear waste disposal than short term batch (plutonium-iron phase) experiments. The X-ray Absorption Near-Edge Spectroscopy (XANES) analysis showed that Pu oxidation state is different on the metal surface and in the precipitated solid. Pu(III) is the dominant oxidation state in the metallic iron (Fe 0 ) system in the presence and absence of organics. Pu(IV) is the dominant oxidation state in the magnetite system in the presence and absence of organics. Also, organics stabilize Pu(IV) in the magnetite system. Analysis of Pu in the precipitated solid by Extended X-ray Absorption Fine Structure (EXAFS) analysis showed that Pu formed an inner-sphere complex with iron with minor amounts of PuO 2 present. X-ray diffraction (XRD) results indicate that metallic iron and magnetite did not oxidize in three years in the alkaline and high ionic strength system. Under these conditions (8 < pC H+ < 10 at T = (22 ± 2) °C under nitrogen atmosphere, the solubility of Pu changes by up to three orders of magnitude (10 -5 and 10 -8 M). The spread in solubility is highest at pC H+ = 9. Pu(III) and Pu(IV) showed different solubility behavior in the synthetic WIPP brine. A summary of the data collected in this report will be submitted to Sandia National Laboratories as part of a parameter update report which will outline the changes to the OXSTAT parameter for the 2026 Compliance Recertification Application (CRA-2026). The experiments performed were done according to the U.S. Department of Energy (DOE) approved Test Plan entitled “Effects of Radiolysis, Organic Complexation, and Redox Conditions on the Speciation and Oxidation State Distribution of Pu(III/IV)” (LCO-ACP-25). All data reported were obtained under the Los Alamos National Laboratory-Carlsbad Office (LANL-CO) Quality Assurance Program, which is compliant with the DOE Carlsbad Field Office, Quality Assurance Program Document (CBFO/QAPD).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Sub-pilot-scale Production of High-Value Products from U.S. Coals

Investigators from the University of Utah, University of Wyoming and Marshall University pursued a program to study the conversion of raw coal to high-value products of carbon fiber and silicon carbide. Team members also developed an initial framework for a data portal that can incorporate laboratory data on coal processing and product quality, and also work with tools for machine learning for data analysis, data visualization and economic assessment. Experimental R&D efforts focused on the conversion of raw coal to coal tar and other byproducts, and the resulting tar intermediates were upgraded to form anisotropic and isotropic pitch materials. These pitch materials were produced from coal using both thermal (pyrolysis) and chemical (mild solvolysis liquefaction) decomposition of raw coal. Four different coals were studied: Utah bituminous coal (Sufco), Wyoming PRB coal (Black Thunder), Illinois bituminous coal (Illinois #6), and West Virginia bituminous coal (Flying Eagle). Both metallurgical-grade coking coals and lower-grade steam coals were investigated, and controlled secondary gas-phase reactions were used during a two-stage pyrolysis process to induce cracking and condensation reactions among the pyrolytic tar species. This approach successfully improved the performance of the lower grade coals for yielding pitch materials, with properties more consistent with a commercial-grade pitch that had previously demonstrated success for quality carbon fiber production. The use of waste plastic materials was also studied, to help improve physical and chemical characteristics of the intermediate tars and final pitch product; in particular, for lowering the pitch softening point to an acceptable level for melt spinning carbon fiber. Mild solvolysis liquefaction was also used as a method for producing pitch for carbon fiber production. As expected, significantly higher pitch yields were obtained using this approach, and waste plastic materials were also successfully used to reduce pitch softening point to an acceptable level. The plastic materials were also utilized to create a solvent for the mild solvolysis process, and this plastic-derived solvent was shown to provide results consistent with more expensive commercial chemical solvents, and could thus avoid the need for costly recovery and recycle of a liquefaction solvent. Additional experimental R&D focused on the production of silicon carbide (β-SiC) from the residual char byproduct from pitch production, and also on the production of carbon fiber from the anisotropic pitch. SiC was successfully synthesized using a mixture of residual char and sandstone at a ratio of 1:1. Reaction temperature and residence time were optimized and yielded a product purity of 81%. For carbon fiber production, the most successful pitch samples were obtained from the mild solvolysis liquefaction approach, combined with the use of a plastic (HDPE)-derived solvent. Fiber properties improved over time as laboratory fiber production methodologies improved, and final yields of carbon fiber were obtained with a diameter of 12.14 ± 1.10 um, Modulus of 173.73 ± 15.25 GPa, and Tensile Strength of 1.04 ± 0.10 GPa. A proof-of-concept Modern Community Research Data Portal (MCRDP) was developed and deployed for coal and coal-derived pitch characterization, with the full support of (i) remote web-based access, (ii) distributed analysis, (iii) interactive visualization and exploration, (iv) shared and long-term data access, (v) advanced query capabilities and (vi) real-time collaboration. The Coal to Products Data Portal “coaltoproducts.org” provides researchers with space to store and share data within a project, tools for analyzing and understanding data for scientific investigation, and the ability to publish data to the broader community for reproducibility. The portal leverages the Material Commons 2.0 (MC) platform developed by the Center for PRedictive Integrated Structural Materials Science (PRISMS) of the University of Michigan, to achieve long-term longevity of data collections and, more importantly, collaborative science. A number of data visualization tools were also assessed and implemented for interrogating the experimental and modeling data. The machine learning portion of this project analyzed datasets from two different coal conversion processes performed on a diverse set of coal samples from both the coal pyrolysis experiments and the solvent liquefaction experiments. The work was initiated by exploring standard regression models on the pyrolysis data, aiming to understand the impact of sample characteristics and processing conditions on key product metrics. Over the course of the project, the focus expanded to include a variety of machine learning tools, delving into both supervised and unsupervised learning methods. Models tested on the pyrolysis data included linear, ridge, lasso, elastic-net, Gaussian process, random forest regression, and AutoSklearn, and the approach was continually refined to enhance predictive accuracy and model interpretability. Similar techniques were applied to the liquefaction data with an additional focus on feature engineering. Along with mesophase content, additional outputs of interest were the pitch yield, softening point, and QI content. Insights derived from these analyses are crucial in determining the factors influencing the quality and yield of coal-derived products. As the work progressed, the research evolved from foundational model comparisons to analyses of random forests, decision paths, and feature importance scores. A thorough market analysis was performed to examine the prospects of coal-based carbon fibers. The best opportunities for coal come from its lower and more stable price relative to petroleum, particularly for subbituminous coals, which is the primary advantage that a coal refinery may have over a petroleum refinery. Before a commercial CTP production facility can be modeled, however, several things need to be understood regarding the nature of the would-be coal refinery. These include the technology to be deployed, the size of facility, the volume(s) of co-product(s), and the waste and emissions profile of the plant. The volume of co-products and waste may be substantial and will require separate market analysis to ensure viability. In the near-term, the importance of coal tar pitch, in the form of carbon pitch, to the aluminum and steel industries is likely to overshadow the alternative use of this material as an input for carbon fiber. The importance of steel and aluminum in building materials, and the need for carbon materials in their manufacturing, will ensure that demand for these products remains for the long run. In addition, carbon fiber may also be the best substitute for steel and aluminum well into the future. While society will eventually be able to shift production of much of its electricity needs to renewables, it will not be able to shift away from fossil fuels for production of high-strength construction and vehicular materials. Demand for carbon fiber is expected to increase quickly, but the volume of carbon fiber and the amount of coal that would be needed to produce even a sizeable share of this market may still be relatively small compared to current coal production. Thus, other coal-based products like graphene, graphite, carbon foams, resins, and carbon-based building products will play important roles in sustaining coal production as coal-fired power generation continues to decline.

01 COAL, LIGNITE, AND PEAT↗

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS↗