Search NASA⌕ Search

SEARCH · Search NASA

Results for “Tribal Energy Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

183 records · Page 11

Deep Borehole Disposal Research in the United States - 17427

The U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) manages a research and development (R and D) program for the disposal of spent nuclear fuel and high-level radioactive waste in the United States. Deep boreholes are being evaluated for disposal of some smaller DOE-managed waste as an alternative to disposal in a mined geologic repository. The deep borehole disposal concept consists of drilling borehole(s) to a total depth of about 5,000 m (16,400 ft - or greater than three miles) into crystalline basement rock, placing waste packages in the lower emplacement zone portion of the borehole, and sealing and plugging the upper portion of the borehole. The required bottom-hole diameter of the borehole(s) depends on the waste package configuration for the reference concept, but ranges from 22 to 43 cm (8.5 to 17 inches). Additional research and development is desired in several important areas for further consideration of deep borehole disposal of radioactive waste. A Deep Borehole Field Test (DBFT) will be conducted by DOE to further assess the viability of deep borehole disposal as an alternative for the disposal of smaller DOE-managed waste forms. The DBFT will be used to evaluate three main areas: 1) evaluation of the capability for drilling and construction of deep, large-diameter boreholes; 2) downhole scientific analyses to assess hydrogeochemical conditions that control waste stability and containment; and 3) engineering activities to assess the viability and safety of waste package emplacement and retrieval in deep boreholes. The DBFT will include first drilling a characterization borehole, followed by an optional field test borehole, to a total depth of about 5,000 m (16,400 feet) into crystalline basement rock in a geologically stable continental location. The initial smaller diameter characterization borehole will be drilled and completed to facilitate downhole scientific testing and analysis. If site conditions are found to be suitable, DOE intends to drill a larger-diameter field test borehole to evaluate emplacement activities using surrogate waste packages. The surrogate waste packages will not contain any radioactive waste, nor will any radioactive waste be used in these tests. One of the advantages of deep borehole disposal is that it would give DOE the flexibility to consider options for disposal of smaller waste forms. Deep borehole disposal also potentially offers earlier disposal of some wastes than might be possible in a mined repository, and could reduce costs associated with projected treatments of some wastes. In order to accomplish the DBFT, DOE will require the support of multiple national laboratories, along with a site contractor to acquire a suitable test site and to manage the site and the required testing activities. DOE issued a competitive solicitation via a request for proposal (RFP) in July, 2015, which requested proposals to provide a test site and site management services. The contract was awarded in January, 2016, to a team led by Battelle Memorial Institute which included a proposed test site in Pierce County, North Dakota. After efforts to acquire both the initial test site in North Dakota and an alternative proposed site in Spink County, South Dakota were unsuccessful, activities were suspended. The experiences in Pierce County, ND and Spink County, SD highlighted the importance of public engagement and support for the DBFT, and that relevant levels of government and other public stakeholders should be involved from the beginning. Using the lessons learned in North and South Dakota, DOE issued a new RFP on August 22, 2016 which emphasized local, state, and tribal (if applicable) government engagement, as well as public and other stakeholder involvement ahead of proposal submittals and throughout the contract execution phases. The new RFP allowed for multiple initial awards and multiple phases of contract execution. In December, 2016, DOE announced the selection of four companies - AECOM, ENERCON, RE/SPEC, and TerranearPMC - to begin exploring the possibility of conducting a DBFT under the terms of the new RFP. Ultimately, only one site will be chosen for the field test. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Constructing a resilience index for the Enhanced Critical Infrastructure Protection Program

Following recommendations made in Homeland Security Presidential Directive 7, which established a national policy for the identification and increased protection of critical infrastructure and key resources (CIKR) by Federal departments and agencies, the U.S. Department of Homeland Security (DHS) in 2006 developed the Enhanced Critical Infrastructure Protection (ECIP) program. The ECIP program aimed to provide a closer partnership with state, regional, territorial, local, and tribal authorities in fulfilling the national objective to improve CIKR protection. The program was specifically designed to identify protective measures currently in place in CIKR and to inform facility owners/operators of the benefits of new protective measures. The ECIP program also sought to enhance existing relationships between DHS and owners/operators of CIKR and to build relationships where none existed (DHS 2008; DHS 2009). In 2009, DHS and its protective security advisors (PSAs) began assessing CIKR assets using the ECIP program and ultimately produced individual protective measure and vulnerability values through the protective measure and vulnerability indices (PMI/VI). The PMI/VI assess the protective measures posture of individual facilities at their 'weakest link,' allowing for a detailed analysis of the most vulnerable aspects of the facilities (Schneier 2003), while maintaining the ability to produce an overall protective measures picture. The PMI has six main components (physical security, security management, security force, information sharing, protective measures assessments, and dependencies) and focuses on actions taken by a facility to prevent or deter the occurrence of an incident (Argonne National Laboratory 2009). As CIKR continue to be assessed using the PMI/VI and owners/operators better understand how they can prevent or deter incidents, academic research, practitioner emphasis, and public policy formation have increasingly focused on resilience as a necessary component of the risk management framework and infrastructure protection. This shift in focus toward resilience complements the analysis of protective measures by taking into account the three other phases of risk management: mitigation, response, and recovery (Figure 1). Thus, the addition of a robust resilience index (RI) to the established PMI/VI provides vital information to owners/operators throughout the risk management process. Combining a pre-incident focus with a better understanding of resilience, as well as potential consequences from damaged CIKR, allows owners/operators to better understand different ways to decrease risk by (1) increasing physical security measures to prevent an incident, (2) supplementing redundancy to mitigate the effects of an incident, and (3) enhancing emergency action and business continuity planning to increase the effectiveness of recovery procedures. Information provided by the RI methodology is also used by facility owners/operators to better understand how their facilities compare to similar sector/subsector sites and to help them make risk-based decisions. This report provides an overview of the RI methodology developed to estimate resilience and provide resilience comparisons for sectors and subsectors. The information will be used to (1) assist DHS in analyzing existing response and recovery methods and programs at facilities and (2) identify potential ways to increase resilience. The RI methodology is based on principles of Appreciative Inquiry, which is 'the coevolutionary search for the best in people, their organizations, and the relevant world around them' (Cooperrider et al. 2005). Appreciative Inquiry identifies the best of 'what is' and helps to envision 'what might be.' The ECIP program and the RI represent a new model (using Appreciative Inquiry principles) for information sharing between government and industry (Fisher and Petit 2010). A 'dashboard' display, which provides an interactive tool - rather than a static report, presents the results of the RI in a convenient format. Additional resilience measures can be modeled to illustrate how such actions would impact the asset's RI value.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008 data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the Pacific Northwest Aquatic monitoring Partnership (PNAMP) steering committee in Portland on August 28, 2008. Further information on CSMEP strengths and weaknesses assessments and monitoring design products for FY2008 is presented in the main text and appendices of this Annual Report as well as being available on CBFWA's public website.

13 HYDRO ENERGY↗