Search NASA⌕ Search

SEARCH · Search NASA

Results for “alarm systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

184 records · Page 11

Using High-Resolution NSRDB Data to Evaluate Cloud Mask Forecast from WRF-Solar EPS

Validating spatiotemporal distributions of cloud forecasts using numerical weather prediction (NWP) models is difficult as this requires high-quality cloud-property at significantly high spatial and temporal resolution over extended periods of time. Observations of cloud properties, such as cloud mask, cloud optical thickness, and cloud type, are vital for assessing the capability of NWP models to forecast various types of clouds. Using the National Solar Radiation Database (NSRDB), this research evaluates ensemble cloud-mask predictions from the WRF-Solar ensemble prediction system (WRF-Solar EPS). From the WRF-Solar EPS, day-ahead solar forecasts for the contiguous United States (CONUS) for 2018 are simulated. Given the NSRDB data is accessible at a resolution of 2 km, we can calculate the cloud fraction across the 9-km grid of WRF-Solar EPS. This allows us to spatially assess the cloud-mask forecasts using two methods against the high-resolution NSRDB: (a) considering all 2-km NSRDB clouds in the forecast domain (EMAll), and (b) using a minimum cloud fraction threshold of 50% to designate a pixel as cloudy (EMP50). The low-resolution cloud masks from WRF-Solar EPS are evaluated directly against the cloud-resolving scale gridded observations from NSRDB using EMAll. With EMP50, we presume that scenes with less than 50% cloud cover from the 2-km NSRDB are clear. Thus, this assessment approach allows for a fair comparison with WRF-Solar EPS resolved to a 9-km grid. A method of point-by-point verification is used to evaluate dichotomous (yes/no) cloud mask predictions against the NSRDB. For each pixel of model extent, cloud frequency and traditional metrics (e.g., probability of detection, false alarm rate, and hit rate, etc.) are computed and compared with satellite-derived data sets. Mismatched cloud frequency (MCF) is computed to measure the present capability of WRF-Solar EPS in representing various types of clouds, which are categorized using three levels of cloud top height (CTH) and cloud optical depth (COD) across entire CONUS. Preliminary results show that the WRF-Solar EPS provides MCF values ranging from 9% to 46%, 16% to 33%, and 8% to 27% for low-level, middle-level, and high-level clouds, respectively, for three CTHs. The model produces MCFs ranging from 27% to 46%, 13% to 34%, and 8% to 19% for thin, medium-thickness, and thick clouds, respectively, for three CODs. The presentation will include a detailed description of the current outcomes as well as potential future extensions. The evaluation approach established in this study is readily extensible to the evaluation of cloud predictions from different ensemble NWP models. In addition, the findings of the suggested evaluation technique aid in identifying model weaknesses and will ultimately lead to advances in WRF-Solar EPS's skill in predicting clouds and solar irradiance.

cloud mask forecast↗

Self-calibrating the look-elsewhere effect: fast evaluation of the statistical significance using peak heights

In experiments where one searches a large parameter space for an anomaly, one often finds many spurious noise-induced peaks in the likelihood. This is known as the look-elsewhere effect, and must be corrected for when performing statistical analysis. Here, this paper introduces a method to calibrate the false alarm probability (FAP), or p-value, for a given dataset by considering the heights of the highest peaks in the likelihood. Specifically, we derive an equation relating the global p-value to the rank and height of local maxima. In the simplest form of self-calibration, the look-elsewhere-corrected $\chi^2$ of a physical peak is approximated by the $\chi^2$ of the peak minus the $\chi^2$ of the highest noise-induced peak, with accuracy improved by considering lower peaks. In contrast to alternative methods, this approach has negligible computational cost as peaks in the likelihood are a byproduct of every peak-search analysis. We apply to examples from astronomy, including planet detection, periodograms, and cosmology.

79 ASTRONOMY AND ASTROPHYSICS↗

Detection of DoS Attacks Using ARFIMA Modeling of GOOSE Communication in IEC 61850 Substations

Integration of Information and Communication Technology (ICT) in modern smart grids (SGs) offers many advantages including the use of renewables and an effective way to protect, control and monitor the energy transmission and distribution. To reach an optimal operation of future energy systems, availability, integrity and confidentiality of data should be guaranteed. Research on the cyber-physical security of electrical substations based on IEC 61850 is still at an early stage. In the present work, we first model the network traffic data in electrical substations, then, we present a statistical Anomaly Detection (AD) method to detect Denial of Service (DoS) attacks against the Generic Object Oriented Substation Event (GOOSE) network communication. According to interpretations on the self-similarity and the Long-Range Dependency (LRD) of the data, an Auto-Regressive Fractionally Integrated Moving Average (ARFIMA) model was shown to describe well the GOOSE communication in the substation process network. Based on this ARFIMA-model and in view of cyber-physical security, an effective model-based AD method is developed and analyzed. Two variants of the statistical AD considering statistical hypothesis testing based on the Generalized Likelihood Ratio Test (GLRT) and the cumulative sum (CUSUM) are presented to detect flooding attacks that might affect the availability of the data. Our work presents a novel AD method, with two different variants, tailored to the specific features of the GOOSE traffic in IEC 61850 substations. The statistical AD is capable of detecting anomalies at unknown change times under the realistic assumption of unknown model parameters. The performance of both variants of the AD method is validated and assessed using data collected from a simulation case study. We perform several Monte-Carlo simulations under different noise variances. The detection delay is provided for each detector and it represents the number of discrete time samples after which an anomaly is detected. In fact, our statistical AD method with both variants (CUSUM and GLRT) has around half the false positive rate and a smaller detection delay when compared with two of the closest works found in the literature. Our AD approach based on the GLRT detector has the smallest false positive rate among all considered approaches. Whereas, our AD approach based on the CUSUM test has the lowest false negative rate thus the best detection rate. Depending on the requirements as well as the costs of false alarms or missed anomalies, both variants of our statistical detection method can be used and are further analyzed using composite detection metrics.

IEC 61850 electrical substations↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗