Search NASA⌕ Search

SEARCH · Search NASA

Results for “VC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Launch Complex 39A, SWMU 008, Operations, Maintenance, and Monitoring Report, Kennedy Space Center, FL

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from Year 1 operation of the air sparging (AS) groundwater interim measure (IM) for High-Concentration Plumes (HCPs) and Low-Concentration Plumes (LCPs) within the perimeter fence line at Launch Complex 39A (LC39A) located at Kennedy Space Center (KSC), Florida. The objective of the LC39A groundwater IM is to actively decrease concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC) in groundwater in the HCP and LCP within the pad perimeter fence line via AS to levels less than Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTLs). The objective was developed because LC39A is currently being leased to Space Exploration Technologies (SpaceX), and the original IM for monitored natural attenuation (MNA) over an extended period of time was not suitable for future planned site use.

Operations↗

Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

MLPV↗

Effects of 2G on Gene Expression of Stress-Related Hormones in Rat Placenta

Understanding the effects of spaceflight on mammalian reproductive and developmental physiology is important to future human space exploration and permanent settlement beyond Earth orbit. Fetal developmental programming, including modulation of the HPA axis, is thought to originate at the placental-uterine interface, where both transfer of maternal hormones to the fetus and synthesis of endogenous hormones occurs. In healthy rats, fetal corticosterone levels are kept significantly lower by 11BetaHSD-2, which inactivates corticosterone by conversion into cortisone. Placental tissues express endogenous HPA axis-associated hormones including corticotropin-releasing hormone (CRH), pre-opiomelanocortin (POMC), and vasopressin, which may contribute to fetal programming alongside maternal hormones. DNA methylase 3A, 11BetaHSD-2, and 11BetaHSD-1, which are involved in the regulation of maternal cortisol transfer and modulation of the HPA axis, are also expressed in placental tissues along with glucocorticoid receptor and may be affected by differential gravity exposure during pregnancy. Fetuses may respond differently to maternal glucocorticoid exposure during gestation through sexually dimorphic expression of corticosterone-modulating hormones. To elucidate effects of altered gravity on placental gene expression, here we present a ground-based analogue study involving continuous centrifugation to produce 2g hypergravity. We hypothesized that exposure to 2g would induce a decrease in 11BetaHSD-2 expression through the downregulation of DNA methylase 3a and GC receptor, along with concurrent upregulation in endogenous CRH, POMC, and vasopressin expression. Timed pregnant female rats were exposed to 2G from Gestational day 6 to Gestational day 20, and comparisons made with Stationary Control (SC) and Vivarium Control (VC) dams at 1G. Dams were euthanized and placentas harvested on G20. We homogenized placental tissues, extracted and purified RNA, synthesized cDNA, and quantified the expression levels of the genes of interest relative to the GAPDH housekeeping gene, using RT-qPCR and gene-specific cDNA probes. Elucidation of glucocorticoid transfer and synthesis in the placenta can provide new insights into the unique dynamics of mammalian development in microgravity and guide future multi-generational studies in space.

Benson, S.↗

Electrolytes for Low Impedance, Wide Operating Temperature Range Lithium-Ion Battery Module

A lithium ion battery cell includes a housing, a cathode disposed within the housing, wherein the cathode comprises a cathode active material, an anode disposed within the housing, wherein the anode comprises an anode active material, and an electrolyte disposed within the housing and in contact with the cathode and anode. The electrolyte consists essentially of a solvent mixture, a lithium salt in a concentration ranging from approximately 1.0 molar (M) to approximately 1.6 M, and an additive mixture. The solvent mixture includes a cyclic carbonate, an non-cyclic carbonate, and a linear ester. The additive mixture consists essentially of lithium difluoro(oxalato)borate (LiDFOB) in an amount ranging from approximately 0.5 weight percent to approximately 2.0 weight percent based on the weight of the electrolyte, and vinylene carbonate (VC) in an amount ranging from approximately 0.5 weight percent to approximately 2.0 weight percent based on the weight of the electrolyte.

Hallac, Boutros↗

The Harmonized Landsat and Sentinel-2 Surface Reflectance Data Set

The Harmonized Landsat and Sentinel-2 (HLS) project is a NASA initiative aiming to produce a VirtualConstellation (VC) of surface reflectance (SR) data acquired by the Operational Land Imager (OLI) and MultiSpectral Instrument (MSI) aboard Landsat 8 and Sentinel-2 remote sensing satellites, respectively. The HLS products are based on a set of algorithms to obtain seamless products from both sensors (OLI and MSI): atmospheric correction, cloud and cloud-shadow masking, spatial co-registration and common gridding, bidirectional reflectance distribution function normalization and spectral bandpass adjustment. Three products are derivedfrom the HLS processing chain: (i) S10: full resolution MSI SR at 10 m, 20 m and 60 m spatial resolutions; (ii)S30: a 30 m MSI Nadir BRDF (Bidirectional Reflectance Distribution Function)-Adjusted Reflectance (NBAR);(iii) L30: a 30 m OLI NBAR. All three products are processed for every Level-1 input products from Landsat 8/OLI (L1T) and Sentinel-2/MSI (L1C). As of version 1.3, the HLS data set covers 10.35 million km2 and spans from first Landsat 8 data (2013); Sentinel-2 data spans from October 2015. The L30 and S30 show a good consistency with coarse spatial resolution products, in particular MODIS Collection 6 MCD09CMG products (overall deviations do not exceed 11%) that are used as a reference for quality assurance. The spatial co-registration of the HLS is improved compared to original Landsat 8 L1T and Sentinel 2A L1C products, for which misregistration issues between multi-temporal data are known. In particular, the resulting computed circular errors at 90% for the HLS product are 6.2 m and 18.8 m, for S10 and L30 products, respectively. The main known issue of the current data set remains the Sentinel-2 cloud mask with many cloud detection omissions. The cross-comparison with MODIS was used to flag products with most evident non-detected clouds. A time series outlier filtering approach is suggested to detect remaining clouds. Finally, several time series are presented to highlight the high potential of the HLS data set for crop monitoring.

Landsat Sentinel-2↗

Optimization for Load Alleviation of Truss-Braced Wing Aircraft with Variable Camber Continuous Trailing Edge Flap

This paper focuses on load alleviation optimization for a high aspect ratio truss braced wing (TBW) aircraft. The TBW aircraft model is based on the Subsonic Ultra Green Aircraft Research (SUGAR) concept developed by Boeing, with the wing structures of the model modified to include a novel aerodynamic control surface known as the Variable Camber Continuous Trailing Edge Flap (VCCTEF). The purpose of the study is to investigate the effectiveness of a Performance Adaptive Aeroelastic Wing (PAAW) technology, specifically the VCCTEF, for alleviating load on the TBW wing during flight maneuver. The specific flight maneuver under consideration in this study is a 2.5g pull-up maneuver. Constrained gradient-based optimization is conducted to tailor the deflections of the VC- CTEF such that bending moment along the wing is minimized at the 2.5g pull-up flight condition. Aerodynamic modeling for this study is conducted using a vortex-lattice method code called Vorlax. A non-linear finite element analysis (FEA) method is constructed for analyzing the structural deformation and resulting bending moment along the wing of the aircraft with the inclusion of effects from tension-stiffening due to axial loading in the truss. This study is the first phase of several, and involves optimization of a rigid wing aircraft for preliminary analysis. Future studies will incorporate flexible wing structures with aeroelastic interactions and deformations. The results of this first phase positively demonstrate the potential of utilizing the novel control surface on modern aircraft wing designs for shaping control in order to provide load alleviation during flight maneuver.

Lebofsky, Sonia↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM completed in September 2019 for the Northern Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. The IGWM was implemented for the Northern VOC Area to provide additional data, to be evaluated along with previous long-term monitoring data, to determine future IGWM options and to evaluate the efficacy of monitored natural attenuation (MNA) as a passive remedial measure in comparison to active remedies for the Northern VOC Area. The primary contaminants of concern in the Northern VOC Area are trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), vinyl chloride (VC), and benzene.

groundwater↗

Aerodynamic Optimization of Mach 0.745 Transonic Truss-Braced Wing Aircraft with Variable-Camber Continuous Trailing-Edge Flap

This paper presents an aerodynamic optimization study of the Mach 0.745 Transonic Truss-Braced Wing (TTBW) aircraft with Variable-Camber Continuous Trailing-Edge Flap (VC-CTEF). The VCCTEF is a novel wing shaping control concept to improve aircraft aerodynamic efficiency. Drag reduction studies are conducted for three different VCCTEF configurations with 6-, 10-, and 21-spanwise sections, respectively. A simple VCCTEF actuator weight model is proposed to account the weight penalty of the actuator in the design. A vortex-lattice model of the TTBW model is developed with transonic small disturbance, integral boundary-layer, and wing-strut interference corrections for rapid aerodynamic performance evaluations. The VSPAERO model has been validated against wind tunnel test data. The optimization results show that the 21-spanwise sections VCCTEF has largest absolute drag coefficient reduction, however, the 6-spanwise sections VCCTEF provides a relatively better solution for drag reduction when the actuator weight penalty is considered. A high-fidelity CFD solver FUN3D is used to validate the VCCTEF optimization.

Aerodynamic Optimization↗

A Spectralon BRF data base for MISR calibration applications

The Multi-angle Imaging SpectroRadiometer (MISR) is an Earth-observing sensor which provides global retrievals of aerosols, clouds, and land surface parameters. Instrument specifications require an accurate absolute calibration, as well as accurate camera-to-camera, band-to-band, and pixel-to-pixel relative response determinations. In order to achieve these requirements, MISR makes use of an on-board calibrator (OBC), as well as vicarious calibration (VC) experiments.

Satellite↗

Aerodynamic Optimization of Mach 0.8 Transonic Truss-Braced Wing Aircraft using Variable Camber Continuous Trailing Edge Flap

This paper presents an aerodynamic optimization study of the Mach 0.8 Transonic Truss-Braced Wing (TTBW) aircraft with Variable Camber Continuous Trailing Edge Flap (VC-CTEF). The VCCTEF is a novel wing shaping control concept to improve aircraft aerodynamic efficiency. Drag reduction studies are conducted for two different VCCTEF configurations with 6- and 10-spanwise sections, respectively. A simple VCCTEF actuator weight model is used to account the weight penalty of the actuator in the design for the Mach 0.8 TTBW aircraft. A vortex-lattice model of the Mach 0.8 TTBW aircraft is developed with transonic small disturbance, integral boundary-layer, and wing-strut interference corrections for rapid aerodynamic performance evaluations. The VSPAERO model has been validated against the wind tunnel test data. The optimization results show that the 6-spanwise sections VCCTEF provides a relatively better solution for drag reduction when the actuator weight penalty is considered. A high-fidelity CFD solver FUN3D is used to verify the VCCTEF optimization design.

Aerodynamic optimization↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Hemispheric Airborne Measurements of Air Quality (HAMAQ)

Hemispheric Airborne Measurements of Air Quality (HAMAQ, pronounced “hammock”) was selected for funding under NASA’s Earth Venture Suborbital (EVS-4) solicitation. As originally proposed, HAMAQ would have flown under each of the geostationary satellites in the Atmospheric Composition Virtual Constellation (AC-VC). Selected under a reduced budget ($15M), HAMAQ has been descoped to include only sampling under TEMPO. The science objectives and approach are still relevant to the broader constellation, and partnerships are still in place to continue the pursuit of the larger vision of HAMAQ to also sample in Asia and Europe. HAMAQ plans include two deployments in 2028, including the Mexico City megalopolis and a second North American site yet to be selected. The effort will include two aircraft, NASA’s B777 for in situ sampling and G-III for remote sensing. These aircraft will be used to complete the integrated observing system, combining satellite observations, ground-based monitoring, research observations, and air quality modeling. With the long lead time for deployments in 2028, HAMAQ leadership are soliciting feedback on the project white paper available for download at https://science.larc.nasa.gov/HAMAQ.

Laura M Judd↗

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

Production of Medium-Scale Metal Additive Geometry With Hybrid Manufacturing Technology

Oak Ridge National Lab’s (ORNL) Metal Big Area Additive Manufacturing (mBAAM) and Hybrid Manufacturing teams in the Manufacturing Demonstration Facility (MDF) was tasked with developing a part that exceeded 24 inches in length and 100lbs in weight on a laser hotwire welding system. The Mazak VC-500A/5X AM HWD hybrid 5-axis CNC laser hotwire system was leveraged to complete the task. The proposed geometry was manufactured with 410 stainless steel on AISI1018 steel substrate in just over 36 hours of build time. The proposed geometry was sliced and additively manufactured in three segments; the base, and two extrusions measuring 10 inches in length and 14 inches in length. Production of this component demonstrated hybrid capabilities requiring fixed 5-axis rotations to complete geometry that exceeded the defined build volume of the machine. Multiple repairs of the part were conducted in-situ leveraging the additive and subtractive capabilities of the Mazak hybrid system. Significant overbuilding challenges were encountered and manually addressed by leveraging subtractive capabilities of the hybrid system. Future processes are presented for development to reduce overheating of top layers. Final part measurements exceeded 107 lbs. in weight and 24.5 inches in length along the principal axis; the largest and heaviest part created by a hybrid system at the MDF.

Saleeby, Kyle↗

Natural Attenuation Progress, Plume Movement, and Source Reduction for the SRS CMP Pits VOC Plume - 18384

Monitoring the effectiveness of natural attenuation for remediating the Savannah River Site (SRS) Chemical, Metals, and Pesticides (CMP) Pits plume fringe has focused intensive sampling of shallow groundwater for different reaches of Pen Branch from 2005 to 2017. Volatile organic compounds (VOCs) were analyzed for the critical hyporheic zone beneath Pen Branch and adjacent floodplain. These sampling efforts assisted larger-scale compliance monitoring in accordance with US Environmental Protection Agency (EPA) guidelines. When applicable, EPA has found natural attenuation to be an acceptable mode of achieving regulatory compliance. While natural attenuation can include any ecosystem function that reduces contaminant loads, it is focused on microbial biochemical pathways. The study plume originated from CMP Pits, a waste disposal area in operation from 1971 to 1979, when the pits were closed and backfilled. In 1984, excavations of source material and contaminated soils were removed up to a depth of 7.6 m below the trenches. However, monitoring well data indicated that perchloroethylene (PCE) and trichloroethylene (TCE) had seeped beneath the vadose zone and formed groundwater plumes reaching the Pen Branch valley below. Although 'hot spots' of TCE were found within the Pen Branch floodplain, it was unknown just how the flow pattern was entering Pen Branch and to what degree natural attenuation was reducing the contaminant load. For this reason, our stations were located along the Pen Branch reach bordering the modelled plume fringe. In general, VOCs were highest at station piezometer holes in the middle study zone. Moderate VOC levels were detected at upstream stations and lowest VOC levels were found at downstream stations. Electrical resistance heating (ERH) with soil vapor extraction (SVE) conducted by Savannah River Nuclear Solutions (SRNS) from 2008 to 2009 at the filled CMP Pits helped to remove contaminants trapped in clay horizons beneath the CMP Pits and to reduce overall new plume concentrations. Collectively PCE, TCE, and their degradation products displayed a favorable yearly trend of contaminant natural attenuation. Additionally, phytoremediation actions by native bamboo, Arundinaria gigantea, added to VOC removal from wetlands soils. Total VOC concentrations at some stations declined by >25% and concentrations of vinyl chloride (VC), a nearly-final stage degradation product increased from 0.0 ppb to >20 ppb. Temporal patterns displayed a continued reduction of VOCs, while spatial patterns indicated a possible slow progression of the plume downstream along Pen Branch. Conclusions about plume export into surface waters must address the seasonal and geological complexities of this system. Hydrological patterns are complex and plumes do not directly outcrop into Pen Branch surface waters, but emerge into the stream through pathways in the porous hyporheic zone. For this reason, continued sampling must identify critical depths and downstream locations where plume flows may be more intense. During drought periods with no surface flow in Pen Branch, subsurface plume flows may be flowing downslope in the hyporheic zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗